The upcoming residential projects in Gurugram on record are 16 HRERA registrations of 2025 to 2026, from Godrej Samaris in Sector 53 to Experion Emerelle Reserve in Sector 88A. Published prices run from ₹3 crore to ₹18 crore, five have no price yet, and most HRERA completion dates fall in 2032 to 2034.
By Preeti Pandey · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Which upcoming residential projects in Gurugram are on record?
The upcoming residential projects in Gurugram worth a investor's shortlist are the ones already on HRERA Gurugram's register, not the ones in brochures. Below are 16 projects registered between January 2025 and November 2026 by large or listed developers, from Godrej Samaris in Sector 53 to Smartworld Nature's Court I in Manesar. Published prices start at ₹3 crore and reach ₹18 crore, and five projects has no price out yet.
HRERA is the Haryana Real Estate Regulatory Authority, and its Gurugram bench register every project before the developer can advertise or take money. A registration gives you the land, the licence, the number of homes and a completion date the builder have committed to. That is the backbone of every table in this post.
How these 16 projects were chosen
The list is not ranked on quality, and no project here is called better than other. Every pick is a group housing project registered with HRERA Gurugram between 1 January 2025 and 26 November 2026, by a listed or large developer, with either a launch announced or sales already open. Commercial registrations, plotted-only colonies without a sales launch and projects that are announced but not registered was kept out.
Some known registrations are left out on purpose. Birla Pravaah and two DLF launches sold out at launch, so nothing is open to book. Lodha's Sector 28 registration is on an HSVP commercial site, not housing. Elan The Statement in Sector 49 is on sale but have no published price.
For scale, Business Today (16 July 2026, citing HRERA Gurugram data) reported 131 projects approved in 2025 worth about ₹87,000 crore, and 51 projects in H1 2026. Our tally of the register counts 192 registrations since 1 January 2025, so these 16 are a small, filtered slice.
HRERA registered projects 2026 and late 2025: the 16 at a glance
Here is every pick with its registration as HRERA Gurugram's register shows it (read up to 29 November 2026). Homes are the count the developer or HRERA give for that registration; a phase can hold less homes than the full colony.
| Project | Developer | Sector | HRERA registration | Registered | Homes |
|---|---|---|---|---|---|
| Godrej Samaris | Godrej Properties | Sector 53 | RC/REP/HARERA/GGM/1059/791/2026/31 | 04.05.2026 | 494 |
| Godrej Verano | Godrej Properties | Sector 63A | RC/REP/HARERA/GGM/1081/813/2026/53 | 11.08.2026 | 630 |
| SOBHA Crescent | Sobha Limited | Sector 63A | RC/REP/HARERA/GGM/1054/786/2026/26 | 03.04.2026 | 336 |
| Three Sixty North | Oberoi Realty | Sector 58 | GGM/1069/801/2026/41 to GGM/1074/806/2026/46 (6 towers) | 26.06.2026 | 832 |
| The Bungalows (Max Estates Sector 59 project) | Base Buildwell (Max Estates) | Sector 59 | RC/REP/HARERA/GGM/1099/831/2026/71 | 05.11.2026 | 243 |
| Tonino Lamborghini Residences Gurugram | Signature Global | Sector 71 | RC/REP/HARERA/GGM/1056/788/2026/28 | 08.04.2026 | 812 |
| Sarvam at DXP Estate | Signature Global | Sector 37D | RC/REP/HARERA/GGM/1008/740/2025/111 | 07.11.2025 | 1,798 |
| The Iconic Residences Gurugram | Signature Global | Sector 37D | RC/REP/HARERA/GGM/1101/833/2026/73 | 06.11.2026 | 116 |
| Adani The Marq | Adani Realty | Sectors 102 and 102A | RC/REP/HARERA/GGM/1042/774/2026/14 | 24.02.2026 | 368 |
| Estate 361 (with The Terraces) | Max Estates | Sector 36A (HRERA: Sector 36) | RC/REP/HARERA/GGM/1012/744/2025/115 | 21.11.2025 | 1,096 |
| Riviera at AIPL LakeCity | AIPL | Sector 103 | RC/REP/HARERA/GGM/1019/751/2025/122 | 08.12.2025 | 412 |
| Emaar Serenity Hills | Emaar India | Sector 86 | RC/REP/HARERA/GGM/993/725/2025/96 and 994/726/2025/97 | 16.10.2025 | 997 |
| Experion Emerelle Reserve | Experion Developers | Sector 88A | RC/REP/HARERA/GGM/1104/836/2026/76 | 16.11.2026 | 320 flats |
| L & T Realty Aravista Phase 1 | L&T Realty | Sectors 81 and 86 | HARERA/GGM/1106/838/2026/78 | 26.11.2026 | 444 |
| Suncity's Monarch Residences | Suncity Projects | Sector 78 | RC/REP/HARERA/GGM/1037/769/2026/09 | 22.01.2026 | 900 |
| Smartworld Nature's Court I | Smartworld Developers | GIC, Manesar (M9 to M11) | RC/REP/HARERA/GGM/1029/761/2026/01 | 02.01.2026 | 1,214 |
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Golf Course Road and Golf Course Extension Road: the top of the new launch Gurugram market
This belt carry the highest published prices of the 16. Oberoi Three Sixty North in Sector 58 offers 3 BHK and 4 BHK homes with a studio, plus duplexes and penthouses, of about 5,500 to over 13,000 sq ft (size basis not stated). Business Today reported on 7 July 2026 that homes start from ₹18 crore at a base price of ₹35,000 per sq ft.
