Upcoming Projects on Dwarka Expressway: 2026 Launches and Prices

HRERA Gurugram lists 43 registrations in Dwarka Expressway sectors from 8 Jan 2025 to 6 Nov 2026, led by Emaar Urban Ascent, Elan The Emperor, Westin Residences, Estate 361 and Signature Global Sarvam, with developer prices for 3 and 4 BHK homes mostly starting at Rs 2.5 crore to Rs 6.65 crore and branded towers from Rs 11 crore as reported. M3M Jacob & Co. Residences (from Rs 26 crore as announced), Elan's JW Marriott Residences, MVN Aero One Phase 2 and Prestige's Sector 109 parcel are announced or applied for but not yet registered.

By Jaiprakash Mourya · Edited by Rakesh Mahajan · · 12 min read

Illustration of a new construction site with finished towers beyond Illustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.

Upcoming projects on Dwarka Expressway: the short answer

HRERA Gurugram lists 43 registrations in Dwarka Expressway sectors from 8 Jan 2025 to 6 Nov 2026, so the list of upcoming projects on Dwarka Expressway is a long one. The best known are Emaar Urban Ascent, Elan The Emperor, Westin Residences, Max Estates Estate 361 and Signature Global Sarvam, with HRERA completion dates from 2031 to 2033. Four more projects has been announced or applied for, but none is registered yet: M3M Jacob & Co. Residences, Elan's JW Marriott Residences, MVN Aero One Phase 2 and Prestige's 17-acre parcel in Sector 109.

HRERA is the Haryana Real Estate Regulatory Authority, it keeps the register a project must join before any flat is booked or advertised. The 43 counts each phase, plotted colony and floor block separate, so it isn't 43 townships.

We count Sectors 99 to 115 (with 99A, 102A and 110A), 36A and 37B to 37D as the expressway. Projects in Sectors 76 to 79 and 84 to 95 are near it, not on it, and our post on upcoming residential projects in New Gurgaon covers those ones. For every project type, sector by sector, see our projects on Dwarka Expressway hub.

Which projects registered on HRERA in Dwarka Expressway sectors since January 2025?

The table is a selection, not the full list of 43: we left out small add-on phases and most commercial registrations. None of them has an OC yet, and most are newly on sale or under construction. An OC, or occupation certificate, is the DTCP paper that let people move in; DTCP is Haryana's Department of Town and Country Planning.

A developer's price or launch price come from the builder or its release, reported means a news account, and listings means asking prices on property sites.

Project, developerSectorType, launchUnitsAcresHRERA number, datePrice (kind, date)HRERA completion
Urban Ascent, Emaar India112Flats, Jan 20258169.164GGM/898/630/2025/01, 8 Jan 2025Rs 2.5 to 6 crore (developer, Jan 2025)30 Nov 2031
Elan The Emperor, Elan Group106Flats, penthouses, Jan 20255854.827GGM/902/634/2025/05, 17 Jan 20254 BHK Rs 12.99 crore (listing, 2026)30 Sep 2032
The Palatial, Hero Homes104Flats, retail, Jun 2025170, 174 and 461 (3 phases)11.0901 licensedGGM/906/638/2025/09 and two more, Jan 2025Rs 4.68 to 6.15 crore (launch, reported, Jun 2025)30 Jun 2030
Amstoria Verti-Greens, BPTP102Flats, Mar 20258859.4292GGM/910/642/2025/13, 5 Feb 2025From Rs 3.38 crore with Gaia (developer, Nov 2026)14 Dec 2031
The Forest Reserve I and II, Krisumi36AFlats, Apr 2026298 and 2446.4868GGM/944/676/2025/47 and GGM/945/677/2025/48, 2 May 20253 BHK Rs 6.29 crore (listing, Nov 2026)30 Jun 2031
Twin Horizon, HCBS102Flats, Jul 20252685.2902GGM/948/680/2025/51, 15 May 2025From Rs 4 crore (launch, Jul 2025)15 Oct 2028
Westin Residences (HRERA: Urban Resort), Whiteland103Flats, May 20251,700 planned (reported)19.23Phases 4 and 6: GGM/949/681/2025/52 and GGM/950/682/2025/53, 16 May 2025At least Rs 5 crore (founder, Jul 2024)31 Dec 2032; phases 1 to 3: 30 Sep 2031
Gaia Residences, BPTP1023 BHK flats, Jul 20255311.6838GGM/963/695/2025/66, 27 Jun 2025As Verti-Greens31 Jul 2032
Delphine, Central Park104Studios, 3 and 4 BHK, Nov 20258927.8507GGM/996/728/2025/99 and two more, 16 Oct 20253 BHK from Rs 11 crore (reported at launch, Nov 2025)31 Aug 2032; Phase III: 30 Nov 2032
Residences by Elie Saab, M3M1114 BHK flats, Jan 20262962.7505GGM/992/724/2025/95, 16 Oct 2025From Rs 15 crore (developer, Jan 2026)29 Feb 2032
Sarvam at DXP Estate, Signature Global37DFlats, Dec 20252,15913.5656GGM/1008/740/2025/111, 7 Nov 2025Rs 3 to 4 crore (launch band in news, Dec 2025)31 Dec 2032
Estate 361, Max Estates36AFlats, senior living, Dec 20251,09614.2944GGM/1012/744/2025/115, 21 Nov 2025From Rs 6.65 crore (developer, Nov 2026)30 Sep 2033
Riviera at AIPL LakeCity, AIPL103Flats, priced May 20264125.1375GGM/1019/751/2025/122, 8 Dec 2025From Rs 17,450 per sq ft (launch, May 2026)30 Jun 2033
The Marq, Adani Realty102Flats, on sale by Nov 20263685.16GGM/1042/774/2026/14, 24 Feb 2026From Rs 4.60 crore (developer, Nov 2026)31 Dec 2031
Grandstand Phase 2, ATS HomeKraft99AFlats, Sep 20263623.568GGM/1082/814/2026/54, 17 Aug 2026Not published31 Mar 2031
The Iconic Residences, Signature Global37DFlats, no launch yet1162.303GGM/1101/833/2026/73, 6 Nov 2026Not published31 Aug 2032
Puri Diplomatic Residences, Puri Constructions111Flats, registered 20246925.4112GGM/787/519/2024/14, 19 Feb 2024About Rs 19,250 per sq ft (listings, Sep 2026)31 Mar 2032

