PropertyNivesh.in

Buying Guides

Hiranandani New Projects in Mumbai 2026 and 2027: MahaRERA List

MahaRERA registered eight Hiranandani projects around Mumbai in 2026, four in the city (Bay Heights, Rockside, Maitri Park Phase 1 and Bluecrest) and four in Thane, Panvel and Alibaug, but none has a dated launch or price yet. No 2027 launch is confirmed, and The Arena and Hiranandani Sands, both 2025 launches, carry on into 2026.

By Preeti Pandey · Edited by Rakesh Mahajan · · 12 min read

Bar chart of units in the six largest Hiranandani MahaRERA registrations of 2026 around Mumbai, led by Maitri Park Phase 1 with 694 and Bluecrest with 661
Property Nivesh launch guide

What are Hiranandani's new projects in Mumbai for 2026 and 2027?

MahaRERA, the Maharashtra Real Estate Regulatory Authority, has registered eight Hiranandani projects in and around Mumbai in 2026 so far. None of them has a dated launch or a developer price, so we call them registered, not launched. No source gives a 2027 launch date for any Hiranandani project in the region.

Four are inside Mumbai city: Bay Heights in Bandra West, Rockside in Powai, Maitri Park Phase 1 in Chembur and Bluecrest in Borivali West. Other four is in the wider region. They are the Stadia tower at The Arena near Panvel, Villa Carino and Westgate Hampstead in Thane, and 121 plots at Hiranandani Sands in Alibaug.

Two separate companies use the name. Hiranandani Communities, run by Niranjan Hiranandani, is behind Bay Heights, Rockside, Stadia and the plots. House of Hiranandani, run by his brother Surendra, is behind the other four.

From 2025, The Arena at Hiranandani Fortune City and Hiranandani Sands in Alibaug carry on into this year. Beyond that there are only plans, from an eighth Arena tower to offices in Andheri East and Vikhroli. None of these is registered, so none can be booked.

Hiranandani projects by statusNumber of Hiranandani projects, homes and commercial, in each status, as of November 2026 0246810Launched: 33LaunchedRegistered: 1010RegisteredAnnounced: 11AnnouncedPlanned: 33Planned Source: Property Nivesh research, November 2026
Hiranandani projects, homes and commercial, grouped by where they stand today.

The status chart sorts all 17 projects named here, offices included, by where each stood on 6 November 2026. The company history is on our Hiranandani Group profile.

Which Hiranandani company is behind each Mumbai project?

The brothers divided some joint projects in 2022, ETRealty reported on 18 March 2022. Niranjan kept the 250-acre Powai township and Surendra the 350-acre Hiranandani Estate in Thane. Since then two company sell under one surname.

Niranjan's Hiranandani Communities registers through HGP Community in Powai, Persipina Developers at The Arena and Dynamix Vacation Resorts at Sands. Bay Heights is a joint project with Excel Group, registered by Excel Enterprises India. Surendra's House of Hiranandani uses Shoden Developers for Westgate, Maitri Park and Bluecrest, and Roma Builders for Villa Carino.

House of Hiranandani's press releases still list Hiranandani Gardens, Powai, among its landmark projects, but that is a old claim from before the split. So read the promoter on the certificate, not the brochure. Neither Hiranandani company has a new project in Hyderabad as of 6 November 2026. Niranjan's townships are covered on our Hiranandani Communities profile.

Which Hiranandani projects inside Mumbai city did MahaRERA register in 2026?

Four, and not a single one have a published price. Maitri Park and Bluecrest are redevelopments, Bay Heights is a joint project, and Rockside sits inside the Powai township.

