Elevate Vista, Sector 63A Gurgaon

Elevate Vista master plan, Sector 63A Gurgaon: land, towers, open space and layout

Elevate Vista's master plan covers a licensed colony of 10.525 acres in Sector 63A Gurgaon. Phase I takes 7.825 acres and holds four residential towers of 31 to 34 floors with 380 apartments, an EWS block, a community building, eight shops and three basements. The other 2.70 acres are kept for a later phase.

Everything here comes from the drawings and forms that Elevate Edition Realtech Pvt Ltd filed with HRERA Gurugram for Elevate Homes, the Hines and Conscient housing platform. The authority approved the application on 2 November 2026 with conditions. No registration number existed on 23 November 2026, so the project is pre-launch and has no marketing layout.

Below, the site is read as a whole: land, towers, open ground, density, edges and the gaps.

By Rajan Khosla, Property Nivesh Team Reviewed by Rakesh Mahajan Published Updated
Licensed land
10.525 acres, DTCP Licence No. 43 of 2026
Phases
Phase I 7.825 acres; Phase II 2.70 acres for later
Towers in Phase I
A and B at 34 floors; C and D at 31 floors
Units in Phase I
380 apartments, 68 EWS flats, 8 shops
Maintained green area
4,850.196 sq m, stated as 15.32% of Phase I
HRERA status, 23 November 2026
Approved with conditions; no registration number

The short answer

  • The licensed colony in Sector 63A Gurgaon is 10.525 acres, split into 7.825 acres for Phase I and 2.70 acres kept for future development.
  • Phase I has four towers: A and B at 34 floors with 68 homes each, and C and D at 31 floors with 122 homes each.
  • Form REP-I gives 2.619 acres of Phase I to parks and playgrounds, about a third of the land, while the site plan's maintained green area is 15.32%.
  • The filed FAR of 2.0319, against 2.05 permitted, works out on the whole 10.525 acre colony, which leaves the shape of Phase II an open question.
  • No developer master plan, brochure or Phase II layout had been published by 23 November 2026, and HRERA had not yet issued a registration number.

How big is Elevate Vista?

Elevate Vista stands on a licensed colony of 10.525 acres in Sector 63A Gurgaon. Only Phase I, 7.825 acres, is before HRERA, and it holds 380 apartments. The remaining 2.70 acres were earmarked as future development in the building plan approval of 6 October 2026, and no homes or towers have been filed for them.

The land is covered by DTCP Licence No. 43 of 2026, dated 10 March 2026 and valid up to 9 March 2031. DTCP, Haryana's Directorate of Town and Country Planning, licenses private colonies. Two landowners, Smt. Sangeeta Bhatia and Sh. Laksh Bhatia, hold it in collaboration with Elevate Edition Realtech Pvt Ltd, the applicant company for this Elevate Homes project.

Put simply, Phase I is about three quarters of the land and Phase II about a quarter. When Elevate Homes announced the site on 1 and 2 September 2026, the trade press spoke of 10.5 acres, about 2 million sq ft of saleable area and over 600 homes, with the master plan to follow approvals. Phase I is still the only part with drawings.

Master plan in numbers: Elevate Vista, as filed with HRERA Gurugram
ItemFigure on recordDocument
Licensed colony10.525 acresDTCP Licence No. 43 of 2026
Phase I, filed with HRERA7.825 acresForm REP-I; building plan approval of 6 October 2026
Phase II2.70 acres, earmarked as future developmentBuilding plan approval of 6 October 2026
Buildings counted in Phase I7Approved site plan, sheet A-01
Main apartments380 (68 + 68 + 122 + 122)Approved site plan
EWS flats and shops68 flats and 8 shopsSite plan; Form REP-I
FAR permitted and proposed2.05 and 2.0319Form REP-I, Part B
FAR area86,544.186 sq m (about 9.32 lakh sq ft)Approved site plan
Non-FAR area58,421.952 sq mApproved site plan
Ground coverage7,380.905 sq mForm REP-I
Maintained green area4,850.196 sq m, 15.32% of the Phase I siteApproved site plan
Basement levels3 (B1, B2, B3)Approved site plan
Sq ft figures are conversions at 1 sq m = 10.7639 sq ft. Nothing for Phase II has been filed beyond its land area.

How many towers and floors does Elevate Vista have?

Phase I has four residential towers. Towers A and B rise 34 floors above a stilt and ground level, with two homes a floor and 68 homes each. Towers C and D have 31 floors, four homes a floor and two on the first floor, for 122 homes each. An EWS block of stilt plus six floors completes the housing.

