Godrej New Projects in Gurgaon 2026 and 2027: Samaris, Verano, HRERA
Godrej's one Gurgaon launch of 2026 so far is Godrej Samaris, 488 flats on Golf Course Road registered with HRERA Gurugram on 4 May 2026, while Godrej Verano in Sector 63A was registered on 11 August 2026 and its launch has slipped to October to December 2026. No Godrej launch in Gurugram is confirmed for 2027, and Astra, Alira and Sora, all launched in 2025, are still on sale.
By Preeti Pandey · Edited by
Rakesh Mahajan · · 13 min read
What are Godrej's new projects in Gurgaon for 2026 and 2027?
So far in 2026, Godrej Properties has put one new Gurgaon project on sale. That is Godrej Samaris, 488 flats on plot GH-24 in Sector 53, Golf Course Road, registered with HRERA Gurugram on 4 May 2026. Godrej Verano in Sector 63A, on Golf Course Extension Road, was registered on 11 August 2026, but its launch has slipped to October to December 2026, Godrej says. A further 1.703-acre Verano phase is planned with no date, and no source names any Godrej launch in Gurugram for 2027.
For anyone searching Godrej new projects launch Gurgaon, the 2026 list is short. Three projects from 2025 is still selling: Astra in Sector 54, Alira in Sector 39 and Sora in Sector 53. We keep them in a separate list below.
The register is kept by HRERA Gurugram, short for the Haryana Real Estate Regulatory Authority, Gurugram. Under the RERA Act of 2016, no one may advertise or sell a flat before the project is on it. So the certificate number is first thing to look. On 6 November 2026 the register's latest certificate was dated 2 November, and it showed no Godrej-linked registration after 11 August.
| Project | Where | Kind of project | Where it stands | HRERA certificate (date) | HRERA completion | Homes |
|---|---|---|---|---|---|---|
| Godrej Samaris | GH-24, Sector 53, Golf Course Road | Apartments plus 6 commercial units | Launched April to June 2026 | RC/REP/HARERA/GGM/1059/791/2026/31 (4 May 2026) | 31 Aug 2033 | 488 |
| Godrej Verano | Sector 63A, Golf Course Extension Road | Apartments plus 6 commercial units | Registered; launch pending (October to December 2026, per Godrej) | RC/REP/HARERA/GGM/1081/813/2026/53 (11 Aug 2026) | 31 Aug 2033 (OC by 2 Jun 2033) | 624 |
The chart sorts the six Godrej entries here by status: four have launched, one is registered and one is only planned. The full company record is on our Godrej Properties developer page.
What is Godrej Samaris, the 2026 launch on Golf Course Road?
Samaris is the big Godrej launch of the year in Gurgaon. It sit on 7.413 acres at plot GH-24. HSVP (Haryana Shehri Vikas Pradhikaran) allotted the land, and Godrej took it by conveyance deed in February 2026, as per its page. When Godrej won the plot in October 2024, its filing put the revenue potential at over ₹5,500 crore (Outlook Business, PTI, 25 October 2024).
HRERA's hearing brief describe 5 towers of G+36 with 488 flats and 6 commercial units, 494 units in all. Carpet area, the floor space inside a flat's walls, runs from 150 to 362 sq m (about 1,615 to 3,897 sq ft). Completion on the register is 31 August 2033.
Exact launch day was not published. Godrej still called Samaris upcoming on 25 May 2026. Yet it counted the project in its April to June launches, with ₹1,248 crore of sales, so selling began between late May and 30 June. By 4 August the total had crossed ₹1,500 crore, and July to September added more than ₹500 crore (₹514 crore in the results deck). These are Godrej's own figures, we can't check them on any register.
Before launch, Business Standard (25 May 2026) quoted the brochure: a launch phase of two towers. It gave about ₹11 crore for a 3,000 sq ft 3 BHK and ₹15.2 crore for a 4,000 sq ft 4 BHK, area basis not stated. Godrej's page now shows Samaris from ₹9.84 crore for a 3 BHK, and no possession date.
Tata Projects holds the core-and-shell contract for Samaris, Sora and Astra, about ₹1,100 crore combined (NBM&CW, 25 May 2026). Our Golf Course Road locality page give more on the stretch.
This chart compares homes per project, as HRERA lists them.
