Upcoming Infrastructure Projects in Gurgaon: Metro, Roads, Water Status
The main upcoming infrastructure projects in Gurgaon are the Gurugram Metro (Phase 1 under construction since September 2025, Phase 2 to Cyber City at tender stage), the elevated SPR, Global City, and GMDA water, drain and junction works. Others, such as the Sector 56 to Pachgaon metro and the Delhi-Gurugram Namo Bharat line, are still proposals without final sanction, so check each project's status before you pay for it.
By Rajan Khosla · Edited by
Rakesh Mahajan · · 14 min read
Illustrative image What are the upcoming infrastructure projects in Gurgaon?
The main upcoming infrastructure projects in Gurgaon are the metro from Millennium City Centre to Cyber City with its spur to Dwarka Expressway, the elevated Southern Peripheral Road (SPR), the Global City township, and water, drain and junction works by the Gurugram Metropolitan Development Authority (GMDA). The metro's first phase and Global City are under construction. Several other lines and roads are still proposals waiting for sanction.
This guide stay inside the city. For regional corridors, read our guide to upcoming infrastructure projects near Gurgaon. City averages, rental yield and price history sits on our Gurgaon city page.
Property Nivesh Research found that of the 8 Gurgaon infrastructure projects it follow, 2 are open, 3 are under construction or partly open and 3 are approved or proposed only, as our Gurgaon infrastructure impact report for Q3 2026 shows.
A DPR (detailed project report) is the cost and engineering plan that must be approved before money get sanctioned. A tender only invites bids; a contract award mean a builder is actually hired.
Upcoming infrastructure projects in Gurgaon: the master table
Most upcoming government projects in Gurgaon sit with GMDA, the metro company GMRL, HSIIDC (Haryana's industrial corporation) or NHAI. The table give each project's body, cost, status and next step as of 28 November 2026, with the source. MLD means million litres a day.
| Project (body) | Cost (source) | Status and latest date | Sectors served | Next step |
|---|---|---|---|---|
| Metro Phase 1 (GMRL): Millennium City Centre to Sector 9, spur to Sector 101 | Network ₹5,452.72 crore (Union Cabinet, Jun 2023); revised ₹10,266.54 crore (Haryana Cabinet, 18 May 2026) | Under construction since 5 Sep 2025; approvals pending (Hindustan Times, 27 Nov 2026) | 45, 47, 48, 72A, 10, 37, 9, 101 | GMDA design approvals |
| Metro Phase 2 (GMRL): Sector 9 to Cyber City | ₹1,662 crore civil tender (Hindustan Times, 6 Oct 2026) | Bids 9 to 18 Nov 2026; no award reported | 4, 5, 7, 22, 23A, Palam Vihar, Udyog Vihar, Cyber City | Award, then 30 months |
| Sector 56 to Pachgaon metro (HMRTC) | No approved cost | Proposal; revised DPR being finalised (ThePrint/PTI, 11 Sep 2026) | 56, 61, 65, 66, 84, 86, 90 | State, then Union approval |
| Delhi-Gurugram-SNB Namo Bharat (NCRTC) | ₹24,975 crore (2018 DPR base cost) | Not sanctioned (Lok Sabha reply, PIB, 6 Aug 2026) | Udyog Vihar, Kherki Daula | Union Cabinet sanction |
| SPR elevated Package 1 (GMDA): NH-48 to Vatika Chowk | About ₹776.19 crore excl. GST (GMDA tender notice, 1 Oct 2026) | Bids closed 18 Nov 2026; no award reported | 69 to 75A | Award, then 30 months |
| MCC underpass, Dadi Sati Chowk and Ambedkar Chowk flyovers (GMDA) | ₹136.41 crore together (The Tribune, 3 Nov 2026) | Approved by the High Powered Works Purchase Committee | 27, 29, 43, 44; 85, 86, 89, 90; 45, 46, 51, 52 | Tender award, then 18 months each |
| Global City (HSIIDC), about 1,000 acres | ₹1,000 crore (Chief Minister, 12 Aug 2026) | 70% to 80% done (CM, Aug 2026; minister, 21 Nov 2026) | 36, 36B, 37B | Expressway tunnel from Dec 2026, then allotment |
| Chandu Budhera water unit, 100 MLD (GMDA) | ₹49.5 crore (Hindustan Times, 21 Oct 2026) | Approved; construction expected Dec 2026 | 81 to 115 | Two to three years to build |
| Shri Sheetla Mata Devi hospital, Sector 102, 883 beds (Haryana) | ₹679.08 crore (Medical Dialogues, Apr 2026) | Construction deadline 31 Dec 2026; no service date (The Tribune, 18 Oct 2026) | Dwarka Expressway sectors, New Gurgaon | PPP operator award |
Gurugram Metro: route, station list and work status
The city's only new metro with work on the ground is built by GMRL, a 50:50 company of the Union government and Haryana. The Union Cabinet approved a 28.5 km network with 27 stations on 7 June 2023, PIB said.