Two rows sit outside the 2025 window a bit. Westin registered phases 1 to 3 on 18 Jun 2024 and phases 4 and 6 in May 2025, before its launch on 30 May 2025. Puri Diplomatic Residences, registered on 19 Feb 2024, is Phase B of the same licensed colony as Puri Diplomatic Greens, which is ready and has an OC dated 29 Aug 2016.

Estate 361 is in Sector 36A by Max Estates' account, though the register writes Sector 36. Its tower The Terraces opened on 13 May 2026 from Rs 2.4 crore.

How fast have the new Dwarka Expressway launches sold?

Builders file booking numbers with HRERA each quarter. Not audited sales, just what the developers declared.

Illustration of piling rigs at work on a new residential siteIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.
ProjectSales reportedSource, date
Urban Ascent657 of 816 flats bookedEmaar's HRERA filing, 30 Apr 2026
Elan The Emperor390 of 585 sold by 30 Sep 2026, 52 of them in 2026Elan's quarterly reports to HRERA
Amstoria Verti-Greens450 of 885 booked; Rs 1,500 crore on launch day (company claim)BPTP filing, Jun 2025; BPTP release, 4 Mar 2025
Estate 361Rs 3,451 crore sold, about 70% of launched unitsMax Estates deck, Nov 2026
The Terraces at Estate 361Phase 1 of 120 homes sold outMax Estates, Jul 2026
Residences by Elie Saab18 of 296 homes bookedM3M's revised HRERA filing, Jun 2026

Early sales at the 2025 launches were quick. Urban Ascent had 657 of its 816 flats booked by April 2026. At Elan The Emperor the pace eased: 211 units sold in April to June 2025 and 104 in the next quarter, then 12 to 23 a quarter up to September 2026.

The branded end is moving more slowly. M3M's June 2026 filing showed 18 of 296 homes booked at Residences by Elie Saab, though one project don't tell the whole story.

Supply, unsold homes and price levels on Dwarka Expressway in 2025 and 2026

ANAROCK's Dwarka Expressway report of September 2026 counts 38,680 homes supplied on the corridor from 2021 to H1 2026, with 10,770 still unsold in H1 2026. About 95% of the unsold stock are under construction, and ANAROCK reckons about 18 months to clear it at the current pace.

Fresh supply has dropped sharp. The expressway's share of Gurugram's new housing supply was 41% in 2024, 37% in 2025 and 16% in H1 2026, by ANAROCK's count.

Prices need care, because each series measures something different. ANAROCK's average basic selling price was Rs 14,180 per sq ft in H1 2026 on super built-up area, up 135% from Rs 6,032 in 2021. Its quarterly base-price rate, on built-up area, climbed from Rs 12,300 per sq ft in Q1 2025 to Rs 13,150 in Q3 2025 and Rs 14,000 in Q1 2026. That's an average of all primary stock, old and new.