Project (company)AreaKindWhere it standsMahaRERA registration (date)Completion date declaredUnits
Bay Heights (Hiranandani Communities with Excel Group)Bandra West3 and 4 BHKRegisteredPR1180002501983 (2 Jan 2026)29 Nov 2030118
Rockside (Hiranandani Communities)Powai4 BHKRegisteredPR1180002502729 (12 Mar 2026)30 Sep 203052
Maitri Park Phase 1 (House of Hiranandani)Chembur EastRedevelopment, 2 to 4 BHKRegisteredPR1180002600200 (18 Apr 2026)31 Mar 2031694 (some not marketed)
Bluecrest (House of Hiranandani)Borivali WestRedevelopment, 2 and 3 BHKRegisteredPR1180002602042 (24 Sep 2026)31 Aug 2033661

Bay Heights, Bandra West

Bay Heights has 118 units on 26 floors at Bandra Reclamation. It offers 3 and 4 BHK from 1,054 sq ft carpet. Carpet area is the floor space inside a flat's own walls. The developer still calls it a upcoming project, and the commencement certificate on record goes only up to plinth.

Rockside, Powai

Rockside is having two wings of 13 habitable floors and 26 homes each, all 4 BHK from 1,729 sq ft carpet. It is marketed as under construction, with no price or launch date.

Maitri Park Phase 1, Chembur

It comes from House of Hiranandani's September 2024 Chembur deal of five societies, 459 tenants and ₹3,200 crore planned investment, as per its press release. The registration covers 14 towers and 694 units on about 9 acres. The developer markets only five towers, Calgary, Causeway, Caviana, Chancery and Crossgate. The rest are likely for existing members, though the certificate don't say so.

Bluecrest, Borivali West

Bluecrest is Building No. 2 at Gorai. It has 70 units on 15 floors, 240 on 53 and 351 on 46, so 661 in all.

On 28 April 2026 House of Hiranandani announced a development agreement for about 3 acres in Borivali West, with a gross development value of about ₹3,000 crore. Re-Mumbai reported the next day that the launch would come in 3 to 4 months. Timing and place matches Bluecrest, but the company has not said they are the same. The April figures of 380 member homes and 850-plus sale homes are also more than 661, so ask how they relate.

Which 2026 Hiranandani registrations are in Thane, Panvel and Alibaug?

These sit outside the city, but people searching for Mumbai often means them too. Thane and Panvel are in the Mumbai Metropolitan Region. Alibaug is in Raigad district, near Mumbai.

Project (company)AreaKindWhere it standsMahaRERA registration (date)Completion date declaredUnits or plots
Stadia, The Arena (Hiranandani Communities)Fortune City, Khalapur taluka (marketed as Panvel)3 BHKRegisteredPR1270002502090 (16 Jan 2026)31 Dec 2032160
Villa Carino (House of Hiranandani)Hiranandani Estate, Thane1 BHKRegistered; OC received, per developerPR1330002502577 (4 Mar 2026)31 Mar 202697
Westgate Hampstead (House of Hiranandani)Hiranandani Estate, Thane West4 BHKRegisteredPR1331012503026 (23 Mar 2026)30 Apr 2033210
Coral Bay, Coral Court, Coral Nest (Hiranandani Communities)Hiranandani Sands, AlibaugPlotsRegistered; launch awaitedPP1270002600903, PP1270002600904 (23 Jun 2026); PP1270002600911 (24 Jun 2026)31 Dec 2028121 plots

Stadia at The Arena, Panvel

Stadia was registered on 16 January 2026 as the seventh Arena tower, it has 160 homes on 40 floors, 3 BHK from 910 sq ft carpet. Fortune City is sold as Panvel, but the certificate places it in Khalapur taluka of Raigad district.

Villa Carino and Westgate Hampstead, Thane

Villa Carino is a 11-storey block of 97 one-bedroom flats, 438 to 453 sq ft carpet, beside The Walk. It was registered on 4 March 2026 with completion due on 31 March 2026. The developer now lists it ready with its OC (occupancy certificate), date not published.

Westgate Hampstead, sold as 'Westgate Reserve', is one 55-floor tower of 210 homes. All are 4 BHK of 1,622 to 1,761 sq ft carpet, and it was registered on 23 March 2026. Thane buyers may also want our note on the TRIM Metro protests in Thane.

Coral plots at Hiranandani Sands, Alibaug

Coral Bay (70 plots), Coral Court (21) and Coral Nest (30) came on MahaRERA on 23 and 24 June 2026, due by 31 December 2028. The developer's page still asks buyers to 'stay tuned for the launch', so no launch is confirmed.

