Global City Gurugram, Dwarka Expressway
Global City Gurugram highlights: ten facts that define the Dwarka Expressway township
Global City Gurugram is a government township of more than 1,000 acres beside the Dwarka Expressway. It is developed by HSIIDC (Haryana State Industrial and Infrastructure Development Corporation), which the Haryana government owns outright. The land covers parts of Sectors 36, 36B, 37 and 37B. Three things define it: large mixed-use parcels sold by e-auction to companies, trunk infrastructure built by the state, and no homes on sale yet.
This page sets out ten or so highlights, each with its source. It sorts them into two groups. The first is what sits on record in HSIIDC documents, court orders and the HRERA register. The second is what ministers, officials or newspapers have announced or reported.
Facts are as of 28 November 2026. Where two sources disagree, both are given with their dates.
- Developer
- HSIIDC, 100% owned by the Haryana government
- Land
- More than 1,000 acres (HSIIDC project site)
- Sectors
- Parts of Sectors 36, 36B, 37 and 37B, Gurugram
- Phase one
- 587 acres, Rs 940 crore (CM, 11 April 2025)
- HRERA projects inside
- None on the register as of 28 November 2026
- Auction results
- No official result published
The short answer
- Global City is a land township, not a housing project: HSIIDC sells whole parcels of 4.84 to 86.05 acres by e-auction to companies and firms.
- HSIIDC's 2023 bid documents allowed floor area of 6.17 times the land on Parcel A and 5.00 times on Parcels B1 and C2.
- Progress claims differ: the Chief Minister said 80% of physical work was done on 12 August 2026, while a minister put phase one at about 70% on 21 November 2026.
- As of 28 November 2026, HRERA Gurugram's register shows no project on Global City land, so no home inside it can be bought yet.
- The tallest-tower plan, the metro and the Rs 1 lakh crore investment figure are announcements; none rests on a published sanction.
- Every Global City building must be GRIHA 4-star or 5-star rated, and HSIIDC maintains the township at no extra cost until 31 December 2033.
What are the highlights of Global City Gurugram?
The short list: a state-owned developer, over 1,000 acres on the Dwarka Expressway, land sold only to firms by e-auction, parcels allowed up to 6.17 times their area in floor space, a 587-acre phase one with Rs 940 crore of works, strict green-building rules and free upkeep to 2033. Against that: no auction result and no registered housing project yet.
| # | Highlight | Key figure | Source and date | Basis |
|---|---|---|---|---|
| 1 | Developer | HSIIDC, 100% state-owned | HSIIDC bid document, 20 September 2023 | On record |
| 2 | Size and place | More than 1,000 acres; parts of Sectors 36, 36B, 37, 37B | HSIIDC project site (saved copy, 9 October 2026) | On record; other sources say 1,003 to 1,080 acres |
| 3 | Road frontage | About 400 m on Dwarka Expressway, about 700 m on Pataudi Road | HSIIDC bid document, 20 September 2023 | On record |
| 4 | Who can buy land | Firms and companies by e-auction; parcels 4.84 to 86.05 acres | HSIIDC advertisement, 20 September 2023 | On record |
| 5 | Floor area allowed | FAR 6.17 (A), 5.00 (B1, C2), 3.00 (B2, March 2023) | HSIIDC bid documents, 2023 | On record |
| 6 | Phase one | 587 acres, Rs 940 crore | Chief Minister, 11 April 2025 | Stated by government |
| 7 | Progress | 80% (12 August 2026); about 70% of phase one (21 November 2026) | CM press note; minister to The Times of India | Stated; figures conflict |
| 8 | Utilities | 10.7 km utility tunnel; 350 million litre reservoir; 125-acre green zone | Chief Minister, 11 April 2025 | Announced |
| 9 | Building rules | GRIHA 4 or 5 star; free upkeep to 31 December 2033 | HSIIDC bid document, 20 September 2023 | On record |
| 10 | Land disputes | Last PIL dismissed 19 January 2023; CWP 6797 of 2023 status not published | High Court order; HSIIDC bid document | On record, one open item |
| 11 | Homes for sale | No project on the HRERA register | HRERA Gurugram, 28 November 2026 | On record |
'On record' means the figure sits in a binding document or official register. 'Stated' or 'announced' means a minister, official or newspaper said it, with no published sanction behind it. The sections below explain each row.
