Top Real Estate Developers in Mumbai: Lodha vs Godrej vs Prestige vs Oberoi
On their own filings, Lodha is the most Mumbai-focused of the four, with about 76% of FY26 pre-sales in the MMR, while Godrej Properties sold the most overall at ₹34,171 crore. Oberoi Realty holds net cash and has delivered all 51 of its completed projects in Mumbai, and Prestige, which entered in 2022, has the lowest rating of the four, ICRA A+.
By Rajan Khosla · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Top real estate developers in Mumbai: how the four compare
Lodha, Godrej Properties, Oberoi Realty and Prestige are four of the top real estate developers in Mumbai that are listed, so their sales, debt and ratings are on public record. On their own filings, Lodha is the most Mumbai-heavy, with about 76% of FY26 pre-sales from the Mumbai Metropolitan Region (MMR), while Godrej sold the most in total. Oberoi holds net cash, and Prestige only entered Mumbai in 2022.
This post don't rank them on quality, since no filing measures how well a tower is built. It sets their numbers side by side: bookings, deliveries, debt, rating, Mumbai share and record with MahaRERA, the Maharashtra Real Estate Regulatory Authority where every project must register before sale. FY26 means April 2025 to March 2026, and H1 FY27 is April to September 2026.
People searching for the best builders in Mumbai usually wants one name, and filings can't honestly give it. More developers sit on our builder comparison page.
Lodha, Godrej, Oberoi and Prestige side by side
Every figure is from the company's own filings or a rating agency, as dated in the last row. Each firm defines bookings in there own way, Lodha says pre-sales, and Oberoi's booking value includes subvention and stamp duty where applicable since Q1 FY26, so the rows are close but not exactly like for like.
| Measure | Lodha | Godrej Properties | Oberoi Realty | Prestige |
|---|---|---|---|---|
| FY25 bookings | ₹17,630 crore | Not stated; FY26 was up 16% | ₹5,281 crore | ₹17,023 crore (reported) |
| FY26 bookings | ₹20,530 crore, up 16% | ₹34,171 crore, up 16% | ₹5,447 crore | ₹30,024 crore, up 76% |
| H1 FY27 bookings | ₹9,670 crore | ₹16,669 crore | ₹10,199.57 crore, mostly Gurugram | ₹13,804.3 crore (reported) |
| Mumbai or MMR share | About 76% of FY26 (MMR) | About 30% of FY26 (MMR) | All of FY26 in MMR | 12% of Q2 FY27 (reported) |
| Deliveries on record | 6,373 homes in FY26, all cities | 12.1 million sq ft in FY26, all cities | 51 completed projects, all in Mumbai | First 3 Mumbai projects, May 2025 |
| Debt | Net ₹5,279 crore (30 Sep 2026) | Gross ₹15,615 crore against ₹8,970 crore cash (31 Mar 2026) | Net cash (H1 FY27) | Net about ₹12,122.3 crore (30 Sep 2026, tentative) |
| Credit rating | AA (Stable) | ICRA AA+ (Stable), Sep 2026 | CARE AA+ (Stable), Oct 2025 | ICRA A+ (Stable), Aug 2026 |
| Main sources | Lodha filings, Apr 2025 to Oct 2026 | Press release Apr 2026, call Oct 2026, ICRA | Filings Apr and Oct 2026; CARE | Filing Apr 2026, PTI, Multibagg, ICRA |
A credit rating grades how likely a company is to repay its debt; AA+ sits above AA, and A+ below both. Two cells needs a caution. A Multibagg summary (April 2026) puts Godrej's net debt at a tentative ₹6,414 crore, which doesn't match ICRA's own definition. ICRA (19 August 2026) also puts Prestige's FY26 growth at 64%, not 76%, probably counting only its own share.
Lodha vs Godrej: one leans on Mumbai, one spreads across five cities
Lodha projects in Mumbai: segment, sales and debt
Lodha Developers Ltd, formerly Macrotech Developers, sells luxury, premium and mid-income homes from about 40 operating locations in MMR, Pune, Bengaluru and, from FY27, NCR (Q2 FY27 presentation, 30 October 2026). Its finished city towers include Lodha World Towers in Worli, which has a OC, the occupancy certificate that lets owners move in. It also holds about 3,700 acres at Palava and Upper Thane.
