Market Trends
Top Upcoming Residential Projects in Mumbai for Investment: 2026-27 List
The upcoming residential projects in Mumbai with a MahaRERA registration from 2025 or 2026 include Lodha Aureus in Sewri, Godrej Bandra Bay, Oberoi Oceanic on Carter Road, L&T Realty Ahana in Malad East and Prestige Forest Hills Phase 2 in Mulund. This list of 14 is chosen by registration and dated launch statements, not ranked, and most luxury launches still publish no price.
By Prerna Sharma · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Upcoming residential projects in Mumbai: the short answer
The upcoming residential projects in Mumbai with the firmest paper trail are those already registered on MahaRERA, Maharashtra's real estate regulator, in 2025 or 2026. This list has 14, from Lodha Aureus in Sewri to Prestige Forest Hills Phase 2 in Mulund. It isn't a ranking, and none with a declared date is due before mid-2030.
New registrations has stayed in the hundreds each year. MahaRERA's annual reports count 752 project registrations in Greater Mumbai in FY2024-25, after 697 in FY2023-24 and 873 in FY2022-23.
How this list of MahaRERA registered projects in Mumbai was chosen
A project made the list if it sits in Mumbai City or Mumbai Suburban district and was registered on MahaRERA, or launched with a dated developer statement, between January 2025 and November 2026. Only listed or long-established developers was taken, three entries at most each. Thane, Mira-Bhayandar and Palava belong to the wider MMR (Mumbai Metropolitan Region) and stay off it.
Two terms help. A MahaRERA registration means the developer has filed the plans, the promoter (legal seller), the unit count and a completion date. Carpet area is the usable floor inside a flat's walls, built-up area adds the walls so it reads bigger then carpet. Developers are compared in our Lodha vs Godrej vs Prestige vs Oberoi post.
New launch projects in Mumbai: the list at a glance
Numbers and home counts are from MahaRERA certificates, developer filings or dated reports (October and November 2026). Where no count is on record the cell say so.
| Project | Locality | MahaRERA number | Homes |
|---|---|---|---|
| Lodha Aureus | Sewri | PR1170002502863 | 354 |
| Godrej Trilogy (Seaturf, Seafront) | Worli / Lower Parel | PR1171012501267; PR1171012501309 | 122 in Seaturf Tower A |
| Mahindra BeaconHill | Mahalaxmi | PM1170002600357 | 198 |
| Oberoi Oceanic | Bandra West | PR1180002600318 | 47 |
| Godrej Bandra Bay (3 phases) | Bandra West | PR1181012601775; PR1181012601785; PR1181012601786 | Not stated |
| The Westpark (DLF, Trident) | Andheri West | PR1181012500079; PR1181012602591 | 416 in Phase 1 |
| Lodha Sovrano | Jogeshwari West | PR1180002501771; PR1180002501743; PR1180002501764 | 360 |
| Rustomjee Ozone Skye | Malad West | PR1180002601227 (developer page) | Not stated |
| L&T Realty Ahana | Malad East | PM1180002600813; PM1180002600814 | 554 |
| Hiranandani Bluecrest | Borivali West | PR1180002602042 | 661 |
| Oberoi Sky City Tower H | Borivali East | PR1180002502390 | 783 |
| Lodha Elaris | Vikhroli West | PR1180002501965 | 124 |
| Mahindra Rainforest | Kanjurmarg | PM1181012502957; PR1181012502956 | Not stated |
| Prestige Forest Hills Phase 2 | Mulund West | PR1181012600556 | 500 (as reported) |
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
South and central Mumbai: Sewri and Worli
The island city's new towers are mostly large luxury flats, and none here prints a rupee price. Mahindra's BeaconHill in Mahalaxmi, a 58-storey tower of 198 homes launched on 6 May 2026, is the same story.
Illustrative imageLodha Aureus, Sewri
Registered on 16 March 2026 (PR1170002502863), Aureus is two 56-floor wings with 354 homes in 3 and 4 Bed flats, duplexes and penthouses. Lodha calls it one of it's FY26 key launches. Its price page said "on request" on 6 November 2026. MahaRERA's completion date is 30 April 2033, already moved from 31 December 2032. Check: what moved it.
Godrej Trilogy, Worli and Lower Parel
Trilogy is a joint development on 2.63 acres; Phase 1 is two towers, Seaturf (PR1171012501267) and Seafront (PR1171012501309). It sells 3 and 4 BHK flats; Seaturf Tower A has 122 units. Price is "available on request" (Godrej page, 28 November 2026). Possession is December 2033 on that page but 30 April 2034 on Seaturf's certificate. Check: Seafront's certificate, which dates aren't on record.