Hiranandani projects: homes or plots per projectNumber of homes, or plots in plotted colonies, in each Hiranandani project that publishes a count 05001,0001,5002,000Hiranandani Westgate Phase 1 Hiranandani Westgate Phase 1: 1,844 1,844 homesHiranandani Maitri Park Phase 1 Hiranandani Maitri Park Phase 1: 694 694 homesHiranandani Bluecrest, Borivali West Hiranandani Bluecrest, Borivali West: 661 661 homesThe Arena, Hiranandani Fortune City Nov 2025 The Arena, Hiranandani Fortune City Nov 2025: 633 633 homesThe Arena, Hiranandani Fortune City Phase 1 The Arena, Hiranandani Fortune City Phase 1: 600 600 homesHiranandani Sands, Alibaug Hiranandani Sands, Alibaug: 330 330 homesHiranandani Westgate - Hampstead Hiranandani Westgate - Hampstead: 210 210 homesStadia, The Arena, Hiranandani Fortune City Stadia, The Arena, Hiranandani Fortune City: 160 160 homesAqua Suites, Hiranandani Sands, Alibaug Aqua Suites, Hiranandani Sands, Alibaug: 150 150 homesHiranandani Sands plots: Coral Bay, Coral Court Hiranandani Sands plots: Coral Bay, Coral Court: 121 121 plots Source: MahaRERA registrations and developer disclosures, as researched by Property Nivesh, November 2026
Homes, or plots in plotted colonies, in each Hiranandani project, as registered or disclosed.

The units chart shows homes, or plots, in the ten biggest housing entries in this guide. It leaves out Bay Heights, Villa Carino and Rockside, and Maitri Park's count include buildings the developer does not market.

Which 2025 Hiranandani launches carry into 2026?

Not 2026 launches. But their later towers are what most buyers meet this year.

ProjectCompanyLaunch or registrationMahaRERA numbersHomes and price as published
The Arena Phase 1 (Greenfield, Arcadia, Citadel)Hiranandani CommunitiesLaunched 9 Jun 2025P52000080098, P52000080195, P52000080155600 homes; 2 BHK from ₹1.31 crore
The Arena: Grandstand, Pavilion, AtheleticaHiranandani CommunitiesRegistered 27 and 28 Nov 2025PR1270002501603, PR1270002501589, PR1270002501610633 homes; no price published
Hiranandani Sands Phase 1 (Aqua Vista, Aqua Bliss, Aqua Shores)Hiranandani CommunitiesLaunched 29 Sep 2025; sold outPR1270002500750, PR1270002500751, PR1270002500762330 units; ₹80 lakh to ₹2.85 crore
Aqua Suites, Hiranandani SandsHiranandani CommunitiesRegistered 27 Nov 2025PR1270002501600150 units; sale status not known

The Arena opened on 9 June 2025 with three towers, 600 homes and an estimated ₹1,100 crore topline for that phase, Business Standard reported. Grandstand alone have 313 units, and Pavilion and Atheletica 160 each.

Sands Phase 1 sold out at its 29 September 2025 launch: 330 units and ₹450 crore of gross sales, by the company's account. Business Standard gave delivery as likely by 2028, while MahaRERA says 31 December 2030. We could not confirm if Aqua Suites' 150 units are on sale.

Westgate Phase 1 in Thane launched in December 2024 from ₹1.69 crore. House of Hiranandani said 30% of it, about ₹1,300 crore, sold in the first month (30 January 2025). It is here just for context only, as Hampstead is its next phase.

What are the two Hiranandani companies planning for late 2026 and 2027?

No source gives a 2027 launch date. What is there is plans, and none of them is registered.

