Ready-to-Move vs Under-Construction Property in Mumbai: GST, OC, Delays
In Mumbai a ready flat with an occupancy certificate avoids 5% GST, rent paid while you wait and the risk of a late handover, which MahaRERA reduces but does not remove. An under-construction flat makes sense only when its price or payment plan saves more than those costs, which on a ₹1.9 crore Mulund 2 BHK come to roughly ₹28.9 lakh over a three-year wait.
By Prerna Sharma · Edited by
Rakesh Mahajan · · 14 min read
Illustrative image Ready to move vs under construction in Mumbai: the short answer
For ready to move vs under construction in Mumbai, a ready flat with an occupancy certificate avoids three costs: 5% GST, rent while the tower rises and the risk of a late handover. An under-construction flat makes sense only when its price, payment plan or location gives back more than those take away. MahaRERA's rules cut the risk, but they don't remove it.
Mumbai add its own twists. Older buildings sold as ready can have gaps in their papers, and redevelopment is now a big slice of sales. Thousands of projects in the Mumbai Metropolitan Region (MMR) have also overrun their MahaRERA dates. The general trade-offs sit in our all-India guide on choosing between the two.
Ready to move flats in Mumbai and flats still being built, side by side
The table sets ready to move flats in Mumbai against under construction flats in Mumbai on the points that really changes your money. Sources: the RERA Act, 2016, MahaRERA Order No. 60/2024 (4 September 2024) and CBIC's real estate FAQs (7 May 2019).
| Point | Under-construction flat | Ready flat with OC |
|---|---|---|
| GST | Effective 5%, or 1% if affordable | Nil if the full price is paid after the completion certificate |
| Stamp duty in BMC limits | 6% on the agreement for sale, paid at the start | 6% on the sale document |
| Key paper | MahaRERA registration and commencement certificate | Occupancy certificate and conveyance to the society |
| Carpet area | Fixed after the OC, 3% variation allowed | Can be checked before you pay |
| Rent while waiting | Continues until possession | Stops when you move in |
| Main risk | Late or stalled handover | Missing OC or approvals in older buildings |
Carpet area is the net usable floor area, leaving out external walls, shafts and an exclusive balcony or terrace (RERA Section 2(k)). Stamp duty inside the Brihanmumbai Municipal Corporation (BMC) is 6%, as listed in our state costs table, including a 1% metro cess on sale documents. Duty is charged on the higher of the agreement value and the ready reckoner value, the state's official yearly valuation. Maharashtra froze those rates for 2026-27 (Free Press Journal, 31 March 2026). Registration costs 1%, capped at ₹30,000; confirm both with the sub-registrar before paying.
Is an under-construction flat in Mumbai actually cheaper?
Not on any recent measure on record. ANAROCK reported that the gap between ready and under-construction prices in the top seven cities shrank from 9 to 12% in 2017 to 3 to 5% by January to March 2021 (PTI, 2021). It's a old, seven-city figure, so treat it as tentative.
One analysis by 1 Finance Magazine, reported by Business Today on 13 March 2026, put the new-home premium over resale in Greater Mumbai at about 23% in 2025. In 2016 it was about 5%. But new versus resale is not the same thing like under-construction versus ready, and the method isn't stated.
Knight Frank's H1 2026 report (9 July 2026) says Mumbai developers sustain sales through targeted pricing, flexible payment plans and customer incentives. ANAROCK counted 1,98,050 unsold MMR homes in Q3 2026 (9 October 2026). No consultancy has published a 2025 or 2026 ready versus under-construction gap for MMR, so get the both all-in prices on paper.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
What MahaRERA protects, and where the protection stops
MahaRERA, the Maharashtra Real Estate Regulatory Authority, registers projects under the RERA Act, 2016 and rules on buyers' complaints. Each protection has a edge. Sources are the Act and Order No. 60/2024 unless named.
