Global City Gurugram, Dwarka Expressway
Is Global City Gurugram a good investment? Dwarka Expressway prices, demand and risks
Global City Gurugram is a township of more than 1,000 acres beside the Dwarka Expressway, spread over parts of Sectors 36, 36B, 37 and 37B. As of 28 November 2026, no home project on its land is on HRERA Gurugram's register, so nobody can yet buy a flat inside it. For now, any Global City investment is really a position on the corridor around it.
The township is developed by the Haryana State Industrial and Infrastructure Development Corporation (HSIIDC), which the Haryana government owns in full. HSIIDC builds trunk roads and services and sells large parcels to companies by e-auction. Homes will only come through developer projects on those parcels.
Below are corridor prices and rents from named research firms, labelled views, the routes open to an investor, entry costs and the risks, each with a way to check it. We give no forecast.
- Developer
- HSIIDC, 100% owned by the Haryana government
- Township size
- More than 1,000 acres (HSIIDC)
- Home projects on HRERA register
- None on Global City land, 28 November 2026
- Corridor average price, H1 2026
- Rs 14,180 per sq ft, super built-up (ANAROCK)
- Unsold homes on the corridor
- 10,770 units in H1 2026 (ANAROCK)
- Phase-one progress claims
- 80% (CM, Aug 2026); about 70% (minister, Nov 2026)
The short answer
- ANAROCK Research puts the Dwarka Expressway average at Rs 14,180 per sq ft (super built-up) in the first half of 2026, up 135% from Rs 6,032 in 2021.
- Momentum has cooled: ANAROCK recorded a 1% quarterly rise in Q2 2026, and Savills a 1% annual rise in under-construction values in H1 2026.
- Corridor rents rose 87% from 2021 to H1 2026 against 135% for prices, per ANAROCK, so gross rental yields have thinned.
- ANAROCK counted 10,770 unsold homes on the corridor in H1 2026, about 18 months of sales, with nearly 95% still under construction.
- No project on Global City land is on HRERA Gurugram's register as of 28 November 2026, and HSIIDC has published no auction result.
- Progress claims differ: the Chief Minister said 80% of physical work was done on 12 August 2026; Minister Rao Narbir Singh was quoted at about 70% of phase one on 21 November 2026.
Is Global City a good investment?
It is too early to call, because there is no Global City home to buy. HSIIDC sells only large parcels to companies, no auction result has been published, and no project on township land is registered with HRERA Gurugram as of 28 November 2026. What an investor can hold today is property in the corridor around it.
HRERA is the Haryana Real Estate Regulatory Authority, which registers housing projects under the RERA Act of 2016. Without a registered project, there is no carpet area, price list or completion date to judge. That is the first fact any investment case has to start from.
What is on record is trunk infrastructure work. The Chief Minister said on 12 August 2026 that 80% of physical work was done and the rest would finish by December 2026. Minister Rao Narbir Singh was quoted by The Times of India on 21 November 2026 at about 70% of phase one, with land allotment to investors to follow. The full sequence is on our Global City timeline.
The township may interest people already looking at Sectors 36A, 37C or 37D who want to know what is planned next door, and long-horizon investors willing to wait for registered launches. It suits less well anyone who needs rent from Global City itself soon, or a fixed handover date.
What this page does not do
This page reports what named sources say and shows simple sums from their figures. It does not predict prices, rents, possession or returns, and it is not a recommendation to buy or to stay away.
What is the price trend in nearby sectors?
ANAROCK Research puts the Dwarka Expressway corridor's average basic selling price at Rs 14,180 per sq ft in the first half (H1) of 2026, up from Rs 6,032 in 2021, a rise of 135%. Gurugram's city average in the same period was Rs 13,350, so the corridor sits about Rs 830 per sq ft above the city.
ANAROCK quotes these rates on super built-up area, which is the flat's carpet area plus a share of walls, lobbies and common areas. Carpet area, the usable floor inside the walls, is the measure RERA uses. A rate per sq ft of carpet area is therefore always higher than the same flat's super built-up rate, so compare like with like.
Recent momentum is slower than the five-year figure suggests. ANAROCK's Q2 2026 viewpoint shows the corridor's quoted rate up only 1% on the previous quarter. Savills India found completed homes of Rs 2 crore and above up 6% year on year in H1 2026, the most in Gurugram, while under-construction values rose 1% and residential plot values 16%.