Illustrative imagePre-sales, the value of homes booked, rose from ₹17,630 crore in FY25 to ₹20,530 crore in FY26, and Lodha said some March 2026 sales was deferred because of the Iran war. The MMR gave ₹15,550 crore, with South and Central Mumbai alone at ₹7,920 crore and an average ₹44,225 per sq ft of saleable area (presentation, 24 April 2026). Saleable area counts more than carpet area, the usable floor inside the walls. H1 FY27 pre-sales were ₹9,670 crore, about 68% from the MMR.
Lodha handed over 6,373 homes in FY26, not split by city. Net debt, borrowings minus cash, went from ₹3,990 crore in March 2025 to ₹5,279 crore on 30 September 2026, about 0.2 times equity. Its slide shows an AA (Stable) rating without naming the agency; India Ratings announced its IND AA/Stable upgrade in April 2025.
Lodha's MahaRERA certificates, read on 6 November 2026, carries 15 completion-date extensions across Pune and MMR, mostly approved in 2026 and moving dates by 3 to 24 months. Those are dates moved on MahaRERA, not proven construction delays. Its 2026 registrations are listed in Lodha new projects in Mumbai.
Godrej Properties Mumbai: record sales, a smaller Mumbai slice
Godrej Properties sells across five top markets, Mumbai, NCR, Bengaluru, Pune and Hyderabad, and is "entering more micro markets", its management said on 23 October 2026. In Mumbai, the chairperson say it had no Worli project, added Godrej Trilogy and sold "INR 4,000 crores plus" there in less than a year. Godrej Bandra Bay, the first one of it in Bandra, is planned for launch in October to December 2026.
A Marine Lines deal followed in September: about 2.5 acres with revenue potential of about ₹6,000 crore (Free Press Journal, 28 September 2026), covered in Godrej's Marine Lines entry. Record FY26 bookings of ₹34,171 crore included ₹10,313 crore from the MMR, per its press release as reported by Free Press Journal on 10 April 2026. H1 FY27 bookings were ₹16,669 crore, with Mumbai at about ₹1,900 crore in July to September (call, 23 October 2026). Deliveries was 12.1 million sq ft in FY26, with no city split.
ICRA reaffirmed AA+ (Stable) on 2 September 2026 and expects gross debt to rise to ₹18,500 to 19,000 crore in FY27. Older city projects on our pages runs from Godrej Reserve in Kandivali East, from ₹5.94 crore (checked 2 October 2026), to Godrej Urban Park in Chandivali. Urban Park's MahaRERA completion date of 30 September 2026 passed with no extension certificate and no OC published, as our page flagged on 3 October 2026.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Oberoi vs Prestige: a Mumbai specialist and a recent arrival
Oberoi Realty Mumbai projects and filings
Oberoi Realty calls itself "focused on premium developments" across homes, offices, retail and hotels, and it has delivered 51 completed projects, all in Mumbai (press release, 16 October 2026). Its biggest site on our pages are Oberoi Garden City, an 80-acre township in Goregaon East with the Elysian towers. Others include Sky City in Borivali East, Three Sixty West in Worli and Oceanic on Carter Road.
FY26 bookings were ₹5,447 crore, all in Mumbai and Thane (sales update, 20 April 2026). H1 FY27 leapt to ₹10,199.57 crore, but ₹7,891.14 crore came in July to September from Three Sixty North in Gurugram, its first project outside MMR. The MMR projects booked about ₹2,308 crore over the half. Its average realisation at Elysian was ₹54,900 per sq ft of carpet area in Q2 FY27 (results update, 16 October 2026), and its CMD said Oceanic started at ₹1,50,000 per sq ft and been pushed to ₹1,70,000 to ₹1,80,000 per sq ft (call, 19 October 2026).
It has the least debt of the four, with net debt to equity of (0.02) at H1 FY27, meaning more cash than borrowings. CARE reaffirmed AA+ (Stable) on 8 October 2025. Instead of homes handed over, Oberoi report tower progress: Elysian Towers A and B were 89% and 81% built at 30 September 2026. Sky City Towers A to E already has OC.
In October 2026 the CMD said Aurelius on Pedder Road, Jardin Tower A, another Forestville tower and Alibaug would "slide over a quarter here and there". No 2025 or 2026 MahaRERA order affecting buyers of an Oberoi Mumbai project had come to light by 6 November 2026, which is not proof of none. Tower status is in Oberoi Realty projects in Mumbai.
Prestige Group Mumbai: four years in
Prestige Estates Projects, from Bengaluru, entered Mumbai in 2022. In May 2025 it completed its first three projects there: Siesta at The Prestige City in Mulund (462 homes), Prestige Jasdan Classic in Mahalaxmi (233 homes) and the Prestige Turf Tower offices, over 800 units in all (company announcement, 29 May 2025). Prestige calls Prestige Nautilus in Worli its flagship Mumbai project, and it reported ₹2,385.7 crore of sales within a month of launch (Business Standard, 9 April 2025).
