The Gurugram metro expansion is mostly under construction or on paper: only Rapid Metro runs, Phase 1 was about 11% built by June 2026 per HMRTC, and Phase 2 has bids but no award. The only quantified price evidence is a tentative 2025 study of about 20% to 30% within 500 m of a station, so near-metro gains are possible, not settled.
By Jaiprakash Mourya · Edited by
Rakesh Mahajan · · 12 min read
Illustrative image What does the Gurugram metro expansion mean for property prices?
The Gurugram metro expansion is mostly a building site and a stack of proposals so far. Only Rapid Metro runs today. Phase 1 of the Old Gurugram metro is being built for 2027 or 2028, depending on the newspaper, and every other line wait for a tender, an award or a sanction. Any effect on Gurugram metro property prices is so far a matter of expectation, not of trains.
One 2025 academic paper found a tentative premium of about 20% to 30% for plotted homes within 500 m of a station. It fades beyond 1.5 to 2 km. That is one paper on 300 properties, so the honest word is "may", and this post goes line by line to show what stage each one actually have reached.
Roads and water are in our upcoming infrastructure projects in Gurgaon guide; here we stays with rail.
Every Gurugram metro and rail line, with status and target
Start with the stage, because a line on paper and a line with a contractor is very different things for a buyer.
| Line | Stage (as of date) | Target or next step | Source |
|---|---|---|---|
| Rapid Metro Gurugram | Open; transfer from DMRC to GMRL began Sep 2025 | No date for completing the transfer | Construction World, 13 Oct 2026 |
| Gurugram Metro Phase 1: Millennium City Centre to Sector 9, spur to Sector 101 | Under construction since 5 Sep 2025; about 11% built to June 2026 | 2028 (Business Standard) or 2027 (Times of India), both reported | Government of Haryana, 21 Jul 2026; Business Standard, 1 Oct 2026 |
| Gurugram Metro Phase 2: Sector 9 to Cyber City | Civil bids received 9 to 18 Nov 2026; no award | About 30 months from award; whole corridor 2029 (reported) | Hindustan Times, 23 Nov 2026 |
| Sector 56 to Pachgaon metro | Proposal; revised DPR being finalised | Haryana approval, then Union sanction; no tender | ThePrint (PTI), 11 Sep 2026 |
| Bhondsi to Gurugram Railway Station metro | Proposal; RITES preparing the DPR | Alignment choice, DPR, approvals | Swarajya citing Hindustan Times, 17 Jun 2026 |
| Rezangla Chowk to Dwarka Sector 21 metro | Haryana DPR approval 19 Oct 2022; no Union sanction | Union sanction | Government of Haryana, 19 Oct 2022 |
| Yashobhoomi to Rajiv Chowk (Delhi Metro Phase V) | One of eight routes submitted for approval | Approvals; no length or cost published | Hindustan Times, 18 Nov 2026 |
| Namo Bharat: Sarai Kale Khan to Gurugram to Bawal | Not sanctioned; Public Investment Board clearance Nov 2025 | Union Cabinet sanction, then tenders | Swarajya, 19 Oct 2026 |
| Namo Bharat: Gurugram to Faridabad to Noida | DPR done Dec 2025; awaiting state and central approval | State and Union approvals | Business Today, 30 Jun 2026 |
A target date here is a stated aim on that date, not a promise, and several already disagree with each others.
Old Gurugram metro Phase 1: Millennium City Centre to Sector 9 and Sector 101
The whole Old Gurugram metro is a 28.5 km elevated line with 27 stations, built by GMRL, a 50:50 venture of the Centre and Haryana. The Union Cabinet approved it on 7 June 2023 at ₹5,452.72 crore (PIB). Haryana's Cabinet approved a revised ₹10,266.54 crore on 18 May 2026, nearly twice more. A Union approval of that revision isn't on record yet.
Phase 1 have 14 stations, as DNA India listed them on 16 February 2024: HUDA City Centre, Sector 45, Cyber Park, Sector 47, Subhash Chowk, Sector 48, Sector 72A, Hero Honda Chowk, Udyog Vihar Phase 6, Sector 10, Sector 37, Basai Village, Sector 101 and Sector 9. A Dilip Buildcon and Ranjit Buildcon joint venture holds the civil contract, ₹1,277 crore plus GST over 30 months. Work began on 5 September 2025.