Global City features: who builds it, how big it is and where
Global City is built by HSIIDC, a corporation the Haryana government owns in full. HSIIDC's own project site puts the land at more than 1,000 acres across parts of Sectors 36, 36B, 37 and 37B, with direct access from the 8-lane Dwarka Expressway and Pataudi Road. The land lies in five revenue villages of Gurugram district.
The Haryana government named the villages in January 2023: Khandsa, Narsinghpur, Mohammadpur Jharsa, Garauli Khurd and Garhi Harsaru. It gave the area then as 1,003 acres. GMDA (Gurugram Metropolitan Development Authority) said 1,002.45 acres in 2018, and HSIIDC's managing director presented about 1,080 acres in October 2022. Sector lists also vary between sources, so HSIIDC's own wording is the safest one to quote.
HSIIDC's September 2023 bid document gives about 400 m of frontage on the expressway and about 700 m on Pataudi Road. The same document lists 30 minutes to IGI Airport and 20 minutes to Cyber City. These are HSIIDC's drive times, not measured distances. Our location page covers roads, rail plans and neighbours in detail.
Land history in brief
The land was notified for acquisition for a Special Economic Zone in January 2003. A deed of 26 April 2007 conveyed 1,383.68 acres to Reliance Haryana SEZ Ltd. After the SEZ was shelved, the land was conveyed back to HSIIDC on 29 August 2014, as HSIIDC's affidavit recited in a High Court order.
Three writ petitions and a PIL (public interest litigation) were closed between November 2022 and January 2023. The High Court dismissed the PIL as infructuous on 19 January 2023. HSIIDC's September 2023 bid document made that round subject to a later writ, CWP No. 6797 of 2023, whose status has not been published. The full sequence is on our timeline page.
Illustrative image How Global City land is sold: parcels, FAR and the company-only rule
HSIIDC does not sell flats or small plots here. It auctions whole parcels online, freehold and as-is, to sole proprietors, firms, LLPs, companies or consortia of up to three. Parcels cannot be subdivided. The 2023 rounds offered 4.84 to 86.05 acres, and bidders had to show net worth running into hundreds of crores.
| Parcel | Round | Area (acres) | FAR | Use rule |
|---|---|---|---|---|
| B2 | March 2023 | 40.23 | 3.00 | At least 70% non-residential |
| A | September 2023 | 86.05 | 6.17 | At least 65% non-residential |
| B1 | September 2023 | 23.76 | 5.00 | At least 65% non-residential |
| C2 | September 2023 | 58.11 | 5.00 | At least 50% residential |
| PSP1.A | September 2023 | 4.84 | 1.50 | School |
The money tests were steep. HSIIDC set minimum net worth at Rs 273.51 crore for B2 and Rs 327.25 crore for C2. Registration needed an EMD (earnest money deposit) of 2% of the reserve price plus a Rs 5 lakh fee. Our plot sizes page sets out each category, and our guide to the HSIIDC plot scheme explains its auctions across Haryana.
The split of duties is also unusual. HSIIDC builds trunk services (utility tunnels, roads, water and power networks, treatment plants) up to each plot boundary. Everything inside is the allottee's job. Allottees need not build EWS (economically weaker sections) housing, because HSIIDC or the state will. Ground coverage is capped at 30%.
Two rules stand out for future residents. Every building must be rated 4-star or 5-star under GRIHA (Green Rating for Integrated Habitat Assessment), with no extra floor area as a reward. And HSIIDC will maintain the township at no extra cost until 31 December 2033; from 2034, allottees pay actual costs in proportion to built-up area.
Phase one works: what has been said and when
Phase one is the first part of the township to get roads, pipes and power. The Chief Minister put it at 587 acres and Rs 940 crore in April 2025; 2023 reports said 570 acres. Progress figures differ: 80% of physical work in August 2026, and about 70% of phase one in November 2026.
On 12 August 2026 the Chief Minister said the rest would be done by December 2026. He also ordered a plan to finish power and water within three months. On 21 November 2026, minister Rao Narbir Singh told The Times of India that about 70% was done, at around Rs 900 crore, with land allotment to investors after completion.
Targets have moved before. In September 2023, HSIIDC's then managing director gave October 2026 for completion. A News24 report of August 2026 mentioned June 2027. We print each date with its speaker and make no forecast of our own.