Illustrative imageGodrej Verano in Sector 63A has 2 to 5 BHK flats plus duplexes, with 3 BHK of 1,183 to 1,449 sq ft carpet area. Carpet area is the floor inside your walls; super area adds a share of lobbies, walls and common space, so the same flat looks bigger on a super area quote. Godrej management said on 23 October 2026 the launch slipped into Q3 FY27, that is October to December 2026.
Next door, SOBHA Crescent has 3 and 4 bedroom homes of 2,277 to 2,966 sq ft as Sobha publish them (super area), or 1,079 to 1,694 sq ft carpet on HRERA. Phase 1 launched in April 2026. In Sector 53, Godrej Samaris is the one Golf Course Road pick, with 3 and 4 BHK and penthouses of 1,615 to 3,897 sq ft carpet on HSVP-allotted land.
The Sector 59 registration is the tentative one. Max Estates bought Base Buildwell on 26 December 2025, and Base Buildwell registered "The Bungalows" on 5 November 2026 with 243 large homes, many of 252.90 sq m (about 2,722 sq ft) carpet. Max Estates said on 4 November 2026 it expects to launch a Sector 59 project in Q3 FY27, but it hasn't confirmed that name as the marketed one. For the Godrej pair in detail, see our Godrej new projects in Gurgaon post.
Dwarka Expressway and SPR: six upcoming projects Gurgaon buyers are watching
Dwarka Expressway has the most picks, five, and Signature Global alone has two of them in Sector 37D. Sarvam at DXP Estate is a 3 BHK project of about 2,000 sq ft super built-up (891 to 1,420 sq ft carpet on HRERA), launched at the end of December 2025 with about 800 units opened. The Iconic Residences sits on a separate Ramprastha group licence, has 116 homes, and no launch or price was announced by 29 November 2026.
Adani The Marq in Sectors 102 and 102A offers 3 BHK to 4 BHK homes of 1,081 to 1,786 sq ft carpet on HRERA; Adani quote 2,565 to 3,559 sq ft by adding exclusive areas to carpet. Estate 361 by Max Estates in Sector 36A launched on 3 December 2025 with 3 and 4 bedroom homes, while its The Terraces wing has 1.5 and 2 bedroom homes of 595 to 877 sq ft carpet. Riviera at AIPL LakeCity in Sector 103 is two 43-floor towers of 3 and 4 BHK, priced at its 14 May 2026 launch event.
Our upcoming projects on Dwarka Expressway list covers the full road, and our Max Estates 36A guide explain the Sector 36A cluster.
On SPR, the Southern Peripheral Road, Tonino Lamborghini Residences Gurugram in Sector 71 is a branded project of 3 BHK, 4 BHK and 4 BHK plus utility, 894 to 1,516 sq ft carpet on HRERA. Phase 1 launched in May 2026 and sold out by 29 October 2026, and the company said on 30 October 2026 that Phase 2 has also launched, without a Phase 2 price.