Elevate Vista Phase I buildings on the approved site plan
BuildingLevels above groundTerrace levelUnitsUnits a floor
Tower AStilt/ground + 34, refuge floors 17th and 26th119.35 m68 apartments2
Tower BStilt/ground + 34, refuge floors 17th and 26th119.35 m68 apartments2
Tower CStilt/ground + 31, refuge floors 16th and 25th112.75 m122 apartments4 (2 on the 1st floor)
Tower DStilt/ground + 31, refuge floors 16th and 25th112.75 m122 apartments4 (2 on the 1st floor)
EWS blockStilt + 621.8 m68 EWS flatsNot stated
Community buildingGround + 110.5 mNoneNone
Convenient shoppingNot statedNot stated8 shopsNot stated
Three basements run below the site. Heights are terrace levels as marked on sheet A-01, dated 31 March 2026.

A refuge floor is a level set aside in a high-rise where residents can wait in safety during a fire. The plan gives each tower two. Room sizes and the 3 and 4 BHK layouts are on the floor plan page.

For towers this tall, Form REP-I lists an AAI NOC, the height clearance from the Airports Authority of India, dated 7 April 2026. Lifts per tower aren't stated, so ask.

An illustrative picture of a aerial view of a planned residential site of premium high-rise residential towers around a large central green on Golf Course Extension Road in Sector 63A Gurugram Illustrative image
Illustrative image, not a picture of Elevate Vista.

Elevate Vista land area: where the 7.825 acres of Phase I go

Form REP-I splits Phase I's 7.825 acres into eight uses. Grouped by purpose, about a third is parks and playgrounds, about a third is roads, pavements and surface parking, a fifth is allotted to apartments and the club house, and the last tenth is services and other uses.

Phase I land grouped by purpose (acres as filed in Form REP-I)
GroupUses as filedAcresShare of 7.825 acres
Green and playParks and playgrounds 2.6192.61933.5%
MovementRoads 2.249, pavements 0.307, vehicle parking 0.1582.71434.7%
BuildingsApartments 0.887, club house 0.7551.64221.0%
Services and otherElectricity sub-station 0.083, any other 0.7670.85010.9%
TotalEight uses7.825100%
The grouping is Property Nivesh's; the eight acreages are as filed. Shares are rounded.

Surface parking is small at 0.158 acres, and the site plan puts parking in three basements, with EV provision under the Haryana Building Code 2017 amendment. The 'any other' line, 0.767 acres, isn't broken down, and the EWS block and shops have no line of their own, so ask what it covers.

Form REP-I puts 0.887 acres under apartments. Ground coverage, the footprint of every building in Phase I, is 7,380.905 sq m, about 1.82 acres or roughly 23% of the Phase I land. The 0.887 acres is about 3,590 sq m, so most of the gap is the community building, whose ground floor alone covers 3,076.410 sq m.

How much open area is there at Elevate Vista?

Two filed figures describe the open area. Form REP-I puts 2.619 acres of Phase I under parks and playgrounds, about 33.5% of the land. The approved site plan shows a narrower 'maintained green area' of 4,850.196 sq m, which it puts at 15.32% of Phase I, a shade above the 15% minimum, and at 11.39% of the whole colony.

The filing doesn't reconcile the two, so treat them as different measures. The land table sorts ground by use, while the green area is a planning compliance figure checked on the drawing against a required share. When a brochure quotes 'open area', ask which one it means.

Per home, the numbers are easier to picture. The maintained green comes to about 12.76 sq m, or roughly 137 sq ft, for each of the 380 main apartments. The parks and playgrounds figure comes to about 300 sq ft per apartment. If Phase II residents share these spaces, both ratios fall, and no filing says whether they will.

What sits inside Elevate Vista?

Inside the Phase I boundary, the site plan draws four towers, an EWS block of seven levels, a two-storey community building, a block labelled 'COMMUNITY BUILDING (SPORTS BLOCK)', a convenient shopping block, an electrical sub-station and an assembly and drill area. Three basements run below. That is the full list on record today.

  • Community building: ground plus first floor with 4,169.195 sq m of FAR area, 3,076.410 on the ground floor and 1,092.785 above, on a club house allotment of 0.755 acres.
  • Sports block: drawn and labelled on the site plan, with no facility list filed against it.
  • EWS block: 68 flats for economically weaker section (EWS) households, the small homes set aside for lower incomes, at 182.1 and 184.3 sq ft carpet area.
  • Convenient shopping: 212.555 sq m, sized against 0.5% of the site area, with eight shops of 246.9 to 247.6 sq ft carpet each.
  • Electrical sub-station: 0.083 acres in the land table.
  • Assembly and drill area: 100 sq m, a gathering point for fire drills and evacuation.
  • Services in Form REP-I: rain water harvesting, a sewage treatment plant, an underground water tank, a renewable energy system, security and fire fighting.