FY26 pre-sales hit a record ₹30,024 crore, up 76% (filing reported by Free Press Journal, 8 April 2026), but H1 FY27 sales fell 24% to ₹13,804.3 crore, as reported. Mumbai bring in ₹847.7 crore of Q2 FY27 and holds the largest value of Prestige's unsold housing stock, ₹7,608.1 crore (Multibagg summary, 6 November 2026).
ICRA reaffirmed A+ (Stable) on 19 August 2026, lower than the other three, and flagged execution and funding risk from large commercial projects in Mumbai and New Delhi. Net debt at 30 September 2026 is a reported ₹12,122.3 crore, though another summary derive about ₹11,825 crore, so treat it as approximate. Prestige Garden Trails, marketed as Dahisar-Mira Road, is registered in Mira-Bhayandar in Thane district: MMR, not Mumbai.
Flagship Mumbai projects by developer
Here is two Mumbai projects per developer, picked from finished towers to 2026 registrations. Details are from MahaRERA and developer pages and filings, read in October and November 2026. It is not a ranking.
| Developer | Project | Locality | Status on record | MahaRERA number |
|---|---|---|---|---|
| Lodha | Lodha World Towers | Worli | Ready, OC received | P51900000624 |
| Lodha | Lodha Aureus | Sewri | Registered 16 Mar 2026; 354 homes; completion 30 Apr 2033; price on request | PR1170002502863 |
| Godrej | Godrej Trilogy (Seaturf) | Worli / Lower Parel | Launched; MahaRERA validity to 30 Apr 2034 | PR1171012501267 |
| Godrej | Godrej Bandra Bay | Bandra West | Registered 2026; launch planned Oct to Dec 2026 | PR1181012601775 (Phase 1) |
| Oberoi | Elysian, Oberoi Garden City | Goregaon East | Towers A and B: completion 30 Jun 2027 on MahaRERA | P51800027667, P51800031456 |
| Oberoi | Oceanic | Carter Road, Bandra West | Launched; 47 units; completion 31 Dec 2030 | PR1180002600318 |
| Prestige | Forest Hills Phase 2, The Prestige City | Mulund West | Registered 2026; 500 homes | PR1181012600556 |
| Prestige | Prestige Ocean Towers | Marine Lines | Under construction; validity to 30 Jun 2030 (North) and 31 Dec 2030 (South) | P51900053993, P51900066470 |
Most 2025 and 2026 luxury launches here says "price on request". More launches are in our list of top upcoming residential projects in Mumbai.
Balance sheet, delivery or price: which measure tells a buyer what
A rating and net debt show whether a company can keep funding construction if sales slow. Oberoi's net cash and Godrej's AA+ sit at one end, Lodha's AA in middle and Prestige's A+ at the other, but none of it guarantee one tower.
Illustrative imageDelivery figures are company-wide, so Lodha's 6,373 homes say nothing about which Mumbai tower was on time. For one tower, the useful numbers are the MahaRERA date, any extensions, the OC and the developer's progress figure.
Price needs the most care. Lodha's FY26 average ran from ₹44,225 per sq ft saleable in South and Central Mumbai to ₹7,136 in Palava and Upper Thane, while Oberoi quotes carpet area, so lining them up side by side mislead. In any Lodha vs Godrej or Oberoi comparison, compare carpet with carpet.
What to check on MahaRERA for a Lodha, Godrej, Oberoi or Prestige project
MahaRERA is searched by project name or registration number, not by developer, so each project gets looked up on it's own. Examples are from MahaRERA records read on 6 November 2026 unless dated. An EOI is an expression of interest, a payment to hold a place before sales open. The full method is in how to check a builder's track record on RERA.
| What to check | Why it matters | Example on record |
|---|---|---|
| Promoter name | The legal seller can be a group company | Three Sixty West's promoter is Oasis Realty; Sky City's is Incline Realty |
| Declared completion date | The date committed on MahaRERA | Lodha Aureus: 30 Apr 2033 (originally 31 Dec 2032) |
| Extension certificates | Each one moves the date | Eternia: 30 Dec 2023 moved to 10 May 2026 |
| OC for a ready flat | Confirms the building may be occupied | Godrej Urban Park: date passed, no OC published (3 Oct 2026) |
| Registration itself | A booking or EOI before it deserves caution | Oberoi Aurelius: not on MahaRERA's search by name, 6 Nov 2026 |
| Registered location | Marketing names can differ | Prestige Garden Trails: registered in Mira-Bhayandar, Thane district |
| RERA number in adverts | Required with a QR code since 8 Apr 2025 | Penalty up to ₹50,000 (Free Press Journal, 10 Apr 2025) |
More checks are in our guide to what buyers must check on RERA.
