PropertyNivesh.in

Elevate Vista pre-launch

Get the official Elevate Vista price list

Leave your name and mobile number. Our advisor calls you when the project is registered and the price list is released.

Unbiased advice. Your data is never sold to builders or brokers.

Elevate Vista, Sector 63A Gurgaon

Elevate Homes Gurgaon: Elevate Vista in Sector 63A Gurgaon at a glance

Elevate Vista is the Sector 63A Gurgaon project of Elevate Homes, the housing platform of Hines and Conscient Infrastructure. Its first phase is filed with HRERA Gurugram as 380 apartments in four towers on 7.825 acres. On 23 November 2026 the application was approved but not yet registered, so the project is still pre-launch.

That status shapes everything else. There is no registration number, nobody has published a price, and sales have not opened. Almost everything known about the project comes from the public application file, not from a brochure.

This page is the front door of our Elevate Homes Gurgaon microsite. It sets out the headline facts first, then points you to 14 detailed pages on price, plans, paperwork and track record.

By Rajan Khosla, Property Nivesh Team Reviewed by Rakesh Mahajan Published Updated
Developer brand
Elevate Homes (Hines and Conscient platform)
Promoter on the application
Elevate Edition Realtech Private Limited
Land
10.525 acres licensed; Phase I is 7.825 acres
Phase I homes
380 apartments in 4 towers, plus 68 EWS flats
RERA status, 23 November 2026
Approved with conditions; no certificate issued
Price
Not published by anyone

The short answer

  • Elevate Vista is a pre-launch project: HRERA Gurugram approved its Phase I application on 2 November 2026 with conditions, and no registration number existed on 23 November 2026.
  • Elevate Homes is a brand, not a separate builder; the applicant company is Elevate Edition Realtech Private Limited, which declared no projects launched in the last five years.
  • The Phase I filing shows 380 main apartments: 136 in Towers A and B and 244 in Towers C and D, with carpet areas from 1,352.5 to 2,251.3 sq ft.
  • The licensed colony is 10.525 acres under DTCP Licence No. 43 of 2026, with 2.70 acres held back as Phase II for future development.
  • The application gives a likely construction start of 1 January 2027 and a likely completion date of 31 December 2034.
  • No developer price list, starting price or per sq ft rate has been published, and the rate fields in the draft allotment letter are blank.

What is Elevate Vista?

Elevate Vista is a planned group housing colony in Sector 63A, Gurugram, on the Golf Course Extension Road corridor. The licensed land is 10.525 acres. Phase I, the part now before the regulator, covers 7.825 acres with four high-rise towers, a block of EWS flats (homes reserved for economically weaker sections), a community building and eight shops.

People who search for 'Elevate Homes Gurgaon' usually mean this project. Before the name was public, the September 2026 trade news called it Elevate Homes Sector 63A. Some marketing material uses 'Conscient Elevate 3.0' or 'Conscient Hines Elevate 3.0'. Those labels are unofficial. The name in the HRERA application is Elevate Vista (Phase I).

Elevate Vista project details at a glance, as on 23 November 2026
ItemWhat is on recordBasis
Developer brandElevate Homes, the residential platform of Hines and Conscient InfrastructureTrade press; Form REP-I names the Elevate Homes website, office and CEO
PromoterElevate Edition Realtech Private Limited, with licensees Smt. Sangeeta Bhatia and Sh. Laksh BhatiaHRERA application
LocationSector 63A, Gurugram, revenue estate of village UllawasHRERA public notice
Land10.525 acres under DTCP Licence No. 43 of 2026, valid up to 9 March 2031Licence details in the draft allotment letter
PhasesPhase I 7.825 acres; Phase II 2.70 acres kept as future developmentBuilding plan approval of 6 October 2026
TowersFour residential towers (A, B, C, D); 7 buildings in all, over three basementsApproved site plan
FloorsTowers A and B: 34 floors; Towers C and D: 31 floorsApproved site plan
Homes380 main apartments, 68 EWS flats, 8 shops in Phase IForm REP-I and site plan
Unit types4 BHK with service personnel room; 3 BHK with utilityOur reading of the filed floor plans
RERAApproved subject to conditions on 2 November 2026; certificate not issuedHRERA project page, 23 November 2026
PossessionLikely completion 31 December 2034; draft possession date 30 November 2034Form REP-I and draft allotment letter
PriceNot publishedNo developer list; rate fields blank in the filing
Dates and counts are as filed by the promoter. They can change before or after registration.

One number needs care. The September 2026 news spoke of 'over 600' homes across the full 10.5 acres. The Phase I filing shows 380 apartments, and no filing gives a unit count for Phase II. A property blog also noted marketing sites quoting '244 residences', which matches only Towers C and D.

Who is the developer of Elevate Vista?

