Buying Guides
Oberoi Realty Projects in Mumbai 2026: Status, MahaRERA and Prices
Oberoi Realty has 15 completed housing projects in Mumbai and Thane, plus part-ready Sky City, seven towers or phases under construction and three recent launches registered on MahaRERA: Elysian Tower D, Sky City Tower H and Oceanic in Bandra. Seven more projects are announced and eight planned, none with a MahaRERA registration yet, and Oberoi's Q2 FY27 average realisation ran from ₹19,900 to ₹1,82,400 per sq ft of carpet.
By Rajan Khosla · Edited by
Rakesh Mahajan · · 12 min read
Which Oberoi Realty projects are in Mumbai, and what stage is each one at?
Oberoi Realty projects in Mumbai and Thane, as we checked them on 6 November 2026, include 15 completed housing projects and two part-ready ones, Sky City at Borivali East and the Oberoi Garden City township at Goregaon East. Seven towers or phases are under construction, three are recent launches (Elysian Tower D, Sky City Tower H and Oceanic in Bandra West) and Elysian Tower E is registered but not launched. Seven more projects are only announced and eight are planned, and none of those has a MahaRERA registration.
Most of building work is at Goregaon, Borivali and two Thane sites, Kolshet and Pokhran Road No. 2.
MahaRERA is the Maharashtra Real Estate Regulatory Authority, and a project must be registered with it before any home is advertised or sold. We hold 17 MahaRERA registrations for Oberoi housing here, and all of them was read on the portal. They cover every tower under construction or launched, plus ready projects in Goregaon, Borivali, Mulund, Andheri and Worli. Ten completed buildings in Goregaon, Andheri, Juhu and Kandivali have no MahaRERA number in our records.
The chart counts each housing record by status, towers sold on their own counted separately.
Oberoi Realty is a different company from the Oberoi hotels group (EIH Limited) and has no link to BNW Developments, people mix them often. Three Sixty North in Gurugram, launched on 29 June 2026, sits outside this guide. History and finances are on our Oberoi Realty developer page.
Which Oberoi projects in Mumbai and Thane are ready, and which are still being built?
The table list every Oberoi housing record we hold in Mumbai and Thane. Completion dates are as declared on MahaRERA, and progress is Oberoi's own figure for 30 September 2026 (Q2 FY27).
| Project or tower | Location | Type | Status | MahaRERA number | Completion or possession | Homes |
|---|---|---|---|---|---|---|
| Elysian Tower A | Goregaon East | flats | under construction | P51800027667 | 30 Jun 2027; 89% built | n/a |
| Elysian Tower B | Goregaon East | flats | under construction | P51800031456 | 30 Jun 2027; 81% built | n/a |
| Elysian Tower C | Goregaon East | flats | under construction | P51800050677 | 31 Oct 2031; 60% built | n/a |
| Elysian Tower D | Goregaon East | flats | launched 30 Apr 2025 | P51800050677 | 31 Oct 2031; 49% built | n/a |
| Elysian Tower E | Goregaon East | flats | registered, not launched | P51800050677 | 31 Oct 2031 | n/a |
| Esquire | Goregaon East | flats | ready | P51800005229 | completed | n/a |
| Exquisite, Oberoi Seven, Oberoi Woods | Goregaon East | flats | ready | none on file | completed | n/a |
| Sky City Towers A to D, and Tower E | Borivali East | flats | ready | P51800003582 (A to D), P51800018404 (E) | OC by 31 Dec 2024 | n/a |
| Sky City Tower F | Borivali East | flats | under construction | P51800028419 | 30 Jun 2027; 93% built | n/a |
| Sky City Tower G | Borivali East | flats | under construction | P51800047575 | 31 Dec 2027; 79% built | n/a |
| Sky City Tower H | Borivali East | flats, 60 floors | launched 2026 | PR1180002502390 | 30 Jun 2030; below reporting threshold | 783 |
| Eternia Towers A to D | Mulund West | flats | ready | P51800006141 | full OC, reported Jan 2026 | 1,312 |
| Enigma Towers A and B | Mulund West | flats | ready | P51800002656 | OC obtained | 682 |
| Prisma | Andheri East | flats | ready | P51800004199 | completed | n/a |