Phase 1 is a 15.2 km elevated line from Millennium City Centre to Sector 9, with a spur towards Sector 101. Construction World reported on 18 August 2025 that a Dilip Buildcon and Ranjit Buildcon joint venture won the civil package for ₹1,277 crore plus GST, with 30 months for build it.
Gurugram metro station list
Phase 1 names are from the Cabinet approval as recorded in our infrastructure index; Phase 2 names are as Hindustan Times reported on 6 October 2026. Check final names with GMRL.
| Line | Stations named | Source |
|---|---|---|
| Phase 1 main line | Millennium City Centre (start), Sector 45, Cyber Park, Sector 47, Subhash Chowk, Sector 48, Sector 72A, Hero Honda Chowk, Sector 10, Sector 37, Basai Village, Sector 9 | PIB, Union Cabinet decision, 7 Jun 2023 |
| Phase 1 spur | Towards Sector 101 on Dwarka Expressway | PIB, 7 Jun 2023 |
| Phase 2 (13 stations) | Sector 7, Ashok Vihar, Bajghera Road, Palam Vihar, Sector 23A, Udyog Vihar Phase 4, Udyog Vihar Phase 5, Cyber City and others | Hindustan Times, 6 Oct 2026 |
| Railway station spur | About 1.80 km, Sector 5 to Gurugram Railway Station, ₹454.32 crore | Haryana Cabinet revised cost, 18 May 2026 |
Progress, cost and dates
Progress reports don't agree with each others. Haryana's HMRTC review put physical progress at about 11% up to June 2026. Hindustan Times reported about 15% on 6 October, and The Times of India about 30% on 13 October and about 35% on 13 November 2026.
Some files is still stuck. GMDA's approval of the Bakhtawar Chowk double-decker design was still awaited on 27 November, Hindustan Times reported. GMDA has since moved to fast-track pending metro approvals.
The Times of India reported Phase 1 as scheduled for 2027, and Haryana's Chief Minister said in September 2025 the project would finish within four years. The Haryana Cabinet approved a revised cost of ₹10,266.54 crore on 18 May 2026, no Union approval of that revision is published.
Phase 2: the Gurgaon new metro line to Cyber City
Phase 2 is a 14.2 km elevated corridor with 13 stations, Hindustan Times reported; Swarajya gave 15.3 km and 14 stations. Bids for the ₹1,662 crore civil tender, with World Bank financing, ran from 9 to 18 November 2026, as our note on the Phase 2 metro tender near Cyber Hub explain. No award was reported as of 28 November 2026 and work takes 30 months from award, so a train in Palam Vihar is still some year away.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Gurgaon metro new route proposals and the Namo Bharat RRTS
When a sales pitch mention a gurgaon metro new route, it is usually one of the lines below. None has Union sanction as of 28 November 2026.
