Birla Estates New Projects in Mumbai 2026 and 2027: Thane to Worli

Birla Estates has no 2026 launch inside Mumbai city: its 2026 MahaRERA registrations are Birla Taranya Phase 1 (1,339 units) and Taranya Retail 1 in Kalwa, Thane, plus Birla Mrida's 539 plots near Boisar in Palghar district. For 2027 it targets Khar West in January to February and Niyaara Tower C by July to September, with a new Taranya phase in FY27 and Vashi in FY28, none of them registered yet.

By Rahul Mishra · Edited by Rakesh Mahajan · · 13 min read

Bar chart of Birla Estates projects around Mumbai by status: 3 launched, 1 registered, 4 announced and 3 planned
Property Nivesh launch guide

What are Birla Estates' new projects in Mumbai for 2026 and 2027?

Birla Estates has launched nothing new inside Mumbai city in 2026, and all its 2026 registrations sit outside the city. MahaRERA registered Birla Taranya Phase 1 in Kalwa, Thane on 3 February 2026 (1,339 units, about ₹1,200 crore booked, from ₹1.49 crore), its commercial Birla Taranya Retail 1 on 12 March 2026, and Birla Mrida, 539 plots at Padghe near Boisar in Palghar district, in March 2026. Birla counts Mrida in its Mumbai region. It starts from ₹60 lakh and about 160 plots is sold.

Inside the city we found no Birla launch in 2025 or 2026; Birla Anayu in Walkeshwar, still selling, dates from a July 2024 registration. MahaRERA, the Maharashtra Real Estate Regulatory Authority, is the body who registers projects under the RERA Act of 2016, and no home can be sold before that.

For 2027 there are targets, not registrations. Birla expects to launch the Khar West redevelopment with Parinee in January or February 2027, and a new Taranya phase in FY27, the year that end on 31 March 2027. Niyaara Tower C in Worli and the Vashi redevelopment are FY28 plans, Tower C aimed at July to September 2027. None has a MahaRERA number, so none can be booked.

ProjectLocalityTypeStatusMahaRERA number (date)Completion on MahaRERAHomes or units
Birla Taranya Phase 1Kalwa, ThaneApartments, 5 wingsLaunched Jan to Mar 2026PR1331012502243 (3 Feb 2026)31 Mar 20321,339
Birla Taranya Retail 1Kalwa, ThaneShops (commercial)Registered; no launch foundPC1331012502738 (12 Mar 2026)31 Mar 203229 units
Birla MridaPadghe, Boisar, Palghar districtResidential plotsLaunched Mar 2026PP1240002502953 (18 Mar 2026)31 Mar 2029539 plots
Birla Estates projects by statusNumber of Birla Estates projects, homes and commercial, in each status, as of November 2026 01234Launched: 33LaunchedRegistered: 11RegisteredAnnounced: 44AnnouncedPlanned: 33Planned Source: Property Nivesh research, November 2026
Birla Estates projects, homes and commercial, grouped by where they stand today.

The chart counts the projects in this guide by status, homes and commercial together.

Which Birla Estates projects did MahaRERA register in Thane in 2026?

Two, both at Birla Taranya in Kalwa, Thane: one for homes and one for shops.

Birla Taranya Phase 1

The promoter on certificate PR1331012502243 is Ekamaya Properties Private Limited, not Birla Estates Private Limited, and Birla's parent, Aditya Birla Real Estate Ltd (ABREL), shares that company with IFC 56:44. The registration runs from 3 February 2026 to 31 March 2032. Its annexure lists five wings of 39 to 40 floors with 295, 295, 297, 226 and 226 units, so 1,339 in all.

Birla's website gives 13.74 acres of land, 2 BHK homes of 742 to 888 sq ft and 3 BHK homes of 1,019 to 1,165 sq ft. These are carpet sizes, the usable floor inside the walls, with the balcony or deck counted in.

Very much buying was there early on. Birla reported about ₹1,007 crore booked within three months of RERA approval (press release, 20 May 2026), and ABREL's 26 October 2026 presentation showed about ₹1,200 crore against a GDV, or gross development value, of ₹2,150 crore. These are Birla's own figures, we can't check them.