The brand is Elevate Homes, which the trade press describes as a residential platform set up in 2022 as a joint venture between Hines and Conscient. The applicant on paper is Elevate Edition Realtech Private Limited, acting in collaboration with the two licence holders, Smt. Sangeeta Bhatia and Sh. Laksh Bhatia.

The link between the company and the brand is visible in the filing. Form REP-I, the application form, gives the promoter's website as the Elevate Homes site and its office as the 12th floor of One Horizon Centre, Golf Course Road. It names Sudhanshu Dutt, the Elevate Homes CEO, as authorised representative. HRERA's record shows he attended the 2 November 2026 hearing.

Two cautions. The applicant company is new and declared no projects launched in the last five years. And nothing on the public file states its shareholding or what Hines and Conscient each do on this project. The directors listed are Lalit Jain, Amit Jain, Ajay Kumar Agrawal and Ankur Gupta; the filing doesn't state their affiliations. Our Conscient developer page has more on one of the two partners behind the platform.

On design, Construction World named Benoy as architect on 2 September 2026, while the approved drawings are signed by Arcop Associates Pvt Ltd. No source explains the split, so it is a fair question to put to the developer.

An illustrative picture of a aerial view of premium high-rise residential towers on Golf Course Extension Road in Sector 63A Gurugram Illustrative image
Illustrative image, not a picture of Elevate Vista.

Where is Elevate Vista?

HRERA's public notice places the site in the revenue estate of village Ullawas, Sector 63A, Gurugram. Construction World's report of 2 September 2026 puts it on Golf Course Extension Road. The approved site plan shows the plot fronting a constructed 24 m wide road, with a proposed 60 m wide road along another side.

The same plan records a 7 m wide existing approach road, approved by the municipal corporation in a letter dated 26 September 2025. The DTCP letter of intent adds two site conditions: a gas pipeline crosses part of the land, and a 7 m wide culvert must be built over a nallah between the sector road and the site. DTCP is Haryana's town planning department, which licenses colonies.

No official or developer source gives distances or drive times from this site, so we don't print any. Sector 63A does have company: the HRERA register shows 2026 registrations for Sobha Crescent Phase 1, Godrej Verano and Anant Raj The Estate One in or beside the sector.

Is Elevate Vista RERA registered?

Not yet. RERA is the 2016 law that requires a project to be registered before it is advertised or sold, and HRERA Gurugram is the authority that applies it here. The authority approved the Phase I application on 2 November 2026, subject to conditions. No registration number had been issued by 23 November 2026.

The hearing order says the certificate will follow once the promoter corrects its forms and lodges three bank-backed securities or demand drafts of Rs 25 lakh each. Those cover environment clearance, fire scheme approval and service plan estimates, all applied for but not yet received. The project page reads 'APPROVED AND READY FOR CERTIFICATE ISSUING PROCESS'. The live register of registered projects had no entry for Elevate Vista on the same day.

Elevate Vista status timeline from the public record
DateEventSource
10 March 2026DTCP Licence No. 43 of 2026 granted for 10.525 acresDraft allotment letter
31 March 2026Date on the approved site planHRERA upload
1 to 2 September 2026Elevate Homes' Sector 63A project reported, launch 'planned for later in 2026'Trade press
6 October 2026Phase I building plans approvedDraft allotment letter
7 October 2026Application submitted to HRERA GurugramForm REP-I
13 October 2026Public notice; objections open to 28 October 2026HRERA notice
2 November 2026Hearing: approved subject to conditionsHRERA proceedings
23 November 2026No certificate uploaded; not on the registerHRERA project page and register
1 January 2027Likely construction start, as filedForm REP-I
31 December 2034Likely completion, as filedForm REP-I
The last two rows are the promoter's own filed dates, not our forecast.

What pre-launch means here

Until the certificate is issued, the law does not allow the project to be advertised, marketed or sold. This microsite is research only. The full paper trail sits on our RERA page, and the launch date page tracks what still has to happen. Both are linked in the guide further down.

What home types does Elevate Vista offer?

The Phase I filing lists 380 main apartments in two families. Towers A and B hold 136 larger homes, which the filed floor plans show as 4 BHK with a service personnel room. Towers C and D hold 244 homes that read as 3 BHK with a utility room. The BHK labels are our reading of the drawings.

All sizes below are carpet area, the usable floor inside the walls, which is the measure RERA uses. Super area, the older sales measure that adds a share of common spaces, isn't in the filing. Neither are balcony areas per unit. The unit table in the form doesn't label bedrooms, and the developer hasn't confirmed the mapping.