Is Godrej Verano in Sector 63A launched or only registered?
Only registered, so far. Its HRERA Gurugram certificate is dated 11 August 2026. On the 23 October 2026 earnings call, MD and CEO Gaurav Pandey said the launch planned for July to September had slipped into October to December.
Godrej's Verano page already wear a "New Launch" label, from ₹4.91 crore for a 3 BHK with possession in March 2031 (read 6 November 2026). We found no launch announcement till then, so we call it registered, launch pending.
HRERA's dates are much more later. The hearing brief gives an occupation certificate (OC, the permit to live in a building) by 2 June 2033. Completion is due by 31 August 2033, and that HRERA date is the one the regulator tracks.
Verano has 4 towers of G+39 and G+40 over 4 basements, with 624 flats and 6 commercial units. The brief lists 2, 3, 4 and 5 BHK flats plus 4 BHK and 6 BHK duplexes. Sizes run from 935 sq ft carpet up to 3,740 sq ft. Godrej's page shows 3, 4 and 5 BHK, so ask which sizes is really on offer.
Godrej bought the land outright: 11.36 acres in the revenue estate of Village Ullawas. Its 4 March 2026 filing put revenue potential at over ₹4,500 crore (Outlook Business, PTI, 5 March 2026). The registration cover 9.6532 acres of it. On 5 February, a month earlier, management said Godrej had bought no Gurugram land for about 18 months, as prices had run up. See our Golf Course Extension Road locality page.
Which Godrej projects from 2025 are still selling in Gurgaon?
Three of them. Astra, Alira and Sora went on sale in 2025 and still show prices on Godrej's site on 6 November 2026. Their completion dates on HRERA run from October 2031 to September 2032.
| Project | Location | HRERA number (registered) | Completion on HRERA | Units | Godrej's starting price, 6 Nov 2026 |
|---|---|---|---|---|---|
| Godrej Astra | GH-100, Sector 54 | RC/REP/HARERA/GGM/883/615/2024/110 (8 Nov 2024) | 16 Oct 2031 | 151 flats and 101 small units | ₹10.34 crore (3 BHK) |
| Godrej Alira | GH-01, Sector 39 | RC/REP/HARERA/GGM/959/691/2025/62 (26 Jun 2025) | 30 Apr 2032 | 132 flats and 2 small units | ₹6.25 crore (3 BHK) |
| Godrej Sora | GH-21, Sector 53 | RC/REP/HARERA/GGM/976/708/2025/79 (25 Aug 2025) | 30 Sep 2032 | 244 flats and 4 shops | ₹11.80 crore (4 BHK) |
Godrej Astra, Sector 54. Launched in March 2025, it sold 90 homes worth over ₹1,000 crore on launch day, Godrej reported (Business Standard, 28 March 2025). Its 151 flats are 3 and 4 BHK of 1,298 to 2,030 sq ft carpet, and the other 101 units are shop-sized. HRERA's promoter is Wonder City Buildcon Ltd, a Godrej group company, so don't be surprise to see that name on the papers. Possession is January 2031 on Godrej's page and 16 October 2031 on HRERA. See our Godrej Astra page.
Godrej Alira, Sector 39. Registered on 26 June 2025, it has no dated launch we could find. It is the smallest of the three, 1.9745 acres with less flats, 132 plus 2 small units. Godrej shows 3 BHK from ₹6.25 crore, 4 BHK from ₹6.90 crore and 4+ BHK at ₹8.18 to 10.12 crore. Its possession date is January 2030, while HRERA's is 30 April 2032.
Godrej Sora, Sector 53. Registered on 25 August 2025, Sora have 244 flats and 4 shops in 4 towers on 3.6 acres. Business Standard reported in May 2026 that it was marketed as 3 and 4 BHK at about ₹8.3 to 11.4 crore. Godrej's page now offers 4 BHK from ₹11.80 crore, with possession in September 2032, the same as HRERA. More on our Godrej Sora page.
Our copy of the register also holds three Godrej-linked registrations from 2024: Zenith in Sector 89, Vrikshya in Sector 103 and Miraya in Sector 43. They are older and outside this guide. HRERA spells it Vrikshya, while Godrej's own site also uses Vriksha.
What is Godrej planning in Gurugram for late 2026 and 2027?