New Gurugram and Manesar: four fresh registrations, three with no price
New Gurugram is where the November 2026 registrations cluster. L&T Realty Aravista covers Sectors 81 and 86, with 444 flats of 103.50 to 217.04 sq m (about 1,114 to 2,336 sq ft) carpet in three towers. Experion Emerelle Reserve in Sector 88A has 320 apartments of 90.07 to 146.52 sq m carpet, on a mixed land use licence under the TOD (transit oriented development) policy. Neither developer has publish configurations or prices.
Illustrative imageThe two priced projects here is older. Emaar Serenity Hills in Sector 86 launched on 12 November 2025 with 3 BHK and 4 BHK homes of 947 to 1,576 sq ft carpet. Suncity's Monarch Residences in Sector 78 has 3 BHK of 1,333 sq ft and 4 BHK of 1,744 sq ft carpet, and 130 flats were booked by 5 August 2026.
Out in Manesar, Smartworld Nature's Court I at Gurgaon International City has small 1.5 and 2.5 BHK flats of about 464 to 646 sq ft carpet. HRERA's hearing of 29 December 2025 records they keep affordable sizes but sell at the promoter's own rates, with no DTCP draw. No developer price is published. The full sector-wise list for this belt is in our upcoming residential projects in New Gurgaon post.
Published prices with dates and size basis
Prices below are as the developer or a named newspaper published them, with the date read. Treat each as a dated snapshot.
| Project | Published price | Area basis | Source and date |
|---|---|---|---|
| Godrej Samaris | ₹9.84 crore onwards | not stated | Developer page, read 6 Nov 2026 |
| Godrej Verano | 3 BHK from ₹4.91 crore | not stated (sizes on carpet) | Developer page, read 6 Nov 2026 |
| SOBHA Crescent | ₹4.8 to 7.9 crore band at launch; later from ₹5.86 crore | super area | Sobha investor presentation, 20 Jul 2026 |
| Three Sixty North | from ₹18 crore; base ₹35,000 per sq ft | not stated | Business Today, 7 Jul 2026 |
| Tonino Lamborghini Residences | a little above ₹22,000 per sq ft (Phase 1) | not stated | Signature Global Q1 FY27 call, 6 Aug 2026 |
| Sarvam at DXP Estate | about ₹16,000 per sq ft; ₹3 to 4 crore per unit (PTI) | super built-up | Signature Global call, 4 Feb 2026 |
| Adani The Marq | from ₹4.60 crore | not stated | Developer page, read 5 Nov 2026 |
| Estate 361 | 3 and 4 bedroom ₹6.65 crore and up | not stated | Developer page, read 6 Nov 2026 |
| The Terraces at Estate 361 | from ₹2.4 crore at launch; now ₹2.60 crore and up | carpet sizes | Max Estates filing, 13 May 2026; developer page |
| Riviera at AIPL LakeCity | from ₹17,450 per sq ft after a launch benefit | not stated | AIPL press release, 14 May 2026 |
| Emaar Serenity Hills | ₹3 crore to ₹5.7 crore per unit | carpet sizes | Construction World, 17 Nov 2025 |
| Suncity's Monarch Residences | from ₹3.99 crore (₹3.76 crore in March 2026) | not stated | Official microsite, read 6 Nov 2026 |
| Iconic Residences, The Bungalows, Emerelle Reserve, Aravista, Nature's Court I | no published price | As of 29 Nov 2026 |
A per sq ft rate on super area and one on carpet area cannot be compared directly, so ask which one a quote use.
When HRERA says these projects finish
These are completion dates the developers declared to HRERA Gurugram, read up to 29 November 2026. HRERA extended completion dates by four months in an order of 11 August 2026, which do not cover projects registered after 31 July 2026. None of the 16 has an OC, or occupation certificate (the permission to live in a finished building), on record yet.