Illustrative image- Sector 56 to Pachgaon metro: 35.25 km and 28 stations via Sectors 56, 61, 65, 66, Global City, Sectors 84, 86 and 90 and IMT Manesar, ThePrint (PTI) reported on 11 September 2026. The revised DPR is being finalised and there is no approved cost.
- Rezangla Chowk (Palam Vihar) to Dwarka Sector 21: 8.4 km with 7 stations, including Sectors 110 and 111. Haryana approved the DPR on 19 October 2022; The Tribune reported in July 2026 it was still waiting the Union housing ministry.
- Yashobhoomi to Rajiv Chowk: about 20 km underground. Hindustan Times reported on 18 November 2026, citing an RTI reply, that it is one of eight Delhi Metro Phase V routes sent for approval.
- Delhi-Gurugram-SNB Namo Bharat: a Lok Sabha reply of 6 August 2026 still listed only the DPR, and NCRTC said in October 2026 it expect approval soon.
- Gurugram-Faridabad-Noida Namo Bharat: about 63 km with stations such as IFFCO Chowk and Sector 61, at DPR stage (Hindustan Times, 17 October 2026).
One change exist already on paper. DTCP put land within 1.5 km of 12 proposed Namo Bharat stations under TOD (transit-oriented development) rules, with extra FAR (floor area allowed on a plot), Hindustan Times reported on 29 September 2026. The zone split is still to be notified; see our note on TOD rules around RRTS stations.
Roads: SPR, Golf Course Extension, Dwarka Expressway links and flyovers
Among the new infra projects in Gurgaon, the elevated SPR is the biggest road job. GMDA re-tendered Package 1, 4.23 km from NH-48 to Vatika Chowk, on 1 October 2026 at about ₹776.19 crore excluding GST, per its tender notice; see our SPR elevated road tender note.
The first tender, ₹755 crore in March 2026, got withdrawn in June because the state want changes, Hindustan Times reported. GMDA also finalised an ₹850 crore tender for a Vatika Chowk interchange, and a DPR for the Vatika Chowk to Ghata stretch is expected in 3 to 4 months (Hindustan Times, 14 November 2026). Golf Course Extension Road have no separate underpass or widening announced, the Ghata end is the nearest road work.
Flyovers, underpasses and junctions
- The Tribune reported on 3 November 2026 that a ₹57 crore underpass near Millennium City Centre and flyovers at Dadi Sati Chowk (₹43.05 crore) and Ambedkar Chowk (₹36.36 crore) were approved. Each take 18 months from allotment; see the approved flyovers and underpass.
- DLF awarded a ₹325 crore contract for a flyover and four underpasses between Ambience Mall and Cyber City, Hindustan Times reported on 4 November 2026. Work start only after a traffic plan is approved.
- A 2.2 km elevated road from Hero Honda Chowk towards Dwarka Expressway, at ₹181 crore plus about ₹100 crore for utility shifting, was approved by the state in October 2026. NHAI was awaiting written directions on 25 November, Hindustan Times reported.
- The AIT Chowk underpass on Golf Course Road was yet to be approved in May 2025 (The Tribune), and GMDA is hiring a consultant to redesign Old and New Railway Road (Hindustan Times, 4 November 2026).
Dwarka Expressway links
The expressway is fully open since 17 August 2025, when its Delhi section opened, PIB said. About 1.5 km of GMDA service roads stay unfinished for want of land (Hindustan Times, 20 November 2026). DTCP also advised a social impact assessment before taking about 107 acres for internal roads in Sectors 81 to 86 and 104 (Hindustan Times, 16 November 2026). For a regional road, see KMP Expressway impact on property prices.
Global City and other big land projects
Global City is a HSIIDC township of about 1,000 acres in Sectors 36, 36B and 37B, between Dwarka Expressway and Pataudi Road. Haryana's Chief Minister said on 12 August 2026 that 80% of physical work on the ₹1,000 crore development was done. The minister told The Times of India on 21 November 2026 that about 70% of phase one was done.
