Buying Guides
Suncity Builders Projects: Every Project by City, Status and RERA
Suncity Projects has 54 projects in our research, 42 of them ready, mostly townships, plots, floors and flats in Gurugram, the rest of Haryana and Jaipur, and 27 carry a RERA number. Its one current home launch is Suncity's Monarch Residences in Sector 78, Gurugram, registered on HRERA on 22 January 2026 with 900 flats, and no Suncity launch is named for 2027.
By Divyangna Pathak · Edited by
Rakesh Mahajan · · 11 min read
What are Suncity builders projects, and which one is on sale in 2026?
Suncity Projects Pvt Ltd, the developer of the Sector 54 township on Golf Course Road, has 54 projects in our research, and most of them is older and ready. Its only current home launch is Suncity's Monarch Residences in Sector 78, Gurugram. It has 900 flats in 5 towers, was registered with HRERA Gurugram on 22 January 2026 and is due for completion by 31 March 2031.
By status, 42 are ready, 2 part-ready, 6 under construction, 1 launched, 1 registered, 1 announced and 1 planned. Of these, 33 are housing (flats, floors, plots and townships) and 21 are malls, offices, shops, a clubhouse and a hospital. Gurugram have 23 records, Jaipur 8, Rohtak 5 and Vrindavan 4.
RERA is the state Real Estate Regulatory Authority, and HRERA is Haryana's. Each must register a project before any home in it is sold. Of the 54 records, 27 carry a RERA number. We read 24 on the regulator's portal, and 3 in Vrindavan are only reported. Older ones like the Sector 54 township was built before RERA, or no registration was found. No source names a new launch for late 2026 or 2027.
The chart counts all 54 records by status, homes and commercial together. Our Suncity Projects developer page has the company's history.
What is Suncity's Monarch Residences in Sector 78, Gurugram?
Monarch Residences is in Sector 78, New Gurugram, off NH-48 and the Southern Peripheral Road. HRERA registered Phase 1, on 9.506 acres, as number 09 of 2026, with 5 towers. The microsite say 45 storeys a tower, but the certificate gives no storey count.
The flats are 3 BHK of 1,333 sq ft and 4 BHK of 1,744 sq ft carpet, matching HRERA's 123.83 and 162.03 sq m. Carpet area is the usable floor inside the walls. HRERA's unit table have 704 flats of the smaller size and 176 of the bigger, plus 20 others.
The promoter on the certificate is DVOK Buildcon LLP, not Suncity Projects. It is a Suncity promoter-family LLP whose partners are Laxmi Narain Goel and Ashish Mittal.
The microsite showed "From ₹3.99 crore" on 6 November 2026, up from ₹3.76 crore in March 2026. It is a total price with no unit or area stated, not a per sq ft rate. HRERA filings show 130 flats booked by 5 August 2026, with ₹83.75 crore collected and ₹416.17 crore still due. That is about ₹499.92 crore in all, or ₹3.85 crore a flat in average, on our own arithmetic.
The declared project cost is ₹2,452.51 crore. No possession date is published, and HRERA's brief projects the OC, or occupation certificate, by 31 March 2031. Suncity's Monarch Club, registered on 8 October 2026 as HRERA 66 of 2026, is a clubhouse phase with no homes. Phases IV and V is only future development on HRERA, with no date or product. So they are planned and cannot be booked.
| Project or plan | Status | Source and date |
|---|---|---|
| Suncity's Monarch Residences, Sector 78 (900 flats) | Launched | HRERA, 22 Jan 2026; microsite price, 6 Nov 2026 |
| Suncity's Monarch Club (no homes) | Registered | HRERA, 8 Oct 2026 |
| Monarch Phases IV and V | Planned | HRERA brief, 19 Jan 2026 |
| Suncity Ultima, Zirakpur | Under construction, tagged New Launch | RERA Punjab list, 16 Oct 2026 |
| The Empire Centre, Gurugram (commercial) | Under construction | HRERA, 4 Mar 2025 |
| Suncity Galleria, Jaipur (commercial plots) | Ready | RERA Rajasthan, 2 Jan 2025 |
| Suncity Hospital, Sector 63A | Announced | Suncity project list, 6 Nov 2026 |
Nothing is named for 2027, and the group's press page carry only older items. Other launches nearby are in our upcoming residential projects in New Gurgaon.