| Project | HRERA completion date | Developer's own date |
|---|---|---|
| Suncity's Monarch Residences | 31.03.2031 | none given |
| Adani The Marq | 31.12.2031 | none given |
| Emaar Serenity Hills | 30.09.2032 | about five years (press) |
| Sarvam at DXP Estate | 31.12.2032 | about five years from launch (CEO) |
| L & T Realty Aravista Phase 1 | 31.12.2032 | none given |
| The Iconic Residences Gurugram | 31.08.2032 (register); 30.11.2032 (Form REP-I) | none given |
| Tonino Lamborghini Residences | 01.01.2033 | none given |
| SOBHA Crescent | 31.03.2033, plus HRERA's four-month extension | March 2033 |
| Godrej Verano | 02.06.2033 | March 2031 (developer page) |
| Smartworld Nature's Court I | 30.06.2033 (Form REP-I) | none given |
| Riviera at AIPL LakeCity | 30.06.2033 | none given |
| Godrej Samaris | 31.08.2033 | none given |
| Estate 361 | 30.09.2033, plus four-month extension | FY31 (company target) |
| Three Sixty North | not given by the developer | our project page lists December 2033 |
| The Bungalows, Sector 59 | 30.05.2034 (Form REP-I) | none given |
| Experion Emerelle Reserve | 30.09.2034 | none given |
Most dates land in 2032 to 2034. That is a long time for money to sit in a under-construction flat, so plan your cash and EMI (the monthly loan instalment) around the HRERA date, not the earlier brochure date.
New projects Gurgaon 2027: announced but not registered yet
Several launches are spoken about for late 2026 and early 2027, but none of these is registered, so no one can legally sell them yet:
Illustrative image- DLF said on 4 August 2026 the next high-rise phase at Privana in Sectors 76 and 77 was due early next year, if not last quarter; it was not on HRERA as of 6 November 2026.
- DLF told analysts on 17 October 2026 that a luxury project in DLF City Phase 4 is aim for Q4 FY27, January to March 2027, with its Sector 61 parcel following only after the land deal close.
- Sobha's MD said on 21 July 2026 that Crescent Phase 2 is planned around December 2026 to January 2027.
- Business Today (9 September 2026) named M3M Brabus Residences in Sector 58 and Anant Raj Estate One in 63A among upcoming launches, with a tentative pipeline of nearly ₹35,000 crore that the paper did not attribute.
Some projects have applied and wait. As of 21 November 2026, HRERA Gurugram's public notices showed residential applications pending for Emaar Marbella North villas in Sectors 65 to 66, Experion Emerelle Phase 2 in 88A and MVN Aero One Phase 2 in 37D. For the DLF pipeline, read our DLF new projects in Gurgaon post.
Pre launch Gurugram offers and other risks to weigh
A pre launch Gurugram offer is a booking taken before HRERA registration, and it is the single biggest trap here. Without registration you have no approved plan, no declared completion date and no HRERA account where your money must go.
Registration also don't mean every approval is in hand. HRERA registered Experion Emerelle Reserve and L&T Aravista Phase 1 before environmental clearance, fire scheme and service plan approvals, against ₹25 lakh security deposits per pending approval. Some 2026 registrations also carry conditions tied to pending court matters over the land, written into the order itself.
Run through this list before you pay a token:
- Find the project on HRERA Gurugram's register and match the registration number to the agreement.
- Read the registration order for conditions: pending approvals, deposits, road access and any court matter.
- Ask for the price on carpet area, with every extra charge (parking, club, PLC, the preferential location charge) listed.
- Plan for the HRERA completion date, not the brochure date.
- Budget stamp duty: 7% for men and about 5% for women, plus a 1% registration fee capped at ₹50,000, as listed in our state costs table. Confirm the rate before you pay.
- Never pay anything for a project that is not registered yet.
Where to go from here
If a project here fits your budget and timeline, compare the launch route with a finished home first in our new launch vs resale in Gurugram guide. Sohna has its own pipeline, covered in our upcoming residential projects in Sohna post. For live launch pages across the city, browse our new launches list, and remember past price growth do not predict future growth.
Questions
Frequently Asked Questions
Which upcoming Gurugram project on this list has the lowest published price? +
Emaar Serenity Hills in Sector 86 has the lowest per-unit figure, ₹3 crore to ₹5.7 crore, as its CEO gave at the November 2025 launch (Construction World, 17 November 2025). Max Estates' The Terraces at Estate 361 started from ₹2.4 crore, but that is a smaller 1.5 and 2 bedroom wing within a larger project, not a separate project.
Why are some November 2026 registrations shown without a price? +
The Iconic Residences, The Bungalows in Sector 59, Experion Emerelle Reserve and L&T Aravista Phase 1 were all registered in November 2026, and none of the developers had published a price list by 29 November 2026. Nature's Court I also has no developer price. Ask the developer for a written price list on carpet area before you compare them.