Bandra to Jogeshwari: four western-suburb launches
This stretch has the widest price spread on the list. From Carter Road above ₹1 lakh per sq ft to Jogeshwari 2 BHK flats under ₹3 crore.
Oberoi Oceanic, Carter Road, Bandra West
Oceanic is one 19-floor building of 47 units, registered on 30 April 2026 (PR1180002600318), with no configurations listed. Oberoi's CMD said on 19 October 2026 the price started at ₹1,50,000 per sq ft and were pushed to ₹1,70,000 to ₹1,80,000. By 30 September 2026, 3 units had been booked for ₹199.16 crore. Completion is 31 December 2030. Check: your own unit's carpet area. More in our Oberoi Realty projects guide.
Godrej Bandra Bay, Bandra West
Godrej's first Bandra project is registered in three phases (PR1181012601775, PR1181012601785, PR1181012601786), with Roshni Developers & Realtors as co-promoter. The developer page offers 4 BHK flats, price on request, possession November 2033. On 23 October 2026 its MD called it "a very critical and important launch for Mumbai" for October to December 2026. Check: the certificates' dates and unit counts, and whether the launch actually happen.
The Westpark, Andheri West
DLF (51%) and Trident Realty registered Phase 1 off Link Road on 16 June 2025 (PR1181012500079): Towers 2 to 5, 416 units. The Free Press Journal reported prices of ₹5.5 crore to ₹7.5 crore before the 17 July 2025 launch, and Phase 1 reportedly sold out in about a week. It is a redevelopment (old housing rebuilt, residents rehoused) with a slum rehabilitation part. A Phase-1B registration (PR1181012602591) follow in 2026. Phase 1's MahaRERA date is 30 June 2032. Check: Phase-1B's sizes and date.
Lodha Sovrano, Jogeshwari West
At Patel Estate off SV Road, Lodha register Sovrano as three towers (PR1180002501771, PR1180002501743, PR1180002501764) in December 2025, with 360 homes. Starting list prices run from ₹2.79 crore for a 2 BHK to ₹4.56 crore for a 3.5 BHK (Lodha price page, November 2026). Completion is 31 December 2030 for Towers B and C and 31 March 2031 for Tower A, after a 4 June 2026 extension. Check: what the list price includes. More in our Lodha new projects list.
Malad to Borivali: under-construction projects in Mumbai's north-west
All four are new towers, so a OC (occupancy certificate, the civic permission to live in a building) only matters near possession.
Rustomjee Ozone Skye, Malad West
Rustomjee launched this 50-storey tower on the Goregaon Mulund Link Road in July to September 2026. Carpet sizes are 693.74 to 771.24 sq ft for 2 BHK and 944.54 to 976.29 sq ft for 3 BHK, from ₹2.61 crore all inclusive (developer page, 29 November 2026). The page give PR1180002601227 as its MahaRERA number. Check: that number and the completion date on MahaRERA, and how your flat is freed from the ICICI Bank mortgage the developer discloses.
L&T Realty Ahana, Malad East
Ahana stands on the Western Express Highway near Kurar Metro station, as reported, in two towers (PM1180002600813, PM1180002600814). Construction World reported the launch on 24 June 2026: 554 homes in 2, 3 and 4 BHK of 845 to 2,080 sq ft. The report don't say if the sizes are carpet. Check: price and completion date, neither on record.
Hiranandani Bluecrest, Borivali West
House of Hiranandani registered Bluecrest at Gorai III on 24 September 2026 (PR1180002602042): 661 homes of 2 and 3 BHK, completion 31 August 2033. It's a redevelopment on about 3 acres. In April 2026 the developer said about 380 homes goes to existing members and over 850 are for sale, more than the 661 registered. Check: which phase this registration covers. More in our Hiranandani new projects guide.
Oberoi Sky City Tower H, Borivali East
Tower H is the eighth tower of Oberoi Sky City at Magathane, registered on 17 February 2026 (PR1180002502390): 60 habitable floors, 783 units. Bookings began in January to March 2026 on limited, high-priced inventory, the CMD said. Towers A to E have an OC; F and G was 93% and 79% built at 30 September 2026. Check: a listing page claimed June 2027 possession, but MahaRERA says 30 June 2030.
Central and eastern suburbs: Vikhroli, Kanjurmarg and Mulund
Hiranandani's Rockside in Powai (PR1180002502729) and Maitri Park Phase 1 in Chembur East (PR1180002600200) was also registered on this side in 2026.