Birla Taranya Retail 1

This separate registration, PC1331012502738 of 12 March 2026, covers one building of 2 floors with 29 units, due by 31 March 2032. We found no launch or sales disclosure. In writing Birla should be asked by shop buyers whether sales are open.

What is Birla Mrida near Boisar, and why is it on a Mumbai list?

Birla Mrida is a plotted colony at Padghe village near Boisar, in Palghar district and outside Mumbai city. ABREL puts Boisar in its MMR list, MMR being the Mumbai Metropolitan Region around the city.

MahaRERA registered it on 18 March 2026 under PP1240002502953: 539 plots, due by 31 March 2029, with Birla Estates Private Limited as promoter. Birla's site says the plots ranges from 1,200 to 9,000 sq ft, about 111 to 836 sq m, on 56 of 68 acres. They start from ₹60 lakh, a total price.

On the 26 October 2026 call, K.T. Jithendran, Birla Estates' MD and CEO, said "we just launched in March of this year" and that sales has slowed, with about 160 plots sold. ABREL's presentation that day showed ₹109 crore booked against ₹530 crore of GDV, at an average realised rate of ₹4,000 per sq ft of plot area.

Birla Estates projects: homes or plots per projectNumber of homes, or plots in plotted colonies, in each Birla Estates project that publishes a count 02004006008001,0001,2001,400Birla Taranya Phase 1 Birla Taranya Phase 1: 1,339 1,339 homesBirla Mrida Birla Mrida: 539 539 plotsBirla Anayu Birla Anayu: 8 8 homes Source: MahaRERA registrations and developer disclosures, as researched by Property Nivesh, November 2026
Homes, or plots in plotted colonies, in each Birla Estates project, as registered or disclosed.

The chart shows homes, or plots in Mrida's case, for each Birla project here that gives a count.

Which older Birla projects in Mumbai are still selling?

We found no Birla launch in the Mumbai region in calendar 2025, so there are less names to list. These earlier projects still had stock in 2026, but they are not new launches.

  • Birla Anayu, Walkeshwar. A boutique tower of 8 apartments, registered with MahaRERA as P51900077140 from 23 July 2024 and due by 31 March 2029. The CEO said 5 of them was sold by 26 October 2026.
  • Birla Niyaara, Worli. Held by ABREL itself. On 26 October 2026 Tower A had 401 of 413 units sold and Tower B 119 of 148.
  • Birla Vanya, Kalyan. ABREL marks the OC, or occupation certificate, as received and 97% sold by value, so very less is left.

What is Birla Estates planning in Mumbai for late 2026 and 2027?

No launch date in the rest of 2026 has been named. ABREL's FY27 list, to 31 March 2027, holds only the next Taranya phase and Khar West from this region.

Project or planLocalityWhat is knownSource and dateStatus
Khar West redevelopmentKhar West, MumbaiWith Parinee, 1.3 acres; launch expected Jan to Feb 2027Birla release, 27 Mar 2026; CEO, 26 Oct 2026Announced; not on MahaRERA
Birla Taranya, next phaseKalwa, Thane₹1,375 crore of GDV to launch in FY27ABREL, 26 Oct 2026Announced; not on MahaRERA
Birla Niyaara Tower CWorli, MumbaiRedesigned; ready for market by Jul to Sep 2027ABREL and CEO, 26 Oct 2026Announced; not on MahaRERA
Vashi redevelopmentVashi, Navi MumbaiWith a Priyanka Group affiliate, 3.06 acres; FY28Birla release, 12 Aug 2026; CEO, 26 Oct 2026Announced; not on MahaRERA
Worli New PlotWorli, Mumbai₹13,787 crore of GDV; no dateABREL, 26 Oct 2026Planned; not on MahaRERA
Worli WestWorli, Mumbai₹2,699 crore of GDV; no dateABREL, 26 Oct 2026Planned; not on MahaRERA
Worli office buildingWorli, Mumbai1.3 mn sq ft to lease, not sellCEO, 26 Oct 2026Planned; not on MahaRERA

Khar West redevelopment

This is the most nearest launch inside Mumbai city. Birla announced it on 27 March 2026 as its first redevelopment project in Mumbai, covering Anmol CHS and Bhartiya Bhavan CHS, two housing societies. The release discussed about 2.9 lakh sq ft to sell and about ₹1,700 crore of revenue potential. The CEO's timing on 26 October 2026 was "sometime in Jan, Feb in the coming year". No name or price is published yet.