| Maxima | Andheri East | flats | not stated by Oberoi | P51800017154 | MahaRERA date 30 Jun 2023; no OC source found | n/a |
| Oberoi Splendor, Oberoi Splendor Grande | Andheri East | flats | ready | none on file | completed | n/a |
| Oberoi Springs, Oberoi Sky Heights, Oberoi Sky Gardens | Andheri West | flats | ready | none on file | completed | n/a |
| Oberoi Beachwood House | Juhu | flats | ready | none on file | completed | n/a |
| Oberoi Parkview | Kandivali East | flats | ready | none on file | completed | n/a |
| Three Sixty West | Worli | ultra luxury flats, 2 towers | ready | P51900012115 (promoter Oasis Realty) | ready to move in | n/a |
| Oceanic | Bandra West | flats, 19 floors | launched 2026 | PR1180002600318 | 31 Dec 2030; below reporting threshold | 47 |
| Forestville Phase 1 (Towers A, B, C) | Kolshet, Thane | flats, 60 floors | under construction | P51700050312 | 31 Dec 2029; B 59%, C 57%, A below threshold | 1,257 |
| Jardin (Towers B and C) | Pokhran Road No. 2, Thane | flats, over 65 storeys | under construction | PR1331012400078 | 30 Jun 2031; B 28%, C 27% | 934 |
Elysian had 1,242 homes launched in Towers A to D at that date, and 940 of them were booked. Maxima is the odd one: Oberoi's page shows no status, its MahaRERA date has passed and we found no OC source. The OC, or occupation certificate, is the permission to live in a finished building, so ask to the seller for it.
Sky City is registered by Incline Realty Private Limited, a wholly owned Oberoi subsidiary. Eternia, Enigma, Prisma and Maxima still show Oberoi Constructions Limited, which merged into Oberoi Realty Limited from 29 March 2024. At Three Sixty West, MahaRERA lists Oasis Realty as promoter; Oberoi retired from it on 3 March 2023 and now sell its own apartments there.
Our project pages cover Oberoi Garden City, Oberoi Sky City, Three Sixty West and Oberoi Forestville.
What has Oberoi Realty launched in Mumbai since 2025, and what is announced?
Three towers or projects were launched in 2025 and 2026, and each come with a MahaRERA record. Seven more are announced for FY27 (April 2026 to March 2027) by Vikas Oberoi, the chairman and managing director, but none had a MahaRERA registration in our search of 6 November 2026, so none can be booked yet. The quarters are from his results call of 11 May 2026, where Oceanic was also on the first-quarter list.
| Project or tower | Location | Status | MahaRERA | What is known (source, date) |
|---|---|---|---|---|
| Elysian Tower D | Goregaon East | launched 30 Apr 2025 | P51800050677 (with Towers C and E) | 3 and 4 BHK, 2,009 to 3,430 sq ft carpet; about ₹970 crore booked for 2.1 lakh sq ft (Oberoi filing, via PTI, 5 May 2025) |
| Sky City Tower H | Borivali East | launched 2026 | PR1180002502390, 17 Feb 2026 | 60 floors, 783 homes; limited inventory opened, priced high (chairman, 11 May 2026) |
| Oceanic | Carter Road, Bandra West | launched 2026 | PR1180002600318, 30 Apr 2026 | 19 floors, 47 homes; 1 home booked in Q2 FY27 for ₹47 crore (Oberoi, 16 Oct 2026) |
| Fairview | Malabar Hill, as Oberoi lists it | announced | none found | Q1 in May; no bookings to 30 Sep 2026 |
| Forestville Tower D | Kolshet, Thane | announced | no separate registration found | Q1 in May; sliding a quarter (19 Oct 2026) |
| Jardin Tower A | Pokhran Road No. 2, Thane | announced | no separate registration found | Q2 in May; sliding a quarter (19 Oct 2026) |
| Mulund West project ("Ralliwolf") | Mulund West | announced | none found | Q2 in May; possibly Q4 FY27 (20 Jul 2026) |
| Aurelius | Pedder Road | announced | none found | Q2 or Q3 in May; may slide a quarter (19 Oct 2026) |
| Adarsh Nagar redevelopment | Worli | announced | none found | "Safely Q3" in May; still awaiting approvals (19 Oct 2026) |
| Tardeo redevelopment | Tardeo | announced | none found | Q3 or Q4 in May; named among FY27 launches (20 Jul 2026) |
Tower H put only a part of its 783 homes on sale, as Sky City's launched count went from 2,734 to 2,988. Oceanic is smallest of the three.