Which Suncity projects are in Gurugram, and what does HRERA show?
Gurugram holds 12 of the housing records.
| Project | Location | Type | Status | RERA number (date) | Completion or possession | Homes |
|---|---|---|---|---|---|---|
| Suncity's Monarch Residences | Sector 78 | 3 and 4 BHK flats | Launched | RC/REP/HARERA/GGM/1037/769/2026/09 (22 Jan 2026) | Due 31 Mar 2031 | 900 |
| Monarch Phases IV and V | Sector 78 | Not stated | Planned | None | Not applicable | Not stated |
| Suncity Township | Sector 54 | Plots, floors, flats | Ready | None, pre-RERA | CC 16 Jan 2018 (reported) | No count |
| Suncity Heights, La Lagune, Suncity Essel Towers | Sectors 54 and 28 | Flats | Ready, per Suncity | None found | No date given | No count |
| Suncity Platinum Towers | Sector 28 | 3 and 4 BHK flats | Ready | RC/REP/HARERA/GGM/2018/04 (16 May 2018) | OC 4 Jan 2023 | 132 |
| Suncity Avenue 102 | Sector 102 | Affordable 2 BHK | Ready | 91 of 2017 (24 Aug 2017) | CC 27 Dec 2023 | 761 |
| Suncity Avenue 76 | Sector 76 | Affordable flats | Ready, per Suncity | GGM/384/116/2019/78 (23 Dec 2019), lapsed | No OC on HRERA | 1,464 |
| Suncity Vatsal Valley | Gwal Pahari | Plots | Ready | GGM/484/216/2021/52 (16 Sep 2021) | CC 1 Sep 2023 | 156 plots |
| Vatsal Valley Floors 1 | Gwal Pahari | Builder floors | Ready, per Suncity | GGM/510/242/2021/78 (9 Nov 2021), lapsed | No OC on HRERA | 288 |
| Vatsal Valley Floors 2 | Gwal Pahari | Floors, larger units | Ready, per Suncity | GGM/660/392/2023/04 (12 Jan 2023), lapsed | No OC on HRERA | 361 (336 floors) |
A Times of India report of March 2018 said the Sector 54 township got its completion certificate (CC) on 16 January 2018, even as residents' association was opposing it over unfinished work. Platinum Towers, filed by group firm Essel Housing Projects, has an OC dated 4 January 2023, though HRERA's remark does not name Tower S2.
Suncity lists Avenue 76 as completed. HRERA, read on 6 November 2026, shows the registration lapsed after 30 September 2024 and no OC uploaded. Both Vatsal Valley floor projects, which the group also lists as completed, are in the same place. Their registrations lapsed after 30 January 2025, no OC is on the list, and 2025 show-cause cases are pending. Of the second project's 361 units, 336 are homes.
Asking prices by sector are on our Gurgaon property rates page and in the Gurgaon city guide.
What has Suncity built in Rohtak and the rest of Haryana?
Outside Gurugram, the group mostly built plotted townships and floors, and Rohtak is its biggest base. HRERA Panchkula regulates these.
| Project | Location | Type | Status | RERA number (date) | Completion or possession | Homes |
|---|---|---|---|---|---|---|
| Suncity Heights, Rohtak | Sector 36A | Flats | Part-ready | HRERA-PKL-RTK-107-2019; HRERA-PKL-ROH-224-2021; HRERA-PKL-ROH-255-2021 | T8, T14, T16, T17 extended to 31 Mar 2028 | No count |
| Suncity Rohtak township | Sector 36A | Plots | Ready | HRERA-PKL-ROH-925-2026 (30 Jun 2026) | Licence CC 17 Jan 2025 | No count |
| Suncity Independent Floors 36A | Sector 36A | Builder floors | Ready | HRERA-PKL-ROH-924-2026 (30 Jun 2026) | OCs 2015 and 2016 | 198 |
| Suncity 34 | Sector 34, Rohtak | Plots | Ready | HRERA-PKL-ROH-284-2021 | CC 16 Sep 2022 | 82 plots |
| Suncity 35 | Sector 35, Rohtak | Plots | Ready | HRERA-PKL-ROH-296-2022 | CC 14 Nov 2022 | 198 plots |
| Suncity Yamuna Nagar | Sector 20, Jagadhri | Plots | Ready | HRERA-PKL-YNR-205-2020 | CC 9 Jul 2021 | 188 plots |
| Suncity Kaithal, Suncity Rewari, Suncity Parikrama | Kaithal, Rewari, Panchkula | Townships, plots, flats | Ready, per Suncity | None found | No date given | No count |
Suncity lists Suncity Heights in Rohtak as completed. HRERA Panchkula registered it in three parts and keep extending them. On 24 June 2026 it took Towers T8, T14, T16 and T17 to 31 March 2028. Tower T8 had an OC by the 2020 application.