Project or planCompanyWhat is knownSource and dateStatus
Eighth tower at The ArenaHiranandani CommunitiesOne of eight planned towers (1,700-plus homes in all); seven are registeredBusiness Standard, 10 Jun 2025Still to come; not registered
Later Hiranandani Sands phases, AlibaugHiranandani CommunitiesServiced apartments, villas, hotels; township over 10 yearsBusiness Standard, 29 Sep 2025Planned
Shrinagar redevelopment, Chembur WestHouse of HiranandaniAbout six acres; completion planned in 4 to 5 yearsHouse of Hiranandani, 25 Sep 2024Planned; no MahaRERA record by name
Office tower, Andheri EastHouse of HiranandaniOne acre; about ₹500 crore; about 4 lakh sq ft to leaseHouse of Hiranandani, 17 Oct 2025Planned (commercial)
Eastbridge offices, VikhroliHiranandani Group (Niranjan)8.15 lakh sq ft leased to Smartworks; delivery expected in the second half of 2026Moneycontrol, 3 Nov 2025Announced (commercial)

House of Hiranandani said on 29 October 2024 it would invest ₹12,500 crore in the Mumbai region over 24 months. It named Westgate, Castalia, Belicia in Thane, and redevelopment in Chembur and the western suburbs, plus talks in South Mumbai.

Niranjan Hiranandani told ETRealty on 30 June 2025 the group aim for 15% to 20% growth in FY26, a company-wide figure. He spoke of four redevelopment launches that year but did not name them. Bay Heights could be one, but nobody has confirmed it. For Sands, the company put revenue potential at ₹17,000 crore across 225 acres (29 September 2025), which is not a flat price.

Some marketing pages show 'Hiranandani Versova', 'Hiranandani Bandra West' and 'Hiranandani Karjat' as booking open, though none of these is registered. One page also took 'interest' for Borivali before it was registered. Section 3(1) of the RERA Act says a promoter may not advertise, book or sell a project, or even invite buyers, until it is registered. Section 59 sets the fine for that at as much as 10% of what the project is estimated to cost. MahaRERA fined one promoter ₹10,000 for an ad with an unreadable RERA number and QR code (LiveLaw, 9 January 2026).

What do Hiranandani homes around Mumbai cost, and what does stamp duty add?

None of the 2026 registrations has a developer price, and we hold no Property Nivesh 2026 asking estimate for them. The published prices belongs to older launches. Each is a 'starting from' total as published on that day, never a per sq ft rate.

ProjectPrice as publishedWhose figure, and date
The Arena Phase 1, Fortune City2 BHK from ₹1.31 crore; 3 and 4 BHK above ₹1.77 croreBusiness Standard, 9 and 10 Jun 2025
Hiranandani Sands Phase 1, Alibaug₹80 lakh for a studio to ₹2.85 crore for a 3 BHK (sold out)Hiranandani Communities, 29 Sep 2025
Hiranandani Westgate Phase 1, ThaneFrom ₹1.69 croreHouse of Hiranandani, 30 Jan 2025
All eight 2026 registrationsNot publishedNone found by 6 Nov 2026

Business Standard, citing market data, gave an average of about ₹10,700 per sq ft in Panvel in early 2025 (9 June 2025). For Borivali West it gave about ₹31,300 in March 2026 (28 April 2026), so Borivali is clearly the costly price market. These are not Hiranandani prices. See our Mumbai property rates and Panvel property rates by locality.

Stamp duty in Maharashtra is 6%, and registration is 1% with a ₹30,000 ceiling. The Mumbai 6% has a 1% metro cess built in, and a woman buyer pays 1% less. As illustration only, on two published starting prices:

ChargeRateOn ₹1.31 crore (The Arena)On ₹1.69 crore (Westgate)
Stamp duty6%₹7.86 lakh₹10.14 lakh
Stamp duty, woman buyer5%₹6.55 lakh₹8.45 lakh
Registration1%, capped at ₹30,000₹30,000₹30,000

For Thane, Panvel or Alibaug, confirm your area rate in our stamp duty calculator.

What does MahaRERA show on Hiranandani delivery dates?

A few dated changes, and none of them is a ruling on either company.

  • Castalia, Kandivali/Borivali West (House of Hiranandani, P51800031613): completion was extended from 31 December 2025 to 31 March 2027, approved on 2 March 2026. The developer still list it as 'upcoming'.
  • Westgate Hampstead, Thane: completion moved four months, from 31 December 2032 to 30 April 2033, by a correction of 1 October 2026, six months after registration.
  • Hiranandani Fortune City: the company said in June 2025 it has delivered more than 2,200 apartments there. No OC dates were published.
  • Powai: a special court closed the criminal case over the affordable-housing land in June 2025 (ETRealty, 5 June 2025).