For the rest of 2026 the only Gurgaon launch named is Verano, now expect in October to December. For 2027 no source names any Godrej launch in Gurugram. On 23 October Pandey said Noida is the priority for new land. Gurugram additions would come only in micro-markets such as Golf Course Extension Road and SPR.
| Plan | What has been said | Who said it, and when | Status now |
|---|---|---|---|
| Godrej Verano, Sector 63A | Launch slipped from July to September into October to December 2026 | Gaurav Pandey, Q2 FY27 call, 23 Oct 2026 | Registered; launch pending |
| Verano future phase, 1.703 acres | No home type, size or date | HRERA hearing brief; Godrej's Verano page, read 6 Nov 2026 | Planned; not registered |
| Later Samaris towers | Launch phase was two of the 5 towers | Business Standard, 25 May 2026 | Registered; no date for the rest |
| Second-half FY27 pipeline | Names Sector 63A; about ₹32,000 crore of launches company-wide | Pirojsha Godrej, Q2 FY27 call, 23 Oct 2026 | Plan; not split by city |
| A 2027 Gurgaon launch | None named | Godrej calls of Aug and Oct 2026; HRERA register, 6 Nov 2026 | None confirmed |
The Verano future phase exist only on paper. HRERA's brief lists a Phase 2 of 1.7030 acres outside the registered land. Godrej's page says a future phase will come up there, but with no registration it cannot be booked.
Big numbers from the calls are company-wide. The about ₹32,000 crore of launches planned for October 2026 to March 2027 covers all cities. NCR's July to September bookings of just under ₹2,000 crore are not split by city either. In August, Pandey called Gurugram the laggard market of April to June. Godrej's Noida plans are in our guide to Godrej new projects in Noida.
Marketing pages are running ahead of the facts. Price ranges for Verano and Samaris go around online, one Verano figure is ₹5.91 crore onwards, a crore above Godrej's own. One page claim a ₹20 lakh "refundable" EOI (expression of interest). These are claims only. Section 3(1) of the Act does not let a promoter advertise, book or sell flats in a project that has no registration. Under section 59, breaking it can bring a fine as high as 10% of what the project is estimated to cost. One page also quoted RERA-GRG-2216-2026, HRERA's application ID for Samaris, instead of the certificate number, so read the certificate.
What do Godrej's Gurgaon projects cost, and what does Haryana add?
Godrej shows a starting total on each project page, not a rate per sq ft. The figures here is its current ones on 6 November 2026, not dated launch prices.
| Project | Godrej's starting price, 6 Nov 2026 | Other dated figure | Status |
|---|---|---|---|
| Godrej Samaris | ₹9.84 crore (3 BHK) | About ₹11 crore to ₹15.2 crore before launch (brochure), Business Standard, 25 May 2026 | Launched 2026 |
| Godrej Verano | ₹4.91 crore (3 BHK) | None | Registered |
| Godrej Astra | ₹10.34 crore (3 BHK) | None | Launched 2025 |
| Godrej Alira | ₹6.25 crore (3 BHK); ₹8.18 to 10.12 crore (4+ BHK) | None | Launched 2025 |
| Godrej Sora | ₹11.80 crore (4 BHK) | About ₹8.3 to 11.4 crore as marketed, Business Standard, 25 May 2026 | Launched 2025 |
Don't read the gaps as price moves. Samaris now starts below its brochure figures and Sora above its May range, but the sizes behind each figure are not known to match.
In Haryana you pay 7% stamp duty, about 5% if the buyer is a woman, plus registration at 1% that stops at ₹50,000. A labelled illustration on two of the starting totals:
| Charge in Haryana | Rate | On ₹4.91 crore (Verano start) | On ₹9.84 crore (Samaris start) |
|---|---|---|---|
| Stamp duty | 7% | ₹34.37 lakh | ₹68.88 lakh |
| Stamp duty (woman buyer) | About 5% | About ₹24.55 lakh | About ₹49.2 lakh |
| Registration fee | 1%, up to ₹50,000 | ₹50,000 | ₹50,000 |
These are on the starting totals only, before other charges. For asking rates sector by sector, see Gurgaon property rates.
What does HRERA's record show on Godrej's delivery in Gurugram?