The next Birla Taranya phase

Taranya don't stop at Phase 1. ABREL lists ₹1,375 crore of Taranya GDV, about 1.1 mn sq ft, to launch in FY27, and ₹6,941 crore more in its future pipeline with no date. No phase name or unit count is published.

Birla Niyaara Tower C, Worli

Tower C has slipped once. In August 2026 the CFO, Keyur Shah, hoped for RERA approval by the end of Q2 FY27. On 26 October ABREL said the tower was redesigned, adding about ₹1,900 crore of net GDV, and moved it to FY28, with the CEO aiming for July to September 2027. His August figure of ₹1 lakh to ₹1.2 lakh per sq ft of carpet? Only tentative, and said before the redesign was announced.

Vashi redevelopment, Navi Mumbai

Vashi, announced on 12 August 2026, is Birla's first redevelopment in Navi Mumbai: Shiv Sai CHS on 3.06 acres with a Priyanka Group affiliate, worth about ₹2,600 crore in revenue. Birla said the partner handle about 500 society members. The launch, first aimed at Q2 FY28, is now "next year, not this year", meaning FY28. See our guide to luxury apartments in Navi Mumbai.

Worli plans with no date

Three Worli items has no dates: the Worli New Plot, bought from the Wadias and joined to the Niyaara plot (₹13,787 crore of GDV), Worli West (₹2,699 crore) and a 1.3 mn sq ft office building for leasing, which needs about 9 to 10 months of approvals and then about 4 years of building, the CEO said. Birla is also considering to redevelop Century Bhavan for lease income.

None of it can be booked. Section 3(1) of the RERA Act bars advertising, booking or selling before registration, and section 59 lets the penalty reach 10% of the project's estimated cost. On 6 November 2026 we found no 2026 MahaRERA notice on pre-launch bookings, which only means the regulator have published none.

Most big numbers are company-wide: FY26 bookings of ₹8,136 crore, the ₹15,000 crore presales target for FY29, and FY27 presales that will not reach ₹8,000 crore, the CEO said. For MMR alone, ABREL counts 5 ongoing projects worth ₹13,302 crore of GDV and 4 upcoming worth ₹36,896 crore. Our Mumbai property price reports track city prices.

What do Birla's new projects around Mumbai cost, and what does stamp duty add?

Only a few projects carry a price, each from a different source, so read the last column first.

ProjectPrice figureWhose figure, and date
Birla Taranya Phase 1From ₹1.49 crore (total price)Birla's website, read 6 Nov 2026
Birla Taranya Phase 1₹12,728 per sq ft, average realised, saleable areaABREL, 26 Oct 2026
Birla Taranya Phase 1₹19,500 per sq ft (₹18,100 to ₹20,500)Property Nivesh 2026 estimate, compiled from public listing data, asking-price based
Birla MridaFrom ₹60 lakh (total price); ₹4,000 per sq ft of plot area, average realisedBirla's website, read 6 Nov 2026; ABREL, 26 Oct 2026
Birla Anayu₹87,668 per sq ft, average realised, saleable areaABREL, 26 Oct 2026
Birla Niyaara Tower C₹1 lakh to ₹1.2 lakh per sq ft of carpet, tentativeCEO, call of 14 Aug 2026
Vashi redevelopment₹38,000 to ₹40,000 per sq ft, planned, area basis unclearCEO, call of 14 Aug 2026

A "from" price is the total for the entry unit on the day we read it, it is not a rate. ABREL's figures are average realised rates on saleable area and ours come from asking prices, so they should not be compare one to one. As a labelled illustration, a 742 sq ft Taranya 2 BHK at our ₹19,500 is about ₹1.45 crore (742 x ₹19,500), close to the ₹1.49 crore start.

In Mumbai city, stamp duty is 6%, which include the 1% metro cess, and women buyers get a 1% concession. Registration is 1% of the value, capped at ₹30,000.