Illustrative image| Protection | What it says | Where it stops |
|---|---|---|
| 10% advance cap | Nothing above 10% of the cost before a registered agreement (Section 13(1)) | Then 30% after the agreement, 45% at plinth, 70% at slabs, 95% before possession |
| Carpet area | Price on RERA carpet area, parking shown separately | 3% variation allowed after the OC; refund within 45 days beyond that |
| Escrow | 70% of collections kept in a separate project account | The other 30% is outside it |
| Delay | Exit with refund, interest and compensation, or stay with monthly interest (Section 18) | One February 2026 order used SBI MCLR plus 2% on amounts paid (Free Press Journal, 28 February 2026) |
| Extension | Only for force majeure or reasonable cause (Section 6) | Up to one year in total, moving your date lawfully |
| Lapse or revocation | The authority or the buyers' association may finish the work (Sections 7 and 8) | Completion then rests on someone else |
The weak spot is enforcement. Mid-Day reported that buyers holding MahaRERA refund orders still struggle to get paid (our news, 17 October 2026). Appeals goes to a tribunal where a vacant judicial member post was slowing over 1,000 appeals (Mid-Day, 9 October 2026). An order is a start, it isn't money. Before booking, go through the RERA checks every buyer should run.
How often MMR projects run late: MahaRERA possession delay counts
A MahaRERA possession delay is common enough in MMR to plan for. In December 2024 MahaRERA sent notices to 10,773 lapsed projects, and 5,231 were in MMR and north Konkan (Free Press Journal, 17 December 2024). A lapsed project is past its completion date with no OC filed and no extension.
- January 2025: Construction World reported 1,950 projects suspended (10 January) and later 1,905 (23 January). Of 5,324 projects that replied, 3,517 sent occupancy certificates, so lapsed can mean late paperwork as much than late building.
- By 20 August 2025: 4,812 projects suspended in Maharashtra, including Thane 535, Raigad 465, Mumbai Suburban 438 and Palghar 377 (The Realty Today). Sub-registrars were told not to register flat sales in them.
- January to March 2026: 8,212 projects missed the quarterly progress report deadline, 4,644 of them in MMR (Outlook Money, 4 May 2026). That is a notice-stage count, not suspensions.
There's an older backlog too. ICRA put 36% of the top seven cities' 1.56 lakh stalled homes in MMR in December 2025, roughly 56,000. About 78% of those MMR homes come from projects launched before FY2017 (ICRA, March 2026). ANAROCK says a record 5,40,400 homes are due across the seven cities in 2026, about 57% of them in MMR and Pune. In 2020 only about 46% of scheduled units was delivered (Business Today, 11 June 2026).
The occupancy certificate in Mumbai: when ready is not ready on paper
An occupancy certificate (OC) is the official permission to occupy a building that has water, sanitation and electricity, as RERA defines it. A commencement certificate only lets work begin, and a completion certificate says the building matches its sanctioned plans. Both gets called CC, so ask which one the seller is meaning.
For a ready flat the OC matters most. In older Mumbai buildings it can be missing or cover only some floors or wings, called a part OC. No official count of such buildings is published. The line is tightening. The Times of India reported that sub-registrars were told to refuse documents for buildings lacking permissions or for flats bigger than sanctioned (our news, 14 October 2026). In Virar East, police say 113 flats were sold on a forged commencement certificate (our news, 22 October 2026). Confirm certificates with the authority that issued them.
After the OC, the promoter must offer possession in writing within 7 days and you take it within 15 days of that notice (model agreement). If you rather start from finished buildings, see our list of ready-to-move projects, and ask for each OC anyway.
GST on an under construction flat in Mumbai, and when it falls away
GST is the one cost only the under-construction route carry. CBIC's FAQs (7 May 2019) set it at an effective 5% without input tax credit, or 1% for an affordable flat, since 1 April 2019.
Illustrative imageThe 1% rate needs carpet area up to 60 sq m (about 646 sq ft) and a gross amount charged of not more than ₹45 lakh. The whole of MMR counts as metropolitan, so Thane and Navi Mumbai use the same test. Parking, location and amenity charges all counts toward the ₹45 lakh (CBIC FAQs Part II, 14 May 2019).
No GST is due when the entire price is received after the completion certificate or first occupation, whichever is earlier. A resale flat from an owner is outside GST. Reports said the 56th GST Council (September 2025) left housing rates unchanged; treat that as tentative. Other charges are in our guide to the cost of buying property in Mumbai.
