Birla Estates New Projects in Gurgaon 2026 and 2027: HRERA and Prices

Birla Estates has registered one new Gurgaon project with HRERA Gurugram in 2026, Birla Arika Phase 2 in Sector 31-32A with 234 units, and Birla said 152 of the 156 homes it launched sold within a month. A new Birla Navya phase is announced for FY27 but not registered, no 2027 launch is dated, and Arika Phase 1, Navya Avik Phase-2 and Birla Pravaah are 2025 launches.

By Rahul Mishra · Edited by Rakesh Mahajan · · 13 min read

Bar chart of homes per Birla Estates project registered with HRERA Gurugram in 2025 and 2026
Property Nivesh launch guide

What has Birla Estates launched in Gurgaon in 2026, and what is due in 2027?

Birla Estates has one new project in Gurgaon in 2026 so far. It is Birla Arika Phase 2 in Sector 31-32A, registered by HRERA Gurugram on 25 February 2026. No other Birla registration show up on the register up to its 2 November 2026 entries. No Birla launch in Gurgaon is dated for 2027.

Next in line is a new Birla Navya phase on Golf Course Extension Road. Birla's parent lists it for FY27, the financial year ending 31 March 2027, but it is not on HRERA yet, so it cannot be booked. The last Arika tower is also waiting, with no any date.

Three projects from 2025 are still around this year. They are Arika Phase 1, Navya Avik Phase-2 in Sector 63A and Birla Pravaah in Sector 71, which Birla says sold out within a day.

HRERA Gurugram, the Haryana Real Estate Regulatory Authority at Gurugram, keeps the official list. The RERA Act of 2016 says a builder can't advertise, book or sell before registering, so the registration number is where every check start.

ProjectLocalityTypeStatusHRERA number (date)Declared completionHomes
Birla Arika Phase 2Sector 31-32A, off NH-484 BHK apartments, Towers 4 to 6Launched (sales from about March 2026)RC/REP/HARERA/GGM/1044/776/2026/16 (25 Feb 2026)9 Jul 2033 on HRERA; March 2032 on ABREL's slide234 registered; 156 in the launch
Birla Estates projects by statusNumber of Birla Estates projects, homes and commercial, in each status, as of November 2026 01234Launched: 44LaunchedAnnounced: 11AnnouncedPlanned: 11Planned Source: Property Nivesh research, November 2026
Birla Estates projects, homes and commercial, grouped by where they stand today.

The chart counts the six entries in this guide by status: four launched, one announced and one planned. Our Birla Estates developer page has the full company record.

What is in Birla Arika Phase 2, the one Gurgaon registration of 2026?

Phase 2 is the second registration at Birla Arika, Birla's luxury tower project off NH-48 in central Gurugram. Certificate No. 16 of 2026 covers 1.53 acres of a 13.275-acre licence, with three towers numbered 4, 5 and 6. It have 234 homes, all 4 BHK of about 2,319 to 2,356 sq ft carpet area, carpet area means the usable floor inside the walls.

Sales opened around March 2026; Birla hasn't published the exact day. On 7 April 2026 Birla said 152 of the 156 units it launched sold within a month, for over ₹1,600 crore. That is the company's claim only, we have no way for checking it flat by flat.

The counts don't match. HRERA registered 234 units and Birla launched 156, a gap of 78 (234 minus 156). On the 26 October 2026 earnings call, CEO K.T. Jithendran said the last Arika tower will be launched "at a later date". He did not gave a date, and Birla hasn't said if that tower sits inside this registration.

ABREL, the listed parent, puts Phase 2's GDV at ₹1,651 crore. GDV, or gross development value, is the total sales it expects, here on 0.67 million sq ft of saleable area. About 0.59 million sq ft was sold for ₹1,465 crore up to 30 September 2026. Cancellations at Arika was ₹114 crore in July to September and ₹120 crore since April, the call shows.

Dates differ too. HRERA's register says 9 July 2033, the REP-I form Birla filed with HRERA says 9 October 2033, and ABREL's slide says March 2032. Check the date on register, not on slide.