What isn't drawn matters as much. The papers on record name no pool, gym or court, and no amenity list has been published. Carpet area, used above, is the usable floor inside a unit's walls and the measure RERA requires. See the amenities page for the club house, and the highlights page for what is on record versus claimed.

An illustrative picture of a detailed white architectural site model of premium high-rise residential towers with landscaping Illustrative image
Illustrative image, not a picture of Elevate Vista.

Density and floor area: how built-up is the site?

Phase I places 380 main apartments on 7.825 acres, about 48.6 homes an acre, or about 57.3 once the 68 EWS flats are counted. Its FAR, floor area ratio, the counted floor area divided by land area, is 2.0319 against 2.05 permitted. With ground coverage near 23%, the layout stacks homes high and keeps most ground open.

One detail in these numbers deserves a question. The FAR area of 86,544.186 sq m divided by the full 10.525 acres, about 42,593 sq m, matches the filed 2.0319. Worked on Phase I's 7.825 acres alone, it would be about 2.73. So the ratio is calculated across the whole colony, and Phase I's buildings use almost all of the 2.05 allowed on it.

That leaves Phase II unexplained. On the filed figures, the unused margin is only about 771 sq m of FAR area, yet the September 2026 news spoke of over 600 homes on the full site against 380 filed. The site plan also records land given to the government for the 60 m road against TDR No. 323A. A TDR, transferable development right, is a credit of building rights for land surrendered. Whether it adds floor area for Phase II isn't stated, so ask the developer.

The site plan adds 58,421.952 sq m of non-FAR area, built space such as basements that doesn't count against the ratio, for 144,966.138 sq m in all, about 15.6 lakh sq ft. That is a construction measure, not the saleable area the news quoted.

Roads and site conditions on the Elevate Vista site plan

The site plan frames Phase I between two roads: a constructed 24 m wide road along the frontage and a proposed 60 m wide sector road along another edge. A 7 m existing approach road with a 12 m service road, approved by the municipal corporation by letter of 26 September 2025, links the plot to the sector road.

Two licence conditions also bear on the layout. DTCP's letter of intent of 11 November 2025 requires the promoter to keep the right of way over a gas pipeline crossing part of the land, and to build a 7 m wide culvert over the nallah, a drainage channel, between the sector road and the site. Ask to see where the pipeline runs on the drawing, and what may sit above it.

A partly legible note says a village link road towards Kadarpur will be extended for the 60 m sector road. Access and surroundings are covered on the location page.

Phase II and what the master plan does not show yet

Phase II is still blank on paper. Its 2.70 acres carry no tower count, unit count, layout or timeline in any filing, and the 'over 600' homes in the trade news can't be split between phases from the documents. DTCP issued a revised demarcation, zoning and phasing plan dated 30 July 2026, but only Phase I has approved building plans.

  • A developer master plan or marketing layout: none released, and Elevate Homes' website didn't mention Elevate Vista on 23 November 2026.
  • Phase II towers, heights, home count and timing.
  • Whether Phase II homes will share the Phase I club house, parks and basements.
  • Spacing between towers and their orientation in figures; the drawing is to scale, but no distances are stated.
  • Lift count per tower and the internal layout of the community building.

The architect question is open too. Construction World named Benoy on 2 September 2026, while the approved drawings are signed by Arcop Associates Pvt Ltd as architect of record. For timing, see the launch date page and the Elevate Homes Gurgaon overview; no rate exists yet, as the price page explains.

How to read the Elevate Vista site plan

The approved site plan is sheet A-01, dated 31 March 2026, drawn at a scale of 1:500 and filed in the public HRERA application. At that scale, 1 cm on paper is 5 m on the ground. Read it in this order.

  1. Start with the title block: sheet number, date, scale and the architect's stamp. A later revision would carry a new date.
  2. Read the area summary: 380 main units, seven buildings, the FAR figures and the green area. Match each against Form REP-I.
  3. Find the Phase I boundary and the land kept for Phase II, and note which edge meets the 24 m road and which the proposed 60 m road.
  4. Locate each tower letter and check homes a floor against the unit table: two in A and B, four in C and D.
  5. Trace the green areas, the community building, the shops and the drill area, and judge how far each tower sits from them.
  6. Look for the pipeline right of way, the nallah and the culvert named in the licence conditions.