- Utility tunnel: 10.7 km (Chief Minister, April 2025); trade press said 10 km in May 2024.
- Water: a 350 million litre reservoir on 18 acres with seven days of backup (Chief Minister, April 2025).
- Green space: a 125-acre green zone for the township; 82 acres of green areas reported for phase one.
- Networks reported for phase one: 13 km of internal roads, 26 km of storm drains and about 12 km each of potable and recycled water pipes.
No published source confirms any of these items as complete. Our infrastructure page tracks each one with its status.
Which Global City highlights are on record and which are claims?
On record means a document anyone can point to: an HSIIDC bid document, a court order or the HRERA register. Announced means a minister, official or press report said it, without a published sanction behind it. Most physical and rule-based facts are on record. Most big numbers on jobs, towers and transit are announcements.
| Topic | On record | Announced or reported | Who said it, when |
|---|---|---|---|
| Investment | No committed figure in any binding document | Over Rs 1 lakh crore; USD 15 billion potential | Chief Minister, 11 April 2025; Industries Minister, 12 July 2018 |
| Jobs | None | About five lakh jobs on completion | Chief Minister, 11 April 2025 |
| Tallest tower | None approved | 6.7-acre plot earmarked; 620 to 700 m height | Business Standard via Swarajya, 6 June 2026; News24, 10 August 2026 |
| Metro | No approved line serves it | Sector 56 to Panchgaon line names it as a stop; revised DPR ordered | PTI, 11 September 2026 |
| Namo Bharat | None | 'A Namo Bharat Metro train will also operate'; no route or sanction | Chief Minister, 12 August 2026 |
| Expressway underpass | No NHAI award published | Rs 923 crore underground interchange paid by HSIIDC; start due December 2026 | Swarajya citing The Times of India, 7 March 2026; The Times of India, 21 November 2026 |
| Third access from NH-48 | None | Entry about 200 m short of Kherki Daula cloverleaf; legal issues | The Times of India, 21 November 2026 |
| Environmental clearance | No clearance record published | Granted by the Union environment ministry | Moneycontrol report, May 2024 |
| Land-use split | No official table published | 56.08% commercial, 40.05% residential, 2.73% institutional | IANS, 25 January 2025 |
| Auction outcome | No result published | No bids on three tenders; developers 'shown interest in or acquired parcels' | Daily Jagran, 13 April 2025; ThePrint, 14 August 2026 |
The auction row is the one to read twice. The two reports point in opposite directions, and HSIIDC has published no result, bid count or winner. No developer can be named as a buyer of Global City land on the evidence available.
Illustrative image What makes Global City different from other Gurugram townships?
Three things set it apart. The state, through HSIIDC, owns the land and lays the trunk network, while private developers build only after winning parcels. The parcels are very large and mixed-use. And unlike several neighbours on the Dwarka Expressway, it has no home a buyer can register for today.
| Estate | How it is developed | Size or unit, as sourced | What a home buyer can do |
|---|---|---|---|
| Global City, Sectors 36 to 37B | HSIIDC sells parcels to firms | More than 1,000 acres; parcels 4.84 to 86.05 acres | Nothing yet; no HRERA project |
| Vision City, Sector 88 | Developer not stated in the reports | 121 acres, across the expressway | Not published |
| Express Greens, IMT Manesar M1 and M1A | HSIIDC is the HRERA-registered promoter | Two registrations dated 19 September 2022 | Registered housing, per HRERA |
| IMT Sohna, Sectors 19A and 20A | HSIIDC auction, 2022 | Industrial plots of 4,050 sq m | Industrial, not housing |
| Krisumi City Phase I, Sector 36A | Private developer | DTCP OC of 12 December 2024 for 433 flats and 77 EWS units | Completed flats, per the OC |
The IMT Sohna case is a useful reference. There, HSIIDC declined highest bids above the reserve price, and the High Court upheld that on 4 December 2024. Global City's bid documents give HSIIDC the same power to reject any bid. At IMT Kharkhoda, another HSIIDC estate, Maruti Suzuki's 800-acre plant started production in February 2025.