Birla Estates projects: homes or plots per projectNumber of homes, or plots in plotted colonies, in each Birla Estates project that publishes a count 0100200300400500Birla Pravaah Birla Pravaah: 492 492 homesBirla Arika Birla Arika: 322 322 homesBirla Arika Phase 2 Birla Arika Phase 2: 234 234 homesBirla Navya Birla Navya: 141 141 homes Source: HRERA Gurugram registrations and developer disclosures, as researched by Property Nivesh, November 2026
Homes, or plots in plotted colonies, in each Birla Estates project, as registered or disclosed.

The chart shows homes per Birla registration in Gurgaon, as HRERA lists them, without EWS flats (homes for the economically weaker section). Our Birla Arika project page covers the site.

Which Birla projects from 2025 are still on the Gurgaon market?

These are 2025 launches or registrations, not 2026 ones. They still come up in buyers' searches in this year through leftover stock, cancellations and resale.

ProjectLocalityHRERA number (date)HomesCompletion on HRERAWhere it stands
Birla Arika Phase 1Sector 31-32ARC/REP/HARERA/GGM/914/646/2025/17 (20 Feb 2025)322, plus 64 EWS9 Dec 2031Sold out by area (ABREL, Oct 2026)
Birla Navya Avik Phase-2Sector 63A, Golf Course Extension RoadRC/REP/HARERA/GGM/909/641/2025/12 (5 Feb 2025)141 floors30 Apr 2030₹473 crore booked of ₹820 crore GDV (ABREL; our matching)
Birla PravaahSector 71, SPRRC/REP/HARERA/GGM/1006/738/2025/109 (6 Nov 2025)492, plus 88 EWS and 7 commercial31 Mar 2032All 492 sold in 24 hours (Birla, Dec 2025)

Birla Arika Phase 1, Sector 31-32A

Registered on 20 February 2025 and open for sales in February and March, Phase 1 has four towers on 11.745 acres. Its 4 BHK homes run from 2,319 to 2,815 sq ft carpet, plus 64 EWS flats on top. ABREL's October 2026 slide shows ₹3,254 crore booked against ₹3,265 crore of GDV. So a Phase 1 flat offered now are likely a resale or a cancelled unit.

Birla Navya Avik Phase-2, Sector 63A

Birla Navya is a low-rise project of independent floors on Golf Course Extension Road. Avik Phase-2 covers 141 units on 2.67 acres, from 1,161 to 2,481 sq ft carpet, due by 30 April 2030. Its promoter is Avarna Projects LLP, whose partners is Birla Estates and Anant Raj. ABREL's "Navya (Ph 4)" carries the same April 2030 date; matching the two is our reading, Birla don't label it so.

Birla Pravaah, Sector 71

Pravaah has five towers on 5.075 acres in Sector 71, on the Southern Peripheral Road (SPR). Birla took EOIs, expressions of interest paid before allotment, from November 2025 and held the allotment on 7 December. It told to the exchanges on 9 December that all 492 units sold within 24 hours. The main homes are 3 BHK and 3 BHK plus utility, at 1,059 and 1,300 sq ft carpet.

Its page, read on 6 November 2026, still shows an EOI line starting at ₹10 lakh. Don't pay an EOI for a sold-out project. If someone offer you a Pravaah flat, ask in writing whether it is a resale or a cancelled unit.

What is Birla Estates planning in Gurgaon for late 2026 and 2027?

Only one Birla project in Gurgaon has a time frame, and it isn't on HRERA. ABREL's FY27 launch list, in its presentations of 13 August and 26 October 2026, names a new Birla Navya phase with ₹710 crore of GDV. In August the CEO said most of the year's launches is planned for October 2026 to March 2027.

So it is announced, not registered. The RERA Act's section 3(1) stops a builder from booking, selling or inviting buyers before registration. Under section 59, breaking that rule can draw a fine as high as 10% of the estimated project cost. On 14 August 2026 HRERA Gurugram put out an advisory warning buyers about pre-launch offers in not registered projects.

Its unit count and price are not published. The slide gives 0.3 million sq ft for the FY27 part. The estimate for all of Navya fell from ₹3,119 crore in August to ₹2,636 crore in October, no reason for it is on our record.

The last Arika tower sits in ABREL's "future pipeline", outside the FY27 list, at an estimated ₹1,199 crore of GDV. Birla's revenue share at Arika is 58%. On 26 October the CEO said Birla won't pre-launch it now.

