Akshaya Projects in Chennai 2026: Status, TNRERA and Prices

Akshaya Pvt Ltd, the Chennai builder founded in 1995 by T. Chitty Babu, has 29 projects in our research: 14 ready, 5 part-ready, 7 under construction and 3 announced with no dates, 13 of them on or off OMR and one each in Coimbatore and Trichy. Fourteen carry a TNRERA number, but no Akshaya company has registered a new project in 2025 or 2026; the latest are Podigai (23 December 2024), Avanthika (June 2024) and Rhythm (June 2023), all under Akshaya Estates Realty LLP.

By Pranav Adhikari · Edited by Rakesh Mahajan · · 12 min read

Bar chart of Akshaya projects by status: 14 ready, 5 part-ready, 7 under construction and 3 announced
Property Nivesh developer guide

How many Akshaya projects are there in Chennai, and which are on TNRERA?

Akshaya Pvt Ltd, the Chennai developer T. Chitty Babu founded in 1995, has 29 projects in our research as of 6 November 2026. By status, 14 are ready, 5 are part-ready, 7 are under construction and 3 are announced with no dates: Linga, Krishna and Kanchi. Fourteen carry a number from TNRERA, the Tamil Nadu Real Estate Regulatory Authority, where a project have to be registered before its flats are sold.

No Akshaya company has registered a new project with TNRERA in 2025 or 2026, checked to 6 November 2026, and we found no dated plan for late 2026 or 2027. The latest registrations are Podigai (23 December 2024), Avanthika (June 2024) and Rhythm (June 2023), so Podigai is not a 2025 launch. The only dated targets are Republic Block B by 31 December 2026 and Podigai by 31 March 2027.

Thirteen projects sit on or off OMR (Old Mahabalipuram Road). Most others are in city areas such as Nungambakkam, Adyar and Mylapore or in suburbs from Kovur to Mambakkam, with one each in Coimbatore and Trichy.

Akshaya projects by statusNumber of Akshaya projects, homes and commercial, in each status, as of November 2026 02468101214Ready: 1414ReadyPart ready: 55Part readyUnder construction: 77Under constructionAnnounced: 33Announced Source: Property Nivesh research, November 2026
Akshaya projects, homes and commercial, grouped by where they stand today.

The chart counts all 29 Akshaya projects by status, homes and the three commercial ones (HQ, Shanti and Cube) together. Our Akshaya developer profile and Chennai city guide have more background.

Which Akshaya projects are ready, part-ready, under construction or announced?

Part-ready means some blocks have a completion certificate (CC) from the planning authority, CMDA or DTCP, and others do not yet. Homes are the counts that TNRERA or Akshaya gives.