Two project-level figures sit next to the township. ANAROCK listed Signature Global's Sarvam in Sector 37D among Q1 2026 launches at Rs 15,000 per sq ft. Max Estates said its Estate 361 in Sector 36A averaged about Rs 22,000 per sq ft in FY2026 pre-sales of about Rs 1,704 crore. Signature Global's 37D projects are its own colonies, not part of HSIIDC's township. Our Dwarka Expressway locality page covers the wider belt.
| Measure | Figure | Period | Source |
|---|---|---|---|
| Corridor average basic selling price | Rs 14,180 per sq ft (super built-up) | H1 2026 | ANAROCK, September 2026 |
| Corridor average basic selling price | Rs 6,032 per sq ft | 2021 | ANAROCK, September 2026 |
| Change in corridor price | 135% | 2021 to H1 2026 | ANAROCK, September 2026 |
| Gurugram city average | Rs 13,350 per sq ft | H1 2026 | ANAROCK, September 2026 |
| Quoted rate, quarter on quarter | 1% | Q2 2026 | ANAROCK, 3 August 2026 |
| Completed homes, Rs 2 crore and above | 6% year on year | H1 2026 | Savills India, 22 July 2026 |
| Under-construction values | 1% year on year | H1 2026 | Savills India, 22 July 2026 |
| Residential plot values | 16% year on year | H1 2026 | Savills India, 22 July 2026 |
| 2 BHK rent, about 1,000 sq ft | Rs 25,000 to 31,250 a month | H1 2026 | ANAROCK, September 2026 |
| Change in 2 BHK rent | 87% | 2021 to H1 2026 | ANAROCK, September 2026 |
| Rent change | 22% year on year | H1 2026 | Savills India, 22 July 2026 |
| Gurugram rental yield (city) | 4.3% (3.5% in 2019) | Q2 2026 | ANAROCK data reported by Upstox, 7 August 2026 |
| Sarvam, Sector 37D, launch rate | Rs 15,000 per sq ft | Q1 2026 | ANAROCK, 7 May 2026 |
| Estate 361, Sector 36A, average realisation | about Rs 22,000 per sq ft | FY2026 | Max Estates, 6 April 2026 |
Land reserve prices are not home prices
HSIIDC's reserve prices for Global City parcels are land rates for whole sites with their own FAR and use rules. They are not a guide to flat prices, and we never turn them into one. They are set out on our Global City price page.
Illustrative image Rents and rental yield on the Dwarka Expressway
Rents on the corridor have risen, but not as fast as prices. ANAROCK found 2 BHK rents up 87% from 2021 to H1 2026 while prices rose 135%. Savills reported corridor rents up 22% year on year in H1 2026, the fastest in Gurugram. When prices outrun rents, the gross yield an owner earns gets thinner.
A simple sum shows the scale. A 1,000 sq ft flat at ANAROCK's corridor average of Rs 14,180 per sq ft comes to about Rs 1.42 crore. ANAROCK's rent band of Rs 25,000 to 31,250 a month gives Rs 3 lakh to Rs 3.75 lakh a year, a gross yield of about 2.1% to 2.6% before maintenance, tax and empty months.
That is an illustration, not a price for any flat. ANAROCK's city-level yield of 4.3% for Gurugram in Q2 2026 is worked out on its own basis, so the two numbers are not like for like. Run your own figures through our rental yield calculator with the actual price and rent of the unit you are weighing.
What could Global City mean for the Dwarka Expressway corridor?
ANAROCK, in its September 2026 corridor report, described Global City as a major employment generator that would anchor long-term housing demand. That is ANAROCK's view, not a measured result. The township has no offices, residents or jobs yet, and the only figures for its future scale come from government statements and consultants.
- ANAROCK (September 2026): calls Global City a major employment generator; its infrastructure table lists the township at Rs 70,000 crore without explaining the basis, and places it in a 25 to 30 minute travel band from the corridor.
- Chief Minister Nayab Singh Saini (11 April 2025): over Rs 1 lakh crore of investment, about five lakh jobs on completion and about 16 lakh people benefiting. These are government projections.
- Industries Minister (12 July 2018): an investment potential of USD 15 billion.