Three short notes. ABREL's fourth NCR project, on Mathura Road, is in Delhi, not Gurugram. Marketing pages also talks about a "Birla Sector 36" project, but we found no Birla filing or HRERA registration behind it. And no Birla project is launched or registered in Noida as of 6 November 2026.

NameKnown so farWho said it, and whenWhere it stands
New Birla Navya phase, Sector 63A₹710 crore of GDV to launch in FY27 (by 31 Mar 2027)ABREL presentations, 13 Aug and 26 Oct 2026Announced; not on HRERA
Last Birla Arika tower, Sector 31-32AFuture pipeline, no dateABREL presentation and call, 26 Oct 2026Planned; not launched
A dated 2027 Gurugram launchNone namedABREL filings to 26 Oct 2026; HRERA to 2 Nov 2026None

What do Birla homes in Gurgaon cost, and what does stamp duty add?

Birla's own project pages gives "from" totals. On 6 November 2026 Arika showed "from ₹10.42 crore" and Pravaah "from ₹3.26 crore". A "from" figure is a whole-home price on that day, never a per sq ft rate.

The per sq ft figures in our table are mostly Birla's average realisation, from ABREL's 26 October 2026 presentation. It is booking value over the saleable area sold up to 30 September 2026, and saleable area means carpet plus a share of common areas. Our resale figures are Property Nivesh estimates, compiled from public listing data and asking-price based. Asking prices is what sellers hope for, not what buyers pay.

ProjectPrice figureWhose figure, and date
Birla Arika Phase 1About ₹23,000 per sq ftBirla's average realisation (ABREL, 26 Oct 2026)
Birla Arika Phase 2About ₹24,600 per sq ftBirla's average realisation (ABREL, 26 Oct 2026)
Birla ArikaFrom ₹10.42 crore (total); resale ₹23,300 per sq ft (₹22,100 to ₹24,700)Birla Estates website, 6 Nov 2026; Property Nivesh 2026 estimate, asking-price based
Birla PravaahAbout ₹17,600 per sq ft; from ₹3.26 crore (total); resale ₹16,100 per sq ft (₹16,000 to ₹16,500)ABREL, 26 Oct 2026; Birla Estates website, 6 Nov 2026; Property Nivesh 2026 estimate, asking-price based
Birla Navya (Ph 4, our match to Avik Phase-2)About ₹19,400 per sq ftBirla's average realisation (ABREL, 26 Oct 2026)
New Navya phase, last Arika towerNo priceNot open for booking

Haryana charges 7% stamp duty, about 5% for women buyers, and 1% registration capped at ₹50,000. Here they are on Birla's own "from" totals, as an illustration only.

Haryana chargeRateOn ₹10.42 crore (Arika "from" total)On ₹3.26 crore (Pravaah "from" total)
Stamp duty7%About ₹72.9 lakhAbout ₹22.8 lakh
Stamp duty if the buyer is a womanAbout 5%About ₹52.1 lakhAbout ₹16.3 lakh
Registration fee1% (cap ₹50,000)₹50,000 (cap applies)₹50,000 (cap applies)

For your own price, use our stamp duty calculator and the registration charges calculator. Sector-wise asking rates are on our Gurgaon property rates page.

How has Birla Estates delivered in Gurgaon so far, going by HRERA?

Birla's Gurgaon record is mostly Birla Navya, since Arika and Pravaah are years from their due dates. The dated steps, to 6 November 2026, are these.

  • OCs, or occupation certificates (the permission to move in), for Navya's Drisha 1A and Drisha 1B was dispatched on 29 December 2025.
  • Navya Anaika's completion moved from 31 December 2025 to 31 December 2026 under HRERA Extension No. 44 of 2025, dated 4 November 2025.
  • Navya Phase-I (Amoda I and II) drew a suo motu monitoring case, one HRERA opens on its own, after its registration expired. On 18 December 2025 HRERA noted all the OCs came within validity, the last on 3 June 2024. It put the matter on file, though the portal still say pending.
  • An older compliance case on Drisha 1A is sitting at "first hearing" on the portal since 2022.
  • ABREL says Navya Phase 1 was delivered in FY26 and marks Navya Phase 2 as "OC received".
  • On 21 May 2026 HRERA dismissed a waitlisted NRI applicant's complaint over Pravaah. His ₹12 lakh EOI had been refunded on 7 January 2026, and with no allotment he was not an allottee.
  • HRERA decided a suo motu case on Arika Phase 1 on 11 February 2025, reported as a ₹50 lakh penalty for advertising before registration. Birla told the exchanges it published no advert and paid to comply. Some reports spell the project "Birla Akira"; it is the same one.

