DLF The Dahlias Flat Price 2026: All 27 Flat Sizes, Rate Per Sq Ft

Buying Guides

DLF The Dahlias Flat Price 2026: All 27 Flat Sizes, Rate Per Sq Ft

DLF sells each flat in The Dahlias at its own price, with no single price list: a South flat is about ₹100 crore and a North flat about ₹120 crore to ₹125 crore (DLF, 17 October 2026), the top apartments were ₹160 crore to ₹170 crore in August 2026, and one penthouse sold for ₹271 crore. The rate is above ₹1,00,000 per sq ft on saleable (super) area and north of ₹1.5 lakh to ₹1.6 lakh on carpet area (DLF, 14 May 2026). HRERA records 420 flats in 27 carpet sizes, from 5,447 sq ft to 11,942 sq ft, the most common being 6,233 sq ft with 125 flats. At launch in October to December 2024 the average was ₹65,000 per sq ft on saleable area and about ₹70 crore a flat.

11 November 2026 · 13 min read

Godrej DMIC Greater Noida Township Price: 2 BHK, 3 BHK Flat Quotes

Buying Guides

Godrej DMIC Greater Noida Township Price: 2 BHK, 3 BHK Flat Quotes

Godrej Properties has published no price list, flat sizes or project name for its DMIC township project in Greater Noida, which is not registered with UP RERA (register read 11 November 2026) and has not launched. Price sheets in pre-launch marketing quote a 2 BHK at ₹1.35 crore to ₹2.15 crore and a 3 BHK at ₹1.75 crore to ₹3.50 crore, and the quoted ₹1.05 crore is a marketing figure for a 1 BHK of about 985 sq ft that Godrej has not published. Godrej's own estimates work out to about ₹12,100 per sq ft on average, which is not a price list.

11 November 2026 · 14 min read

Lodha New Projects in Pune 2026: Sylvan, Wakad and 2027 Plans

Buying Guides

Lodha New Projects in Pune 2026: Sylvan, Wakad and 2027 Plans

Lodha's new projects in Pune in 2026 are Lodha Sylvan in Hinjewadi Phase 3, launched on seven MahaRERA registrations from 21 January to 5 March with 986 homes, and Lodha Wakad, 162 homes registered in October but not yet launched. New towers came up at Lodha Magnus and Lodha Camelot too, and Lodha's plan to March 2027 lists one unnamed new Pune project and one new phase, with no Pune launch named for 2027.

6 November 2026 · 13 min read

Lodha New Projects in Mumbai 2026 and 2027: MahaRERA List and Prices

Buying Guides

Lodha New Projects in Mumbai 2026 and 2027: MahaRERA List and Prices

In Mumbai city, MahaRERA registered three new Lodha projects in 2026: Lodha Elaris in Vikhroli (1 January, from ₹8 crore), Lodha Elise in Worli (23 January, 195 units, sale opening not confirmed) and Lodha Aureus in Sewri (16 March, launched, 354 units). No named Lodha launch is confirmed for 2027 yet, though Lodha plans about ₹10,000 crore of Mumbai-region launches from October 2026 to March 2027, and Thane, Palava, Mira Road and Khopoli added five more registrations in 2026.

6 November 2026 · 13 min read

Hiranandani New Projects in Mumbai 2026 and 2027: MahaRERA List

Buying Guides

Hiranandani New Projects in Mumbai 2026 and 2027: MahaRERA List

MahaRERA registered eight Hiranandani projects around Mumbai in 2026, four in the city (Bay Heights, Rockside, Maitri Park Phase 1 and Bluecrest) and four in Thane, Panvel and Alibaug, but none has a dated launch or price yet. No 2027 launch is confirmed, and The Arena and Hiranandani Sands, both 2025 launches, carry on into 2026.

6 November 2026 · 12 min read

Birla Estates New Projects in Noida 2026 and 2027: Plans, No RERA Yet

Buying Guides

Birla Estates New Projects in Noida 2026 and 2027: Plans, No RERA Yet

Birla Estates has no launched or UP RERA-registered project in Noida or Greater Noida as of 6 November 2026, and no launch there is confirmed for 2027. What exists are plans: a 5-acre co-development in Sector 10, Greater Noida West announced by Sikka Group, reported talks for 10 acres in central Noida, and a land auction bid with no known result.