A date can be moved by a extension or a correction, so read the latest certificate.

What to check before you book with Hiranandani

  • Read the promoter on the MahaRERA certificate and find out which Hiranandani company stands behind it.
  • Match the number with the project name, tower and completion date on MahaRERA's own site. Marketing pages sometimes prints a wrong number.
  • For a 2026 registration, get it in writing that sales are open, and ask for the price list.
  • At Maitri Park and Bluecrest, ask which towers are for sale and how far the commencement certificate goes.
  • At Bay Heights the developer discloses a lender's credit facility, so ask how your flat will be released from it.
  • Pay nothing for 'Versova', 'Bandra West', 'Karjat' or any name without a MahaRERA number.
  • Check if the completion date was already extended, like it happened at Castalia.

Then try our registration charges calculator, read our RERA checklist for 2026, and see our guide to checking a builder.

Questions

Frequently Asked Questions

What new projects has Hiranandani launched in Mumbai in 2026? +

None has a dated launch yet, but MahaRERA registered eight Hiranandani projects around Mumbai in 2026. Inside the city they are Bay Heights in Bandra West, Rockside in Powai, Maitri Park Phase 1 in Chembur and Bluecrest in Borivali West. Outside it are Stadia at The Arena near Panvel, Villa Carino and Westgate Hampstead in Thane, and 121 plots at Hiranandani Sands, Alibaug.

Is any Hiranandani launch in Mumbai confirmed for 2027? +

No. No source gives a 2027 launch date for either Hiranandani company in the Mumbai region. The known plans are an eighth tower at The Arena, later phases of Hiranandani Sands, the Shrinagar redevelopment in Chembur and offices in Andheri East and Vikhroli. None of them is registered with MahaRERA, so none can be booked.

Are Hiranandani Communities and House of Hiranandani the same company? +

No, they are separate companies. Hiranandani Communities is Niranjan Hiranandani's and runs Powai, Fortune City near Panvel, Hiranandani Sands in Alibaug and Bay Heights in Bandra. House of Hiranandani is Surendra Hiranandani's and runs Hiranandani Estate in Thane and the Chembur and Borivali redevelopments. The promoter named on the MahaRERA certificate shows which one is behind a project.

Is Hiranandani Bluecrest the Borivali West project announced in April 2026? +

The company has not said so. In April 2026 House of Hiranandani announced a Borivali West redevelopment of about 3 acres, with a launch planned in 3 to 4 months. Bluecrest, registered on MahaRERA on 24 September 2026 with 661 units in three towers, matches that place and timing. Ask the developer in writing before you rely on the April figures.

What was the launch price at The Arena, Hiranandani Fortune City? +

Business Standard reported in June 2025 that The Arena opened with 2 BHK homes from ₹1.31 crore and 3 and 4 BHK homes above ₹1.77 crore. Those are starting totals from the 2025 launch, not current prices. No price has been published for Stadia, the Arena tower MahaRERA registered on 16 January 2026.

How much stamp duty applies to a Hiranandani home around Mumbai? +

Stamp duty is 6% in Maharashtra, with a 1% metro cess inside that figure in Mumbai, and a woman buyer pays 1% less. Registration costs 1% but stops at ₹30,000. As an illustration on The Arena's ₹1.31 crore starting price, 6% duty is ₹7.86 lakh. Confirm the rate for your area in our stamp duty calculator.

How do I check a Hiranandani project's MahaRERA number? +

Search MahaRERA's registered projects by the project name, not by Hiranandani alone, because the promoters are companies such as Shoden Developers, Persipina Developers, HGP Community, Dynamix Vacation Resorts and Excel Enterprises India. Then compare the number, project name, promoter and completion date with what the seller shows you, because marketing pages can get the number wrong.