One order touch every Birla registration in Gurugram. HRERA's Order No. 9/1-2026, dated 11 August 2026, gives four extra months to any completion date on or after 28 February 2026. It applies on its own to projects registered by 31 July 2026 and cites the West Asia conflict as force majeure. It is a general order, not a finding on Birla, and the dates on the register have not been changed.

Which Birla company is behind the Gurgaon projects, and what are its company-wide numbers?

Birla Estates is the property arm of Aditya Birla Real Estate Ltd (ABREL), which is Century Textiles renamed, not a separate parent. Birla Estates Private Limited is the promoter of Arika and Pravaah, and Avarna Projects LLP of Navya. Aditya Birla Housing Finance belong to the same group but is a home-loan lender, and CK Birla Hospitals is a different business altogether. The developer's own website is the one declared on its HRERA form.

Big numbers in the news are company-wide, not for Gurgaon. On 26 October 2026 the CEO set a presales target of ₹15,000 crore by FY29 and said FY27 presales won't reach ₹8,000 crore. ABREL's net debt was ₹284 crore on 30 September 2026. FY26 bookings was ₹8,136 crore with NCR leading, but July to September 2026 brought ₹298 crore, and these are company-wide figures too.

What to check before you book with Birla Estates

  • Open HRERA Gurugram's register yourself and match the number to the project name, then the promoter and the completion date. A number printed on an advert or a marketing page can be wrong.
  • Don't pay a token, EOI or "pre-launch" amount for the new Navya phase or the last Arika tower until it appear on the register.
  • For Pravaah, there's no reason to pay any EOI now, since it sold out in December 2025. Ask if a unit on offer is a resale or a cancellation.
  • At Arika Phase 2, ask which tower your flat is in and which certificate covers it, since 234 units are registered but 156 were launched.
  • At Navya, check the agreement names Avarna Projects LLP, the promoter on the certificate, and ask for your floor's OC before the final payment.
  • Add the four months of HRERA's August 2026 order to the register's date and compare it with your builder-buyer agreement. And remember the Pravaah order: a waitlisted EOI gave no rights as an allottee.

Then put your price into our property calculators, and read our RERA checklist for 2026 before you sign anything.

Questions

Frequently Asked Questions

What are Birla Estates' new projects in Gurgaon in 2026? +

Birla Arika Phase 2 in Sector 31-32A is the only one so far. HRERA Gurugram registered it on 25 February 2026 as RC/REP/HARERA/GGM/1044/776/2026/16, with 234 units, all 4 BHK, in Towers 4 to 6, valid to 9 July 2033. Birla said on 7 April 2026 that 152 of the 156 units it launched sold within a month.

Is any Birla Estates launch in Gurgaon confirmed for 2027? +

No Birla launch in Gurgaon is dated for 2027. The only project with a time frame is a new Birla Navya phase in Sector 63A, which ABREL lists for FY27, the year ending 31 March 2027, with ₹710 crore of GDV. It is announced, not registered on HRERA, so it cannot be booked. The last Arika tower has no date.

Can I still book a flat in Birla Pravaah, Sector 71? +

Not from Birla's launch. Birla said all 492 units sold within 24 hours of its December 2025 launch. Its website still showed an EOI line on 6 November 2026, but there is no reason to pay an EOI for a sold-out project. A flat offered now is a resale or a cancelled unit, so get the seller to confirm which in writing.

What is the price of Birla Arika Phase 2? +

Birla has published no Phase 2 price list. Its website shows Birla Arika "from ₹10.42 crore" for the whole project, read on 6 November 2026. ABREL reported Birla's average realisation in Phase 2 at about ₹24,600 per sq ft of saleable area up to 30 September 2026, against about ₹23,000 in Phase 1. Neither figure is a rate card.