ChargeRateOn ₹1 crore of value (illustration)
Stamp duty, Mumbai city6%, including 1% metro cess₹6 lakh
Stamp duty, Mumbai city, women buyers5% (1% concession)₹5 lakh
Registration fee, Maharashtra1%, capped at ₹30,000₹30,000

The cap bites early. As an illustration, 1% of Taranya's ₹1.49 crore start is ₹1.49 lakh and of Mrida's ₹60 lakh is ₹60,000, so both stop at ₹30,000. For Thane and Palghar, use our stamp duty calculator rather than the Mumbai rate, and see Mumbai property rates for asking rates by area.

What does MahaRERA's record show on Birla's delivery around Mumbai?

These are the latest dated steps we found, not a verdict on the developer.

Birla Vanya, Kalyan. ABREL's 26 October 2026 presentation marks it "OC Received". Earlier, a MahaRERA extension of 26 March 2025 ran Phase 2's registration to 30 June 2025. The Times of India reported in April 2026 that residents protest a water shortage; Birla said it was supplying tanker water.

Birla Niyaara, Worli. Phase 1 is due by 31 March 2028, and in August 2026 management said it expect to be ready to hand over Tower A by Q3 2027. Phase 2 is due by 31 March 2029. Both certificates show a section 15 transfer approved on 6 April 2026, without details.

Birla Anayu, Walkeshwar. A correction approved on 28 December 2025 led to a re-issued certificate on 14 August 2026. Completion stays 31 March 2029.

One order touch every Birla project here that is still being built, Taranya and Mrida included: MahaRERA's Order No. 66/2026 of 7 August 2026 adds four months to completion dates on or after 28 February 2026, except for projects registered on or after 1 August 2026. It is a general force majeure order, not a finding about Birla.

Outside Maharashtra, our record holds one penalty, from HRERA Gurugram: ₹50 lakh for advertising Birla Arika before registration, as The Realty Today reported on 19 February 2025. Birla said it published no advertisement.

Watch the names. ABREL is Century Textiles renamed, so older Birla Vanya registrations still show "Century Textiles & Industries Ltd" as promoter, and Aditya Birla Housing Finance is a group lender, not the developer. See our Birla Estates developer page and our guide on how to check a builder.

What to check before you book with Birla Estates

  • Search MahaRERA by project name and match the number, promoter and completion date to your papers, because marketing pages can show a wrong number.
  • Read the promoter on certificate: Ekamaya Properties Private Limited for Birla Taranya, Aditya Birla Real Estate Limited for Birla Niyaara, Birla Estates Private Limited for Birla Mrida and Birla Anayu.
  • Pay no token or EOI for Khar West, Niyaara Tower C, Vashi or the next Taranya phase until each one appear on MahaRERA.
  • Plots need their own checks: at Mrida, match the plot number and size in your agreement with the registered details.
  • At Niyaara, ask what the 6 April 2026 section 15 transfer changed for buyers.
  • Add Order 66/2026's four months only if your project was registered before 1 August 2026, and get the OC before the final payment.

Then run your price through our stamp duty calculator and registration charges calculator, and read our RERA checklist for 2026.

Questions

Frequently Asked Questions

What new projects has Birla Estates launched in Mumbai in 2026? +

None inside Mumbai city. Birla's 2026 MahaRERA registrations are in the wider region: Birla Taranya Phase 1 in Kalwa, Thane on 3 February 2026 with 1,339 units, the commercial Birla Taranya Retail 1 on 12 March 2026, and Birla Mrida, 539 plots near Boisar in Palghar district, on 18 March 2026. Birla counts Mrida in its Mumbai region.

Is any Birla Estates launch in Mumbai confirmed for 2027? +

Not by any registration. Birla expects to launch the Khar West redevelopment in January or February 2027 and wants Niyaara Tower C in Worli ready for market by July to September 2027. A new Taranya phase is listed for FY27 and the Vashi redevelopment for FY28. None of them has a MahaRERA number yet, so none can be booked.

What is the price of Birla Taranya in Thane? +

Birla's website showed Birla Taranya Phase 1 from ₹1.49 crore when we read it on 6 November 2026, a total price rather than a rate. Its listed parent, Aditya Birla Real Estate Ltd, gives an average realised rate of ₹12,728 per sq ft of saleable area to 30 September 2026. Our own 2026 asking estimate is ₹19,500 per sq ft, so the figures measure different things.