- The Tribune (29 October 2026): DLF, M3M, Godrej Properties, Sobha and Signature Global have shown interest. Interest is not a purchase, and no source names a buyer.
- Government of Haryana (11 April 2025): the Chief Minister met 14 private groups at the site.
The figures do not agree with each other, and none is a commitment. Read them as statements of intent. ANAROCK's report also carries its own price projection for 2027; we leave forecasts out of this page.
Global City could also add housing supply. HSIIDC's 2023 parcels are mixed-use with set limits: residential use was capped at 30% of built-up area on Parcel B2 and 35% on Parcels A and B1, while Parcel C2 required at least 50% residential. Hindustan Times reported about 12 million sq m of built-up area for the whole township. How many homes that means has not been published. The master plan page covers the land-use rules.
Ways an investor can take exposure to Global City
There are three routes in principle, and only one is open to an individual today: a home in a registered project in the sectors around the township. A project on an auctioned Global City plot does not exist yet, and bidding for land directly is built for large companies, not households.
1. A home in a neighbouring registered project
Sectors 36A, 37C and 37D have registered and completed projects. Krisumi City Phase I in Sector 36A received its occupation certificate (OC, the permit to occupy a finished building) from DTCP Haryana on 12 December 2024 for 433 flats, and Hindustan Times reported that its land abuts Global City. Max Estates' Estate 361 in Sector 36A is on HRERA's register. Check each project's own record; being near the township is not a feature you can verify in a document.
2. A future project on an auctioned plot
Under section 3(1) of the RERA Act, no promoter may advertise, book or sell a home before registering the project. HSIIDC's bid documents also oblige allottees to follow the RERA Act and Haryana's RERA rules. Any expression of interest (EOI) or token money sought for a 'Global City project' before registration is a warning sign. See our RERA status page for how to check.
3. Bidding for land
HSIIDC registers bidders as a company or firm and set minimum net worth at Rs 273.51 crore for Parcel B2 (bid document of 16 March 2023) and Rs 327.25 crore for Parcel C2 (bid document of 20 September 2023). Bidders also paid an earnest money deposit (EMD) of 2% of the reserve price and a Rs 5 lakh fee. The process is laid out on our How to Bid page and, across Haryana, in our guide to the HSIIDC plot scheme.
If you would rather wait, Property Nivesh runs auction and project-launch alerts for Global City; you can ask for them through our contact page.
Illustrative image Entry and holding costs to plan for
For a home bought by an individual in Haryana, stamp duty is 7% for men, 5% for women and 6% for joint owners, and the registration fee is 1% capped at Rs 50,000. RERA allows a developer to take no more than 10% of the price before the agreement for sale is signed. These apply to registered projects near the township.
| Item | Rule | Amount |
|---|---|---|
| Stamp duty, male buyer | 7% | Rs 9.93 lakh |
| Stamp duty, female buyer | 5% | Rs 7.09 lakh |
| Stamp duty, joint owners | 6% | Rs 8.51 lakh |
| Registration fee | 1%, capped at Rs 50,000 | Rs 50,000 (1% would be Rs 1.42 lakh) |
| Most a developer can take before the agreement | 10% under RERA | Rs 14.18 lakh |
Holding costs depend on the project. An under-construction flat ties up money with no rent, and ANAROCK says nearly 95% of unsold corridor stock is still under construction. Ask the developer in writing for maintenance charges, any club or power-backup fees and the possession date in the RERA filing. Our stamp duty calculator handles the duty sums.
Inside Global City, HSIIDC's 2023 bid documents say HSIIDC will maintain the township at no extra cost until 31 December 2033, after which allottees pay the actual cost in proportion to built-up area. How a developer would pass that on to flat owners has not been published.
What are the risks?