First, a rule for every developer. On 11 August 2026 HRERA issued Order No. 9/1-2026, on the ground of force majeure from the West Asia war. It pushes completion dates out by four months, on its own, for registered projects due on or after 28 February 2026. It cover Samaris, Sora, Alira and Astra but not Verano, as only projects registered by 31 July 2026 qualify. The register still prints the old dates.
Older projects have newer papers. Godrej Meridien in Sector 106 got occupation certificates dated 13 March 2026 (Meridien-I) and 15 July 2026 (Phase III), both was entered on the portal on 21 October 2026. Godrej's Q2 FY27 deck counted 0.32 million sq ft at Meridien among the quarter's deliveries. Phase III's registration was extended to 30 March 2027.
Godrej Nature Plus in Sohna, with 1,094 homes, had its registration extend to 29 January 2027 by an order of 6 February 2026. Godrej Air's four phases in Sector 85 now show completion between 29 March and 30 September 2027. Godrej Habitat in Sector 3 is valid to 20 August 2029.
HRERA's judgements list shows 49 decisions in 2025 and 53 in 2026, to 6 November, with a Godrej-linked respondent. Almost all are buyer complaints, and two are suo motu monitoring cases that the regulator started itself. We counted them, we did not read them, so how they ended we can't say.
On 4 August Pirojsha Godrej flagged a company-wide risk: much of the deliveries due in FY28 is in NCR, exposed to NGT construction bans.
What to check before you book with Godrej
In the order you will meet them:
- Look up the project by name on HRERA Gurugram's site. Make sure the certificate number, promoter and completion date line up, because marketing pages sometimes print a wrong one. For Samaris the certificate is RC/REP/HARERA/GGM/1059/791/2026/31.
- Astra is registered to Wonder City Buildcon Ltd, and older Gurgaon projects sits under other Godrej companies. The promoter on your agreement should match the certificate.
- For Verano, ask Godrej in writing if sales has opened, and for which tower and sizes. Pay no EOI or token for the 1.703-acre future phase, which has no registration.
- Paying an EOI do not make you an allottee. Get the allotment letter and the agreement for sale from the promoter on the certificate.
- Godrej's possession dates for Alira, Astra and Verano are earlier than HRERA's. Go by the register, plus four months where the August 2026 order apply, and get your tower's OC in hand before paying the last instalment.
After that, put your own price into our stamp duty calculator, and keep our RERA checklist for 2026 open while you reads the papers.
Questions
Frequently Asked Questions
What new projects has Godrej launched in Gurgaon in 2026? +
One so far. Godrej Samaris, with 488 flats and 6 commercial units in Sector 53 on Golf Course Road, was registered with HRERA Gurugram on 4 May 2026 and opened for sale between late May and 30 June 2026. Godrej booked ₹1,248 crore on it in April to June. Godrej Verano in Sector 63A is registered too, but its launch is still pending.
Can I book a flat in Godrej Verano now? +
Not yet: Verano has an HRERA registration but no launch so far. Its certificate, RC/REP/HARERA/GGM/1081/813/2026/53, is dated 11 August 2026. On 23 October 2026 Godrej said the launch had slipped to October to December 2026, though its website already labels it a new launch from ₹4.91 crore. Ask Godrej in writing whether sales have opened before you pay anything.
Is any Godrej launch in Gurgaon confirmed for 2027? +
No. No source names a Godrej launch in Gurugram for 2027. On 23 October 2026 management said it would add Gurugram land only in micro-markets such as Golf Course Extension Road and SPR. The 1.703-acre Verano future phase is planned with no date and no HRERA registration, so it cannot be booked.
What is the price of Godrej Samaris in Sector 53? +
Godrej's own page showed Samaris from ₹9.84 crore for a 3 BHK on 6 November 2026. That is the lowest total shown that day, not a dated launch price or a rate per sq ft. Before the launch, Business Standard reported brochure prices of about ₹11 crore for a 3 BHK and ₹15.2 crore for a 4 BHK on 25 May 2026.
Which older Godrej projects in Gurgaon are still on sale? +
Three 2025 launches still carry prices on Godrej's site: Godrej Astra in Sector 54 from ₹10.34 crore, Godrej Alira in Sector 39 from ₹6.25 crore and Godrej Sora in Sector 53 from ₹11.80 crore, as read on 6 November 2026. Their HRERA completion dates run from 16 October 2031 to 30 September 2032.