Planning status differs too. GMDA's 2018 proposal would make the land a Special Zone with mixed land use and a 300% global FAR. No final notification has been published. Our master plan page reads the layout, and the Dwarka Expressway locality guide covers the wider corridor.
Global City news: latest updates as of 28 November 2026
Recent reports are about roads and progress, not sales. A minister told The Times of India on 21 November 2026 that phase one was about 70% done and that allotment to investors would follow. The same report said work on a tunnel under the Dwarka Expressway was due to start in December 2026.
- 21 November 2026, The Times of India: a third access from NH-48 about 200 m short of the Kherki Daula cloverleaf is at alignment stage, with legal issues. Our news report on the road links has more.
- 20 November 2026, Hindustan Times: 582 m of expressway service road near the Pataudi Road crossing waits while HSIIDC considers a cloverleaf for Global City and Vision City.
- 11 November 2026, UNI: tender formalities were complete for roads linking Global City with Pataudi Road and the CPR (Central Peripheral Road).
- 29 October 2026, The Tribune: the state pitched Global City at Gandhinagar; DLF, M3M, Godrej Properties, Sobha and Signature Global have shown interest.
- 11 September 2026, PTI: a revised DPR (detailed project report) was ordered for the Sector 56 to Panchgaon metro.
- 28 November 2026: HSIIDC's tender and advertisement listings carried no Global City auction, and its project site returned an error.
What to watch next
Two dates to recheck early in 2027: whether the expressway tunnel work actually started in December 2026, and whether phase one met the Chief Minister's December 2026 target.
What the highlights leave out, and who should watch Global City
The gaps matter as much as the highlights. No official auction result, winner or price has been published. No project on Global City land is on HRERA Gurugram's register. No master planner, land-use table in acres or phase-two plan is public. Anyone weighing the township should treat these as open questions, not settled facts.
- Check the HRERA Gurugram register before paying anyone for a 'Global City' home. HRERA is the Haryana Real Estate Regulatory Authority under the RERA Act 2016; no project may be marketed before registration.
- Ask HSIIDC in writing whether any Global City parcel has been allotted, and to whom.
- Ask for the status of CWP No. 6797 of 2023, which the 2023 round was made subject to.
- Read bid amendments on HSIIDC's own websites; its documents say amendments are not printed in newspapers.
- Treat tower, metro and job figures as announcements until a sanction or award is published.
Who should follow it? Developers and large firms that can meet HSIIDC's net-worth tests. Home buyers waiting for the first registered project on an auctioned plot; our RERA page explains what to check. And corridor investors, for whom our investment page sets out named price data and risks.
Property Nivesh's research desk can send an alert when HSIIDC notifies an auction or a project on Global City land is registered. Contact us to join the list. For the full picture, start from the Global City overview.
Questions people ask
What are the main highlights of Global City Gurugram?
It is an HSIIDC township of more than 1,000 acres in parts of Sectors 36, 36B, 37 and 37B, beside the Dwarka Expressway. Land is sold by e-auction to firms in parcels of 4.84 to 86.05 acres. Phase one covers 587 acres with Rs 940 crore of works, per the Chief Minister in April 2025. All buildings must be GRIHA 4-star or 5-star.
Can I buy a flat in Global City now?
No. As of 28 November 2026, HRERA Gurugram's register shows no project on Global City land. Individuals cannot buy land from HSIIDC there; homes can only come through a developer's project on an auctioned plot, registered with HRERA before any sale. A minister said in November 2026 that allotment to investors would follow the end of phase-one works.
Is Global City Gurugram RERA registered?
No Global City project appears on HRERA Gurugram's register as of 28 November 2026. HSIIDC holds two registrations as a promoter, both for Express Greens housing in IMT Manesar, not Global City. HSIIDC's bid documents require allottees to follow the RERA Act 2016 and Haryana's RERA rules when they build and sell.
How far along is the Global City infrastructure?
Two figures exist. The Chief Minister said on 12 August 2026 that 80% of physical work was done, with the rest due by December 2026. Minister Rao Narbir Singh told The Times of India on 21 November 2026 that about 70% of phase one was complete, at around Rs 900 crore. Neither has been independently confirmed.
Is India's tallest tower being built in Global City?
It is a proposal only. Business Standard, as cited by Swarajya on 6 June 2026, reported that HSIIDC earmarked a 6.7-acre plot for a mixed-use tower of 620 to 700 metres. Final specifications were awaited. No approval, builder or award has been published, so treat the tower as announced rather than planned in a binding sense.