When will Birla Niyaara Tower C launch in Worli? +

Not before FY28, which starts in April 2027. Birla's parent said on 26 October 2026 that Tower C was redesigned and moved out of FY27, and the CEO expects it to be ready for market by July to September 2027. The ₹1 lakh to ₹1.2 lakh per sq ft of carpet he mentioned in August 2026 was tentative. Tower C has no MahaRERA registration.

Is Birla Mrida in Mumbai? +

No. Birla Mrida is at Padghe village near Boisar in Palghar district, outside Mumbai city, though Birla's parent lists it in its Mumbai region. MahaRERA registered its 539 plots on 18 March 2026 under PP1240002502953, due by 31 March 2029. Birla's site shows plots from ₹60 lakh, and the CEO said about 160 were sold by 26 October 2026.

How much stamp duty is charged on a Birla home in Mumbai? +

In Mumbai city, stamp duty is 6%, which includes a 1% metro cess, and women buyers get a 1% concession. The registration fee is 1% of the value, capped at ₹30,000. As an illustration, each ₹1 crore of value carries ₹6 lakh of duty. For Birla Taranya in Thane or Birla Mrida in Palghar district, use our stamp duty calculator.

Which company should appear on a Birla project's MahaRERA certificate? +

It depends on the project. Birla Taranya is registered to Ekamaya Properties Private Limited, Birla Niyaara to Aditya Birla Real Estate Limited, and Birla Mrida and Birla Anayu to Birla Estates Private Limited. Search MahaRERA by project name and match the number, promoter and completion date, because marketing pages can show the wrong number.

Sources

  1. MahaRERA, registration certificate and annexure, Birla Taranya Phase 1 (PR1331012502243), read 6 November 2026
  2. MahaRERA, registration certificate and registered projects list, Birla Taranya Retail 1 (PC1331012502738), read 6 November 2026
  3. MahaRERA, registration certificate, Birla Mrida (PP1240002502953), read 6 November 2026
  4. MahaRERA, registration certificate, Birla Anayu (P51900077140), read 6 November 2026
  5. MahaRERA, registration certificates for Birla Niyaara Phase 1 and Phase 2, read 6 November 2026
  6. MahaRERA, extension certificate (Form F), Birla Vanya Phase 2, read 6 November 2026
  7. MahaRERA, Order No. 66/2026, extension of registration of real estate projects due to force majeure, 7 August 2026
  8. MahaRERA, suo motu advertisement orders list and notice board, read 6 November 2026
  9. Aditya Birla Real Estate Ltd (ABREL), Earnings Presentation Q2/H1 FY2026-27, exchange filing, 26 October 2026
  10. ABREL, transcript of the Q2/H1 FY2026-27 earnings call, held 26 October 2026, filed 30 October 2026
  11. ABREL, Earnings Presentation Q1 FY2026-27, exchange filing, 13 August 2026
  12. ABREL, transcript of the Q1 FY2026-27 earnings call, held 14 August 2026, filed 20 August 2026
  13. Birla Estates press release (filed by ABREL with BSE/NSE), Rs 1007 crores sales booking at Birla Taranya, Thane, 20 May 2026
  14. Birla Estates press release (filed by ABREL with BSE/NSE), FY26 performance with Rs 8,136 Cr booking value, 23 April 2026
  15. Birla Estates press release (filed by ABREL with BSE/NSE), first redevelopment project in Mumbai, Khar (W), 27 March 2026
  16. Birla Estates press release (filed by ABREL with BSE/NSE), Vashi redevelopment in Navi Mumbai, 12 August 2026
  17. Birla Estates website, Birla Taranya Thane and Birla Mrida Boisar pages, read 6 November 2026
  18. Times of India, Birla Vanya residents' protest over water shortage, Kalyan, April 2026
  19. HRERA Gurugram, Ruling and Judgements list, suo motu case on Birla Arika decided 11 February 2025; The Realty Today, 19 February 2025
  20. The Real Estate (Regulation and Development) Act, 2016, sections 3 and 59
  21. Property Nivesh 2026 asking-price estimates, November 2026
  22. Property Nivesh compilation of Maharashtra stamp duty and registration rates, November 2026
A happy family in their new home with the money they got back

Brokerage back offer

Book your home with us and get the brokerage back*

Builders pay a brokerage to whoever brings them a buyer. Book through Property Nivesh and we give it back to you.

*Brokerage is part of the discussion with our advisor.