A tunnel under the expressway is due to start in December 2026, The Times of India reported, and land allotment to investors come only after phase one finish. Property Nivesh Research found the Global City target has been revised 2 times; our note on Global City road links has more. The Final Development Plan 2031 is still in force and no draft 2041 plan has been published, so check DTCP notices.
Water, drainage and sewage: what GMDA is building
GMDA supplies about 770 MLD today, Hindustan Times reported on 21 October 2026, and a sixth 100 MLD unit at Chandu Budhera (₹49.5 crore) would take capacity to 870 MLD in two to three years. It meant mainly for Sectors 81 to 115; see our note on the Chandu Budhera water unit.
Illustrative image- The Sector 72 boosting station began sending 75 MLD to Sectors 58 to 74 in November 2026 (Hindustan Times, 19 November 2026).
- Sectors 77, 78, 79, 79A, 79B and 80 has no piped drinking water today. GMDA expects supply to Sectors 76 to 80 in early 2027, the same report said.
- A ₹34 crore pipeline to lift five Golf Course Road sectors from 61 MLD to 121 MLD awaits administrative approval (Hindustan Times, 21 November 2026).
Drains and sewage
Flooding is a old problem. MCG listed 159 waterlogging hotspots before the 2026 monsoon, The Tribune reported on 19 April 2026. The 3.3 km drain for Sectors 37C, 37D and 9B, cleared by GMDA's board in June 2022, had not started by October 2026 (The Times of India, 4 October 2026); see the Dwarka Expressway drain plan.
GMDA's ₹39 crore master sewer for Sectors 99 to 115 was approved on 23 January 2025 with 24 months to finish, The Tribune reported. Finishing of it has not been confirmed.
Hospitals, stadium and bus depots in Gurgaon
- Shri Sheetla Mata Devi hospital, Sector 102: the construction deadline moved to 31 December 2026 with no date for patient services, The Tribune reported on 18 October 2026. See our Dwarka Expressway hospital delay note.
- Civil hospital near Police Lines: ₹1,054 crore, 400 beds plus 200 later. HSIIDC replaced CPWD as builder in June 2026, Medical Dialogues reported, and construction didn't start yet.
- Tau Devi Lal Sports Complex, Sector 38: GMDA planned a ₹600 crore redevelopment with a 35,000-seat cricket stadium in June 2024, The Tribune reported. No approval or tender is announced after.
- Buses: an e-bus depot in Sector 48 was approved in November 2024 within a ₹50.77 crore package, The Tribune reported. An ISBT in Sector 36 has no official approval, cost or tender published.
Gurgaon infrastructure 2027: what is due and what has slipped
Here is what official bodies or newspapers have tied to 2027. These are targets, not promises.
- Piped water to Sectors 76 to 80: early 2027, as GMDA expects (Hindustan Times, 19 November 2026).
- Metro Phase 1: scheduled for 2027, The Times of India reported. No contract completion date is published.
- Master sewer for Sectors 99 to 115: 24 months from January 2025, which point to early 2027, but nobody confirmed the finish yet.
- Metro Phase 2 and SPR Package 1: each need 30 months from award, and neither award was reported as of 28 November 2026.
Delay record
The table lists delays that the named sources record, as of 28 November 2026.
| Project | First date or approval | What happened | Source |
|---|---|---|---|
| Drain for Sectors 37C, 37D, 9B | GMDA board cleared it, June 2022 | Not started by October 2026 | The Times of India, 4 Oct 2026 |
| SPR elevated Package 1 | ₹755 crore tender, March 2026 | Withdrawn in June; re-tendered 1 Oct 2026 at about ₹776 crore | Hindustan Times, 3 Oct 2026 |
| Metro cost | ₹5,452.72 crore, June 2023 | Revised to ₹10,266.54 crore, May 2026; Union approval not published | Union Cabinet (PIB); Haryana Cabinet |
| Dwarka Expressway service roads | ₹99.50 crore contract, March 2024, due 2026 | About 1.5 km unfinished | Hindustan Times, 20 Nov 2026 |
What the projects mean for property, area by area
The table maps each area to the projects that touch it, with status from the sources named earlier in this guide. It shows facts only, not price effects.