Unofficial figures seen online put Oceanic at about ₹1,60,000 per sq ft. They are not Oberoi's numbers. Section 3 of the RERA Act bars any promoter from advertising, booking or selling homes in a project before registering it, so check for the MahaRERA number beside any quote. Our RERA checks for buyers explain how to read a certificate.
When will the announced Oberoi projects launch, and what else is planned?
On 19 October 2026 the chairman said the second-half launches would "slide over a quarter here and there", and that Adarsh Nagar still waits for approvals, which was taking more longer than expected. On 20 July he had said Oberoi had "not thought of '28 as yet", so no FY28 launch is named.
Oberoi lists Fairview at Malabar Hill as duplex homes, and MahaRERA has no record of an Oberoi project by that name. The Mulund West project is the one Oberoi calls "Ralliwolf"; a final name is not announced.
Outside Mumbai, Oberoi has also announced about 150 branded villas at Tekali in Alibaug, Raigad district, first put in Q3 FY27 and later among the launches sliding a quarter.
Oberoi has also sign land and redevelopment deals that carry no launch date, and all are planned. Free sale is the part a developer can sell after rehousing the old residents; areas are as Oberoi told the stock exchanges.
- Aram Nagar, Versova: land of MHADA, the state housing authority, with Oberoi's share of free sale about 17.18 lakh sq ft of RERA carpet.
- Nepean Sea Road: one redevelopment, about 1.18 lakh sq ft.
- Malabar Hill: two development agreement, of about 51,000 and 68,000 sq ft.
- Pedder Road: two adjoining societies, up to 1.40 lakh sq ft.
- Bandra Reclamation: a slum rehabilitation scheme on MHADA land, about 3.2 lakh sq ft.
- Aman-branded homes at I-Ven, Worli: about 1.5 to 2 lakh sq ft of carpet, planned by I-Ven Realty, where Oberoi holds 39.13%.
- Borivali East: slum rehabilitation land next to Sky City, name not announced.
What price per sq ft does Oberoi Realty actually get in Mumbai and Thane?
What Oberoi report each quarter is the average price it actually realised per sq ft of carpet area, the usable area inside a flat's walls, on homes sold in each project. The table uses the Q2 FY27 figures, for the quarter to 30 September 2026, from the Oberoi Realty investor presentation, Q2 FY27. They are averages achieved, not a price list.
| Project | Location | Q2 FY27 average (per sq ft carpet) | Q1 FY27 | FY26 | Homes booked in Q2 FY27 (value) |
|---|---|---|---|---|---|
| Oceanic | Bandra West | ₹1,82,400 | ₹1,60,600 | not launched | 1 (₹47 crore) |
| Three Sixty West | Worli | ₹1,35,300 | ₹1,54,700 | not given | 2 (₹278 crore) |
| Elysian | Goregaon East | ₹54,900 | ₹52,800 | ₹49,700 | 31 (₹351 crore) |
| Sky City | Borivali East | ₹50,200 | ₹48,100 | ₹51,100 | 33 (₹184 crore) |
| Eternia | Mulund West | ₹36,600 | ₹36,600 | ₹33,300 | 25 |
| Enigma | Mulund West | ₹35,900 | ₹35,900 | ₹35,700 | 12 |
| Jardin | Thane West | ₹25,600 | ₹26,000 | ₹26,200 | 42 (₹120 crore) |
| Forestville | Thane West | ₹19,900 | ₹19,800 | ₹19,600 | 48 (₹86 crore) |
The chart puts the same Q2 FY27 averages side by side.
Over six quarters Elysian climbed from ₹46,900 in Q1 FY26 to ₹54,900, and Eternia went from ₹30,100 in Q2 FY26 to ₹36,600. Thane stayed much more flat, with Forestville between ₹19,400 and ₹19,900, and in July 2026 the chairman put Thane at ₹20,000 to 25,000 per sq ft of carpet.