Elevate Vista Phase I unit mix from Form REP-I
WhereTypeCarpet area (sq ft)Units
Towers A and B, typical floors4 BHK + service personnel room (as read)2,194.5 and 2,251.3128 (64 + 64)
Towers A and B, refuge floorsSame family2,185.1 and 2,187.18 (4 + 4)
Towers C and D, typical floors3 BHK + utility (as read)1,608.3236
Towers C and D, variantSame family1,610.54
Towers C and D, first floorPlan not checked1,352.54
EWS blockEWS flats182.1 and 184.368 (44 + 24)
Convenient shoppingShops246.9 and 247.68 (2 + 6)
Sq ft figures are conversions of the filed sq m areas at 1 sq m = 10.7639 sq ft.

Towers A and B have two homes on each floor, while C and D have four. The specification sheet in the filing lists a VRF air conditioning system, laminated wooden flooring in bedrooms and no modular wardrobes or kitchen appliances. Room-by-room sizes are on the floor plan page, linked in the guide below.

An illustrative picture of a tree-lined internal road between premium high-rise residential towers on Golf Course Extension Road in Sector 63A Gurugram Illustrative image
Illustrative image, not a picture of Elevate Vista.

Elevate Vista price: what is on record

Nothing is on record. The developer has published no price list, starting price or per sq ft rate, and the rate fields in the draft allotment letter filed with HRERA are blank. No indicative market quote was in circulation either on 23 November 2026. Any figure shown to you now isn't backed by a published document.

The draft letter does say how the price would be built. Its 'Total Price' is described as inclusive of EDC and IDC (government development charges), car parking usage charges, PLC (preferential location charges), government fees and GST. Stamp duty and registration charges are extra. In Haryana stamp duty is 7% for men, 5% for women and 6% for joint buyers, plus a 1% registration fee that is capped. That sum can only be worked out once a price exists, and our stamp duty calculator will do it when one does.

Two other numbers get mistaken for a price. The filing estimates Phase I project cost at about Rs 2,463 crore, including about Rs 1,222 crore for land. That is the promoter's cost, not a selling rate. And Business Today reported an average of Rs 22,000 per sq ft on Golf Course Extension Road for 2025, a corridor figure that is not tied to this project.

Elevate Vista review: what the platform has delivered so far

There is nothing to review at Elevate Vista itself: no construction, no sales, no residents and no complaint on record. What can be checked is the platform's earlier work. Elevate in Sector 59 is fully delivered with occupation certificates (OC, the approval to occupy a building), and Elevate Reserve in Sector 62 is under construction.

At Sector 59, the Phase I OC is dated 8 February 2024, ahead of its RERA date of 31 December 2024. The Phase II OC came on 8 May 2025, after the original date of 31 January 2025 but inside an HRERA extension to 30 January 2026. Both of those projects were filed by different promoter companies, so the record belongs to the platform, not to this applicant.

A guide to every page of this Elevate Homes Gurgaon microsite

Each topic has its own page, so this overview stays short. The fourteen pages below all work from the same public record: the HRERA application, the DTCP licence papers, the approved drawings and dated news reports. Pick the question you came with and go straight to it.

  • Price: why no rate exists yet, what the draft total price would include, and the costs that sit on top.
  • Payment plan: the two draft schedules filed with HRERA, stage by stage, including a gap in the arithmetic.
  • Location: the roads on the approved site plan, the approach, the pipeline and culvert conditions, and what isn't published.
  • Launch date: the steps between the hearing order and a certificate, and the dates the promoter has filed.
  • RERA: the application, the hearing order, its conditions and how to verify the register yourself.
  • Reviews: the delivery record at Sector 59, progress at Elevate Reserve and the complaint record on file.
  • Brochure: no official brochure exists; this page lists the filed documents that stand in for one.
  • Booking: the draft allotment terms on booking amount, cancellation and refunds, and why sales cannot open before registration.
  • Floor plan: room-by-room dimensions from the Tower A and Tower C drawings.
  • Master plan: tower positions, land use, built-up area, green area and the Phase II parcel.
  • Amenities: the club house, community building, sports block and parks as they appear in the filing.
  • Highlights: the short list of specifications and facts that set the project apart on paper.
  • Investment: corridor price reports, neighbouring launches and the questions an investor should ask, with no forecast.
  • FAQs: quick answers to the questions buyers search most.

What to check before you go further

With a pre-launch project, the useful work is verification. Five checks cover most of the risk of acting on a rumour. None of them needs a site visit, and each can be done from public records or by asking one direct question.

  1. Look up the HRERA Gurugram register and confirm a registration certificate has actually been issued for Elevate Vista.
  2. Ask anyone quoting a price for the developer's written price list. None existed on 23 November 2026.
  3. Treat any request for an EOI (expression of interest, a token paid before launch) with caution while the project is unregistered.
  4. Ask how many homes Phase II will add, since no filing explains the gap between 380 and 'over 600'.
  5. Ask for confirmation of the BHK labels and for super area and balcony figures, which the filing doesn't give.