ProjectLocationTypeStatusTNRERA numberCompletion or possessionHomes
The MosaicMadipakkamFlatsReadyTN/29/Building/0277/2023CC by Sept 202410
Level UpNungambakkamFlatsReadyNone foundCMDA CC, 18 Jan 201848
JanuaryThaiyur, OMRFlatsReadyNone foundHandover 24 Feb 2018Not stated
Trichy RichTrichyFlatsReadyTN/14/Building/0032/2017Completed (Akshaya)Not stated
Orbit 11CoimbatoreFlatsReadyNone foundReady (Akshaya)30
Sai SubramanyaAdyarFlatsReady (reported)None foundNot stated4
ShirdiMylaporeFlatsReady (reported)None foundNot stated6
DwarakaGopalapuramFlatsReady (reported)None foundNot statedNot stated
BrindavanamAlathur, OMRPlotsReadyTN/01/Layout/9737/2022Completed on TNRERA145 plots
EarthSembakkam, OMRPlotsReadyTN/01/Layout/8735/2022Completed on TNRERA64 plots
KVGNear ThiruporurPlotsReadyNone foundNot statedNot stated
PoongavanamThaiyur, OMRPlotsReadyNone foundNot statedNot stated
HQKazhipattur, OMRCommercialReadyNone (order to register by 30 Apr 2026)Sold out28 units
ShantiAnna SalaiOfficesReadyTN/29/Building/0035/2017CMDA CC, 26 Jul 2019Not stated
TangoThoraipakkam, OMRFlatsPart-readyTN/01/Building/0039/2017; TN/29/Building/0159/2021Housing blocks doneNot stated
RepublicKovur, PorurFlatsPart-readyTN/01/Building/0031/2017; TN/01/Building/0106/2021Blocks C, D, E part CC 2020; Block B target 31 Dec 2026609
OrlandoThaiyur, OMRFlatsPart-readyTN/01/Building/0242/2019Phase I done by Sept 2023522
Vaan Megam and Mann VaasanaiSembakkam, OMRFlatsPart-readyTN/01/Building/0286/2018; TN/01/Building/0285/2018130-home block done442
TodayKelambakkam, OMRFlatsPart-readyNone foundHandovers in 2021 and 2023Not stated
PodigaiMambakkamVillasUnder constructionTN/35/Building/0594/202431 Mar 202722
AvanthikaVirugambakkamFlatsUnder constructionTN/29/Building/0403/2024Valid to 30 Jun 202610
RhythmPerungudiFlatsUnder constructionTN/29/Building/0281/202399.6% built, Dec 202520
Twin DKelambakkam, OMRFlatsUnder constructionNone foundNot stated174
CoveUrapakkamStudiosUnder constructionNone foundNot stated120
AbovKazhipattur, OMRFlatsUnder construction (stalled)TN/01/Building/0038/2017, lapsedRefund ordered 24 Jun 202631
CubeThoraipakkam, OMROfficesUnder constructionTango's 0039/20178.92% built, Sept 2024Not stated
LingaNungambakkamFlatsAnnouncedNoneNo dateNot stated
KrishnaNot givenFlatsAnnouncedNoneNo dateNot stated
KanchiNot givenFlatsAnnouncedNoneNo dateNot stated

The Mosaic is ready though Akshaya's website still call it ongoing, because TNRERA's September 2024 progress report says the CC was obtained. Sai Subramanya, Shirdi and Dwaraka are only reported as ready, Akshaya has not confirmed it. We hold no TNRERA number for the KVG or Poongavanam plots, so ask for the layout approval and registration of your phase. Our Chennai plot price guide gives wider plot rates.

What has Akshaya registered or announced lately, and what is due in 2026 and 2027?

Nothing new was registered in 2025 or 2026. We read TNRERA's building and layout lists for both years, and found no registration by Akshaya Pvt Ltd, Akshaya Signature Homes, Akshaya Leisure or Akshaya Estates Realty LLP. Akshaya's media centre stops at print ads of January 2021, and no 2025 or 2026 report on its launches or land deals we could find.

Akshaya housing projects by year of RERA registrationNumber of Akshaya housing projects first registered with TNRERA in each year 0123452017: 5520172018: 1120182022: 3320222023: 1120232024: 222024 Source: TNRERA registrations, as researched by Property Nivesh, November 2026
Akshaya projects by the year of their first registration. A registration usually comes just before sales open.

The chart counts each housing project once, in the year of its first TNRERA registration. It has no bar after 2024.

ProjectWhat is knownSource and dateStatus and TNRERA
Podigai, Mambakkam22 villas on 0.89 acres; due 31 Mar 2027TNRERA Form C, 23 Dec 2024Under construction; TN/35/Building/0594/2024
Avanthika, Virugambakkam10 flats, builder share 5; valid to 30 Jun 2026TNRERA Form C, 21 Jun 2024Under construction; TN/29/Building/0403/2024
Rhythm, Perungudi20 flats, all booked; 99.6% builtTNRERA progress report, Dec 2025Under construction; TN/29/Building/0281/2023
Republic Block B, Kovur154 flats, 85 booked; 83.5% built; target 31 Dec 2026TNRERA progress report, Jun 2026Part-ready project; extended to 14 Nov 2026
Linga, Nungambakkam3 BHK; no size, price or dateAkshaya website code, 6 Nov 2026Announced; no registration
Krishna and KanchiNames only, in an enquiry formAkshaya website, 6 Nov 2026Announced; no registration