Illustrative image| Area | Sectors | Projects that serve it | Status, Nov 2026 |
|---|---|---|---|
| Golf Course Road | 42, 43, 53 to 56 | ₹34 crore water pipeline; AIT Chowk underpass | Awaiting approval; not approved (May 2025) |
| Golf Course Extension Road | 58 to 67 | Sector 72 booster; Sector 56 to Pachgaon metro; RRTS station at Sector 61 | Operating; proposal; DPR stage |
| Sohna Road and SPR | 45 to 49, 69 to 75A | Metro Phase 1; SPR elevated; Vatika Chowk interchange; Ambedkar Chowk flyover | Under construction; bids closed; tender finalised; approved |
| Dwarka Expressway | 99 to 115 | Metro spur to Sector 101; Sheetla Mata hospital; master sewer; service roads | Under construction; no service date; finish not confirmed; about 1.5 km unfinished |
| West end and Global City | 36, 36A, 36B, 37B to 37D | Global City; Hero Honda Chowk elevated road; 37C and 37D drain; metro at Sector 37 and Basai | 70% to 80% done; approved; not started; under construction |
| New Gurgaon | 76 to 95 | Water to 76 to 80; Dadi Sati Chowk flyover; internal roads in 81 to 86; Pachgaon metro (84, 86, 90) | Early 2027 target; approved; assessment pending; proposal |
| Old Gurgaon | 4, 5, 7, 9, 10, 22, 23A, Palam Vihar | Metro Phase 2; railway station spur; Railway Road redesign; DLF works near Cyber City; civil hospital | Bids closed; in revised cost; consultant stage; contract awarded; not started |
This table doesn't say any price will rise. Title, builder record and today's civic services matters as much as a metro line. Our best sectors to buy property in Gurgaon guide, the post on which Gurgaon sectors will develop in next 5 years and our look at locations along Dwarka Expressway add prices and risks.
How to check infrastructure claims in a builder brochure
Brochure maps love to show a metro line right next door. Run these steps before you trust one.
- Find the status word for each project shown: proposed, approved, tendered, under construction or opened.
- Ask who approved it and when: the Union Cabinet, the Haryana Cabinet or the GMDA board.
- Check whether a contract has been awarded, not just a tender floated.
- Match any metro claim to the Phase 1 station list above; the Sector 56 to Pachgaon and Rezangla Chowk lines are still proposals.
- Measure the real road distance on a map instead of trusting drive times.
- Look up the project's delay record and whether its date has already moved.
- Check the housing project's RERA registration with HRERA Gurugram (the state real estate regulator), and for a ready tower ask for the OC (occupation certificate, the permission to live in it).
- Check civic basics today: piped water, sewer link, internal road access and last monsoon's waterlogging.
Where to read next on Gurgaon infrastructure
For how these projects sit beside supply and prices, read our Gurgaon real estate investment outlook 2027. For each new tender, approval or delay as it happen, follow our local development news.
Questions
Frequently Asked Questions
What are the biggest upcoming infrastructure projects in Gurgaon? +
The metro by GMRL, with Phase 1 under construction since September 2025 and Phase 2 to Cyber City at tender stage; the elevated SPR; Global City; three junction works approved in November 2026 (The Tribune); and GMDA water and drain works. The Sector 56 to Pachgaon metro and the Namo Bharat lines are still proposals.