6 November 2026 · 11 min read

ATS New Projects in Gurgaon 2026 and 2027: Three HRERA Registrations

Buying Guides

ATS New Projects in Gurgaon 2026 and 2027: Three HRERA Registrations

HRERA Gurugram registered three ATS-group projects in 2026: ATS Grandstand Phase 2 in Sector 99A (362 flats, 17 August), ATS Triumph Villas in Sector 104 (19 villas, 20 March) and The Grove at Sanctuary, a commercial project in Sector 105 (19 February). An unnamed 2026 HomeKraft launch backed by HDFC Capital's H-CARE 3 fund is only planned, Sanctuary 105 Phase 2 from 2025 has no confirmed launch, and no source names an ATS Gurgaon launch for 2027.

6 November 2026 · 13 min read

ATS New Projects in Noida 2026 and 2027: What UP RERA Shows

Buying Guides

ATS New Projects in Noida 2026 and 2027: What UP RERA Shows

ATS has registered no new project with UP RERA in Gautam Buddh Nagar in 2026; its latest launch there is Province D Olympia, 603 plots in YEIDA Sector 22D registered on 21 March 2025, where ATS says about 400 plots sold for ₹1,200 crore. A second Olympia phase of about 200 plots and serviced apartments with high-street retail are only announced or planned, with no dates, and no ATS launch is confirmed for 2027.

6 November 2026 · 12 min read

Sobha New Projects in Noida 2026 and 2027: All in Greater Noida

Buying Guides

Sobha New Projects in Noida 2026 and 2027: All in Greater Noida

Sobha has no project in Noida city: its only 2026 launch in Gautam Buddh Nagar is SOBHA Rivana in Sector 1, Greater Noida West, registered with UP RERA on 20 March 2026 with about 1,366 homes, while SOBHA Aurum in Sector 36, a June 2025 launch, is still on sale. One unnamed Greater Noida project is announced for October 2026 to March 2027, but it is not on UP RERA and no 2027 launch is confirmed.

6 November 2026 · 13 min read

Sobha New Projects in Gurgaon 2026 and 2027: Crescent, HRERA, Plans

Buying Guides

Sobha New Projects in Gurgaon 2026 and 2027: Crescent, HRERA, Plans

Sobha's only new project in Gurgaon in 2026 is SOBHA Crescent Phase 1 in Sector 63A, a 336-home launch of April 2026 that HRERA Gurugram registered on 3 April, and no other Sobha registration appears on the register to 2 November 2026. No Sobha Gurgaon launch is confirmed for 2027: Crescent Phase 2 is announced for about December 2026 to January 2027 but is not registered, while SOBHA Strada, a 2025 serviced-residence launch in Sector 106, is still selling.

6 November 2026 · 13 min read

Sobha New Projects in Bengaluru 2026 and 2027: Launches and K-RERA

Buying Guides

Sobha New Projects in Bengaluru 2026 and 2027: Launches and K-RERA

Sobha's new projects in Bengaluru in 2026 are SOBHA Altair off Sarjapur Road, registered with K-RERA on 7 January with 207 homes, and One Residences at SOBHA OneWorld in Hoskote, registered on 8 May with 3,484 homes. Three unnamed Bangalore launches and a Crystal Meadows apartment relaunch are planned or announced up to March 2027, but none is registered and no 2027 launch is confirmed by name.

6 November 2026 · 12 min read

Signature Global New Projects in Gurgaon 2026 and 2027: Launch Status

Buying Guides

Signature Global New Projects in Gurgaon 2026 and 2027: Launch Status

Signature Global's only new project registered with HRERA Gurugram in 2026 is Tonino Lamborghini Residences in Sector 71, with 812 flats, launched in May 2026, while Cloverdale SPR and Sarvam at DXP Estate are 2025 launches still selling. A second Sector 71 launch around Diwali and a third for January to March 2027 are only announced, so no 2027 launch is confirmed yet.