Illustrative imageLodha Elaris, Vikhroli West
Elaris is one 34-floor tower of 124 units in Lodha's Riservo estate, registered on 1 January 2026 as "Vikhroli Premium Tower A1" (PR1180002501965). Lodha sells 4 Bed with Study flats from ₹8 crore (6 November 2026). Completion is 31 December 2030. Check: search by number, as the name on MahaRERA is different then the brochure's.
Mahindra Rainforest, Kanjurmarg
Mahindra Lifespaces launched Rainforest, a mixed-use development on about 25.47 acres, on 19 March 2026. Its residential Phases 1 and 2 (PM1181012502957, PR1181012502956) offers 2 and 3 BHK flats with an estimated GDV (gross development value, the total sales a developer expects) of about ₹3,000 crore. Check: price, unit count and completion date, none on record.
Prestige Forest Hills Phase 2, Mulund West
This phase of The Prestige City, Prestige's Yogi Hills township (about 30 acres, per ICRA), is registered as PR1181012600556 and launched on 30 June 2026. Equitybulls, reproducing Prestige's announcement, gave 500 homes of 3 and 4 bedrooms, 946 to 2,643 sq ft carpet. A starting ticket of about ₹2.73 crore was reported in June 2026, so treat it tentative until Prestige's own price list confirms it. Check: the completion date. Also in Mulund West, Piramal Realty launched Rayansh, the last tower of Piramal Revanta, in June 2025.
Projects by area and price band
Most launches here print no price, and those that do use different bases, so compare like with like, carpet with carpet.
| Area | Project | Price on record | Band |
|---|---|---|---|
| Bandra West | Oberoi Oceanic | ₹1,50,000 to ₹1,80,000 per sq ft (Oberoi CMD, 19 Oct 2026) | Above ₹1 lakh per sq ft |
| Vikhroli West | Lodha Elaris | From ₹8 crore (Lodha, 6 Nov 2026) | ₹5 crore and above |
| Andheri West | The Westpark Phase 1 | ₹5.5 crore to ₹7.5 crore (Free Press Journal, Jul 2025) | ₹5 crore and above |
| Jogeshwari West | Lodha Sovrano | From ₹2.79 crore (Lodha, Nov 2026) | ₹2.5 crore to ₹5 crore |
| Malad West | Rustomjee Ozone Skye | From ₹2.61 crore all inclusive (developer, 29 Nov 2026) | Under ₹3 crore |
| Mulund West | Prestige Forest Hills Phase 2 | About ₹2.73 crore, reported (30 Jun 2026) | Under ₹3 crore, tentative |
| Across the list | The other eight | On request or not published (Nov 2026) | No published price |
Past growth doesn't predict future growth. For area rates see our area-wise Mumbai rates. Stamp duty in Mumbai is 6%, including a 1% metro cess charged inside BMC limits, and registration 1% capped at ₹30,000, as listed in our state costs table. Duty applies on the higher of agreement value and ready reckoner value (the state's official rate). Full sums is in our guide to buying costs; confirm before paying.
Possession dates as stated: MahaRERA against the developer
A MahaRERA completion date is the one a developer declared to the regulator; an extension can move it, and a brochure some times gives another month. Dates below are from MahaRERA certificates and developer pages (October and November 2026).
| Project | MahaRERA completion | Other date on record |
|---|---|---|
| Oberoi Sky City Tower H | 30 Jun 2030 | June 2027 (a listing page) |
| Oberoi Oceanic; Lodha Elaris | 31 Dec 2030 | None |
| Lodha Sovrano | 31 Dec 2030 (B, C); 31 Mar 2031 (A, extended) | None |
| The Westpark Phase 1 | 30 Jun 2032 | None |
| Lodha Aureus | 30 Apr 2033 (was 31 Dec 2032) | None |
| Hiranandani Bluecrest | 31 Aug 2033 | None |
| Godrej Bandra Bay | Not on record | November 2033 (developer page) |
| Godrej Trilogy Seaturf | 30 Apr 2034 | December 2033 (developer page) |
| BeaconHill, Rainforest, Ozone Skye, Ahana, Forest Hills Phase 2 | Not on record | None |
Lodha's MahaRERA certificates, read on 6 November 2026, showed 15 completion-date extensions across Pune and the MMR, moving dates by 3 to 24 months. Those are dates moved on paper, not proof of delay. If a wait into the 2030s is not suiting you, see our ready-to-move vs under-construction guide for Mumbai.