Sources

  1. MahaRERA, registration (correction) certificate, Bay Heights (PR1180002501983), read 6 November 2026
  2. MahaRERA, registration (correction) certificate, Rockside (PR1180002502729), 18 June 2026
  3. MahaRERA, registration (correction) certificate, Hiranandani Maitri Park Phase 1 (PR1180002600200), 15 May 2026
  4. MahaRERA, registration certificate, Hiranandani Bluecrest (PR1180002602042), 24 September 2026
  5. MahaRERA, registration certificate, Stadia (PR1270002502090), 16 January 2026
  6. MahaRERA, registration certificate, Villa Carino (PR1330002502577), 4 March 2026
  7. MahaRERA, registration (correction) certificate, Hiranandani Westgate - Hampstead (PR1331012503026), 1 October 2026
  8. MahaRERA, registration certificates, Coral Bay (PP1270002600903), Coral Court (PP1270002600904) and Coral Nest (PP1270002600911), June 2026
  9. MahaRERA, registration certificates for The Arena (Greenfield, Arcadia, Citadel, Grandstand, Pavilion, Atheletica) and Hiranandani Sands (Aqua Vista, Aqua Bliss, Aqua Shores, Aqua Suites), 2025
  10. MahaRERA, registration certificate, Hiranandani Westgate Phase 1 (P51700077268), 2 August 2024
  11. MahaRERA, extension certificate, Castalia (P51800031613), read 6 November 2026
  12. MahaRERA, registered projects search lists (Hiranandani, Rockside, Shrinagar), read 6 November 2026
  13. The Real Estate (Regulation and Development) Act, 2016, sections 3 and 59
  14. ETRealty (The Economic Times), Niranjan & Surendra Hiranandani divide some joint realty projects in Mumbai region, 18 March 2022
  15. ETRealty (The Economic Times), Hiranandani Group Plans Ambitious 15-20% Growth in FY26 with Major Launches in Alibaug, 30 June 2025
  16. ETRealty (The Economic Times), Niranjan Hiranandani Cleared in Powai Land Scam Case, 5 June 2025
  17. Business Standard, Hiranandani Communities launches Rs 1,100 cr residential project in Panvel, 9 June 2025
  18. Business Standard, The Arena by Hiranandani offers 2-4 BHK flats in Panvel from Rs 1.3-1.8 cr, 10 June 2025
  19. Business Standard, Hiranandani launches Rs 5,000-cr coastal township in Alibaug, eyes Rs 17k cr, 29 September 2025
  20. Business Standard, House of Hiranandani signs Rs 3,000 crore redevelopment project in MMR, 28 April 2026
  21. Hiranandani Communities press release, Hiranandani Launches India's Largest Integrated township in Alibaug with an Estimated Topline of Rs 17,000 Crore, 29 September 2025
  22. House of Hiranandani press release, Hiranandani to invest Rs 3,200 cr to redevelop 5 Mumbai housing societies, 25 September 2024
  23. House of Hiranandani press release, House of Hiranandani announces Rs 12,500 cr expansion plan in MMR, 29 October 2024
  24. House of Hiranandani press release, House of Hiranandani's latest project Hiranandani Westgate sells apartments worth Rs 1300 crore within a month, 30 January 2025
  25. House of Hiranandani press release, acquisition of new land parcel in Andheri East, 17 October 2025
  26. House of Hiranandani press release, House of Hiranandani registers DA for Borivali West project, GDV pegged at approximately Rs 3000 crore, 28 April 2026
  27. Re-Mumbai, House Of Hiranandani Bags Rs 3,000 Crore Redevelopment Project In Borivali, 29 April 2026
  28. Moneycontrol, Smartworks signs deal with Hiranandani Group for India's largest flexible office campus in Mumbai, 3 November 2025
  29. LiveLaw, MahaRERA fines Akola developer Rs 10,000 for blurred RERA number and QR code in newspaper advertisement, 9 January 2026
  30. Hiranandani Communities and House of Hiranandani project pages, read 6 November 2026
  31. Property Nivesh compilation of Maharashtra stamp duty and registration rates, November 2026
A happy family in their new home with the money they got back

Brokerage back offer

Book your home with us and get the brokerage back*

Builders pay a brokerage to whoever brings them a buyer. Book through Property Nivesh and we give it back to you.

*Brokerage is part of the discussion with our advisor.

Unbiased advice. Your data is never sold to builders or brokers.