Rent while you wait: what the wait costs across MMR
If you rent now, buying under construction means rent until the keys come. ANAROCK's Q3 2026 MMR table (21 October 2026) quotes monthly rent for a 2 BHK of 700 sq ft. The last column is our rough sum at the midpoint, with no rent rise.
| Area | ANAROCK rent a month, 2 BHK of 700 sq ft (Q3 2026) | Rent over a 3-year wait at the midpoint (about) |
|---|---|---|
| Worli | ₹86,000 to ₹1.4 lakh | ₹40.7 lakh |
| Andheri West | ₹50,000 to ₹84,000 | ₹24.1 lakh |
| Chembur | ₹51,000 to ₹87,000 | ₹24.8 lakh |
| Mulund | ₹42,000 to ₹66,000 | ₹19.4 lakh |
| Kolshet Road, Thane | ₹28,000 to ₹41,000 | ₹12.4 lakh |
| Dombivli | ₹15,000 to ₹24,000 | ₹7.0 lakh |
Rents has been nearly flat: JLL put Mumbai rent growth at 2.0% a year in Q2 2026, down from 4.7% in Q4 2025. The landlord's view of these numbers is in how much rental income a 2 BHK in Mumbai earns.
A worked example: one price, two routes, a three-year wait
Take a 2 BHK of 700 sq ft carpet in Mulund. At ANAROCK's Q3 2026 quoted primary-market rate of ₹27,083 per sq ft on carpet, it prices about ₹1.9 crore. Assume a ready flat and an under-construction flat at that same price, a buyer now renting at ₹54,000 a month (ANAROCK's Mulund midpoint) and a three-year wait. These are rough, rounded sums, not quotes.
| Item | Under-construction flat | Ready flat with OC |
|---|---|---|
| Before the agreement | Up to 10%, about ₹19 lakh | Nothing separate |
| At registration | Stamp duty about ₹11.4 lakh plus the ₹30,000 fee | Same, plus the full price |
| During construction | Stages up to 95%, with 5% GST on each | Nothing more |
| GST in all | About ₹9.5 lakh | Nil |
| Rent over three years | About ₹19.4 lakh | Nil |
| Extra cash out | About ₹28.9 lakh, roughly 15% of the price | None |
| If possession slips two years | Extra cash out about ₹41.9 lakh | None |
The ready buyer's EMI, the fixed monthly loan instalment, starts on the whole loan at once. An under-construction loan is drawn in stages, so early interest is lower, by how much is depending on the builder's pace. Section 18 delay interest would win back part of a late flat's rent, though orders have been slow to pay out. Test both in the home loan EMI calculator at SBI's 7.50% to 8.80% range (Business Today, 18 October 2026).
Tax matters too. Interest paid before completion is deducted in five equal yearly instalments afterwards. The ₹2 lakh self-occupied cap applies only if the home is bought or built within five years of borrowing. Otherwise the cap is ₹30,000 (Income-tax Act, 2025, Section 22), a long delay can cost this break too. More on the area is in best areas to buy property in Mulund.
Redevelopment flats: Mumbai's other kind of under-construction purchase
Redevelopment is when an old building, often a co-operative society, is rebuilt by a developer who rehouses the members and sells the extra flats. Buying a sale flat there is an under-construction purchase, with GST, stages and a promised date. JLL-NAREDCO, quoted by Business Standard on 3 September 2026, put redevelopment at 15% of Mumbai housing sales in 2025 to H1 2026, from about 6% in 2016 to 2021. It counts more than 1,000 projects since 2020, though another JLL figure in the same article is 850.
Illustrative imageA government resolution of 30 September 2026 asks societies for at least three developer bids, registered rehab agreements and a two-year completion period, The Times of India reported. Our explainer on the society redevelopment GR has more. Ask if the rehab agreement is registered, and is the members' consent on record.
Checklist for each route before money moves
Use the list for the route you leaning to.
Buying under construction
- Confirm on MahaRERA that the registration is active and quarterly progress reports are filed.
- Verify the commencement certificate with the authority that issued it.
- Pay no more than 10% before the agreement for sale is registered.
- Check that the price is on carpet area, with parking and other charges listed separately.
- Get the GST rate in writing.
- Pay only into the RERA designated collection bank account named in the agreement.