Is Max Estates really behind The Bungalows in Sector 59? +
The link is through Base Buildwell, which Max Estates finished buying on 26 December 2025, as its stock-exchange filing says. Base Buildwell registered The Bungalows on 5 November 2026. Max Estates expects a Sector 59 launch in Q3 FY27, but it has not confirmed The Bungalows as the name it will market, so treat that as tentative.
Can I book DLF Privana's next phase or Sobha Crescent Phase 2 now? +
Not legally, if it is still unregistered. DLF's next Privana phase was not on HRERA as of 6 November 2026, and Sobha's Crescent Phase 2 was planned for around December 2026 to January 2027. Wait for the HRERA registration number, then check it on the register before paying any booking amount or expression of interest.
Does HRERA's four-month extension apply to all 16 projects? +
No. HRERA Gurugram's order of 11 August 2026 added four months to completion dates on force majeure grounds, but projects registered after 31 July 2026 are not covered. That leaves out Godrej Verano, The Iconic Residences, The Bungalows, Experion Emerelle Reserve and L&T Aravista Phase 1 from this list. SOBHA Crescent and Estate 361 are covered.
What does a TOD mixed land use licence mean for Emerelle Reserve buyers? +
Experion Emerelle Reserve in Sector 88A sits on licence 135 of 2024 under Haryana's transit oriented development policy, which allows mixed land use on one site. HRERA's register shows 320 apartments plus 146 small units of 19.62 sq m and 13 other small units, whose use is not stated. Ask the developer what those small units are before booking.
How many homes did HRERA Gurugram register in 2025 and 2026? +
Our compilation of HRERA Gurugram registrations counts 34,846 units declared in 2025 across 131 projects, and 19,600 units in January to September 2026 across 61 projects. Business Today, citing HRERA data on 16 July 2026, reported 51 projects with 15,403 residential units approved in H1 2026. These 16 projects are only a part of that supply.
Are the 16 projects ranked from best to worst? +
No. The table order follows the belts, Golf Course Road and its extension first, then SPR, Dwarka Expressway, New Gurugram and Manesar. The list was chosen on facts that can be checked: an HRERA registration in 2025 or 2026, a listed or large developer, and a launch announced or sales open. Quality, delivery and location suit each buyer differently.
Sources
- HRERA Gurugram, register of registered projects, Gurugram (cached copy, latest entry 26 November 2026)
- HRERA Gurugram, project detail and hearing records: Experion Emerelle Reserve (2 November 2026), L & T Realty Aravista Phase 1 (16 November 2026), Smartworld Nature's Court I (29 December 2025)
- HRERA Gurugram, Form REP-I: The Iconic Residences Gurugram and The Bungalows (Base Buildwell), read 29 November 2026
- Business Today, Oberoi Realty's first NCR project clocks Rs 8,109 crore in bookings, 7 July 2026
- Business Today, Gurugram RERA clears 51 projects in H1, 16 July 2026
- Business Today, Golf Course Extension Road gets Rs 35,000 crore luxury housing push, 9 September 2026
- Godrej Properties, Godrej Verano and Godrej Samaris project pages (read 6 November 2026); Q2 FY27 earnings call, 23 October 2026
- SOBHA Limited, Investor Presentation Q1 FY 2027 (20 July 2026) and earnings call of 21 July 2026
- Signatureglobal (India) Ltd, earnings calls of 4 February 2026 and 6 August 2026; Hindustan Times, 30 October 2026
- Outlook Business (PTI), Signature Global to invest Rs 4,800 crore on new housing project in Gurugram, 25 December 2025
- Adani Realty, The Marq Gurugram project page (read 5 November 2026)
- Max Estates Limited, Estate 361 project page; press release on The Terraces (13 May 2026); acquisition of Base Buildwell (26 December 2025); investor release (4 November 2026)
- Punjab Kesari English (NewsVoir/ANI press release), AIPL launches Riviera at AIPL LakeCity, 14 May 2026
- Construction World, Emaar India to invest Rs 16 billion in Gurugram project, 17 November 2025
- Suncity's Monarch Residences official microsite (read 6 November 2026)
- DLF Limited, earnings call transcripts of 4 August 2026 and 17 October 2026
- Property Nivesh, HRERA Gurugram pending residential applications from public notices (21 November 2026) and registration tallies
- Property Nivesh state costs table, Haryana row