New launches are a separate series and sit higher. PropEquity put the weighted average new-launch price at Rs 18,668 per sq ft in 2024. Developer launch rates go from Rs 17,450 per sq ft at Riviera (May 2026) to Rs 37,000 at Elie Saab (January 2026), and M3M expects about Rs 40,000 for Jacob & Co. They state no area basis, so they can't be lined up against ANAROCK's figure. Our Dwarka Expressway price tracker is a third series again, from our own desk.

Announced but not on HRERA yet: M3M Jacob & Co., Elan JW Marriott, MVN and Prestige

These were announced by a developer or applied to HRERA, but none was on the register on 27 Nov 2026. Every price and size here is an announcement, not a registered plan.

Illustration of a desk with a blank application file and calculatorIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.
ProjectSectorAnnounced or filedHRERA status, 27 Nov 2026
M3M Jacob & Co. Residences111Announced 18 Nov 2026: 120 homes averaging about 7,300 sq ft, from Rs 26 crore as announcedNot registered; no application notice on record
JW Marriott Residences, Elan Group106Announced 24 Aug 2026; 3, 4 and 5 BHK; units not disclosedNot registered
MVN Aero One Phase 237DApplied 14 Oct 2026 for 2.426 acres; hearing 5 Nov 2026; use not statedApplied, not registered
Prestige Group, unnamed project109Joint development deal for 17.1375 acres (Bar & Bench, 9 Sep 2026)No Prestige row in Sector 109
Estate 361 Phase 2, Max Estates36APart in FY27, part in FY28 (company)Not registered
Grandstand Phases 3 to 6, ATS HomeKraft99ASix phases approved; no timingNot registered

The 170 acres in some report on Jacob & Co. is M3M's Billionaire's Block enclave, not this project's land. For the JW Marriott homes, Elan Avenue Limited is the sole developer and promoter; Marriott lends the name and will manage them after completion.

Paying an EOI before RERA registration: the Section 3 risk

An EOI, or expression of interest, is a token payment that hold your place in the queue before a formal launch. Section 3 of the RERA Act, the national real estate law HRERA enforces in Haryana, bars a promoter from advertising, booking or selling units before the project is registered. So an EOI paid now for an unregistered project sits outside RERA protection.

The certificates show what goes missing. Delphine's require sale on carpet area at an all-inclusive price, with 70 percent of collections in a separate RERA account. Carpet area is the usable floor inside the flat; super area adds a share of corridors, lifts and the club.

HRERA has acted on this here before. In February 2021 it ordered a Rs 5 lakh penalty for advertising older Amstoria floors in Sector 102 before registration. Elan in the other hand says its JW Marriott sales will start only after RERA registration.

What to check before you pay for an upcoming project on Dwarka Expressway

  1. Search the HRERA Gurugram register by the registered name, which often is different to the brand: Westin Residences is Urban Resort there.
  2. If it isn't listed, look for a public notice of an application, like MVN's for Aero One Phase 2. Applied is not registered.
  3. Match the company on your receipt to the promoter on the certificate, such as Elan Avenue Limited for Elan The Emperor.
  4. Ask in writing if a token or EOI comes back in full, and by when, should the project not register or the price changes.
  5. Go by the HRERA completion date, not brochure. Add four months where HRERA's order of 11 Aug 2026 applies: projects registered by 31 Jul 2026 and due on or after 28 Feb 2026.
  6. Check the price is on carpet area at an all-inclusive figure, for your exact unit.
  7. Check the sector on the licence, so a Sector 88A or 92 project isn't passed off as an expressway one.

Which infrastructure matters for these possession dates?

Possession here falls between 2028 and 2034, so it helps to know which links are real. The whole expressway is open since 17 Aug 2025, when the Delhi stretch and its tunnel to IGI Airport opened; the Haryana stretch had opened on 11 Mar 2024.

The Gurugram Metro spur to Sector 101 is under construction. Phase 1, with its 1.85 km spur, started work in September 2025 and was about 15 per cent done by October 2026. The Chief Minister said in September 2025 it would be ready within four years, a target and not a date in any filing.

Other lines are proposals only. The Rezangla Chowk to Dwarka Sector 21 metro, 8.40 km with seven stations through Sector 111, got the state's approval of its DPR (detailed project report) in October 2022, but no Union sanction is on record. A Yashobhoomi to Gurugram route is one of eight sent for approval under Delhi Metro's Phase V (Hindustan Times, November 2026). The Namo Bharat corridor to Gurugram has no central sanction neither, as per a Lok Sabha reply of August 2026.