How do I check a Godrej project's HRERA number? +
Find the project by its own name in HRERA Gurugram's list of registered projects, then confirm that the number, promoter and completion date agree. Some Godrej projects sit under other companies, such as Wonder City Buildcon Ltd for Astra. Marketing pages can carry the wrong number: RERA-GRG-2216-2026 is HRERA's application ID for Samaris, while its certificate is RC/REP/HARERA/GGM/1059/791/2026/31.
What stamp duty applies to a Godrej flat in Gurgaon? +
Stamp duty in Haryana is 7% of the value, or about 5% for women buyers, and the registration fee is 1% with a ₹50,000 cap. As an illustration on Verano's starting total of ₹4.91 crore, 7% duty comes to ₹34.37 lakh, while registration hits its ₹50,000 cap. The stamp duty calculator on our site works out any other price.
Sources
- HRERA Gurugram, Registered Projects (Gurugram), read on the portal 6 November 2026 (1,086 rows, latest registration certificate dated 2 November 2026)
- HRERA Gurugram, Form REP-I Parts A-H and project hearing brief under Section 4, Godrej Samaris (RC/REP/HARERA/GGM/1059/791/2026/31), read 6 November 2026
- HRERA Gurugram, Form REP-I Parts A-H and hearing brief for registration, Godrej Verano (RC/REP/HARERA/GGM/1081/813/2026/53), read 6 November 2026
- HRERA Gurugram, Form REP-I Parts A-H for Godrej Sora (RC/REP/HARERA/GGM/976/708/2025/79), Godrej Alira (RC/REP/HARERA/GGM/959/691/2025/62) and Godrej Astra (RC/REP/HARERA/GGM/883/615/2024/110), and the Godrej Sora hearing brief, read 6 November 2026
- Property Nivesh copy of the HRERA Gurugram register to 14 September 2026
- HRERA Gurugram, Order No. 9/1-2026 HARERA/GGM (Admn), four-month extension of completion timelines (force majeure), 11 August 2026
- HRERA Gurugram, OC/CC/PCC entries for Godrej Meridien-I (13 March 2026) and Godrej Meridien Phase III (15 July 2026), read 6 November 2026
- HRERA Gurugram, Extension No. 04 of 2026 (Godrej Meridien-III), 12 February 2026, and Extension No. 03 of 2026 (Godrej Nature Plus), 6 February 2026
- HRERA Gurugram, corrigendum and extension entries for Godrej Habitat and Godrej Air Phases I to IV, read 6 November 2026
- HRERA Gurugram, Ruling and Judgements list (Gurugram), read 6 November 2026
- HRERA Gurugram public advisory on booking in unregistered projects, 14 August 2026
- The Real Estate (Regulation and Development) Act, 2016, sections 3 and 59
- Godrej Properties Limited, Q3 FY26 earnings conference call, 5 February 2026 (transcript filed 10 February 2026)
- Godrej Properties Limited, Q1 FY27 earnings conference call, 4 August 2026 (transcript filed 6 August 2026)
- Godrej Properties Limited, Q2 FY27 earnings conference call, 23 October 2026 (transcript filed 27 October 2026)
- Investing.com, Godrej Properties Q2 FY27 slides: record collections amid profit drop (summary of the results presentation), 23 October 2026
- Business Standard, Godrej-Tata team up for Gurgaon's Golf Course homes costing Rs 11-15 cr, 25 May 2026
- Business Standard, Godrej Properties sells homes worth Rs 1,000 cr in Gurugram luxury project, 28 March 2025
- Outlook Business (PTI), Godrej Properties Buys 7.5-acre Land in Gurugram to Build Rs 5,500-Crore Housing Project, 25 October 2024
- Outlook Business (PTI), Godrej Properties Buys 16-acre Land in Gurugram, Kolkata for Rs 1,300 Cr to Build Housing Projects, 5 March 2026
- NBM&CW, Godrej Properties Partners with Tata Projects for Rs 1,100 Cr Projects Along Golf Course Road in Gurgaon, 25 May 2026
- Godrej Properties project pages for Godrej Samaris, Godrej Verano, Godrej Astra, Godrej Alira and Godrej Sora, read 6 November 2026
- Property Nivesh compilation of Haryana stamp duty and registration rates, November 2026