Checklist: vetting any builder in Mumbai before you book
The same steps works for these four or for a smaller developer. Stop at any step that gives a answer you don't like.
Illustrative image- Read the latest quarterly results: bookings, collections and any Mumbai or MMR split.
- Look up the credit rating in the agency's own release, with grade, outlook and date.
- Check net debt against equity, and whether it rose since the last report.
- Search the project on MahaRERA and match the promoter to the seller in your agreement.
- Note the declared completion date and count the extensions already granted.
- For a ready flat, ask for the OC; for a tower near completion, ask for the latest progress figure.
- Compare prices carpet with carpet, and ask for the all-in cost with stamp duty and registration.
- Treat any booking or EOI for a project with no MahaRERA registration with caution.
Our seven-layer framework for vetting a builder go deeper on each step.
What the filings can't tell you about a builder
Lodha, Godrej and Prestige don't publish Mumbai handovers, and MahaRERA doesn't publish complaint counts by developer. Statewide, about 5,073 complaints were filed in 2025 and 6,945 disposed of, with 79% of all complaints since 2017 about pre-RERA projects, as reported by Punekar News in January 2026.
Filings also don't show build quality or upkeep after possession, and launch dates moves: Lodha moved one launch from Q4 FY27 into Q1 FY28 (call, 2 November 2026). Past bookings don't predict future growth. For delivery scored across builders, see our builder delivery record scorecard.
Where to go from here
The four differs most in Mumbai share and debt, not in one quality score. Before shortlisting any project, read its MahaRERA certificate next to the developer's latest results, starting from the project pages and the Lodha and Oberoi guides linked above.
Questions
Frequently Asked Questions
Which of the four developers books the most sales in the Mumbai region? +
On FY26 filings, Lodha booked the most in the MMR, ₹15,550 crore of its ₹20,530 crore pre-sales. Godrej Properties booked ₹10,313 crore in the MMR out of a record ₹34,171 crore, and Oberoi's ₹5,447 crore was all from the MMR. Prestige gives no FY26 Mumbai figure; its Mumbai sales were a reported ₹847.7 crore in Q2 FY27.
Why did Oberoi Realty's bookings jump in 2026? +
Oberoi's H1 FY27 bookings rose to ₹10,199.57 crore from ₹2,937.73 crore a year earlier, but most of it came from Three Sixty North in Gurugram, its first project outside the MMR, which booked ₹7,891.14 crore in July to September 2026. Its Mumbai and Thane projects booked about ₹2,308 crore over April to September 2026.
Is Prestige Garden Trails a Mumbai project? +
Prestige markets Garden Trails as part of the Dahisar-Mira Road corridor, but MahaRERA registers it (PR1330002501223) at Village Mahajanwadi in the Mira-Bhayandar Municipal Corporation area of Thane district. That makes it an MMR project outside Mumbai district. It has 1,324 homes on 5.2 acres, with MahaRERA validity to 31 October 2030.
Do Lodha's MahaRERA extensions mean its projects are delayed? +
Not necessarily. Lodha's certificates read on 6 November 2026 show 15 completion-date extensions across Pune and MMR registrations, most approved in 2026, moving dates by 3 to 24 months. They are dates moved on MahaRERA, not proven construction delays. For any tower, compare the original and current dates and ask the developer for its latest progress figure.
Can I see how many MahaRERA complaints each developer has? +
Not as a developer-wise count. Statewide totals are reported, about 5,073 complaints filed in 2025, but no tally is published for Lodha, Godrej, Prestige or Oberoi. MahaRERA's project search works by project name or registration number, so a buyer has to look up each project separately and read its registration and extension certificates.
What does a developer's credit rating tell a home buyer? +
A rating is an agency's view of how likely a company is to repay its debt. Godrej holds ICRA AA+ (Stable, September 2026), Oberoi CARE AA+ (Stable, October 2025), Lodha AA (Stable) and Prestige ICRA A+ (Stable, August 2026). It speaks to the company's finances, not to the build quality or the completion date of any single project.