  • Global City, the state's HSIIDC township beside the road, was 80% done in August 2026, the Chief Minister said, with the rest due by December 2026.
  • The 883-bed teaching hospital in Sector 102 had a construction deadline of 31 Dec 2026 (The Tribune, October 2026).
  • Nearly 1.5 km of service road between Bijwasan and Elan Mall was unfinished still in November 2026 (Hindustan Times).

When will the upcoming Dwarka Expressway projects get possession?

The earliest HRERA completion date in our table is 15 Oct 2028, for HCBS Twin Horizon. The latest is 30 Sep 2033 for Estate 361, which becomes 30 Jan 2034 once HRERA's four-month order is added. AIPL's Aquaria, registered on 5 Jun 2026, is due on 31 Mar 2034.

Illustration of farmland on a city edge with new towers in the distanceIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.

Developers often talks of earlier dates than HRERA. M3M's brand announcement gave Elie Saab a 2030 completion against an HRERA date of 29 Feb 2032. The HRERA date is what counts if work slips.

Krisumi's first phase got its OC on 12 Dec 2024, about 11 months after its original HRERA date of 31 Dec 2023. With 95% of the unsold stock under construction, lots of towers will be handing over in the same few years. Something our locality guide flags as a risk for rents and resale prices.

Keeping track of new launches on Dwarka Expressway

Our new project launches page lists fresh launches across Gurgaon, and the Dwarka Expressway locality guide covers the sectors, the roads and the toll.

For something ready or nearer to handover, our guide to residential projects on Dwarka Expressway sorts homes by budget and possession. Before signing for any launch price, try the monthly payment on our home loan EMI calculator for the full ticket.

Questions

Frequently Asked Questions

How many new projects have registered on Dwarka Expressway since 2025? +

HRERA Gurugram lists 43 registrations in Dwarka Expressway sectors from 8 Jan 2025 to 6 Nov 2026. That count includes separate phases, plotted colonies, builder floors and some commercial blocks, so the number of distinct housing projects is smaller. The best known include Emaar Urban Ascent, Elan The Emperor, Westin Residences, Estate 361, Signature Global Sarvam and Central Park Delphine.

Is M3M Jacob & Co. Residences in Sector 111 RERA registered? +

Not as of 27 Nov 2026. M3M announced it on 18 Nov 2026 with 120 homes averaging about 7,300 sq ft, from Rs 26 crore as announced. There is no HRERA registration and no public notice of an application on record. Under Section 3 of the RERA Act, it cannot be booked or advertised for sale until it is registered.

Is it safe to pay an EOI for an upcoming Dwarka Expressway project? +

An EOI paid before HRERA registration sits outside RERA protection. Section 3 of the RERA Act bars booking or advertising before registration, so no registered plan, completion date or regulated project account stands behind the money. If a payment is made anyway, get the refund terms in writing and check that the company on the receipt is the promoter.

When will the new projects on Dwarka Expressway be ready? +

HRERA completion dates for the main 2025 and 2026 housing launches run from 15 Oct 2028 (HCBS Twin Horizon) to 31 Mar 2034 (AIPL Aquaria). HRERA's order of 11 Aug 2026 adds four months to projects registered by 31 Jul 2026 and due on or after 28 Feb 2026. Developer dates are often earlier, but the HRERA date is the one on record.

What do new launches on Dwarka Expressway cost in 2026? +

Developer prices for 3 and 4 BHK homes mostly start between Rs 2.5 crore and Rs 6.65 crore, for example Rs 4.60 crore at Adani The Marq in November 2026. The Terraces at Estate 361 opened from Rs 2.4 crore in May 2026. Branded towers start at Rs 11 crore (Delphine 3 BHK, as reported), Rs 15 crore (Elie Saab) and Rs 26 crore (Jacob & Co., as announced).

Is the metro coming to Dwarka Expressway? +

Partly. Phase 1 of the Gurugram Metro, with a 1.85 km spur to Sector 101 on the expressway, has been under construction since September 2025 and was about 15 per cent complete in October 2026. The Rezangla Chowk to Dwarka Sector 21 line and a Yashobhoomi to Gurugram route are still proposals, with no central sanction on record.

Has Elan launched JW Marriott Residences in Sector 106? +

No. Elan and Marriott announced the JW Marriott hotel and residences in Sector 106 on 24 Aug 2026, with 3, 4 and 5 BHK homes. The project was not on the HRERA register on 27 Nov 2026, its unit count is not disclosed, and Elan has said sales and marketing begin only after RERA registration.