The 30 June 2026 Rohtak registrations are old stock. Not a launch. They cover the township's last 59.59 acres, and in it 198 floors that got OCs between 27 August 2015 and 6 May 2016. Both show as lapsed on the list. For Kaithal, Rewari and Parikrama no registration was found, they were probably finished before RERA but this is not confirmed.
Which Suncity projects are in Jaipur, and is Jewel of India complete?
Jaipur is the group's second base, with four housing records, all registered on RERA Rajasthan by Suncity Projects Pvt Ltd itself.
| Project | Location | Type | Status | RERA number (date) | Completion or possession | Homes |
|---|---|---|---|---|---|---|
| Jewel of India, Phase 1 | JLN Marg | 4 and 5 BHK flats | Ready | RAJ/P/2017/244 (27 Sep 2017) | OC 16 Mar 2019 | 212 |
| Jewel of India, Phase 2 | JLN Marg | 4 and 5 BHK flats | Part-ready | RAJ/P/2021/1712 (2 Nov 2021) | In progress, due 8 Mar 2027; no CC or OC uploaded | 264 |
| Jewel Farms | Kukas, Amer | Farmhouse plots | Ready | RAJ/P/2023/2897 (29 Dec 2023) | CC 25 Mar 2026 (Jaipur Development Authority) | 22 plots |
| Suncity Township Jaipur | Sikar Road | Plots | Ready | RAJ/P/2018/699, Phase-1 Extension-1 (23 Apr 2018) | CC 27 Nov 2017 | No count |
Suncity calls Jewel of India completed in two phases and posts Phase II possession testimonials. RERA Rajasthan, on 6 November 2026, still shows Phase 2 in progress, due 8 March 2027, with no CC or OC uploaded. For Phase 2 the group gives 2,220.83 sq ft for the 4 BHK and 2,907.36 sq ft for the 5 BHK, but don't say which area.
For the city, see Jaipur property rates and our Jaipur city guide.
What does Suncity have in Zirakpur, Vrindavan and other cities?
The rest are in Zirakpur, Punjab, and in four places known only from the group's own list: Vrindavan, Indore, Ahmedabad and Baddi.
| Project | Location | Type | Status | RERA number (date) | Completion or possession | Homes |
|---|---|---|---|---|---|---|
| Suncity Ultima | Zirakpur, Punjab | 3 BHK flats with commercial | Under construction | PBRERA-SAS79-PR1049 (date not shown) | Not published | No count |
| Suncity Anantam | NH-2, Vrindavan | Plots, villas, flats | Ready, per Suncity | Reported as UPRERAPRJ704813 and others | No date given | No count |
| Anantam Villas | Vrindavan | Villas | Under construction | None in our research | Not published | No count |
| Suncity Govind Sharnam | Chhatikara, Vrindavan | Township | Ready, per Suncity | Reported as UPRERAPRJ585533/08/2024 | No date given | No count |
| Vistara Indore, Vistara Emerald | Indore | Township; 2 and 3 BHK flats | Ready, per Suncity | None in our research | No date given | No count |
| The Bungalows | SG Highway, Ahmedabad | 4 BHK flats, 5 and 6 BHK duplexes | Ready, per Suncity | None in our research | No date given | No count |
| Suncity Baddi | Baddi, Himachal Pradesh | Township | Ready, per Suncity | None in our research | No date given | No count |
Suncity Ultima is the other project the group tag as New Launch. RERA Punjab's list of 16 October 2026 shows it under Essel Iinfra LLP, spelled so, as a residential and commercial project. Its registration date and completion are not shown. The 3 BHK is given as 1,073 sq ft, without saying which area. Zirakpur is in Mohali district, so see Mohali property rates.
The Vrindavan numbers is only reported, so match each one to the project name on UP RERA's site.