The main risks are timing, unknown auction outcomes, supply already on the corridor, road and metro links that are still plans, drainage in neighbouring sectors, and an open court case named in the 2023 bid document. Each is set out below with what the record shows and how a buyer can check it.
| Risk | What the record shows | How to check |
|---|---|---|
| Works running late | HSIIDC's MD gave October 2026 for phase one (September 2023); the CM said 80% done, rest by December 2026 (12 August 2026); the minister was quoted at about 70% (TOI, 21 November 2026) | Look for HSIIDC's offer of possession to allottees, which comes only once road, water, sewerage and construction power reach a site |
| Auction outcome unknown | The Daily Jagran (13 April 2025) said three tenders drew no bids; ThePrint (14 August 2026) said auctions were held in November and December 2023 and quoted an unnamed officer on interest or acquisitions; no official result | Treat any claim of a 'Global City allotment' as unproven until a developer shows HSIIDC's allotment letter |
| No registered home project | HRERA Gurugram's list read on 28 November 2026 shows none on Global City land | Search the HRERA register by sector and promoter before paying anything |
| Supply on the corridor | 10,770 unsold units, about 18 months of sales, nearly 95% under construction (ANAROCK, H1 2026) | Compare launch prices with ready resale stock; ask for the OC on finished towers |
| Road access | Underpass under the expressway due to start in December 2026 (TOI); NH-48 third access at alignment stage with legal issues (TOI, 21 November 2026); 582 m of service road on hold (HT, 20 November 2026) | Ask for work orders or award notices, not announcements |
| Metro | Sector 56 to Panchgaon line names Global City as a stop; revised DPR ordered on 11 September 2026; the CM's August 2026 Namo Bharat line has no route or sanction | Treat as a proposal until a sanction is published |
| Drainage nearby | GMDA's drain for Sectors 37C and 37D still awaited approval in October 2026 (TOI); Pataudi Road among the worst-hit roads on 7 July 2026 (The Tribune) | Visit in the monsoon and ask the developer about site drainage |
| Pending litigation | HSIIDC's September 2023 bid document made the auction subject to writ CWP No. 6797 of 2023; its status is not public | Ask for the litigation disclosure in any future RERA filing |
| Slowing momentum | Quoted rates up 1% in Q2 2026 (ANAROCK); under-construction values up 1% in H1 2026 (Savills) | Track resale against launch rates over several quarters |
A DPR is a detailed project report, the costed design that comes before a sanction. Plans at DPR or alignment stage can change or stall. Our location page tracks each road and rail link, and our news report on the Global City road links explains the proposed third access. Land history and court cases are covered on the reviews page.
Checks before you put money down
Whether you buy near the township now or wait for a launch on its land, the same short list of checks protects you. Most take an hour online or one written question to the developer. None needs a forecast, only documents that either exist or do not.
- Find the project on HRERA Gurugram's register and note its registration number, carpet area and declared completion date.
- If a project claims to be on Global City land, ask for HSIIDC's allotment letter for the plot. HSIIDC's terms let an allottee sell or lease built space only after paying in full for the phase where it lies.
- Pay no more than 10% before the agreement for sale is signed, as RERA requires.
- Compare prices on carpet area, and convert any super built-up quote before comparing.
- For a ready home, ask for the occupation certificate and check the tower number matches.
- Check road and drainage status yourself on a site visit rather than from a brochure map.
- Keep land reserve prices out of any home price sum; they measure something else.
- Set aside stamp duty and registration on top of the price, and run the loan through your own budget.
For the full picture of what the township is and where it stands, start from the Global City Gurugram overview.
Questions people ask
Can I invest in Global City Gurugram today?
Not inside the township. As of 28 November 2026, HRERA Gurugram's register shows no home project on Global City land, and HSIIDC sells only large parcels to companies. An individual can buy in registered projects in nearby sectors such as 36A, 37C or 37D, or wait for a developer to register a project on an auctioned plot before any booking opens.
Have Dwarka Expressway prices gone up?
Yes, over five years. ANAROCK Research puts the corridor average at Rs 14,180 per sq ft (super built-up) in H1 2026, against Rs 6,032 in 2021, a 135% rise. Recent growth is slower: ANAROCK saw a 1% quarterly rise in Q2 2026, and Savills found under-construction values up 1% year on year in H1 2026.
What rent can a flat near Global City earn?
ANAROCK puts an average 2 BHK of about 1,000 sq ft on the corridor at Rs 25,000 to 31,250 a month in H1 2026. Rents rose 87% from 2021, slower than prices. On a 1,000 sq ft flat at the corridor average, that works out to a gross yield of roughly 2.1% to 2.6% before costs, as an illustration only.
Has any developer bought land in Global City?
No official result has been published. The Daily Jagran reported in April 2025 that three tenders drew no bids, while ThePrint in August 2026 said auctions were held in late 2023 and quoted an unnamed officer on interest or acquisitions. The Tribune in October 2026 said DLF, M3M, Godrej Properties, Sobha and Signature Global had shown interest. No source names a buyer.