Also ask where the environment clearance, fire scheme and service plan approvals stand. HRERA's order gives the promoter six months from registration to submit them.

Questions people ask

What is Elevate Vista?

Elevate Vista is a planned group housing project in Sector 63A, Gurugram, from Elevate Homes, the residential platform of Hines and Conscient. The licensed colony is 10.525 acres. Phase I, on 7.825 acres, is filed with HRERA Gurugram as four towers with 380 apartments, 68 EWS flats and 8 shops. It was pre-launch on 23 November 2026.

Is Elevate Homes a separate builder in Gurgaon?

No. Elevate Homes is a brand and development platform, reported by the trade press as a 2022 joint venture of Hines and Conscient. The company applying for Elevate Vista is Elevate Edition Realtech Private Limited. Its application gives the Elevate Homes website and office and names the Elevate Homes CEO, Sudhanshu Dutt, as authorised representative.

Is Elevate Vista RERA registered?

Not as of 23 November 2026. HRERA Gurugram approved the Phase I application at its 2 November 2026 hearing, subject to corrections and three bank-backed securities or demand drafts of Rs 25 lakh each. The certificate follows once those are submitted. Until a registration number appears on the register, the project can't legally be advertised or sold.

What is the price of Elevate Vista?

No price has been published. The developer has released no price list or per sq ft rate, the rate fields in the draft allotment letter filed with HRERA are blank, and no indicative market quote was in circulation on 23 November 2026. A figure offered before registration has no published document to support it, so ask for the written source.

How many towers and homes does Elevate Vista have?

Phase I has four residential towers. Towers A and B rise 34 floors with two homes a floor, 68 each. Towers C and D rise 31 floors with four homes a floor, 122 each. That makes 380 main apartments, alongside 68 EWS flats and 8 shops. News reports mention over 600 homes for the whole site.

When will Elevate Vista be completed?

The promoter's application gives a likely construction start of 1 January 2027 and a likely completion date of 31 December 2034. The draft allotment letter proposes an occupancy certificate by 30 September 2034 and possession by 30 November 2034. These are filed dates in an application that had not yet received its certificate, not confirmed commitments.

Is Conscient Elevate 3.0 the same as Elevate Vista?

It appears to be the same Sector 63A project under an unofficial marketing label. 'Conscient Elevate 3.0' and 'Conscient Hines Elevate 3.0' don't appear in any official document on the public file. The name in the HRERA application is Elevate Vista (Phase I). The earlier Elevate in Sector 59 and Elevate Reserve in Sector 62 are separate projects.

What home sizes are filed for Elevate Vista?

By carpet area, the filing shows about 2,185 to 2,251 sq ft in Towers A and B, which the floor plans show as 4 BHK with a service personnel room. Towers C and D are mostly about 1,608 sq ft, read as 3 BHK with utility, with four units of 1,352.5 sq ft. Super area isn't filed.

More on Elevate Vista

Related on Property Nivesh

Talk to an advisor about Elevate Vista

Tell us what you are looking for in Elevate Vista. Our advisor calls you with what is confirmed so far and answers your questions on price, plans and paperwork.

Unbiased advice. Your data is never sold to builders or brokers.

Sources

  • HRERA Gurugram, Comprehensive Project Details for Elevate Vista with hearing proceedings of 2 November 2026, read 23 November 2026
  • HRERA Gurugram, Form REP-I preview for Elevate Vista Phase I, submitted 7 October 2026
  • HRERA Gurugram, Public notice of the application for registration of Elevate Vista, 13 October 2026
  • HRERA Gurugram (promoter upload), Draft allotment letter for Elevate Vista Phase I, uploaded 2 November 2026
  • HRERA Gurugram (promoter upload), Approved site plan sheet A-01 dated 31 March 2026
  • HRERA Gurugram, Register of registered projects, read 23 November 2026
  • DTCP Haryana via HRERA, Occupation certificates for Elevate Sector 59, 8 February 2024 and 8 May 2025
  • Construction World, Elevate Homes to Develop Premium Project in Gurugram, 2 September 2026

Property Nivesh is an independent property research and advisory site. This guide is not the website of Elevate Homes (platform of Hines and Conscient Infrastructure) and is not connected with the developer. Facts are as of 23 November 2026 and come from the sources listed on each page; prices quoted in the market are indicative. Pictures marked "Illustrative image" are AI-generated and do not show the project.

Chat with Us +91 79824 13588
A couple going through a price list with a property advisor

Latest price list

Get the latest price list for Elevate Vista

Prices and payment plans change often. Our advisor shares the current Elevate Vista price list and books a site visit if you want one.

Unbiased advice. Your data is never sold to builders or brokers.

Prefer WhatsApp? Chat with Us: +91 79824 13588