Three Sixty West is thin market, only 2 homes sold in the quarter, and the chairman says the price depends on floor. For Oceanic he said on the Q2 FY27 call of 19 October 2026 that pricing started at ₹1.5 lakh per sq ft and was pushed to ₹1.7 to 1.8 lakh, without saying which area it was on.
The Forestville and Jardin launch prices are totals and not per sq ft rate. Oberoi's release of 20 November 2023 gave Forestville 3 BHK homes from 1,090 sq ft at about ₹1.87 crore onwards. Business Standard reported on 22 October 2024 that Jardin 3 BHK homes started from ₹3.23 crore and 3 BHK with studio from ₹4.30 crore, before GST and other charges.
We have no Property Nivesh asking-price estimates for these projects. Area rates are on our Mumbai property rates page.
What does the record show on Oberoi's handovers and MahaRERA dates?
Oberoi reports construction tower by tower, which make it easy to follow.
- Sky City Towers A to E: OC received, per Oberoi's update of 20 January 2025; the exact date is not published. In May 2026 the chairman said five towers are delivered and possession given.
- Eternia: full OC reported on 19 January 2026. MahaRERA approved a fifth extension on 5 April 2026, moving the declared completion from 30 December 2023 to 10 May 2026.
- Enigma: a MahaRERA extension certificate of 20 March 2025 runs the registration to 1 August 2024; the annual report says the OC was obtained.
- Elysian Towers C, D and E: corrections approved on 23 June 2025 and 17 March 2026, and the declared completion stay 31 October 2031.
- Elysian Towers A and B: no extension on record as of 6 November 2026.
In November 2024 the National Consumer Disputes Redressal Commission told Oberoi Realty and landowner Novartis India to execute the conveyance deed for the Oberoi Woods society in Goregaon East, Hindustan Times reported, and we do not have any later update on it till now.
We looked for 2025 and 2026 MahaRERA orders, penalties or court matters affecting buyers of an Oberoi Mumbai project and found none in our checks. That is not proof that none exist, as MahaRERA's order records were not searched directly.
How much do stamp duty and registration add to an Oberoi home in Mumbai?
Maharashtra charges 6% stamp duty on a Mumbai home, including 1% metro cess, and registration at 1% capped at ₹30,000. Women buyers gets a 1% concession.
As a labelled illustration only: the smallest Tower D flat reported is 2,009 sq ft of carpet, and 2,009 x ₹54,900 (the Q2 FY27 Elysian average) is about ₹11 crore. Stamp duty at 6% would be about ₹66 lakh, or about ₹55 lakh at 5% for a woman buyer, plus registration at the ₹30,000 cap. A real flat may cost more or less.
Our 6% figure is for Mumbai, so for Thane check the rate in our stamp duty calculator.
What to check before you book with Oberoi Realty
- Match the MahaRERA number to the exact tower name on the MahaRERA site, because marketing pages can show the wrong number. Elysian has three registrations and Sky City five.
- Read the promoter name on certificate: Oberoi Realty Limited, Incline Realty Private Limited, Oberoi Constructions Limited or, at Three Sixty West, Oasis Realty.
- For an under-construction tower, put the MahaRERA completion date beside Oberoi's latest progress figure.
- For an announced project such as Adarsh Nagar, Tardeo, Aurelius or Fairview, check that a MahaRERA registration exists before paying any amount or signing an expression of interest.
- Look for the registration on the advert. MahaRERA's circular of 8 April 2025 requires every advert to show the MahaRERA registration number, QR code and website.
- For a ready or resale flat, ask the OC and whether the society's conveyance deed is executed.
Our property calculators cover stamp duty, home loan EMI and rental yield.
Questions
Frequently Asked Questions
How many Oberoi Realty projects are there in Mumbai? +
Our research counts 15 completed Oberoi housing projects in Mumbai and Thane, plus part-ready Sky City at Borivali East and the Oberoi Garden City township at Goregaon East. Seven towers or phases are under construction, three were launched in 2025 and 2026, Elysian Tower E is registered but not launched, seven projects are announced and eight are planned, as checked on 6 November 2026.