Progress figures don't agree. HMRTC put physical progress at about 11% up to June 2026. Later news reports said about 15% (Hindustan Times, October) and 30% to 35% (Times of India, October and November). GMRL has finalised Dilip Buildcon's ₹419.47 crore bid for the Sector 33 depot (Hindustan Times, 14 November 2026).
Two knots is still open. The Sector 10 station waits on 0.92 ha of forest land, now sitting with GMDA (Hindustan Times, 27 October 2026). The Bakhtawar Chowk road-and-metro double-decker design was still waiting for GMDA approval on 27 November 2026, the day GMDA told officials to fast-track metro approvals.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Phase 2 to Cyber City: bids are in, no contract yet
Phase 2 runs from Sector 9 to Cyber City. Its 13 stations are Sector 7, Sector 4, Sector 5, Ashok Vihar, Sector 3, Bajghera Road, Palam Vihar Extension, Palam Vihar, Sector 23A, Sector 22, Udyog Vihar Phase 4, Udyog Vihar Phase 5 and Cyber City. Its length are reported two ways, 14.2 km by Hindustan Times and 15.3 km by Swarajya and Business Standard in October 2026.
Illustrative imageGMRL floated a civil tender of about ₹1,662 crore on 5 October 2026, World Bank financed. Bids came in between 9 and 18 November. A land purchase notice of 19 November 2026 covers 2,529.714 sq m in Gurugram, Dundahera and Carterpuri villages (Hindustan Times, 23 November).
No award was reported as of 28 November 2026. Building takes about 30 months from the award, so the end date depend on when that award lands. The revised cost also includes a spur of about 1.8 km from Sector 5 to Gurugram Railway Station at ₹454.32 crore. A buyer in Palam Vihar counting on this line are buying a timeline, not a service.
Rapid Metro Gurugram: the only line running today
Rapid Metro Gurugram is a loop from Sikanderpur through DLF Cyber City and along Golf Course Road to Sectors 55 and 56. It carried 8,881,000 riders from April to August 2026, up 11.62% on a year earlier (Construction World, 13 October 2026, from HMRTC's 66th board meeting).
Operation started moving from DMRC to GMRL in September 2025, and no date for finishing that transfer has been published. The revised metro cost sets aside ₹947.06 crore to integrate Rapid Metro with the GMRL network.
This is the one belt where metro access is already a fact. So any premium is likely in the price already, not waiting to arriving. Our Golf Course Road line stood at ₹32,000 per sq ft in 2025, up from ₹14,500 in 2020. Scarce land drive that rise too, so it isn't a metro effect alone.
Dwarka Expressway metro: one spur being built, two links on paper
The Dwarka Expressway metro story has three parts, and only one is under construction. The Sector 101 station is a Phase 1 spur and shares its timeline. The Dwarka Expressway itself, the 19 km Haryana section to Kherki Daula, opened on 11 March 2024 (PIB).
The Rezangla Chowk to Dwarka Sector 21 link is 8.4 km at ₹1,891.56 crore. It has 7 stations, 4 in Gurugram including Sectors 110 and 111. Haryana approved its DPR on 19 October 2022, and a Union sanction isn't on record. The Yashobhoomi to Rajiv Chowk route is one of eight Delhi Metro Phase V routes sent for approval (Hindustan Times, 18 November 2026), with no length, stations or cost.
For context, ANAROCK's NCR Q2 2026 Residential Market Viewpoints put Dwarka Expressway at ₹14,180 per sq ft, up 1% on the quarter. That is its average quoted base price, primary market, super built-up area. Business Today, on 19 November 2026, found no transaction data to show a premium from the Yashobhoomi proposal.
The proposals: Sector 56 to Pachgaon, Bhondsi and the Faridabad link
The longest proposal is the Sector 56 to Pachgaon line: 35.25 km, 28 stations, about ₹8,500 crore by a RITES DPR estimate (Swarajya, September 2025). Its stage are described three ways. Our city page, citing The Tribune of 1 January 2026, said state funding approval and a final DPR. A Chief Secretary review on 11 September 2026 asked agencies to finalise the revised DPR (ThePrint, PTI), and HMRTC called it in the final approval stage in October 2026.
Illustrative imageNone of that is a sanction or a tender; our Panchgaon metro post follows its southern end.