Will Global City get a metro station?
No approved metro line serves it yet. The proposed Sector 56 to Panchgaon line names Global City as a stop, and a revised detailed project report was ordered in September 2026. The Chief Minister said in August 2026 that a Namo Bharat Metro train would operate in the city, but gave no route, agency or sanction.
Who has bought land in Global City?
No winner has been officially published. HSIIDC ran rounds in 2023, but no result, bid count or price is public. The Daily Jagran reported in April 2025 that three tenders drew no bids; ThePrint quoted an unnamed officer in August 2026 saying developers had shown interest in or acquired parcels. The record stays unclear.
How is Global City different from Vision City?
Global City is HSIIDC's township of more than 1,000 acres east of the Dwarka Expressway. Vision City is a separate 121-acre development in Sector 88, on the opposite side. Both are to be served by a planned underground interchange near Pataudi Road, which HSIIDC is reported to fund at Rs 923 crore, with work due from December 2026.
More on Global City
- Global City: overview What Global City is, who builds it, where it stands today and who can buy what, in one place.
- Global City: price Every Global City reserve price on record, per acre and per sq yd, and why no flat price exists yet.
- Global City: payment plan HSIIDC's 2023 terms: 2% EMD, 10% in 15 days, then a lump sum with 8% rebate or instalments with interest.
- Global City: location Sectors, villages, roads open and planned, metro status and stated travel times for Global City.
- Global City: timeline Dated timeline of Global City Gurugram: land history, 2023 auction rounds, moved targets and what is next.
- Global City: rera status No Global City project is on HRERA Gurugram's register yet: what the RERA Act requires and how to check.
- Global City: reviews Global City weighed on facts: pros, cons, slipped targets, court cases and HSIIDC's record elsewhere.
- Global City: brochure What HSIIDC actually publishes for Global City, which papers bind, and how to spot a marketing copy.
- Global City: how to bid How HSIIDC's Global City e-auction works, who can bid, deposits and refunds, and how home buyers will book.
- Global City: master plan Land, phases, the reported land-use split, parcel FAR and coverage rules, and what the plan leaves out.
- Global City: plot sizes Every Global City parcel HSIIDC has offered, 4.84 to 86.05 acres, with FAR, permitted uses and conversions.
- Global City: infrastructure Roads, utility tunnel, water and green areas in Global City: what is on record and what is only announced.
- Global City: investment Corridor prices, rents, labelled analyst views and the real risks for Global City investors, with checks.
- Global City: faqs 25 plain answers on Global City: what it is, location, reserve prices, auctions, RERA and home buying.
Related on Property Nivesh
Talk to an advisor about Global City
Tell us what you are looking for around Global City. Our advisor calls you with what is confirmed so far on auctions, projects and prices, and answers your questions.
✓
Request received
A senior property advisor will reach you within 4 working hours. No spam, no builder hand-offs — your details stay with our advisory desk only.
You'll also get our property updates on WhatsApp, from +91 79824 13588.
Sources
- HSIIDC, Bid Document/Brochure (Site C2, 58.11 acres), Global City, Gurugram, 20 September 2023
- HSIIDC, E-auction advertisement: mix-use land parcels in Global City, Gurugram, 20 September 2023
- Government of Haryana (DIPRL), Press note 52: CM meets investors at Global City site, 11 April 2025
- Government of Haryana (DIPRL), Press notes 293: CM's fourth State Pragati review, 12 August 2026
- HRERA Gurugram, Registered projects list, Gurugram, 28 November 2026
- Punjab and Haryana High Court, CWP-8814-2007, Gram Panchayat Gharauli Khurd v. Union of India, order of 19 January 2023
- The Times of India, Global City roads to link Dwarka Expressway, Delhi-Gurgaon eway, Pataudi Road, 21 November 2026
- ThePrint, The long road to Gurugram's ambitious 'city within a city', 14 August 2026
Property Nivesh is an independent property research and advisory site. This guide is not the website of HSIIDC or the Government of Haryana and is not connected with them or with any developer. Facts are as of 28 November 2026 and come from the sources listed on each page. Pictures marked "Illustrative image" are AI-generated and do not show Global City.