Akshaya's home page code still hides an "upcoming" slider with Shirdi, Linga, Dwaraka and Sai Subramanya, and its enquiry form also lists Krishna and Kanchi. As Shirdi, Dwaraka and Sai Subramanya are reported ready, only Linga, Krishna and Kanchi counts as announced. None has a date, a size or a TNRERA number, so none can be booked legally today.

Which Akshaya company sells each project, and which Akshaya names are other firms?

Most projects are registered by Akshaya Pvt Ltd itself. Company records list three subsidiaries: Akshaya Signature Homes, the promoter of Brindavanam; Akshaya Leisure, behind Shanti and named on HQ; and K S Realty Constructions, which TNRERA orders names with Akshaya on Orlando and Today. At Republic and Abov, Akshaya registered as agent of the landowners.

Rhythm, Avanthika and Podigai is a different case. TNRERA names their promoter as Akshaya Estates Realty LLP, a limited liability partnership that Akshaya's website markets: its enquiry form is wired to the LLP, and Rhythm's carpet-area statement on TNRERA carries the Akshaya logo. Yet we found no company-registry link between the LLP and Akshaya Pvt Ltd. Avanthika's registration ran out on 30 June 2026. For Sai Subramanya, Shirdi and Dwaraka, which sit in the same form, we found no TNRERA registration at all. So check the promoter name on the TNRERA certificate and in the agreement, because that company is the one who answer to you.

Other firms share the name, and buyers mixes them up. On Karnataka RERA, Akshaya Meadows, Akshaya Infra and Akshaya Builders in Bengaluru, and Akshaya Ventures, are separate promoters. On TNRERA, the rows for Carat Akshaya, Akshaya Plaza and AEC Akshaya carry the word only in an address or another builder's project name, and a Delhi firm, Akshaya Estates LLP, is not the Chennai LLP. Match the promoter name, not just the word.

Where do Republic, Abov, Today and Orlando stand in 2026?

Republic at Kovur, near Porur, was launched in August 2013 as 609 flats in Blocks A to E. Block B (154 flats) was registered in August 2017 and extended four times, lastly to 14 November 2026. Akshaya's June 2026 progress report puts it at 83.5% built and targets 31 December 2026, after the extension ends, so ask whether a further extension is been sought. Akshaya told TNRERA a lender's NCLT case stopped work here. On 13 May 2026 TNRERA's Adjudicating Officer ordered ₹3 lakh compensation and ₹25,000 costs over a Block B flat due in October 2022. Akshaya had promised that flat by April 2026; on 28 July 2026, admitting a further complaint, TNRERA noted it had not been handed over.

Abov at Kazhipattur is stalled. It was planned as 31 homes on 36 floors, and Akshaya says it launched it in 2012. In October 2022 Akshaya told a buyer it had "decided to stall the project", and the registration, extended to November 2023, has lapsed. In the order quoting that email, dated 24 June 2026, TNRERA ordered a refund of ₹3.92 crore with 11.1% interest, and on 22 July 2026 the Madras High Court stayed only the interest above 11.1%, till 14 August 2026.

Today, 13 towers on 21 acres at Kelambakkam, was launched in November 2012, and we found no TNRERA registration for it. Akshaya's page shows only a 2017 CC application to DTCP, not a certificate. One C3 flat promised for 17 July 2016 was handed over on 15 June 2021, and TNRERA ordered delay interest at 11.10% on 30 June 2026. Twin D, Today's D6 and D7 towers with 174 homes, launched in December 2020. We found no TNRERA registration for it either, and Akshaya's last update, of 30 November 2022, say the structure is complete.

