Elevate Vista, Sector 63A Gurgaon
Elevate Vista amenities, Sector 63A Gurgaon: what the filing shows inside the gate
Elevate Vista in Sector 63A Gurgaon has no published amenity list yet. What exists is the Phase I application filed with HRERA Gurugram, the Haryana Real Estate Regulatory Authority that registers projects under the RERA law. It shows a club house on 0.755 acres, a two-storey community building of 4,169 sq m, a sports block, and 2.619 acres of parks and playgrounds.
That filing doesn't name a swimming pool, a gym or any room inside the club. Elevate Homes, the platform behind the project, hasn't released a brochure either. So this page sorts every facility by who would use it and marks each as on record or not yet stated.
One status point shapes everything below. HRERA approved the application on 2 November 2026 subject to conditions, and no registration certificate had been issued by 23 November 2026.
- Club house land
- 0.755 acres (Form REP-I land use)
- Community building
- Ground plus first floor, 4,169.195 sq m FAR area
- Parks and playgrounds
- 2.619 acres of the 7.825 acre Phase I
- Maintained green area
- 4,850.196 sq m, 15.32% of Phase I site
- Swimming pool and gym
- Not named in the filing we read
- Maintenance charge
- Not published by anyone
The short answer
- Form REP-I sets aside 0.755 acres of Elevate Vista's 7.825 acre Phase I for a club house.
- The community building is ground plus first floor with 4,169.195 sq m of FAR area, about 44,877 sq ft.
- Parks and playgrounds take 2.619 acres, the largest single line in the Phase I land use table.
- No swimming pool, gym or room-by-room club list appears in the HRERA papers we read.
- No maintenance rate or club membership fee has been published by the developer or in the filing.
- The project was not RERA registered on 23 November 2026, so it cannot be advertised or sold yet.
What amenities does Elevate Vista have?
On record, Phase I of Elevate Vista has a club house plot of 0.755 acres, a ground plus one community building, a sports block, 2.619 acres of parks and playgrounds, 8 convenience shops, three basement parking levels with EV parking provision, and services such as rain water harvesting and a sewage treatment plant. Nothing beyond that is published.
Every item in that list comes from two documents the promoter, Elevate Edition Realtech Pvt Ltd, filed with HRERA. One is Form REP-I, the application form. The other is the approved site plan dated 31 March 2026. Neither is a sales brochure. They give areas and building names, not what sits inside each room.
When Elevate Homes announced its Sector 63A project in early September 2026, the trade press reported that the 'design vision, master plan, unit configurations' would follow approvals. On 23 November 2026 the developer's own website still didn't mention Elevate Vista. Our brochure page lists which documents are public, and the project overview explains who Elevate Homes is.
| Who uses it | On record in the HRERA filing | Not stated in what we read |
|---|---|---|
| Fitness and sports | Community building marked 'SPORTS BLOCK' on the site plan; club house on 0.755 acres | Swimming pool, gym, courts, indoor games list |
| Children | Parks and playgrounds, 2.619 acres (Form REP-I land use) | Play equipment, creche, age-wise play zones |
| Seniors | Pavements on 0.307 acres; maintained green area of 4,850.196 sq m | Seating courts, walking track length, any senior-specific room |
| Social | Community building, ground plus first floor, 4,169.195 sq m FAR area; 8 shops in 212.555 sq m of convenient shopping | Banquet hall, cafe, co-working, guest rooms |
| Safety | Security and fire fighting in service estimates; refuge floors; 100 sq m assembly and drill area; 1 hour fire rated main door; 1,500 mm balcony railing | Access control, CCTV coverage, guard deployment |
| Green and services | Rain water harvesting, STP, underground water tank, renewable energy system, electrical sub-station; green area 15.32% of Phase I site | Solar capacity, treated water reuse, any green rating |
| Parking | Three basements (B1, B2, B3); EV parking provision 'in accordance with HBC-2017 amendment' | Bays per apartment, number of EV chargers, visitor bays |
How big is the Elevate Vista clubhouse?
Form REP-I sets aside 0.755 acres of the 7.825 acre Phase I site for the club house. The approved site plan draws a community building of ground plus first floor with a FAR area of 4,169.195 sq m, which converts to about 44,877 sq ft. Its terrace level is marked at 10.5 m.