Do these developers publish prices for their new Mumbai launches? +
Mostly not. Lodha Aureus and Godrej's Trilogy and Bandra Bay pages say price on request. Lodha lists Sovrano from ₹2.79 crore and Elaris from ₹8 crore on its price pages, read 6 November 2026. Oberoi gave Oceanic's rate on a call: ₹1,50,000 per sq ft at the start, later ₹1,70,000 to ₹1,80,000 per sq ft.
Which of the four is the newest to Mumbai? +
Prestige, a Bengaluru developer, entered Mumbai's property market in 2022 and completed its first three Mumbai projects in May 2025: Siesta in Mulund, Prestige Jasdan Classic in Mahalaxmi and the Prestige Turf Tower offices. Godrej is also entering new Mumbai micro-markets, Worli, Bandra and Marine Lines, alongside older projects such as Godrej Urban Park in Chandivali.
Sources
- Macrotech Developers Ltd (now Lodha Developers Ltd), Key operational updates for Q4FY25, Regulation 30 disclosure, 7 April 2025
- Lodha Developers Ltd, Key operational updates for Q4FY26, Regulation 30 disclosure, 7 April 2026
- Lodha Developers Ltd, Investor Presentation Q4 FY26, 24 April 2026
- Lodha Developers Ltd, Investor Presentation Q2 FY27, 30 October 2026
- Lodha Developers Ltd, Press release on unaudited financial results for the quarter and half year ended September 30, 2026, 30 October 2026
- Lodha Developers Ltd, Q2 FY2027 post results conference call transcript, call held 2 November 2026
- Lodha Developers Ltd, project price pages for Lodha Sovrano, Lodha Elaris and Lodha Aureus, read 6 November 2026
- MahaRERA, public project search list and registration and extension certificates for Lodha, Godrej, Oberoi and Prestige projects, read 6 November 2026 (Godrej Trilogy Seaturf certificate dated 14 October 2026; Prestige Ocean Towers certificates dated August 2026; Prestige Garden Trails certificate dated 15 May 2026)
- Free Press Journal (from Godrej Properties press release), Godrej Properties Reports Rs 7,830 Crore Operating Cash Flow Alongside Record FY2026 Bookings, 10 April 2026
- Godrej Properties Ltd, Q2 FY27 earnings conference call transcript, 23 October 2026
- ICRA, Godrej Properties Limited: Ratings reaffirmed; rated amount enhanced, 2 September 2026
- Multibagg, summary of Godrej Properties FY26 results, April 2026
- Free Press Journal, Godrej Properties Enters Marine Lines, South Mumbai; Expects Rs 6,000 crore Revenue From New Luxury Project, 28 September 2026
- Oberoi Realty Ltd, Sales Update FY26 Q4, Regulation 30 disclosure, 20 April 2026
- Oberoi Realty Ltd, Oberoi Realty announces H1FY27 and Q2FY27 results, press release, 16 October 2026
- Oberoi Realty Ltd, Results Update Q2FY27, investor presentation, 16 October 2026
- Oberoi Realty Ltd, Q2 FY27 earnings conference call transcript, 19 October 2026
- CARE Ratings, Oberoi Realty Limited (Revised) press release, 8 October 2025
- The Week (PTI), Prestige Group aims 59 pc growth in FY26 sales bookings at Rs 27K cr on strong housing demand, 10 June 2025
- Free Press Journal (from Prestige filing of 7 April 2026), Prestige Estates Surpasses Rs 30,024 Crore Pre-Sales In FY26, Records 76% Annual Growth, 8 April 2026
- Multibagg, summaries of Prestige Group Q2 FY27 presentation and results, 6 November 2026
- ICRA, Prestige Estates Projects Limited: rating assigned for commercial paper and reaffirmed for existing facilities, 19 August 2026
- Prestige Group, company announcement on completing three Mumbai projects, 29 May 2025
- Prestige Group, company announcement on the launch of Prestige Garden Trails, 14 October 2025
- Business Standard, report on Prestige Nautilus sales, 9 April 2025
- Punekar News, MahaRERA Resolves Nearly 7,000 Homebuyer Complaints in 2025, Sets Record Disposal Rate, January 2026
- Free Press Journal, MahaRERA Mandates Prominent Display Of Regulatory Details In Real Estate Ads, 10 April 2025
- Property Nivesh project pages: Lodha World Towers, Godrej Reserve, Godrej Urban Park, Oberoi Garden City, Oberoi Elysian, Oberoi Sky City and Three Sixty West, checked 2 and 3 October 2026