The Bhondsi to Gurugram Railway Station line is earlier still. Swarajya, citing Hindustan Times on 17 June 2026, gave a tentative 20 km, 17-station alignment; earlier reports said about 17 km. It passes Badshahpur, Sector 65, Sector 67, South City-II, Sector 47 and Medanta and meet Phase 2 at Sector 5. There is no approval.
The Gurugram to Faridabad to Noida Namo Bharat line would stop at IFFCO Chowk, Sector 61 and Gwal Pahari on the Gurugram side. Its DPR cost of ₹19,390 crore (Business Today, 30 June 2026) awaits approval; more in our post on the Gurgaon-Faridabad Road and property prices.
Namo Bharat in Gurugram: Delhi to Bawal and the TOD zones
The Namo Bharat Gurugram corridor, Sarai Kale Khan to Gurugram to Bawal, is regional rail rather than metro. Its revised plan is 93.12 km and 13 stations at ₹32,327.09 crore, with Public Investment Board clearance, as summarised from UNI on 23 September 2026. A proposed Behror extension would take the total to nearly ₹43,000 crore (Construction World, 6 August 2026).
It is still not sanctioned. NCRTC said in October 2026 it expects approval soon (Swarajya, 19 October).
What has moved is land-use policy. Haryana notified the revised alignment under its TOD (transit-oriented development) policy on 22 September 2026. Then DTCP brought land within 1.5 km of 12 Gurugram RRTS stations under TOD rules (Hindustan Times, 29 September 2026). TOD allows denser building near stations, so it can change what a plot may carry before any train runs. The zoning split still have to come.
Which sectors sit along each line?
Our locality lines are added only as context; they are belt averages, not station-level figures.
| Belt | Stations named | Line and stage | Our locality line, 2025 (context) |
|---|---|---|---|
| Sector 45, Sohna Road (Sectors 47, 48), Subhash Chowk | 6, HUDA City Centre to Sector 48 | Phase 1, under construction | No locality line; city tracker ₹16,500 per sq ft (Oct 2026) |
| Sector 72A, Hero Honda Chowk, Sectors 9, 10, 37, Basai | 7, Sector 72A to Sector 9 | Phase 1, under construction | No locality line |
| Dwarka Expressway (Sector 101) | Sector 101 | Phase 1 spur, under construction | Dwarka Expressway ₹13,500 per sq ft |
| Old Gurugram Sectors 3 to 9, Palam Vihar, Sectors 22, 23A, Udyog Vihar | 13, Sector 7 to Cyber City | Phase 2, bids received, no award | No locality line |
| Cyber City and Golf Course Road (Sectors 53 to 56) | Sikanderpur to Sectors 55 and 56 | Rapid Metro, open | Golf Course Road ₹32,000 per sq ft |
| Golf Course Extension Road (Sectors 61, 65, 66) and SPR (Sectors 49, 50) | Sectors 56, 61, 65, 66, 50, 49 | Sector 56 to Pachgaon, proposal | Golf Course Extension Road ₹19,500; SPR ₹15,500 per sq ft |
| New Gurgaon (Sectors 84, 86, 90), Global City, IMT Manesar | Kherki Daula, Global City, Sectors 84, 86, 90, Panchgaon | Sector 56 to Pachgaon, proposal; Kherki Daula and Panchgaon also on Namo Bharat | New Gurgaon ₹11,000 per sq ft |
| Palam Vihar, Sectors 110 and 111 | 4 Gurugram stations incl. Sectors 110 and 111 | Rezangla Chowk to Dwarka Sector 21, Haryana DPR only | No locality line |
Sources: DNA India, 16 Feb 2024; Swarajya, 17 Sep 2025; Government of Haryana, 19 Oct 2022; our locality lines and city tracker as of 11 Oct 2026 (average asking price across projects we track). The Golf Course Extension Road page has that belt's history.
What the evidence says about prices near metro stations
Here the evidence get thin fast. No consultancy study of a metro-station premium in Gurugram is on record. ANAROCK, Knight Frank, JLL and CBRE hasn't put a number on one. What exist is one academic paper and some context.