FAR area is the built space counted against the floor area ratio, the cap on how much may be built on a plot. The ground floor holds 3,076.410 sq m and the first floor 1,092.785 sq m. So roughly three quarters of the club sits at ground level. Spread across the 380 main apartments in Phase I, that is about 118 sq ft of club per home.
Treat that ratio with care. The licensed colony is 10.525 acres, and 2.70 acres are earmarked as Phase II for future development. News reports put the full project at over 600 homes. No filing says whether Phase II residents will share this club or get their own.
| Item | Figure | Where it is stated |
|---|---|---|
| Club house land | 0.755 acres | Form REP-I land use |
| Community building height | Ground plus first floor, terrace level 10.5 m | Approved site plan |
| FAR area, ground floor | 3,076.410 sq m (about 33,114 sq ft) | Approved site plan |
| FAR area, first floor | 1,092.785 sq m (about 11,763 sq ft) | Approved site plan |
| Total FAR area | 4,169.195 sq m (about 44,877 sq ft) | Approved site plan |
| Sports block | Drawn as 'COMMUNITY BUILDING (SPORTS BLOCK)'; area not read | Approved site plan |
| Room-by-room facility list | Not published | Community building plans not read by us |
Illustrative image Is there a swimming pool at Elevate Vista?
No document we read names a swimming pool. The Form REP-I land use table and the site plan's area summary mention a club house, a community building and a sports block, and stop there. That doesn't mean there won't be a pool. It means nobody has put one on record in the papers we could check.
The same goes for a gym, a spa, tennis or squash courts and a banquet hall. The detailed community building plans are part of the HRERA application, but we haven't read them. The developer hasn't confirmed any facility list either.
Renders are not records
Unofficial marketing names for this project have been in circulation since September 2026. If a render or leaflet shows a pool, ask which approved drawing sheet it appears on, and check that sheet in the HRERA application.
What sports and kids facilities are there?
For sports, the record shows a community building labelled as a sports block on the approved site plan. For children, Form REP-I lists 2.619 acres of parks and playgrounds, about a third of the Phase I land. No court count, play equipment list or creche is stated anywhere in the papers we read.
Parks and playgrounds are the biggest line in the land use table. They sit ahead of roads at 2.249 acres and the apartment footprints at 0.887 acres. The table shows only 0.158 acres under vehicle parking, while the site plan puts parking in three basements. How the play areas sit between the towers is covered on our master plan page.
Anything for seniors?
Nothing in the filing is labelled for senior residents. The items on record that matter most to older residents are the 0.307 acres of pavements and the maintained green area. Ask whether the walking route is continuous and step-free, and whether the club has a quiet room.
Elevate Vista open spaces: parks, playgrounds and green area
Two different numbers describe the open space, and they're easy to mix up. Form REP-I gives 2.619 acres of parks and playgrounds. The site plan gives a maintained green area of 4,850.196 sq m, about 1.2 acres, which it states as 15.32% of the Phase I site against a required 15%.
The site plan adds that this green area is 11.39% of the total site. We haven't found a line in the filing that reconciles the two measures. When a brochure appears, ask which definition its open space figure follows.
| Use | Acres | Share of Phase I |
|---|---|---|
| Parks and playgrounds | 2.619 | 33.5% |
| Roads | 2.249 | 28.7% |
| Apartments | 0.887 | 11.3% |
| Any other | 0.767 | 9.8% |
| Club house | 0.755 | 9.6% |
| Pavements | 0.307 | 3.9% |
| Vehicle parking | 0.158 | 2.0% |
| Electricity sub-station | 0.083 | 1.1% |
Illustrative image Safety, parking and building services on record
The filing lists security and fire fighting systems among its service estimates. The site plan shows refuge floors in every tower, a 100 sq m assembly and drill area, and three basements with EV parking provision. Fire scheme approval was applied for on 7 October 2026 and hadn't been received when we checked.
- Refuge floors, the protected floors meant for use in a fire: 17th and 26th in Towers A and B, 16th and 25th in Towers C and D.
- Main door: '1 HR FIRE RATED DOOR WITH VENEER FINISH', per Form REP-I Part H.
- Wiring: 'COPPER FRLS WIRES AS PER ISI', per the same form.
- Balcony railing height: 1,500 mm, per a note on the site plan.
- Services: rain water harvesting, a sewage treatment plant (STP), an underground water tank, an electrical sub-station and a renewable energy system.