What is the Gurugram metro station list for Phase 1? +
Phase 1 runs from Millennium City Centre through Sector 45, Cyber Park, Sector 47, Subhash Chowk, Sector 48, Sector 72A, Hero Honda Chowk, Sector 10, Sector 37, Basai Village and Sector 9, with a spur towards Sector 101, as recorded from the Union Cabinet approval of 7 June 2023. Check final names on GMRL's published alignment.
When will the Gurugram Metro open? +
No official opening date is published. The Times of India reported Phase 1 as scheduled for 2027, and Haryana's Chief Minister said in September 2025 the project would finish within four years. Progress reports ranged from about 11% (HMRTC, to June 2026) to about 35% (The Times of India, 13 November 2026).
Is the Sector 56 to Pachgaon metro approved? +
No. It is a proposal. ThePrint (PTI) reported on 11 September 2026 that the Chief Secretary asked agencies to finalise the revised DPR for the 35.25 km, 28-station line. It still needs Haryana government approval and then Union sanction, and no approved cost, tender or construction date has been published.
Which is the Gurgaon new metro line to Cyber City? +
That is Phase 2, a 14.2 km elevated corridor from Sector 9 to Cyber City with 13 stations, as Hindustan Times reported on 6 October 2026. GMRL's ₹1,662 crore civil tender drew bids from 9 to 18 November 2026. Work takes 30 months from contract award, and no award was reported as of 28 November 2026.
When will the SPR elevated road be built? +
GMDA re-tendered Package 1, NH-48 to Vatika Chowk, at about ₹776.19 crore excluding GST on 1 October 2026, and bids closed on 18 November. Construction takes 30 months from award. Hindustan Times reported that the first tender of March 2026 was withdrawn in June, so watch for the award notice.
Which Gurgaon sectors still lack piped water? +
Hindustan Times reported on 19 November 2026 that Sectors 77, 78, 79, 79A, 79B and 80 have no piped drinking water. GMDA expects to link a pipeline by end-2026 and start supply to Sectors 76 to 80 in early 2027. Since November 2026, Sectors 58 to 74 get 75 MLD from the Sector 72 booster.
Has the Delhi-Gurugram Namo Bharat line been sanctioned? +
No. A Lok Sabha reply of 6 August 2026 still listed only the DPR submission for the Delhi-Gurugram-SNB corridor, and NCRTC said in October 2026 it expected approval soon. DTCP has already placed land within 1.5 km of 12 proposed Gurugram stations under TOD rules, Hindustan Times reported on 29 September 2026.
Does a new metro or road near a project mean its price will rise? +
Not necessarily. Infrastructure is one factor among title, builder record, supply and civic services, and many projects here have slipped, such as the 37C and 37D drain cleared in 2022 and still not started in October 2026 (The Times of India). Nobody can promise a price effect, so judge each project on its own papers.
