Buying Guides
Best Areas to Buy Property in Mulund: West and East, Pocket by Pocket
The best areas to buy property in Mulund are the LBS Marg belt, the Goregaon-Mulund Link Road side and Yogi Hills in Mulund West for new gated towers, and the station area and Mulund East for older society and redevelopment flats. ANAROCK put the whole Mulund micro-market at ₹27,083 per sq ft of carpet area in Q3 2026, with no separate rate for either side.
By Rahul Mishra · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Best areas to buy property in Mulund: the short answer
The best areas to buy property in Mulund depend on which side of the Central line you want. Mulund West holds the big gated projects on LBS Marg, the Goregaon-Mulund Link Road and Yogi Hills, while the east side is mostly older societies and redevelopment. ANAROCK's Q3 2026 viewpoint (21 October 2026) put Mulund at ₹27,083 per sq ft of carpet area, up 1% on the quarter.
No firm splits that rate by side, so the seven pockets below is told apart by housing and projects, not ranked. Carpet area is the usable floor inside the walls, as MahaRERA, the state's property regulator, counts it.
Mulund West and Mulund East: how the two sides differ
Mulund sits at the north-eastern end of Mumbai's city limits, on the Thane border. The west side, PIN 400080, runs from the railway along LBS Marg and the link road up to Yogi Hills at the edge of Sanjay Gandhi National Park, and its big gated projects went up on a former industrial land. The east side lies between the station and the Eastern Express Highway, with salt pans out toward Thane creek.
Redevelopment, much of the east side's story, is when a developer rebuild an old society block, gives members new flats and sells the rest. The table uses records cited below, to November 2026.
| Housing on record | Transport on record | Watch-out | |
|---|---|---|---|
| LBS Marg belt (west) | Oberoi's Eternia and Enigma | Line 4 stops in Mulund West (not open) | Flat area prices in 2026 |
| GMLR side, Amar Nagar (west) | Piramal Revanta | GMLR exit, due February 2029 | Works at the tunnel end |
| Yogi Hills (west) | The Prestige City, about 32 acres | None on record | Long phased build |
| Station area (both sides) | Older societies, SRA rehab | Central line | Old-building paperwork |
| Mulund Colony (west) | No project on record | Not on record | Thin data |
| Mulund East and Navghar | Older societies, redevelopment | Eastern Freeway Extension (being built) | Dharavi rehab plan on the salt pans |
| Thane border | No project mapped to it | Mulund Naka; Mulund-Airoli-Palava freeway | Dates are claims |
Mulund property prices and rents, quarter by quarter
ANAROCK gives the longest Mulund series: the average quoted base price of new launches across the micro-market, on carpet area. Before Q3 2024 it used built-up area, which adds the walls (₹21,750 per sq ft in Q1 2024), so them older numbers can't sit beside these. Source: ANAROCK Research, MMR Residential Market Viewpoints, 25 October 2024 to 21 October 2026; changes are against the previous quarter, and rents are for a 2 BHK of 700 sq ft.
Illustrative image| Quarter | Average quoted base price, ₹ per sq ft (carpet) | Change on previous quarter | 2 BHK rent, 700 sq ft, ₹ a month |
|---|---|---|---|
| Q3 2024 | 26,900 | +4% | 39,500 to 58,000 |
| Q1 2025 | 26,500 | +4% | 40,500 to 62,500 |
| Q2 2025 | 26,500 | Not printed | 42,000 to 62,700 |
| Q3 2025 | 27,000 | +2% | 42,420 to 63,327 |
| Q1 2026 | 26,818 | 0% | 42,000 to 65,000 |
| Q2 2026 | 26,924 | 0% | 42,000 to 65,000 |
| Q3 2026 | 27,083 | +1% | 42,000 to 66,000 |
The average moved from ₹26,900 to ₹27,083 in two years, under 1%, while the top of the rent range climbed from ₹58,000 to ₹66,000. Rents done more of the moving. Past moves don't predict the next two years.
Knight Frank's H1 2026 report (9 July 2026) gave Mulund ₹23,062 to ₹23,182 per sq ft, basis not stated and up 2% over 12 months, so it stays apart from ANAROCK's series.
On ANAROCK's Q3 2026 figures a 700 sq ft 2 BHK costs about ₹1.9 crore, and the ₹54,000 midpoint rent gives a gross yield, a year's rent over the price before costs, of roughly 3.4%. Compare suburbs in our area-wise rental yield comparison.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Mulund West flats in the newer gated pockets
LBS Marg belt: Eternia and Enigma
Oberoi Realty's Eternia and Enigma, 3 and 4 BHK projects on adjoining parcels of about 9 acres, anchor this belt. Oberoi reported ₹36,581 per sq ft carpet on Eternia bookings in July to September 2026, against ₹30,092 a year before (results update, 16 October 2026), its own sales rather than a area average. Eternia received a full occupation certificate (OC), the civic sign-off to move in, as reported in January 2026, and Enigma's OC is in the FY26 annual report. Oberoi also hold about 20,262 sq m next door, bought through the insolvency resolution of Nirmal Lifestyle Realty (August 2024), for a project not yet on MahaRERA (6 November 2026).