Illustrative image| Evidence | Source and date | What it says | Weight |
|---|---|---|---|
| Hedonic study of 300 plotted properties, 2007 to 2024 | Manoj Panwar and Sneh Fandian, Journal of Contemporary Urban Affairs, 2025 | Within 500 m: 20% to 25% after announcement, about 30% after operations; falls about 12% per km, gone beyond 1.5 to 2 km; about half came before operations | Tentative: one paper, plots only, price-data source and stations not stated |
| Collector rate revisions from 1 Apr 2026 | The Tribune, 6 Apr 2026 | DLF Phases 1 to 5 up 45% to 75%; New Colony and Delhi Road residential up 25% to 45%; Sikanderpur Ghosi up 75% | Official rates, not market prices |
| Yashobhoomi route | Business Today, 19 Nov 2026 | No transaction data to establish a premium | Shows the gap |
| Premium homes on Golf Course Extension Road and SPR | Savills India Research, H1 2026 | Completed values up 2% and rents up 2% in the year to June 2026 (homes ₹2 crore and above, saleable area) | Context only |
A collector rate is the state's minimum value for a property. Stamp duty is charged on the higher of the deal value and the collector rate value. Its rise moves your duty bill, not what a buyer will pay. The study's note that about half the gain came before trains run is worth sit with: early buyers took the gain and the delay risk both. Past growth does not predict future growth.
Where to go next
One line runs, one is being built, one has bids, and the rest are on paper. Our Gurgaon infrastructure impact report tracks them as they move. The Gurgaon city page and Gurgaon property rates shows where each belt prices now.
Projects outside the city are in upcoming infrastructure projects near Gurgaon. For how sectors may fill in, see which Gurgaon sectors will develop in the next 5 years.
Questions
Frequently Asked Questions
Which Gurugram metro line can I ride today? +
Only Rapid Metro Gurugram is running. It loops from Sikanderpur through DLF Cyber City and along Golf Course Road to Sectors 55 and 56. Operation began moving from DMRC to GMRL in September 2025, and no date for completing that transfer has been published. Phase 1 of the Old Gurugram metro is still under construction.
When will Gurugram Metro Phase 1 open? +
There is no single official date. Business Standard reported on 1 October 2026 that Phase 1 is scheduled for 2028, while the Times of India said 2027. The Chief Minister spoke of the whole line within four years of September 2025. HMRTC put progress at about 11% up to June 2026, so treat every date as a target.
Does a metro station raise nearby home prices in Gurugram? +
It may. A 2025 paper in the Journal of Contemporary Urban Affairs on 300 plotted properties found about 20% to 25% growth after announcement and about 30% after operations within 500 m of a station, fading beyond 1.5 to 2 km. It is one tentative study on plots, and its price-data source is not stated.
Is the Dwarka Expressway metro approved? +
Only partly. The Sector 101 station is a spur of Phase 1 and is under construction. The Rezangla Chowk to Dwarka Sector 21 link has Haryana DPR approval from 19 October 2022 but no Union sanction on record. The Yashobhoomi to Rajiv Chowk route is one of eight Delhi Metro Phase V proposals sent for approval in November 2026.
What does the TOD status near Namo Bharat stations change? +
TOD, or transit-oriented development, lets land near stations be built more densely. DTCP brought land within 1.5 km of 12 Gurugram RRTS stations under TOD rules in September 2026, per Hindustan Times. The corridor itself is not sanctioned yet, and the zoning split and project approvals still have to follow, so check what applies to a specific plot.
Why do collector rates near metro routes matter if they are not prices? +
Stamp duty is charged on the higher of the deal value and the collector rate value. The Tribune reported rises of 45% to 75% in DLF Phases 1 to 5 and 25% to 45% in New Colony and Delhi Road residential areas from 1 April 2026. Those raise your duty floor, but they do not show what buyers actually pay.
How much will the Gurugram metro cost now? +
The Union Cabinet approved the 28.5 km line at ₹5,452.72 crore on 7 June 2023. The Haryana Cabinet approved a revised ₹10,266.54 crore on 18 May 2026, which includes a Sector 5 to railway station spur and Rapid Metro integration. A Union approval of the revised figure is not on record yet.
Is the Sector 56 to Pachgaon metro line sanctioned? +
No. It is a proposal of 35.25 km and 28 stations at about ₹8,500 crore, a RITES estimate reported in September 2025. A Chief Secretary review on 11 September 2026 asked agencies to finalise the revised DPR, and HMRTC called it in the final approval stage in October 2026. There is no tender.