Upcoming projects in Mumbai for 2027: announced but not registered
Pre-launch projects in Mumbai are ones announced, or pushed by marketing pages, before a MahaRERA number exist. Without one there is no declared plan or date to hold anyone to. Treat a request for a booking or EOI (expression of interest, a payment to hold a place) with caution.
Illustrative image| Project | Developer, area | On record | Status (Nov 2026) |
|---|---|---|---|
| Marine Lines project | Godrej, Marine Lines | Revenue potential about ₹6,000 crore (Free Press Journal, 28 Sep 2026) | No launch date |
| Aurelius | Oberoi, Pedder Road | Launch slipped again (CMD, 19 Oct 2026) | No MahaRERA record by name |
| Adarsh Nagar redevelopment | Oberoi, Worli | Ticket size about ₹50 crore to ₹60 crore (CMD, 11 May 2026; tentative) | Awaiting clearances |
| Khar West redevelopment | Birla Estates with Parinee, Khar West | GDV ₹1,631 crore (ABREL, 26 Oct 2026) | Launch Jan to Feb 2027 (CEO) |
| Niyaara Tower C | Birla Estates, Worli | Tentative ₹1 lakh to ₹1.2 lakh per sq ft carpet (CEO, 14 Aug 2026) | By Jul to Sep 2027 |
| Goregaon West cluster, phase 1 | Adani Realty, Goregaon West | ₹34,000 to ₹35,000 per sq ft, reported (Business Today, 25 Sep 2026) | Final approvals, as reported |
For 2027, Lodha told analysts on 2 November 2026 it plans two new MMR projects and seven new phases by March 2027. Birla's plans are in our Birla Estates projects guide; Godrej's deal is in our Marine Lines news report. One warning: in May 2026 a lookalike page using the Hiranandani name took "interest" for a Borivali West project, months before Bluecrest were registered.
How to check a new launch on MahaRERA: an 8-step checklist
Run these on MahaRERA's project search before paying. Wider checks are in our guide to what every buyer must check on RERA, and past delivery in checking a builder's record on RERA.
- Search by registration number, not brand: MahaRERA often shows a working name, such as "Vikhroli Premium Tower A1" for Lodha Elaris.
- Match the promoter on the certificate to the seller on your agreement; it may be a subsidiary, such as Incline Realty.
- Note the declared completion date and open every extension or correction certificate.
- Compare the floors and units in the annexure with the brochure.
- Confirm that the address and district on the certificate match the advertisement.
- For a redevelopment, ask which flats go to existing residents and which ones this registration covers.
- Get your flat's carpet area in writing, with an all-in price that lists GST, stamp duty and registration.
- Check that the advertisement shows the MahaRERA number and QR code clearly; MahaRERA fined an Akola developer ₹10,000 over a blurred one (LiveLaw, 9 January 2026).
Where to go from here
Use this list as a register to check, not a shortlist. Weighing a launch against a finished flat? Our post on new launch vs resale property in Mumbai set the two side by side, and our new launches page lists more.
Questions
Frequently Asked Questions
Which projects on this list cost under ₹3 crore to enter? +
Three have a starting figure under ₹3 crore on record. Rustomjee Ozone Skye in Malad West starts at ₹2.61 crore all inclusive (developer page, 29 November 2026). Lodha Sovrano in Jogeshwari West lists 2 BHK from ₹2.79 crore (Lodha, November 2026). Prestige Forest Hills Phase 2 in Mulund was reported from about ₹2.73 crore in June 2026, a tentative figure. Check what each price includes.
Does a MahaRERA registration mean sales have started? +
No. Registration puts the plan, unit count and completion date on record, but it does not prove sales opened. Lodha Elise in Worli was registered on 23 January 2026 with 195 homes, yet no dated launch or sales opening is on record. Hiranandani Bluecrest, registered on 24 September 2026, had no dated launch or developer price in November 2026.
Which project here has the latest declared completion date? +
Godrej Trilogy Seaturf in Worli. Its MahaRERA validity runs to 30 April 2034, while Godrej's own page says December 2033. Hiranandani Bluecrest (31 August 2033) and Lodha Aureus (30 April 2033) come next. For towers this far out, ask how the payment plan is spread across the construction period before you book.
What does "price on request" tell me about a new launch? +
Only that the developer has not published a figure. Lodha Aureus, Godrej Trilogy and Godrej Bandra Bay all showed price on request in November 2026. Ask for the price in writing with the carpet area of the exact flat, its floor and every charge on top, so you can compare it with a launch that does publish a rate.