Mulund West's Line 4 stations, Mulund Fire Station and Mulund Naka, are under construction (MMRDA, 31 August 2026), so check the walk. The watch-out are a price trend that stood still in early 2026. It suits families after a finished gated 3 BHK who are weighing Mulund against Chembur, where ANAROCK's Q2 2026 rate was ₹30,933 to Mulund's ₹26,924 (our Chembur prices guide).
Goregaon-Mulund Link Road side: Amar Nagar and Piramal Revanta
Piramal Revanta sits behind Nirmal Lifestyle Mall on the link road, with 12 acres and 6 towers, launched in 2017 and part ready in phases (our page, 2 October 2026). The GMLR's tunnels under the national park comes out at Amar Nagar, Mulund West, and the BMC claims a Goregaon trip of 20 minutes against about 90 now, with the whole road targeted for February 2029 (Free Press Journal, 8 November 2026).
The tunnel end is a work site: of 743 structures in the way of the shaft and ramps, 612 were cleared and 131 were due by December 2026 (FPJ); Mid-Day, in our news of 16 October 2026, said all 604 in Amarnagar had gone, so the two counts may cover different ground. It suits buyers who works in the western suburbs and can wait. Phases are in our Goregaon-Mulund Link Road impact guide.
Yogi Hills: The Prestige City
At the national park edge, Prestige is building The Prestige City, about 32 acres. Prestige Forest Hills Phase 2 launched on 30 June 2026 with 500 three and four-bedroom homes of 946 to 2,643 sq ft carpet, from about ₹2.73 crore (Prestige's announcement via Equitybulls, 30 June 2026). The watch-out is time. MahaRERA gives Forest Hills Phase 1 a validity date, the completion date declared by the developer, of 31 December 2030, and Bellanza Phase 1 only 31 December 2026, so ask whether it finish by then. It suit buyers wanting a large new flat over ₹2 crore, a band our under ₹3 crore guide covers.
Older pockets: the station area, Mulund Colony and Mulund East
The station area
Around Mulund station, on both sides of the line, no new launch is on record, so the choice is resale or redevelopment. Records for this part of the city describe old societies under redevelopment and SRA rehab buildings, flats given free to slum families under the Slum Rehabilitation Authority's scheme. Paperwork is the watch-out (see the checklist). A new state resolution adds checks on how societies chooses a developer (our news on the redevelopment GR, 3 October 2026). It suits Central line commuters.
Mulund Colony
Mulund Colony is counted inside Mulund West, but no filing, MahaRERA project or consultancy figure here names it. Judge it building by building: the age of the structure, whether the society have a redevelopment plan and what recent sale deeds show, which a lawyer can pull from Maharashtra's Department of Registration and Stamps (IGR). It suits buyers who know the lanes.
Mulund East: Navghar and the salt pans
The east side, taking in Navghar, is older societies and redevelopment, with no east-only rate. MMRDA's Elevated Eastern Freeway Extension, Chheda Nagar to Anand Nagar in Thane, will have a Mulund junction; superstructure work begun in late September 2026 (our news, 29 September 2026), with no completion date.
The salt pans are the watch-out. Of 58 acres in the Jamasp area, 42.51 acres were allotted for the Dharavi project in October 2024 and handed over in April 2025, but the Supreme Court ordered status quo and no construction had started (Free Press Journal, 13 June 2025). An undated Mumbai Live report said about 26,380 homes are proposed there and the Maharashtra Coastal Zone Management Authority ordered a inquiry. It suits resale buyers who can live with that question.
The Thane border: Mulund Naka and the roads north
Where Mulund meets Thane
Line 4's stations run Sonapur, Mulund Fire Station, Mulund Naka, then Thane Teen Haath Naka (our infrastructure dataset, 9 October 2026), so Mulund Naka is the last stop before the line enter Thane. Lodha said on 2 November 2026 that the Mulund-Airoli-Palava freeway is "clinically complete" and would open within weeks, a developer's word with no official opening yet. It suits households working in Thane or Airoli; Thane itself is in our guide to Thane's residential belts.
Illustrative imageMulund projects on record and where they stand
Listed, not ranked, are the Mulund projects named by Oberoi Realty (16 and 19 October 2026), MahaRERA certificates, the Prestige announcement (30 June 2026) and our Piramal Revanta page. Statuses are as dated and prices changes.
| Project | Developer | MahaRERA number | Status on record |
|---|---|---|---|
| Eternia, LBS Marg | Oberoi Realty | P51800006141 | Full OC reported January 2026; 991 of 1,312 homes booked by 30 September 2026 |
| Enigma, LBS Marg | Oberoi Realty | P51800002656 | OC in annual report FY26; 644 of 682 homes booked |
| New project, LBS Road | Oberoi Realty | None on 6 November 2026 | Approvals "in a very advanced stage" (19 October 2026) |
| Piramal Revanta, GMLR | Piramal Realty | P51800005983 and five more | Phased, part ready |
| Forest Hills Phase 1, The Prestige City | Prestige Group | P51800077457 | Valid to 31 December 2030 |
| Forest Hills Phase 2, The Prestige City | Prestige Estates | PR1181012600556 | Launched 30 June 2026; 500 homes |
| Bellanza Phase 1, The Prestige City | Prestige Group | P51800045339 | Valid to 31 December 2026 |
Knight Frank counted 28,046 unsold homes in its Central Suburbs zone at the end of H1 2026, or 10.6 quarters of sales (9 July 2026), and ANAROCK's September 2026 MMR report puts Mulund West among the zone's top five supply micro-markets, which give buyers room to bargain.