HRERA's order of 2 November 2026 asks for environment clearance, fire scheme approval and service plan estimates within six months of registration. The promoter must lodge a separate Rs 25 lakh security with the authority against each of the three. Those approvals govern the fire and services items above, and our RERA page tracks them.
Form REP-I says external water, sewage and storm drainage will come from GMDA, and electricity from DHBVN. Finishes inside the apartment, such as flooring and air conditioning, are on the floor plan page and the highlights page.
What will maintenance cost at Elevate Vista?
No maintenance rate has been published for Elevate Vista, by the developer or in the HRERA papers we read. No apartment price exists either. So any monthly figure quoted to you today has no document behind it. What the filing does show is the list of things a maintenance bill would have to pay for.
That list is long. Four towers of 31 to 34 floors, three basements, a 4,169 sq m community building, a sewage treatment plant, fire systems, a sub-station and about 1.2 acres of maintained green all need staff, power and upkeep. More shared facilities generally mean a bigger common bill. Ask for the budget instead of guessing.
The draft allotment letter filed with HRERA describes the Total Price as including IDC and EDC (development charges paid to the state), car parking usage charges, PLC (preferential location charges), government levies, common areas and GST. Maintenance and club membership aren't named in the draft terms we read. We haven't read the draft builder-buyer agreement, which is the place to look for them.
What to ask about maintenance and the club
- The rate per sq ft per month, and whether it's charged on carpet area (the RERA measure of usable floor inside the walls) or on super area (carpet plus a share of common spaces).
- Whether an advance maintenance amount or security deposit is collected at possession, and how much.
- Whether club membership sits inside the Total Price or is billed separately, once or every year.
- Who will run the facilities, and until when, before a residents' association takes over.
- Whether the 68 EWS (economically weaker section) flats, the 8 shops and future Phase II homes share the club and its costs.
- Whether upkeep of the VRF air conditioning named in Form REP-I falls on the owner or on the common bill.
Once a price list exists, we'll set these charges beside the apartment cost on the price page. The draft instalment schedule is explained on the payment plan page.
Promised versus on record: reading amenity claims before launch
At this stage there is no developer promise to compare with the record, because no brochure, price list or amenity sheet has been released. The only dependable sources are the HRERA filing and the approved drawings. Anything else, including facility lists under unofficial project names, is unverified until it matches a filed sheet.
- Confirm the registration certificate has been issued. Until then the project can't be advertised or sold. Our launch date page follows this.
- Ask for the 'specifications and amenities' annexure. The draft allotment letter lists it among the papers an allottee is to receive.
- Match every facility in that annexure to the approved community building plan in the HRERA application.
- Ask when the club will open. The filing gives a likely project completion of 31 December 2034 and no separate date for the club.
- Get the maintenance rate, deposits and club terms written into the agreement for sale, not left to a leaflet.
The new promoter company has no delivery record of its own. To see how the same platform's Elevate in Sector 59 was completed, read our reviews page and the Conscient developer profile. Other upcoming projects are on our new project launches list.
If you'd like to know when the certificate and an official amenity sheet appear, write to the Property Nivesh desk. We'll update this page the day either document is public.
Questions people ask
What amenities does Elevate Vista have?
The HRERA filing for Phase I shows a club house on 0.755 acres, a ground plus one community building of 4,169.195 sq m, a sports block, 2.619 acres of parks and playgrounds, 8 convenience shops and three basement parking levels with EV parking provision. Services include rain water harvesting and a sewage treatment plant. The developer hasn't published its own amenity list.
How big is the Elevate Vista clubhouse?
Form REP-I allots 0.755 acres to the club house. The approved site plan shows the community building as ground plus first floor with 4,169.195 sq m of FAR area, about 44,877 sq ft. That splits as 3,076.410 sq m at ground level and 1,092.785 sq m above. It works out to roughly 118 sq ft per home across the 380 main apartments in Phase I.
Does Elevate Vista have a swimming pool?
Not on record yet. Neither Form REP-I nor the site plan area summary we read names a swimming pool, a gym or any specific club facility. The community building plans in the HRERA application may show more, but we haven't read them, and the developer hasn't released a brochure. Ask for the approved sheet that shows the pool.
What kids and sports facilities are planned at Elevate Vista?
The site plan draws a community building marked as a sports block, and Form REP-I lists 2.619 acres of parks and playgrounds within the 7.825 acre Phase I site. No list of courts, play equipment, creche or kids' rooms has been published. Those details should appear in the specifications and amenities annexure that the draft allotment letter refers to.