Sources
- PIB, Union Cabinet approves Metro connectivity from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram, 7 June 2023
- Government of Haryana, Haryana Cabinet decision on revised cost of Gurugram Metro (₹10,266.54 crore), 18 May 2026
- Government of Haryana, press release on HMRTC review: Gurugram Metro physical progress about 11% up to June 2026, 21 July 2026
- Government of Haryana (PR Haryana press note 176), Gurugram Metro Bhoomi Pujan, Sector 44, 5 September 2025
- Business Standard, Gurugram Metro Phase 2: Haryana clears Rs 1,662 crore civil works package, 1 October 2026
- Construction World, Dilip-Ranjit JV wins Rs 12.77 billion Gurugram Metro contract, 18 August 2025
- DNA India, list of 27 Gurugram Metro stations at the foundation stone, 16 February 2024
- Hindustan Times, GMRL floats Rs 1,662 crore tender for Phase 2 corridor to Cyber Hub, 6 October 2026
- Hindustan Times, Land purchase process notified for metro phase two, 23 November 2026
- Hindustan Times, GMRL finalises bidder for construction of Gurugram metro depot, 14 November 2026
- Hindustan Times, GMRL seeks transfer of forest land for construction of Sector 10 Metro station, 27 October 2026
- Hindustan Times, GMDA to fast-track approvals, utility shifting for Gurugram metro, 27 November 2026
- The Times of India, Deadlock holds up double-decker flyover-metro at Bakhtawar Chowk in Gurgaon, 21 October 2026
- Construction World, Gurugram Rapid Metro ridership rises 11.62 per cent to 8,881,000 (HMRTC 66th board meeting), 13 October 2026
- The Daily Jagran, HMRTC begins Gurugram Rapid Metro transfer to GMRL, 16 September 2025
- Swarajya, Pachgaon metro line nears approval, 17 September 2025
- ThePrint (PTI), Haryana chief secy reviews Sector 56-Panchgaon metro project, 11 September 2026
- Swarajya (citing Hindustan Times), Gurugram may get new metro from Bhondsi to railway station, 17 June 2026
- Government of Haryana (PR Haryana), Council of Ministers approves metro from Rezangla Chowk to Sector 21 Dwarka, 19 October 2022
- Hindustan Times (citing an RTI reply seen by PTI), Yashobhoomi to Gurugram among 8 routes proposed under Delhi Metro's new project, 18 November 2026
- Business Today, Dwarka Expressway property prices: will the proposed Yashobhoomi-Gurugram metro fuel another rally?, 19 November 2026
- Swarajya, NCRTC expects approval soon for Delhi-Gurugram-Behror Namo Bharat corridor, 19 October 2026
- UNI, Haryana includes revised Sarai Kale Khan-Gurugram-Bawal Namo Bharat corridor under TOD policy, 23 September 2026
- Construction World, Namo Bharat Corridor Proposed To Be Extended To Behror, 6 August 2026
- NCRTC, NCRTC Board approves DPR of Delhi-Gurugram-SNB RRTS corridor, 6 December 2018
- Hindustan Times, Areas within 1.5km of 12 Gurugram RRTS stations get TOD status, 29 September 2026
- Business Today, Rs 19,390 crore Namo Bharat project (Gurugram-Faridabad-Noida), 30 June 2026
- The Tribune, Rs 15,000 crore RRTS to link Gurugram, Faridabad with Noida, Greater Noida, 26 May 2025
- PIB, PM inaugurates Haryana section of Dwarka Expressway, 11 March 2024
- Manoj Panwar and Sneh Fandian, Influence of the Mass Rapid Transit System on Plotted Residential Property Prices: A Case Study of Gurugram, India, Journal of Contemporary Urban Affairs, Vol 9 No 2, 2025
- The Tribune, Property prices along Ggram Metro expansion routes surge, 6 April 2026
- Savills India Research, Delhi-NCR Residential Market Watch, H1 2026
- ANAROCK Research, NCR Q2 2026 Residential Market Viewpoints, 3 August 2026
- Property Nivesh, Gurgaon city tracker and locality lines (Dwarka Expressway, Golf Course Road, Golf Course Extension Road, New Gurgaon, SPR), as of 11 October 2026