Is Oberoi Sky City Tower H a separate project from the older Sky City towers? +
It has its own MahaRERA registration, PR1180002502390 of 17 February 2026, but sits in the same Sky City complex in Borivali East. Towers A to E already have an OC, while F and G were 93% and 79% built at 30 September 2026. Tower H, with 783 units, has a declared completion date of 30 June 2030.
How is buying into a redevelopment project different? +
Part of the new building goes back to the old residents and only the rest is sold. At Hiranandani Bluecrest the developer said in April 2026 that about 380 homes go to existing members, and The Westpark has a slum rehabilitation part handled by Trident, as reported. Ask which flats your registration covers and how the rehab and sale towers are timed.
Why can't I find a project by its brand name on MahaRERA? +
Developers often register under a working name. Lodha Elaris appears as "Vikhroli Premium Tower A1" and Lodha Elise as "Lodha Worli Residential Project". Search by the registration number from the advertisement or the developer's page instead, then read the promoter name and address on the certificate to make sure it is the same project.
Can a completion date change after I book? +
Yes. MahaRERA can approve an extension that moves the declared date. Lodha Sovrano Tower A moved three months, to 31 March 2031, through an extension approved on 4 June 2026, about six months after registration. Lodha Aureus moved from 31 December 2032 to 30 April 2033. Check the extension certificates before booking and again at each payment stage.
Sources
- MahaRERA, public project search and registration certificates for Lodha Aureus (PR1170002502863), Lodha Elise (PR1170002502174), Lodha Elaris (PR1180002501965), Lodha Sovrano, Oberoi Oceanic (PR1180002600318), Sky City Tower H (PR1180002502390) and Hiranandani Bluecrest (PR1180002602042), read 6 November 2026
- MahaRERA, registration certificate PR1171012501267 (Godrej Trilogy Seaturf), dated 14 October 2026; public search list for Godrej Bandra Bay, 27 October 2026
- MahaRERA, registration certificate PR1181012500079 (The Westpark Phase-1), dated 1 October 2025
- MahaRERA, public search lists for Mahindra Rainforest, Mahindra BeaconHill, L&T Realty Ahana and Forest Hills Ph 2 at The Prestige City, May to October 2026
- MahaRERA, Annual Reports FY2022-23, FY2023-24 and FY2024-25, project registrations by district
- Lodha Developers, project price pages for Aureus, Sovrano and Elaris, read 6 November 2026; Integrated Report 2025-26, 30 June 2026; Q2 FY2027 post-results conference call transcript, 2 November 2026
- Godrej Properties, project pages for Godrej Trilogy and Godrej Bandra Bay, 28 November 2026; Q2 FY27 earnings conference call transcript, 23 October 2026
- Oberoi Realty, Results Update Q2FY27, 16 October 2026; Q2 FY27 earnings conference call transcript, 19 October 2026; Q4 FY26 earnings conference call transcript, 11 May 2026
- Mahindra Lifespace Developers, press releases on Mahindra Rainforest (19 March 2026) and Mahindra BeaconHill (6 May 2026)
- Construction World, L&T Realty Launches Premium Housing Project in Malad, 24 June 2026; Raymond Realty Launches Wadala Project With Rs 50 Billion Potential, 27 January 2026
- Rustomjee (Keystone Realtors), Rustomjee Ozone Skye project page, 29 November 2026; Key Operational Updates for H1FY27 and Q2FY27, 8 October 2026
- Free Press Journal, DLF Enters Mumbai Market With The Westpark Launch On July 17, July 2025; Godrej Properties Enters Marine Lines, South Mumbai, 28 September 2026
- Outlook Business, DLF, Trident Realty JV sells all 416 flats in Mumbai project for Rs 2,300 cr, July 2025
- Equitybulls (reproducing the Prestige Estates announcement), Phase 2 of Prestige Forest Hills, Mulund, 30 June 2026; ICRA, Prestige Mulund Realty Private Limited: Rating reaffirmed, 30 June 2026
- House of Hiranandani, press release on the Borivali West development agreement, 28 April 2026
- Aditya Birla Real Estate Ltd, Q1 FY2026-27 earnings call transcript (14 August 2026) and Q2/H1 FY2026-27 earnings presentation and call transcript (26 October 2026)
- Business Today (citing Livemint), Adani Realty to launch premium, luxury residential projects in Mumbai, 25 September 2026
- The Tribune (company release), Piramal Realty launches Rayansh at Piramal Revanta, Mulund, 26 June 2025
- LiveLaw, MahaRERA Fines Akola Developer Rs 10,000 For Blurred RERA Number And QR Code In Newspaper Advertisement, 9 January 2026
- Property Nivesh state costs table, Maharashtra stamp duty and registration