At Orlando, Phase I towers A4 to A6 were fully completed by September 2023, when 248 of the 522 flats was booked. Phase II's A1 and A2 were at podium stage in Akshaya's February 2023 update, and no extension past September 2023 is shown. Tango's homes are done and only its commercial Block D lags. At Sembakkam the 130-home Vaan Megam block has its CC, but we found no progress report for the 312-home twin, due 31 August 2020.

What do TNRERA orders, court cases and lender records show about Akshaya?

TNRERA's 2025 and 2026 order lists name Akshaya projects in 45 final orders: 27 on Today, 7 on Abov, 4 on January, 3 each on Orlando and Republic, and 1 on HQ. These are complaints decided, not necessarily decided against Akshaya.

On 10 January 2025 the Madras High Court held that a 2014 Thaiyur panchayat letter for January is not a valid completion certificate and upheld compensation for the late handover. On 12 March 2026 TNRERA said the same of HQ's Muttukadu panchayat certificate, ordered Akshaya to register HQ by 30 April 2026 and imposed a ₹3 lakh penalty, but HQ is not on TNRERA's 2026 registration list.

The Madras High Court recorded on 29 January 2026 Akshaya's statement that it was contesting cases at the NCLT (National Company Law Tribunal) to avoid liquidation. IBBI, the insolvency regulator, shows a 2018 petition dismissed on 6 February 2019 and no admission into insolvency as of 6 November 2026.

On funding, Axis RERA Opportunities Fund-I agreed in 2019 to invest ₹60 crore in Orlando, and company charge records shows loans secured for JM Financial Credit Solutions and Pridhvi Asset Reconstruction.

What do Akshaya homes cost in 2026?

Akshaya publishes no prices. Our figures are Property Nivesh estimates, compiled from public listing data and asking-price based, on super built-up area: the flat plus a share of common areas, so bigger than the carpet area TNRERA uses. Most come from a single source, so take them as guide only.

ProjectStatusOur 2026 estimate, per sq ftOur rangeBasis
Dwaraka, GopalapuramReady (reported)₹21,200₹20,000 to ₹22,500Resale asking
Sai Subramanya, AdyarReady (reported)₹18,400₹16,800 to ₹21,200Resale asking
Avanthika, VirugambakkamUnder construction₹16,800₹16,400 to ₹17,200New-home asking
Podigai, MambakkamUnder construction₹13,100₹13,100 to ₹13,200New-home asking
Shirdi, MylaporeReady (reported)₹12,900Single figureResale asking
Rhythm, PerungudiUnder construction₹11,200₹10,600 to ₹11,700New-home asking
Akshaya projects: price per sq ftProperty Nivesh 2026 asking figure, or the reported launch price, per sq ft for Akshaya projects ₹0k₹5k₹10k₹15k₹20k₹25kAkshaya Dwaraka Akshaya Dwaraka: ₹21k ₹21,200Akshaya Sai Subramanya Akshaya Sai Subramanya: ₹18k ₹18,400Avanthika Avanthika: ₹17k ₹16,800Podigai Podigai: ₹13k ₹13,100Akshaya Shirdi Akshaya Shirdi: ₹13k ₹12,900Akshaya Rhythm Akshaya Rhythm: ₹11k ₹11,200 Source: Property Nivesh estimates (asking-price based), November 2026; launch prices as reported
Our 2026 asking figure per sq ft where we have one, otherwise the launch price as reported. Area basis differs between projects, so compare with care.

The chart shows our six estimates. Two older bookings from TNRERA orders is left out of it: about ₹8,400 per sq ft for a 6,607 sq ft Abov flat in 2013 (₹5.55 crore with other charges) and about ₹4,200 per sq ft for a 1,043 sq ft Orlando flat in 2017 (₹44.14 lakh), both on super built-up area. They are history, not today's price.