What will the maintenance charge be at Elevate Vista?
Nobody has published a maintenance rate, and no apartment price exists either. The draft allotment letter's Total Price covers development charges, parking usage, PLC, levies, common areas and GST, but the terms we read don't name maintenance or club fees. Ask for the rate per sq ft, the area it's charged on, any deposit and the start date, all in writing.
Can I rely on amenity lists circulating for Elevate Vista now?
Be careful. The project was not RERA registered on 23 November 2026. HRERA Gurugram approved the application on 2 November 2026 subject to conditions, and the certificate was still pending. A project can't be advertised before registration, and unofficial names for this one are in circulation. Trust only what matches the HRERA filing or a document from Elevate Homes itself.
How much green area does Elevate Vista have?
The approved site plan shows a maintained green area of 4,850.196 sq m, stated as 15.32% of the Phase I site against a required 15%, and 11.39% of the total site. Separately, Form REP-I lists 2.619 acres of parks and playgrounds. The two figures aren't reconciled in the filing, so ask which definition any brochure number follows.
Will Phase II residents share the Elevate Vista clubhouse?
No filing says. Phase I covers 7.825 acres with 380 main apartments, and 2.70 acres are earmarked as Phase II for future development, with no unit count or timeline. News reports put the whole project at over 600 homes. If Phase II shares the 0.755 acre club house, the space per home falls, so ask how the club will be shared.
More on Elevate Vista
- Elevate Vista: overview Elevate Vista at a glance: who builds it, where, what is filed and where it stands today.
- Elevate Vista: price No price list yet: see RERA carpet sizes, what the draft price includes and stamp duty sums.
- Elevate Vista: payment plan Draft 10:40:50 and construction-linked stages from the HRERA filing, worked per Rs 1 crore.
- Elevate Vista: location Address, roads on the approved plan and what no source states yet about distances from Sector 63A.
- Elevate Vista: launch date Dated timeline from licence to HRERA approval, plus the filed 2034 possession dates and next steps.
- Elevate Vista: rera No RERA number yet: what HRERA approved on 2 November 2026 and how to check the status yourself.
- Elevate Vista: reviews Pros, cons, the Elevate Homes delivery record and any complaints, from filings only.
- Elevate Vista: brochure No official brochure yet: what the HRERA file holds and how to check any copy you receive.
- Elevate Vista: booking Booking steps, the 10% draft booking amount, documents and refund terms for Elevate Vista.
- Elevate Vista: floor plan Filed carpet areas for the 3 and 4 BHK homes, room sizes from the HRERA plans, and how to read them.
- Elevate Vista: master plan Land, phases, towers, floors and open area: the Elevate Vista site plan read as a whole.
- Elevate Vista: highlights Ten sourced facts that define Elevate Vista, split into on record and claimed.
- Elevate Vista: investment Area price trend, missing rent data, buying costs and the real risks for Elevate Vista investors.
- Elevate Vista: faqs 29 buyer questions on Elevate Vista, from price and RERA to possession, answered from the filing.
Related on Property Nivesh
Talk to an advisor about Elevate Vista
Tell us what you are looking for in Elevate Vista. Our advisor calls you with what is confirmed so far and answers your questions on price, plans and paperwork.
✓
Request received
A senior property advisor will reach you within 4 working hours. No spam, no builder hand-offs — your details stay with our advisory desk only.
Sources
- HRERA Gurugram, Form REP-I preview for Elevate Vista (Phase I), submitted 7 October 2026, read 23 November 2026
- HRERA Gurugram (promoter upload), approved site plan A-01 dated 31 March 2026, uploaded 6 October 2026
- HRERA Gurugram (promoter upload), draft allotment letter for Elevate Vista Phase I, uploaded 2 November 2026
- HRERA Gurugram, Comprehensive Project Details and hearing proceedings of 2 November 2026, read 23 November 2026
- HRERA Gurugram, registered projects register, read 23 November 2026
- Construction World, Elevate Homes to Develop Premium Project in Gurugram, 2 September 2026
- Elevate Homes, Home and About Us pages, read 23 November 2026
Property Nivesh is an independent property research and advisory site. This guide is not the website of Elevate Homes (platform of Hines and Conscient Infrastructure) and is not connected with the developer. Facts are as of 23 November 2026 and come from the sources listed on each page; prices quoted in the market are indicative. Pictures marked "Illustrative image" are AI-generated and do not show the project.