Is the new Birla Navya phase registered with HRERA Gurugram? +

Not yet. ABREL's FY27 launch list names a new Birla Navya phase on Golf Course Extension Road, but HRERA Gurugram shows no Birla registration after 25 February 2026, going by its entries up to 2 November 2026. Until a number appears, the RERA Act bars any booking or sale, so hold back any token or EOI.

Who is the promoter of Birla's projects in Gurgaon? +

Birla Estates Private Limited is the promoter of Birla Arika and Birla Pravaah on HRERA Gurugram. Birla Navya is registered to Avarna Projects LLP, whose partners are Birla Estates and Anant Raj. Birla Estates itself is the real estate arm of Aditya Birla Real Estate Ltd, the company earlier called Century Textiles.

How much stamp duty applies to a Birla flat in Gurgaon? +

Haryana's stamp duty is 7%, or about 5% for women buyers, and registration is 1% up to a cap of ₹50,000. Taking Birla Pravaah's "from ₹3.26 crore" total as an illustration, 7% duty is about ₹22.8 lakh, while registration is limited to ₹50,000. Enter your own quoted price in our stamp duty calculator to get your figure.

Sources

  1. HRERA Gurugram, Registration Certificate No. 16 of 2026, Birla Arika Phase 2 (RC/REP/HARERA/GGM/1044/776/2026/16), 25 February 2026, and Form REP-I, read 6 November 2026
  2. HRERA Gurugram, Registered Projects (Gurugram), read 6 November 2026, with entries up to a registration dated 2 November 2026
  3. HRERA Gurugram, Form REP-I for Birla Arika (Phase 1), Birla Pravaah and Birla Navya (Avik Phase-2), and Registration Certificate No. 109 of 2025 (Birla Pravaah), read 6 November 2026
  4. HRERA Gurugram, order in Complaint No. 50 of 2026 (Birla Pravaah EOI), 21 May 2026
  5. HRERA Gurugram, Order No. 9/1-2026 HARERA/GGM (Admn), four-month extension of completion timelines, 11 August 2026
  6. HRERA Gurugram, proceedings in suo motu monitoring case RERA-GRG-3723-2025 (Birla Navya, Amoda 1 and 2), 18 December 2025
  7. HRERA Gurugram, OC records for Birla Navya Drisha 1A and Drisha 1B (dispatched 29 December 2025) and Extension No. 44 of 2025 for Birla Navya Anaika (4 November 2025), read 6 November 2026
  8. HRERA Gurugram, Ruling and Judgements list, RERA-GRG-6238-2024 (Birla Arika), decided 11 February 2025
  9. HRERA Gurugram public advisory on pre-launch schemes and bookings in unregistered projects, 14 August 2026
  10. The Real Estate (Regulation and Development) Act, 2016, sections 3 and 59
  11. Birla Estates press release, Birla Arika Phase 2 bookings within a month of launch, 7 April 2026
  12. Birla Estates press release, FY26 performance, 23 April 2026
  13. Aditya Birla Real Estate Ltd (ABREL), Earnings Presentation Q2/H1 FY2026-27, 26 October 2026, and Earnings Presentation Q1 FY2026-27, 13 August 2026
  14. Aditya Birla Real Estate Ltd (ABREL), earnings call transcripts of 14 August 2026 and 26 October 2026
  15. CNBC-TV18, Aditya Birla Real Estate sells flats worth Rs 1,800 crore in Gurugram project within 24 hours, 9 December 2025
  16. Moneycontrol, Birla Arika Phase 1 clocks Rs 3,000 crore sales, 26 March 2025
  17. The Realty Today, Haryana RERA imposes Rs 50 lakh fine on Birla Estates, 19 February 2025
  18. Birla Estates website, Birla Arika and Birla Pravaah project pages, read 6 November 2026
  19. Property Nivesh developer profile of Birla Estates, October 2026 (ABREL exchange disclosure on the HRERA penalty)
  20. Property Nivesh 2026 asking-price estimates, compiled from public listing data, November 2026
  21. Property Nivesh compilation of Haryana stamp duty and registration rates, November 2026

Mentioned here

Projects in this analysis

A happy family in their new home with the money they got back

Brokerage back offer

Book your home with us and get the brokerage back*

Builders pay a brokerage to whoever brings them a buyer. Book through Property Nivesh and we give it back to you.

*Brokerage is part of the discussion with our advisor.

Unbiased advice. Your data is never sold to builders or brokers.