Malls and commercial projects:
- Gurugram: The Empire and The Empire Centre in Sector 43 are under construction, due 21 August 2028 and 31 January 2030. Suncity Hospital is announced, and seven office, retail and industrial projects are ready.
- Jaipur: Jewel Tower in C-Scheme is under construction, due 30 April 2027. Horizon Tower, Suncity Galleria and Triton Mall are ready.
- Elsewhere: Suncity Studio Apartments in Vrindavan is under construction. Five malls in Lucknow, Mumbai, Coimbatore and Delhi are listed as completed.
The chart show homes per project where a count is given, led by Avenue 76 with 1,464 flats.
Which company names appear on Suncity's RERA certificates?
Suncity projects are often registered in a group company's name. RERA filings tie these firms to the group by shared offices, Suncity emails and Goel family officers. Look for DVOK Buildcon LLP (Monarch), Namdev Construction (Vatsal Valley), Essel Housing Projects (Platinum Towers), Essel Infra LLP (The Empire, The Empire Centre, Suncity 35), Essel Iinfra LLP (Ultima) and Sonika Properties (Rohtak). Check the promoter name on the RERA certificate, and see the same name are on your agreement.
Many unrelated builders also uses the name. There are small Suncity or Sun City promoters in Rajasthan and Punjab. Konark Sun City in Lucknow, Mittal Group's Sun City in Pune and United Sun City in Bengaluru belong to others, and Suncity Group of Macau is a gaming company.
What do the regulators' records show on Suncity's delivery?
- 23 June 2025: RERA Rajasthan fined Suncity ₹25,000 for each Jewel of India phase for adverts without the official RERA QR code. The company called it a oversight.
- 27 May 2026: on a complaint by the Jewel of India-I residents' welfare association (RWA), RERA Rajasthan ordered the Phase I and II common areas handed to the RWA within 30 days, with the documents and an account of the maintenance deposits.
- 13 July 2026: on basement flooding at Phase 1, it rejected Suncity's objection on jurisdiction. Suncity must hand drawings and records to the RWA, and repairs are left to the RWA after handover.
- 13 October 2026: the Rajasthan Real Estate Appellate Tribunal dismissed Suncity's appeal in a buyer's complaint and directed ₹4 lakh to be paid to the allottee. The execution case was disposed of on 22 October 2026.
- HRERA Gurugram: suo motu cases over the lapsed Vatsal Valley floors registrations, with show-cause notices sent on 5 August 2025, are listed as pending. The last listed hearing was 29 October 2025.
On the other side, RERA Rajasthan found for Suncity on 16 April 2026 in a Jaipur township case where the buyer had defaulted. We found no 2026 order on pre-launch bookings against a Suncity company and, as far as we could establish, no insolvency petition by October 2026.
What does stamp duty add, and what should you check before booking?
Stamp duty and registration differs by state:
| State (Suncity homes) | Stamp duty | Registration |
|---|---|---|
| Haryana (Gurugram, Rohtak) | 7% (women about 5%) | 1%, capped at ₹50,000 |
| Rajasthan (Jaipur) | 6% | 1% |
| Punjab (Zirakpur) | 7% | 1%, capped at ₹2 lakh |
| Uttar Pradesh (Vrindavan) | 7% (women get a 1% rebate up to a cap) | 1% |
| Gujarat (Ahmedabad) | 4.9% | 1% (women exempt) |
As an illustration on Monarch's ₹3.99 crore starting figure, 7% duty is ₹27.93 lakh, and registration stop at ₹50,000.
What to check before you book with Suncity
- Match the RERA number to the project name and promoter on the regulator's own site, since a marketing page can show a wrong number.
- Monarch Phases IV and V have no registration, and section 3(1) of the RERA Act bars any booking before one.
- For a completed resale, ask for your tower's OC or CC, specially at Avenue 76, the Vatsal Valley floors, Jewel of India Phase 2 and Suncity Heights, Rohtak.
- At Jewel of India, ask the RWA whether the common areas were handed over under the May 2026 order.
Then run your price through our stamp duty calculator and read our RERA checklist for 2026.
Questions
Frequently Asked Questions
How many projects has Suncity Projects built? +
Our research holds 54 Suncity Projects records as of 6 November 2026. Of these, 33 are housing, from townships and plots to flats and floors, and 21 are malls, offices, shops, a clubhouse and a hospital. 42 are ready, 2 part-ready and 6 under construction, with one each launched, registered, announced and planned. Most are in Gurugram, Jaipur and Rohtak.