Which Oberoi Realty projects in Mumbai are ready to move in? +
Oberoi lists Esquire, Exquisite, Oberoi Seven and Oberoi Woods in Goregaon East, Eternia and Enigma in Mulund West, Prisma, Oberoi Splendor and Oberoi Splendor Grande in Andheri East, three Andheri West buildings, Oberoi Beachwood House in Juhu, Oberoi Parkview in Kandivali East and Three Sixty West in Worli as completed. Sky City Towers A to E also have their OC.
What are the newest Oberoi Realty projects in Mumbai? +
The newest is Oceanic on Carter Road, Bandra West, registered with MahaRERA on 30 April 2026 with 47 homes on 19 floors. Before it came Sky City Tower H at Borivali East, registered on 17 February 2026 with 783 homes on 60 floors, and Elysian Tower D in Goregaon East, launched on 30 April 2025.
What is the price per sq ft at Oberoi Elysian and Sky City? +
Oberoi reported an average realisation of ₹54,900 per sq ft of carpet area at Elysian and ₹50,200 at Sky City for Q2 FY27, the quarter to 30 September 2026, in its investor presentation. These are averages achieved on homes sold that quarter, not a price list, so the price of a given flat depends on its tower, floor and size.
Can I book Oberoi's Adarsh Nagar, Tardeo, Aurelius or Fairview projects now? +
Not yet. None of these projects had a MahaRERA registration in our search of 6 November 2026, and section 3 of the RERA Act bars any promoter from advertising, booking or selling homes before registration. The chairman's FY27 launch quarters for them are plans, and in October 2026 he said such launches may slide by a quarter.
When will the Elysian and Sky City towers be completed? +
MahaRERA shows 30 June 2027 for Elysian Towers A and B and Sky City Tower F, 31 December 2027 for Sky City Tower G, 30 June 2030 for Sky City Tower H and 31 October 2031 for Elysian Towers C, D and E. Oberoi reported Elysian A and B at 89% and 81% built, and Sky City F at 93%, on 30 September 2026.
Is Oberoi Realty part of the Oberoi hotels group? +
No. Oberoi Realty, the Mumbai developer listed on the NSE and BSE, is a different company from the Oberoi hotels group, EIH Limited, and it has no link to BNW Developments. On a MahaRERA certificate, expect Oberoi Realty Limited or a related name shown in this guide, such as Incline Realty Private Limited at Sky City.
Sources
- MahaRERA registered projects search and registration certificates for Elysian Towers A, B and C to E, Esquire, Sky City Towers A to D, E, F, G and H, Eternia, Enigma, Prisma, Maxima, Three Sixty West, Oceanic, Forestville Phase 1 and OGC Thane Phase 1, read 6 November 2026
- MahaRERA certificates for extension of registration, Eternia Towers A to D (5 April 2026) and Enigma Towers A and B (20 March 2025); correction summary, Elysian Towers C, D and E
- Oberoi Realty, Results Update Q2FY27 (investor presentation), 16 October 2026
- Oberoi Realty, Results Update Q3FY25 (20 January 2025), Q3FY26 (19 January 2026) and Q4FY26 (8 May 2026), investor presentations
- Oberoi Realty Limited earnings conference call transcripts: Q4 FY26 (11 May 2026), Q1 FY27 (20 July 2026) and Q2 FY27 (19 October 2026)
- Oberoi Realty, Annual Report 2025-26 (Board report dated 8 May 2026)
- Oberoi Realty stock exchange filings under Regulation 30: development agreements for Adarsh Nagar, Tardeo, Aram Nagar, Nepean Sea Road, Peddar Road, Malabar Hill and Bandra Reclamation; amalgamation of Oberoi Constructions (2024); Aman agreements by I-Ven Realty (2026)
- Oberoi Realty press release on the Forestville launch, 20 November 2023
- Free Press Journal (PTI), Oberoi Realty bookings at Elysian Tower D, 5 May 2025
- Business Standard, launch prices at Oberoi Garden City Thane, 22 October 2024
- Free Press Journal, MahaRERA circular on registration details in advertisements, 10 April 2025
- Hindustan Times, NCDRC order on the Oberoi Woods conveyance deed, November 2024
- The Real Estate (Regulation and Development) Act, 2016, section 3
- Maharashtra stamp duty and registration rates, Property Nivesh state costs data, November 2026
- Property Nivesh research note on MahaRERA and order searches, 6 November 2026