Will Global City push up prices in nearby sectors?
We do not forecast prices. ANAROCK said in September 2026 that Global City will be a major employment generator anchoring long-term housing demand; that is its view. Against it, ANAROCK also counted 10,770 unsold homes on the corridor in H1 2026, and quoted rates rose only 1% in Q2 2026. The township also plans housing of its own on mixed-use parcels.
Is it safe to pay an EOI for a Global City project?
The RERA Act bars any promoter from advertising, booking or selling homes before the project is registered with the authority. As of 28 November 2026 no project on Global City land is registered with HRERA Gurugram. Any request for an expression of interest or token money for such a project now should be treated as a warning sign, whoever makes it.
When will Global City's phase one be finished?
The stated target is December 2026, given by the Chief Minister on 12 August 2026 when he said 80% of physical work was done. Minister Rao Narbir Singh was quoted on 21 November 2026 at about 70% of phase one. HSIIDC's MD had earlier given October 2026. Allotment to investors is expected to follow completion, per the minister.
More on Global City
- Global City: overview What Global City is, who builds it, where it stands today and who can buy what, in one place.
- Global City: price Every Global City reserve price on record, per acre and per sq yd, and why no flat price exists yet.
- Global City: payment plan HSIIDC's 2023 terms: 2% EMD, 10% in 15 days, then a lump sum with 8% rebate or instalments with interest.
- Global City: location Sectors, villages, roads open and planned, metro status and stated travel times for Global City.
- Global City: timeline Dated timeline of Global City Gurugram: land history, 2023 auction rounds, moved targets and what is next.
- Global City: rera status No Global City project is on HRERA Gurugram's register yet: what the RERA Act requires and how to check.
- Global City: reviews Global City weighed on facts: pros, cons, slipped targets, court cases and HSIIDC's record elsewhere.
- Global City: brochure What HSIIDC actually publishes for Global City, which papers bind, and how to spot a marketing copy.
- Global City: how to bid How HSIIDC's Global City e-auction works, who can bid, deposits and refunds, and how home buyers will book.
- Global City: master plan Land, phases, the reported land-use split, parcel FAR and coverage rules, and what the plan leaves out.
- Global City: plot sizes Every Global City parcel HSIIDC has offered, 4.84 to 86.05 acres, with FAR, permitted uses and conversions.
- Global City: infrastructure Roads, utility tunnel, water and green areas in Global City: what is on record and what is only announced.
- Global City: highlights Ten sourced facts on Global City Gurugram, sorted into what is on record and what is only announced.
- Global City: faqs 25 plain answers on Global City: what it is, location, reserve prices, auctions, RERA and home buying.
Related on Property Nivesh
Talk to an advisor about Global City
Tell us what you are looking for around Global City. Our advisor calls you with what is confirmed so far on auctions, projects and prices, and answers your questions.
✓
Request received
A senior property advisor will reach you within 4 working hours. No spam, no builder hand-offs — your details stay with our advisory desk only.
You'll also get our property updates on WhatsApp, from +91 79824 13588.
Sources
- ANAROCK Research, Dwarka Expressway Residential Real Estate Report 'The Blueprint to Reality', September 2026
- ANAROCK Research, NCR Residential Market Viewpoints Q2 2026, 3 August 2026
- Savills India Research, Residential Market Watch Delhi-NCR H1 2026, 22 July 2026
- HRERA Gurugram, Registered projects list Gurugram, read 28 November 2026
- Government of Haryana DIPRL, Press notes 293 on the Chief Minister's Pragati review, 12 August 2026
- HSIIDC, Bid Document/Brochure (Site C2, 58.11 acres), Global City Gurugram, 20 September 2023
- The Times of India, Global City roads to link Dwarka Expressway, Delhi-Gurgaon eway, Pataudi Road, 21 November 2026
- The Tribune, Govt woos Gujarat industry with Global City project in Gurugram, 29 October 2026
Property Nivesh is an independent property research and advisory site. This guide is not the website of HSIIDC or the Government of Haryana and is not connected with them or with any developer. Facts are as of 28 November 2026 and come from the sources listed on each page. Pictures marked "Illustrative image" are AI-generated and do not show Global City.