- Study the builder's earlier projects using our guide to checking a builder's delivery track record on RERA.
Buying ready to move
- See the occupancy certificate and check that it covers your wing and floor.
- Ask whether "CC" means the commencement or the completion certificate.
- Match the flat's area with the sanctioned plan.
- For a new flat from the developer, pay the full price after the completion certificate so that no GST applies.
- For resale, get the society NOC (no-objection letter) and check the transfer premium (the fee a society charges on a sale) against the ₹25,000 cap for municipal corporation areas (Bombay High Court, 1 February 2013).
- Budget 6% stamp duty within BMC limits plus the registration fee.
Which route suits whom, and where to read next
A ready flat suits buyers who need a home soon, pay high rent now or can't watch a site. An under-construction flat fits someone who can carry rent through the wait plus slippage and have checked the builder on MahaRERA. It also needs a written price that beats the GST and rent sums above. Neither route is risk-free; the papers decide most of it.
For developer versus owner, read new launch or resale property in Mumbai. For whether to buy at all, see is buying a flat in Mumbai better than renting.
Questions
Frequently Asked Questions
Can a Mumbai builder take more than 10% before the agreement is registered? +
No. Section 13(1) of the RERA Act bars a promoter from taking more than 10% of the cost as an advance or application fee before a written agreement for sale is signed and registered, and MahaRERA's model agreement repeats the cap. After registration the model schedule allows up to 30%, then stages tied to the plinth, slabs and fittings.
What interest does MahaRERA award when possession is late? +
Under Section 18 a buyer who stays in a late project is paid interest for every month of delay until possession. In a February 2026 order on a Ghatkopar East project, MahaRERA applied SBI's MCLR plus 2% on the amounts actually paid, leaving out stamp duty, registration and taxes (Free Press Journal, 28 February 2026). Your own dues can be set off against it.
Can MahaRERA push back my project's completion date? +
Yes, within limits. Section 6 of the RERA Act lets MahaRERA extend a registration for force majeure, such as flood, fire or earthquake, or in reasonable circumstances where the promoter is not at fault, for at most one year in total. Mid-Day reported in October 2026 that MahaRERA cleared 210 deadline extensions, so check your project page for changes.
What happens to my booking if the project's MahaRERA registration is suspended? +
A suspended project cannot be marketed, its bank account is frozen and sub-registrars are told not to register flat sales in it, as reported for the 4,812 projects suspended by August 2025. A developer can revive the project by filing the overdue reports. If a registration is revoked, the authority or the buyers' association may finish the work, the association having first right of refusal.
Does the 1% affordable GST rate apply in Thane or Navi Mumbai? +
It can. CBIC treats the whole Mumbai Metropolitan Region as metropolitan, so one test applies across MMR: carpet area up to 60 sq m and a gross amount charged of not more than ₹45 lakh, in a project begun on or after 1 April 2019. Every charge the promoter bills, including parking and location charges, counts toward the ₹45 lakh.
How soon after the OC must the builder hand over my flat? +
MahaRERA's model agreement says the promoter must offer possession in writing within 7 days of receiving the occupancy certificate, and the buyer takes possession within 15 days of that notice. Section 19(10) of the RERA Act asks the buyer to take possession within two months of the OC. Documents and plans go to the buyers' association within 30 days of the OC.
Can I claim home loan interest while my flat is still being built? +
Not year by year during construction. Under Section 22 of the Income-tax Act, 2025, interest paid before completion is deductible in five equal yearly instalments starting the year construction finishes. For a self-occupied home the yearly cap is ₹2 lakh if the home is bought or built within five years of borrowing, otherwise ₹30,000, and only under the old regime.
What if the carpet area at possession is smaller than in my agreement? +
MahaRERA's model agreement allows a 3% variation in final carpet area, which is confirmed after the occupancy certificate. If the area falls by more than that, the promoter must refund the excess within 45 days with interest at the rate in the rules. If the area rises, the extra is billed at the same rate as in your agreement.
Is a lapsed MahaRERA project always a stalled one? +
Not always. When MahaRERA chased lapsed projects in early 2025, Construction World reported that of 5,324 projects that replied, 3,517 sent occupancy certificates, which suggests many had finished but not updated their filings. A lapsed tag alone does not tell you which case applies, so read the project page and the latest quarterly progress report.