Are projects in Sector 88A or Sector 92 on Dwarka Expressway? +

No. We count Sectors 99 to 115 (with 99A, 102A and 110A), 36A and 37B to 37D as Dwarka Expressway sectors. Projects in Sectors 76 to 79 and 84 to 95 are near the expressway, not on it, even when ads use its name. Our guide to upcoming residential projects in New Gurgaon covers those sectors.

Sources

  1. HRERA Gurugram, register of registered projects, read 27 November 2026
  2. HRERA Gurugram, registration certificates and Form REP-I filings for Urban Ascent, Elan The Emperor, The Palatial, BPTP Amstoria Verti-Greens, Gaia Residences, Delphine Central Park Estates Phases I to III, Estate 361, The Marq, ATS Grandstand Phase 2 and The Iconic Residences, read November 2026
  3. HRERA Gurugram, quarterly progress reports for Elan The Emperor, April 2025 to September 2026
  4. HRERA Gurugram, Form REP-I Part G in Emaar India's Marbella Phase 7 application, 30 April 2026
  5. HRERA Gurugram, revised Form REP-I for M3M Residences by Elie Saab, submitted 4 June 2026
  6. HRERA Gurugram, public notice of the application to register MVN Aero One Phase 2, 23 October 2026
  7. HRERA Gurugram, suo motu order RERA-GRG-4160-2020 (BPTP Amstoria floors), decided 11 February 2021
  8. ANAROCK Research, Dwarka Expressway Residential Real Estate Report, September 2026
  9. ANAROCK Research, NCR Residential Market Viewpoints, Q1 2025 to Q2 2026
  10. PropEquity data reported by PTI, 20 May 2025
  11. Savills India H1 2026 data reported by Business Today, 13 August 2026
  12. PTI, 26 January 2025, carried by Business Standard (Emaar Urban Ascent)
  13. Business Standard, 30 May 2025, and Economic Times, 4 July 2024 (Westin Residences)
  14. Business Standard, 24 November 2025 (Central Park Delphine)
  15. Business Today, 13 January 2026, and Construction World, 14 January 2026 (M3M Residences by Elie Saab)
  16. Business Standard and Construction World, 18 November 2026 (M3M Jacob & Co. Residences)
  17. Outlook Business (PTI), 24 August 2026, and the joint Elan and Marriott release (JW Marriott Residences Gurugram)
  18. Bar & Bench, 9 September 2026 (Prestige Group, Sector 109)
  19. Max Estates stock-exchange filings, December 2025 to November 2026, and the Estate 361 and The Terraces developer pages, read November 2026
  20. BPTP press releases, March and July 2025, and BPTP's Gaia and Verti-Greens page, read November 2026
  21. Adani Realty, The Marq project page, read 5 November 2026
  22. Construction World, 22 August 2025 (Landmark Skyvue) and 30 December 2025 (Signature Global Sarvam)
  23. Developer release on HCBS Twin Horizon, 23 July 2025; AIPL release on Riviera pricing, 14 May 2026
  24. Real estate media report of Hero Realty's launch of The Palatial, 3 June 2025
  25. Economic Times and Hindustan Times, 13 April 2026 (Krisumi new phases)
  26. Leighton Asia (CIMIC Group) news release, 3 June 2025 (Elan The Emperor construction)
  27. PIB, Dwarka Expressway Haryana section, 11 March 2024, and Delhi section, 17 August 2025
  28. PIB, Union Cabinet approval of the Gurugram Metro, 7 June 2023; Haryana Government press note, 5 September 2025; Swarajya, 1 October 2026
  29. Haryana Government, Rezangla Chowk to Dwarka Sector 21 metro DPR approval, 19 October 2022; Hindustan Times, 18 November 2026; PIB Lok Sabha reply on Namo Bharat corridors, 6 August 2026
  30. Haryana Government press note on Global City, 12 August 2026; The Tribune, 18 October 2026; Hindustan Times, 20 November 2026; CMV360, 3 April 2026 (toll)
  31. Asking prices in property listings, read October and November 2026
  32. Property Nivesh research: Dwarka Expressway locality guide and price tracker

Mentioned here

Projects in this analysis

Chat with Us +91 79824 13588
A man reading about property on his phone at home

Free advice

Have a question before you buy?

Get straight answers from our advisor on projects, prices, home loans and paperwork. Free, with no obligation.

Unbiased advice. Your data is never sold to builders or brokers.

Prefer WhatsApp? Chat with Us: +91 79824 13588