Then lay it beside the DTCP zoning and phasing plan of 30 July 2026, Drawing No. DTCP 12427, which sets out the phasing. The brochure page lists what the HRERA application contains, and the RERA page follows the certificate. Our Conscient Sector 63A project page and the Gurgaon city guide give wider context.

HRERA approved Phase I on 2 November 2026 subject to conditions, and no registration number had been issued by 23 November 2026, so nothing can be sold or advertised yet. For help with the drawings, write to the Property Nivesh research desk.

Questions people ask

What is the total land area of Elevate Vista?

The licensed colony is 10.525 acres in Sector 63A Gurgaon, under DTCP Licence No. 43 of 2026. Phase I, the part filed with HRERA, is 7.825 acres. The other 2.70 acres were earmarked as future development when Phase I building plans were approved on 6 October 2026. News reports round the whole site to 10.5 acres.

How many towers are planned in Elevate Vista Phase I?

Four residential towers. A and B have 34 floors above stilt and ground, two homes a floor and 68 homes each, with the terrace at 119.35 m. C and D have 31 floors, four homes a floor and 122 homes each, topping out at 112.75 m. An EWS block of stilt plus six floors holds another 68 small flats.

How much green area does the Elevate Vista site plan show?

The approved site plan shows a maintained green area of 4,850.196 sq m, stated as 15.32% of the Phase I site against 15% required, and 11.39% of the full colony. Form REP-I separately gives 2.619 acres to parks and playgrounds. They are different measures, so ask which one any brochure figure uses.

Does the Elevate Vista master plan include a clubhouse?

Yes. Form REP-I sets aside 0.755 acres for a club house, and the site plan draws a community building of ground plus first floor with 4,169.195 sq m of FAR area, plus a block labelled as a sports block. No facility list has been filed or published, so what the club will contain is not on record.

How dense is Elevate Vista?

Phase I has 380 main apartments on 7.825 acres, about 48.6 homes an acre, or about 57.3 with the 68 EWS flats counted. FAR is 2.0319 against 2.05 permitted, and ground coverage is 7,380.905 sq m, roughly 23% of the Phase I land. Phase II homes, once filed, would change the picture for the whole site.

What will be built on Phase II of Elevate Vista?

Nothing has been filed. Phase II's 2.70 acres are marked as future development, with no tower count, home count or timeline. Trade news in September 2026 spoke of over 600 homes on the whole site, against 380 apartments in Phase I, but no document splits that figure. Ask the developer for the Phase II plan.

Where can I see the Elevate Vista master plan?

No marketing master plan or brochure has been released. The approved site plan, sheet A-01 dated 31 March 2026, sits in the public HRERA application with tower floor plans, sections and elevations. HRERA approved the application on 2 November 2026 subject to conditions, and no registration number had been issued by 23 November 2026.

More on Elevate Vista

Related on Property Nivesh

Talk to an advisor about Elevate Vista

Tell us what you are looking for in Elevate Vista. Our advisor calls you with what is confirmed so far and answers your questions on price, plans and paperwork.

Unbiased advice. Your data is never sold to builders or brokers.

Sources

  • HRERA Gurugram, Form REP-I preview for Elevate Vista Phase I (land use, FAR, ground coverage, approvals), submitted 7 October 2026, read 23 November 2026
  • HRERA Gurugram (promoter upload), Approved site plan sheet A-01 dated 31 March 2026 (area summary, green area, roads, tower heights), uploaded 6 October 2026
  • HRERA Gurugram, Comprehensive Project Details for Elevate Vista with the hearing proceedings of 2 November 2026, read 23 November 2026
  • HRERA Gurugram (promoter upload), Draft allotment letter for Elevate Vista Phase I (licence and building plan details), uploaded 2 November 2026
  • DTCP Haryana via HRERA upload, LC-III letter of intent dated 11 November 2025
  • Construction World, Elevate Homes to Develop Premium Project in Gurugram, 2 September 2026

Property Nivesh is an independent property research and advisory site. This guide is not the website of Elevate Homes (platform of Hines and Conscient Infrastructure) and is not connected with the developer. Facts are as of 23 November 2026 and come from the sources listed on each page; prices quoted in the market are indicative. Pictures marked "Illustrative image" are AI-generated and do not show the project.

Chat with Us +91 79824 13588
A couple going through a price list with a property advisor

Latest price list

Get the latest price list for Elevate Vista

Prices and payment plans change often. Our advisor shares the current Elevate Vista price list and books a site visit if you want one.

Unbiased advice. Your data is never sold to builders or brokers.

Prefer WhatsApp? Chat with Us: +91 79824 13588