Sources
- Government of India, Real Estate (Regulation and Development) Act, 2016 (Act No. 16 of 2016), Gazette of India, 26 March 2016
- Maharashtra Real Estate Regulatory Authority, Order No. 60/2024: new proforma of allotment letter and agreement for sale, 4 September 2024
- CBIC, Department of Revenue (Tax Research Unit), FAQs on real estate, F. No. 354/32/2019-TRU, 7 May 2019, and FAQs Part II, 14 May 2019
- EY India, Navigating GST changes in the real estate and construction ecosystem (tax alert), 5 September 2025
- Free Press Journal, MahaRERA Issues Notices To 10,773 Lapsed Real Estate Projects, Warns Developers Of Strict Action, 17 December 2024
- Construction World, MahaRERA Suspends 1,905 Housing Projects for Non-Compliance, 23 January 2025 (and its report of 10 January 2025)
- The Realty Today, MahaRERA Suspends 4,812 Housing Projects, Freezes Developer Accounts Across Maharashtra, 20 August 2025
- Outlook Money, MahaRERA flags 8,212 projects for missing QPR deadline, gives regulatory warning, 4 May 2026
- Free Press Journal, MahaRERA Sets Aside Flat Termination In Ghatkopar Project, Orders Interest For Possession Delay, 28 February 2026
- ICRA Research, Regulatory reforms drive gradual easing of stalled inventory, March 2026
- Business Today, reporting ANAROCK Research, West Asia conflict puts record 5.4 lakh housing deliveries at risk in 2026, 11 June 2026
- JLL India, Mumbai Mass Residential Market Dynamics Q4 2025, 16 February 2026 (rent growth 4.7%)
- Money9 (PTI), reporting ANAROCK, Price difference between completed, under-construction flats narrows to 3-5%, 2021
- Business Today, reporting 1 Finance Magazine, New home prices now significantly higher than resale homes; Mumbai premium hits 23%, 13 March 2026
- Knight Frank India, India Real Estate: Office and Residential Market, January-June 2026, 9 July 2026
- ANAROCK Research, Q3 2026 Pan India Residential Market Viewpoints, 9 October 2026
- ANAROCK Research, Residential Market Viewpoints, Mumbai Metropolitan Region, Q3 2026, 21 October 2026
- JLL India, Mumbai Residential Market Dynamics Q2 2026, August 2026
- Business Standard, Redevelopment share of Mumbai housing sales rises to 15%: JLL-Naredco, 3 September 2026
- The Times of India, Maharashtra housing redevelopment gets stricter: 3 bids, registered rehab agreements and 2-year deadline, October 2026
- Business Today, SBI raises home loan rates by 25 bps, 18 October 2026
- Income-tax Act, 2025, Section 22 (Act text as reproduced by CAclubindia)
- Free Press Journal, Maharashtra Govt Keeps Ready Reckoner Rates Unchanged For FY27, 31 March 2026
- Free Press Journal, 1% metro cess on sale, gift and mortgage documents executed from April 1, 2022, 24 March 2022; AZB & Partners, Metro Cess in MMR, Pune and Nagpur, 21 April 2022
- Free Press Journal, Maharashtra Govt May Hike Property Registration Fee From Rs 30,000 To Rs 50,000 (fee 1%, capped at Rs 30,000), 15 July 2026
- Property Nivesh state costs table (Maharashtra row: 6% stamp duty in Mumbai including 1% metro cess, 1% registration capped at Rs 30,000), November 2026
- Bombay High Court, The New India Co-operative Housing Society Ltd. v. State of Maharashtra, Writ Petition No. 4567 of 2007, 1 February 2013
- Property Nivesh news: MahaRERA refund orders hard to enforce (citing Mid-Day), 17 October 2026; MahaREAT judicial member vacancy (citing Mid-Day), 9 October 2026; Maharashtra registration curbs (citing The Times of India), 14 October 2026; forged permit case in Virar East, 22 October 2026; society redevelopment GR, 3 October 2026; MahaRERA registers 435 projects (citing Mid-Day), 23 October 2026