Unofficial figures we have seen for Podigai, Sai Subramanya and Shirdi runs from ₹12,850 to ₹16,750 per sq ft. Section 3(1) of the RERA Act bars a promoter from marketing or booking flats before registering the project, and we found no TNRERA registration for Sai Subramanya or Shirdi. For nearby asking prices, see Chennai property rates and our 3 BHK price guide for Chennai.

What do stamp duty and registration add on an Akshaya home?

Tamil Nadu charges 7% stamp duty and 2% registration, 9% in all. The registration fee on sale deeds was cut from 4% to 2% from 1 April 2023 (G.O. Ms. No. 34). The table below are labelled illustrations on our estimates and on reported sizes we have not verified.

IllustrationPrice at our estimateStamp duty, 7%Registration, 2%Price plus 9%
Podigai 3 BHK villa, 1,610 sq ft1,610 x ₹13,100 = about ₹2.11 croreAbout ₹14.76 lakhAbout ₹4.22 lakhAbout ₹2.30 crore
Shirdi 2 BHK flat, 1,170 sq ft1,170 x ₹12,900 = about ₹1.51 croreAbout ₹10.57 lakhAbout ₹3.02 lakhAbout ₹1.65 crore

Try your own price in the registration charges calculator.

What to check before you book with Akshaya

  • On TNRERA's site, see that the number, project name and promoter all agree, since a brochure or marketing page can carry a wrong number.
  • For Rhythm, Avanthika and Podigai, check that the certificate and your agreement both names Akshaya Estates Realty LLP.
  • Ask for your own block's CC from CMDA or DTCP, not a panchayat letter.
  • At Republic Block B, get the newest extension order, as the current one end on 14 November 2026.
  • For Avanthika, ask whether TNRERA has extended the registration that ran out on 30 June 2026.
  • For Today, Twin D, Cove, Sai Subramanya, Shirdi and Dwaraka, ask for the registration or a valid CC.
  • Pay nothing for Linga, Krishna or Kanchi until a TNRERA number exist.
  • Read the latest progress report and TNRERA orders for your project, and check IBBI for any new step.

Our stamp duty calculator works out the 9% on your own price, while our RERA checklist for buyers and guide on how to check a builder before buying go step by step.

Questions

Frequently Asked Questions

How many Akshaya projects are there in Chennai? +

Akshaya Pvt Ltd has 29 projects in our research as of 6 November 2026, 27 of them in Chennai and one each in Coimbatore and Trichy. By status, 14 are ready, 5 part-ready, 7 under construction and 3 announced with no dates. Of the 29, 26 are housing projects and 3 are commercial buildings, and 14 carry a TNRERA number.

Has Akshaya launched a new project in 2025 or 2026? +

No. We found no new TNRERA registration in 2025 or 2026 by Akshaya Pvt Ltd, Akshaya Signature Homes, Akshaya Leisure or Akshaya Estates Realty LLP, checked to 6 November 2026. The latest is Podigai at Mambakkam, registered on 23 December 2024, so it is not a 2025 launch. Linga, Krishna and Kanchi are announced with no date and no registration.

Are Rhythm, Avanthika and Podigai Akshaya projects? +

They are marketed under the Akshaya name, but TNRERA lists their promoter as Akshaya Estates Realty LLP. Akshaya's website markets that LLP, yet we found no company-registry link between the LLP and Akshaya Pvt Ltd. Check the promoter name on the TNRERA certificate and in your agreement. Avanthika's registration ran out on 30 June 2026.

What happened to Akshaya Abov on OMR? +

Abov, a 31-home tower planned at Kazhipattur, is stalled. Akshaya told a buyer in October 2022 that it had "decided to stall the project", and its TNRERA registration, extended to November 2023, has lapsed. On 24 June 2026, in the order that quotes that email, TNRERA ordered a refund of ₹3.92 crore with 11.1% interest.