Sources
- Press Information Bureau, Union Cabinet approves Metro connectivity from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram (PRID 1930452), 7 June 2023
- Government of Haryana, PR Haryana press note 176, Gurugram Metro Bhoomi Pujan, 5 September 2025
- Government of Haryana, Haryana Cabinet decision on revised Gurugram Metro cost of Rs 10,266.54 crore, 18 May 2026
- Government of Haryana, press release on HMRTC review: Gurugram Metro physical progress about 11% up to June 2026, 21 July 2026
- Construction World, Dilip-Ranjit JV wins Rs 12.77 billion Gurugram Metro contract, 18 August 2025
- Hindustan Times, GMRL floats Rs 1,662 crore tender for Phase 2 corridor to Cyber Hub, 6 October 2026
- Hindustan Times, GMDA to fast-track approvals, utility shifting for Gurugram metro, 27 November 2026
- The Times of India, reports on Gurugram Metro progress, 13 October 2026 and 13 November 2026
- Swarajya, Haryana approves Rs 1,662 crore civil works tender for Gurugram Metro Phase 2, 1 October 2026
- ThePrint (PTI), Haryana chief secy reviews Sector 56-Panchgaon metro project, 11 September 2026
- The Tribune, Merged DPR, 5 stations: Gurugram's airport metro plan finally takes shape, 27 July 2026
- Hindustan Times, Yashobhoomi to Gurugram among 8 routes proposed under Delhi Metro's new project, 18 November 2026
- Press Information Bureau, Lok Sabha reply on Namo Bharat RRTS corridors (PRID 2295676), 6 August 2026
- Swarajya and ET Infra, NCRTC expects approval soon for Delhi-Panipat-Karnal and Delhi-Gurugram-Behror Namo Bharat corridors, 19 October 2026
- Hindustan Times, Areas within 1.5km of 12 Gurugram RRTS stations get TOD status, 29 September 2026
- Hindustan Times, Over 10,000 trees need to be felled for Gurugram-Faridabad-Greater Noida RRTS project, 17 October 2026
- GMDA, tender notice for SPR from NH-48 to Vatika Chowk via elevated corridor, Package-1, 1 October 2026
- Hindustan Times, GMDA floats Rs 776 crore SPR elevated road project tender, 3 October 2026
- Hindustan Times, GMDA finalises Rs 850-crore tender for Vatika Chowk interchange, 14 November 2026
- The Tribune, Gurugram to get 2 flyovers, underpass worth Rs 136 crore to ease traffic congestion, 3 November 2026
- Hindustan Times, DLF awards Rs 325-crore contract for flyover, four underpasses near Cyber City, 4 November 2026
- Hindustan Times, NHAI likely to build elevated road connecting two key Gurugram areas, 25 November 2026
- The Tribune, Gurugram development authority plans to build underpass to decongest Golf Course Road, 19 May 2025
- Hindustan Times, GMDA plans overhaul of two key Old Gurugram roads to ease congestion, 4 November 2026
- Press Information Bureau, PM inaugurates Delhi section of Dwarka Expressway and UER-II (PRID 2157281), 17 August 2025
- Hindustan Times, Land hurdles leave Dwarka Expressway service roads incomplete, 20 November 2026
- Hindustan Times, DTCP recommends social impact assessment before land acquisition for internal roads, 16 November 2026
- Government of Haryana, PR Haryana press note 293, CM review: Global City 80% physical progress, 12 August 2026
- The Times of India, Global City roads to link Dwarka Expressway, Delhi-Gurgaon eway, Pataudi Road, 21 November 2026
- National Green Tribunal, report filed in OA No. 470 of 2022, including the Final Development Plan 2031 AD sheet for the Gurgaon-Manesar Urban Complex
- Hindustan Times, GMDA's plan to set up 100 MLD WTP approved, 21 October 2026
- Hindustan Times, GMDA starts 75 MLD water supply in sector 58 to 75, 19 November 2026
- Hindustan Times, GMDA plans Rs 34cr pipeline to boost water supply along Golf Course Road, 21 November 2026
- The Tribune, Gurugram flags 159 waterlogging hotspots ahead of monsoon, 19 April 2026
- The Times of India, After years of flooding after rain, GMDA now plans drain for Dwarka eway sectors, 4 October 2026
- The Tribune, GMDA to lay master sewer network in sectors 99-115, 23 January 2025
- The Tribune, Gurugram's 883-bed hospital still awaits operational timeline, 18 October 2026
- Medical Dialogues, report on Shri Sheetla Mata Devi medical college, 11 April 2026
- Medical Dialogues, Haryana appoints HSIIDC to set up Rs 1,054 crore Civil Hospital, 5 June 2026
- The Tribune, Rs 600 crore for revamping Tau Devi Lal Stadium, 10 June 2024
- The Tribune, Haryana CM approves Rs 249 crore infrastructure development projects for Gurugram, 6 November 2024
- Property Nivesh Research, Gurgaon Infrastructure Impact on Property Prices, Q3 2026 Report