6 November 2026 · 13 min read

Max Estates New Projects in Noida 2026 and 2027: UP RERA and Prices

Buying Guides

Max Estates New Projects in Noida 2026 and 2027: UP RERA and Prices

Max Estates has two new Noida projects in 2026: Estate 105 in Sector 105, registered on UP RERA on 19 March 2026 with 270 homes, and Max One in Sector 16B, the revived Delhi One relaunched on its 2017 registration. Estate 105 Phase 2 is planned for calendar 2027 but is not registered yet, and no 2025 Max Estates launch in Noida is still selling.

6 November 2026 · 14 min read

Max Estates New Projects in Gurgaon 2026 and 2027: HRERA and Prices

Buying Guides

Max Estates New Projects in Gurgaon 2026 and 2027: HRERA and Prices

Max Estates' one new Gurgaon launch of 2026 so far is The Terraces at Estate 361 in Sector 36A, 120 homes from ₹2.4 crore that sold out, and it sells under Estate 361's 2025 HRERA registration because no Max Estates company has registered a new project this year. The Sector 59 project on Golf Course Extension Road is due by December 2026 but is not on HRERA, and no 2027 launch has a confirmed date.

6 November 2026 · 13 min read

Godrej New Projects in Noida 2026 and 2027: UP RERA List and Prices

Buying Guides

Godrej New Projects in Noida 2026 and 2027: UP RERA List and Prices

Godrej's two 2026 launches around Noida are both in Greater Noida: Godrej Arden in Sigma III, registered on UP RERA on 13 August 2025 and launched in January to March 2026, and the 288-flat Crown Residences at Godrej Golf Links in Sector 27, registered on 2 April 2026 and launched in July to September. A 23.2-acre DMIC township parcel in Greater Noida is listed for October 2026 to March 2027 and 4.95 acres in Sector 151, Noida, has no date, but neither is registered and no 2027 launch is confirmed.

6 November 2026 · 14 min read

Godrej New Projects in Gurgaon 2026 and 2027: Samaris, Verano, HRERA

Buying Guides

Godrej New Projects in Gurgaon 2026 and 2027: Samaris, Verano, HRERA

Godrej's one Gurgaon launch of 2026 so far is Godrej Samaris, 488 flats on Golf Course Road registered with HRERA Gurugram on 4 May 2026, while Godrej Verano in Sector 63A was registered on 11 August 2026 and its launch has slipped to October to December 2026. No Godrej launch in Gurugram is confirmed for 2027, and Astra, Alira and Sora, all launched in 2025, are still on sale.

6 November 2026 · 13 min read

Experion New Projects in Noida 2026 and 2027: Saatori and UP RERA

Buying Guides

Experion New Projects in Noida 2026 and 2027: Saatori and UP RERA

Experion's only new project in Noida in 2026 is Experion Saatori in Sector 151, registered with UP RERA on 20 January 2026 and launched in February with 457 units. Nothing is announced or planned for late 2026 or 2027, and its other Noida project, Experion Elements in Sector 45, is a 2024 launch.

6 November 2026 · 12 min read

Experion New Projects in Gurgaon 2026 and 2027: HRERA, Prices, Land

Buying Guides

Experion New Projects in Gurgaon 2026 and 2027: HRERA, Prices, Land

Experion has no new project launched or registered with HRERA Gurugram in 2026, and no Gurgaon launch is dated for late 2026 or 2027. It still sells three 2024 and 2025 registrations, The Trillion in Sector 48, One42 Golf Course Road in Sector 42 and Windchants Nova in Sector 112, while its land in Sectors 88A, 53 and 62 is planned but not registered.

6 November 2026 · 13 min read

Elan Group New Projects in Gurgaon 2026 and 2027: HRERA Status Check

Buying Guides

Elan Group New Projects in Gurgaon 2026 and 2027: HRERA Status Check

Elan Group has registered no new project with HRERA Gurugram in 2026, so its newest Gurgaon homes are two 2025 launches still on sale: The Emperor in Sector 106 (585 units) and The Statement in Sector 49 (380 apartments). JW Marriott Residences Gurugram was announced on 24 August 2026 without a RERA registration, a date or a unit count, and no source names an Elan launch for 2027.