When will Akshaya Republic Block B be completed? +

Akshaya's June 2026 progress report to TNRERA puts Republic Block B at 83.5% built and targets completion on 31 December 2026. Its registration, TN/01/Building/0031/2017, has been extended four times, most recently to 14 November 2026. Blocks C, D and E at Kovur already have a partial completion certificate from 2020.

Is Akshaya Pvt Ltd under insolvency or NCLT? +

IBBI's records show no admission into insolvency as of 6 November 2026, and a 2018 NCLT petition against Akshaya Pvt Ltd was dismissed in February 2019. In January 2026 the Madras High Court recorded Akshaya saying it was contesting NCLT cases to avoid liquidation, and Akshaya told TNRERA that a lender's NCLT case stopped work at Republic.

What is the price of Akshaya flats in Chennai? +

Akshaya publishes no prices. Property Nivesh estimates for 2026, asking-price based on super built-up area, run from ₹11,200 per sq ft at Rhythm in Perungudi to ₹21,200 at Dwaraka in Gopalapuram. Most come from a single source. In Tamil Nadu, 7% stamp duty and 2% registration add 9% to the price.

Sources

  1. TNRERA registered projects lists (Building and Layout), 2017 to 2026, read on the portal, 6 November 2026
  2. Property Nivesh copy of the TNRERA and K-RERA registers, to early October 2026
  3. TNRERA Form C registration certificates: Podigai, TN/35/Building/0594/2024, 23 December 2024; Avanthika, TN/29/Building/0403/2024, 21 June 2024
  4. TNRERA quarterly progress reports: Republic Block B (June 2026), Rhythm (December 2025), Tango Blocks A and D and The Mosaic (September 2024), Orlando and Vaan Megam (September 2023)
  5. TNRERA carpet area statements for Orlando, Republic Block B, Abov and Rhythm
  6. TNRERA order in RCP No. 157 of 2024 (Abov), 24 June 2026
  7. TNRERA Bench 1 order in Complaint No. 156 of 2024, HQ Owners Association v. Akshaya Pvt Ltd and others, 12 March 2026
  8. TNRERA Adjudicating Officer order in CCP No. 47 of 2025 (Republic), 13 May 2026
  9. TNRERA Bench 2 order in RCP No. 165 of 2024 (Today), 30 June 2026
  10. TNRERA Bench 1, Bench 2 and Adjudicating Officer order lists, 2025 and 2026, read 6 November 2026
  11. Madras High Court, P. Anandasundaresan v. M/s. Akshaya Pvt. Ltd., C.M.S.A. No. 41 of 2022, 10 January 2025
  12. Madras High Court, Akshaya Private Limited v. B.L. Kashyap & Sons Limited, Application No. 5687 of 2025, 29 January 2026
  13. Madras High Court, M/s. Akshaya Pvt. Ltd. v. TNRERA, WP No. 28457 of 2026, 22 July 2026
  14. Insolvency and Bankruptcy Board of India, orders for corporate debtor U45200TN2005PTC055753, checked 6 November 2026
  15. Ministry of Corporate Affairs charge register and subsidiary records for Akshaya Private Limited
  16. Track2Realty, Axis RERA Fund invests INR 60 crore in Akshaya Group, 8 May 2019
  17. Akshaya press release on the Twin D launch, December 2020
  18. Akshaya Pvt Ltd website: project pages, progress updates, media centre and enquiry form, read 6 November 2026
  19. Karnataka RERA project lists for other Akshaya-named promoters, 2018 to 2026
  20. The Real Estate (Regulation and Development) Act, 2016, section 3(1)
  21. Tamil Nadu stamp duty and registration rates, registration fee per G.O. Ms. No. 34, from 1 April 2023
  22. Property Nivesh estimates (asking-price based), November 2026
A happy family in their new home with the money they got back

Brokerage back offer

Book your home with us and get the brokerage back*

Builders pay a brokerage to whoever brings them a buyer. Book through Property Nivesh and we give it back to you.

*Brokerage is part of the discussion with our advisor.

Unbiased advice. Your data is never sold to builders or brokers.