What is the price of Suncity's Monarch Residences in Sector 78? +
Suncity's own microsite showed "From ₹3.99 crore" on 6 November 2026, a total price with no unit or area stated, up from ₹3.76 crore in March 2026. HRERA filings show 130 flats booked by 5 August 2026 with about ₹499.92 crore of sale value, roughly ₹3.85 crore a flat on our arithmetic. No per sq ft price is published.
What is the RERA number of Suncity's Monarch Residences? +
HRERA Gurugram registered Suncity's Monarch Residences on 22 January 2026 as RC/REP/HARERA/GGM/1037/769/2026/09, valid to 31 March 2031. The promoter is DVOK Buildcon LLP, a Suncity promoter-family LLP, and the phase covers 9.506 acres with 900 flats in 5 towers. Match the number, project name and promoter on HRERA's own site before you pay.
Is any new Suncity project launching in 2027? +
No source names a Suncity launch for late 2026 or 2027. HRERA shows Monarch Phases IV and V in Sector 78 only as future development, with no date or product, so nothing there can be booked. Suncity's Monarch Club, registered on 8 October 2026, is a clubhouse phase with no homes for sale.
Is Jewel of India Phase 2 in Jaipur complete? +
Suncity lists Jewel of India as completed and posts Phase II possession testimonials. RERA Rajasthan, read on 6 November 2026, still shows Phase 2 (RAJ/P/2021/1712) as in progress, with completion due on 8 March 2027 and no CC or OC uploaded. Phase 1 has a CC of 9 March 2019 and an OC of 16 March 2019.
Is Suncity Projects the same as other Suncity or Sun City builders? +
No. Many unrelated firms use the name, including small promoters in Rajasthan and Punjab, Konark Sun City in Lucknow, Mittal Group's Sun City in Pune, United Sun City in Bengaluru and the Macau gaming firm Suncity Group. Suncity's own projects are often registered under group companies, so match the company name on the RERA certificate.
How much stamp duty applies to a Suncity flat in Gurugram? +
Haryana charges 7% stamp duty, about 5% for women buyers, and a 1% registration fee capped at ₹50,000. As an illustration on Monarch's starting figure of ₹3.99 crore, 7% duty is ₹27.93 lakh and registration stops at ₹50,000. Our stamp duty calculator works it out for your own price.
Sources
- HRERA Gurugram, Registration Certificate No. 09 of 2026 (Suncity's Monarch Residences), 22 January 2026, and Form REP-I project preview
- HRERA Gurugram, brief and proceedings, Suncity's Monarch Residences (RERA-GRG-2100-2025), 19 January 2026
- HRERA Gurugram, Form REP-I, Suncity's Monarch Club, Part G (bookings declared 5 August 2026), and Registration Certificate No. 66 of 2026, 8 October 2026
- HRERA Gurugram registered projects list and OC/CC records, read 6 November 2026
- HRERA Gurugram case detail RERA-GRG-3737-2025 (Vatsal Valley Independent Floors), 29 August 2025
- HRERA Panchkula, continuation of registration decisions for Suncity Heights, Rohtak (13 August 2025, 24 December 2025, 24 June 2026), and certificates HRERA-PKL-ROH-924-2026 and HRERA-PKL-ROH-925-2026, 30 June 2026
- RERA Rajasthan project records for Jewel of India Phases 1 and 2, Jewel Farms, Suncity Township Jaipur, Jewel Tower, Horizon Tower and Suncity Galleria, read 6 November 2026
- RERA Rajasthan orders of 23 June 2025, 16 April 2026, 27 May 2026, 13 July 2026 and 22 October 2026
- RERA Punjab, List of Registered Real Estate Projects as on 16 October 2026
- Suncity Projects, developer website project list, read 6 November 2026
- Suncity's Monarch Residences official microsite, 6 November 2026, and archived copy of 10 March 2026
- Business Standard New Delhi, public notice by DVOK Buildcon LLP, 16 June 2026
- The Times of India, report on the Suncity Sector 54 township completion certificate, March 2018
- K-RERA (Karnataka), RERA Rajasthan and RERA Punjab project lists, for other Suncity-named promoters
- The Real Estate (Regulation and Development) Act, 2016, sections 3 and 59