6 November 2026 · 11 min read

DLF New Projects in Gurgaon 2026 and 2027: Launches, Plans, HRERA

Buying Guides

DLF New Projects in Gurgaon 2026 and 2027: Launches, Plans, HRERA

DLF's only public housing launch in Gurgaon in 2026 so far is The Aureva, a 172-home retirement project in Sector 63, registered with HRERA Gurugram on 14 September 2026 and sold out for about ₹1,985 crore. For 2027 DLF has announced an unnamed luxury-plus project in DLF City Phase 4 and the next Privana high-rise phase, neither registered yet, while its 2025 launches are fully booked and the 41-plot Privana Enclave is not a public launch.

6 November 2026 · 14 min read

Birla Estates New Projects in Mumbai 2026 and 2027: Thane to Worli

Buying Guides

Birla Estates New Projects in Mumbai 2026 and 2027: Thane to Worli

Birla Estates has no 2026 launch inside Mumbai city: its 2026 MahaRERA registrations are Birla Taranya Phase 1 (1,339 units) and Taranya Retail 1 in Kalwa, Thane, plus Birla Mrida's 539 plots near Boisar in Palghar district. For 2027 it targets Khar West in January to February and Niyaara Tower C by July to September, with a new Taranya phase in FY27 and Vashi in FY28, none of them registered yet.

6 November 2026 · 13 min read

Birla Estates New Projects in Gurgaon 2026 and 2027: HRERA and Prices

Buying Guides

Birla Estates New Projects in Gurgaon 2026 and 2027: HRERA and Prices

Birla Estates has registered one new Gurgaon project with HRERA Gurugram in 2026, Birla Arika Phase 2 in Sector 31-32A with 234 units, and Birla said 152 of the 156 homes it launched sold within a month. A new Birla Navya phase is announced for FY27 but not registered, no 2027 launch is dated, and Arika Phase 1, Navya Avik Phase-2 and Birla Pravaah are 2025 launches.

6 November 2026 · 13 min read

Oberoi Realty Projects in Mumbai 2026: Status, MahaRERA and Prices

Buying Guides

Oberoi Realty Projects in Mumbai 2026: Status, MahaRERA and Prices

Oberoi Realty has 15 completed housing projects in Mumbai and Thane, plus part-ready Sky City, seven towers or phases under construction and three recent launches registered on MahaRERA: Elysian Tower D, Sky City Tower H and Oceanic in Bandra. Seven more projects are announced and eight planned, none with a MahaRERA registration yet, and Oberoi's Q2 FY27 average realisation ran from ₹19,900 to ₹1,82,400 per sq ft of carpet.

6 November 2026 · 12 min read

Emaar Projects in Gurgaon 2026: All 44 by Status, Sector and HRERA

Buying Guides

Emaar Projects in Gurgaon 2026: All 44 by Status, Sector and HRERA

Emaar India, formerly Emaar MGF, has 44 projects and planned sites in our Gurugram list, 27 housing and 17 commercial. Its 2025 housing launches are Urban Ascent in Sector 112 and Serenity Hills in Sector 86; five more projects are under construction, two Marbella plot phases were registered on HRERA in 2026 without a launch, and most older townships are ready.

6 November 2026 · 11 min read

Akshaya Projects in Chennai 2026: Status, TNRERA and Prices

Buying Guides

Akshaya Projects in Chennai 2026: Status, TNRERA and Prices

Akshaya Pvt Ltd, the Chennai builder founded in 1995 by T. Chitty Babu, has 29 projects in our research: 14 ready, 5 part-ready, 7 under construction and 3 announced with no dates, 13 of them on or off OMR and one each in Coimbatore and Trichy. Fourteen carry a TNRERA number, but no Akshaya company has registered a new project in 2025 or 2026; the latest are Podigai (23 December 2024), Avanthika (June 2024) and Rhythm (June 2023), all under Akshaya Estates Realty LLP.

6 November 2026 · 12 min read

Suncity Builders Projects: Every Project by City, Status and RERA

Buying Guides

Suncity Builders Projects: Every Project by City, Status and RERA

Suncity Projects has 54 projects in our research, 42 of them ready, mostly townships, plots, floors and flats in Gurugram, the rest of Haryana and Jaipur, and 27 carry a RERA number. Its one current home launch is Suncity's Monarch Residences in Sector 78, Gurugram, registered on HRERA on 22 January 2026 with 900 flats, and no Suncity launch is named for 2027.

6 November 2026 · 11 min read

BNW Developments Projects 2026: Ras Al Khaimah and Dubai List

Buying Guides

BNW Developments Projects 2026: Ras Al Khaimah and Dubai List

BNW Developments has 15 project records as of 6 November 2026: in Ras Al Khaimah, 7 under construction, 2 launched, 1 announced and Beach District projects planned, and in Dubai, 3 launched (one of them Esplora, a ready building sold in 2025) and 1 announced. RERA-RAK's 2026 list shows 7 of the names with a status but no registration numbers, and no BNW-built home has been handed over yet.

6 November 2026 · 11 min read

SS Group Projects in Gurgaon 2026: All 27 by Status and HRERA

Buying Guides

SS Group Projects in Gurgaon 2026: All 27 by Status and HRERA

SS Group has 27 projects in Gurugram district: 15 ready, 2 part-ready, 7 under construction, SS ONE launched in February 2026, SS Linden IV registered but not marketed and SS Quadro still waiting for HRERA registration. Of these, 17 sit under 14 HRERA Gurugram registrations, mostly in New Gurugram Sectors 83 to 86 and 90, while 9 older projects, mostly in Sectors 47 to 57, were finished before RERA.

6 November 2026 · 12 min read

M3M New Projects in Gurgaon 2026 and 2027: HRERA List by Sector

Buying Guides

M3M New Projects in Gurgaon 2026 and 2027: HRERA List by Sector

HRERA Gurugram has registered four M3M projects in 2026 so far: housing phases Forestia West I and Forestia East I at Gurgaon International City, with 1,384 and 872 homes, and the commercial Soulitude Central and Capital Financial Centre. M3M Residences by Elie Saab in Sector 111 also launched in January, while Brabus Residences is only reported upcoming and no M3M Gurugram launch is confirmed for 2027.

6 November 2026 · 13 min read

What the research desk writes about

Our insights explain the thinking behind the scores and verdicts on this site. We publish 182 pieces so far across 7 topics: Buying Guides, Market Trends, Investment Guides, Builder Reviews, NRI Investment, Legal Advice, Home Loans. Every article is written by the same desk that researches projects and advises buyers, uses figures we can source, and is updated when the facts change.

  • Buying Guides — 126 articles, latest: How to Apply for Hanspal and Patia Affordable 2 BHK BMC Flats.
  • Market Trends — 20 articles, latest: Which Gurgaon Sectors Will Develop in the Next 5 Years? The Evidence.
  • Investment Guides — 32 articles, latest: Which Areas Near Gurgaon Will Appreciate the Most? What Data Shows.
  • Builder Reviews — 1 article, latest: How to Vet a Builder Before You Buy: The 7-Layer Framework.
  • NRI Investment — 1 article, latest: The NRI's Complete Guide to Buying Property in India (2026).
  • Legal Advice — 1 article, latest: RERA in Practice: 9 Checks Every Buyer Must Run Before Booking.
  • Home Loans — 1 article, latest: Home Loan Strategy 2026: Rate Cuts, Overdraft Loans and Prepayment Math.

For day-to-day market moves, see our property news; for the numbers behind a decision, use the property calculators and the price tracker.

A happy family in their new home with the money they got back

Brokerage back offer

Book your home with us and get the brokerage back*

Builders pay a brokerage to whoever brings them a buyer. Book through Property Nivesh and we give it back to you.

*Brokerage is part of the discussion with our advisor.

Unbiased advice. Your data is never sold to builders or brokers.