Mulund Metro Line 4 and the GMLR: where the dates stand
Metro Line 4, 32.32 km and 30 elevated stations from Wadala to Kasarvadavali (MMRDA, 31 August 2026), carries no passengers yet. Its first stretch, Gaimukh to Cadbury Junction in Thane, missed April 2026; the transport minister said on 27 October 2026 it would open in December 2026 (Swarajya). The Mumbai-side targets on record, set in September 2025, were October 2026 for Cadbury Junction to Gandhi Nagar, which take in Mulund, and October 2027 for Gandhi Nagar to Wadala (Free Press Journal), so the first has already past. See our Metro Line 4 connectivity guide.
Illustrative imageFor the GMLR, the tunnel machine Vihar started on 7 November 2026 beside Tulsi, which had bored 270 m (FPJ, 8 November 2026; see our news on the second tunnel machine).
Before you book in Mulund: a checklist
- Compare the carpet rate you are quoted with ANAROCK's Mulund average for the same quarter, an area figure for new launches.
- Check the project on MahaRERA: registration, validity date and any extension.
- Ask for the OC on a ready flat, and the conveyance deed and society NOC, the society's no-objection letter, on a resale.
- For a redevelopment, read the development agreement and ask how the society chose the developer.
- Near the salt pans, ask what the Dharavi plan means for your lane and check the court status.
- Treat Metro Line 4 and the GMLR as future links; both have missed earlier targets.
- Time the trip to the schools and hospitals you will use.
- Budget stamp duty, the state's tax on the sale deed, of 6% including a 1% metro cess, an extra levy in Mumbai (women get a 1% concession), plus 1% registration capped at ₹30,000, as in our state costs table. Duty applies to the higher of agreement value and ready reckoner value, the state's minimum value; on ₹1.9 crore that is about ₹11.4 lakh. Confirm before paying with our Mumbai stamp duty guide.
Which Mulund pocket suits which buyer
In short: LBS Marg for a ready gated 3 BHK, the GMLR side if you can wait, Yogi Hills for a new flat and a long build, the older pockets for resale. With prices near flat in 2026, the building matter more than timing.
For a lower budget, our guide to buying in Mumbai under ₹2 crore sets Mulund beside other suburbs; at ANAROCK's Q3 2026 rate, ₹2 crore buys about 740 sq ft of carpet here.
Questions
Frequently Asked Questions
Is Mulund West or Mulund East better for buying a flat? +
It depends on what you want to buy. Mulund West has the big gated projects on record, such as Oberoi's Eternia and Enigma, Piramal Revanta and The Prestige City. The east side is mostly older societies and redevelopment, next to the salt pans proposed for Dharavi rehab housing. ANAROCK and Knight Frank don't split prices between the two sides.
What is the average price per sq ft in Mulund? +
ANAROCK put Mulund's average quoted base price at ₹27,083 per sq ft of carpet area in Q3 2026 (21 October 2026), up 1% on the quarter from ₹26,924 in Q2 2026. Knight Frank's H1 2026 range is ₹23,062 to ₹23,182 per sq ft, with the basis not stated. The two firms measure differently, so compare each only with itself.
How much rent does a 2 BHK in Mulund fetch? +
ANAROCK's quoted range for a 2 BHK of 700 sq ft in Mulund was ₹42,000 to ₹66,000 a month in Q3 2026, up from ₹38,000 to ₹54,000 in Q1 2024. These are quoted rents across the micro-market, not one building's. On the Q3 2026 rate and the midpoint rent, the gross yield works out to roughly 3.4%.
When will the Mulund-Goregaon Link Road open? +
The road's official name is the Goregaon-Mulund Link Road (GMLR), a 12.20 km BMC project. The Free Press Journal reported on 8 November 2026 that the whole road is targeted for February 2029, later than the 2028 date Swarajya reported in November 2025. Both tunnel boring machines are now digging, and the BMC claims the Goregaon trip will drop from about 90 minutes to 20.
Which Metro Line 4 stations are in Mulund, and when do they open? +
Mulund Fire Station and Mulund Naka, both under construction according to MMRDA (31 August 2026). The last published target for the Cadbury Junction to Gandhi Nagar stretch, which includes Mulund, was October 2026, set in September 2025, and it has passed. Only the Thane stretch, Gaimukh to Cadbury Junction, has a newer date: December 2026, as the transport minister said (Swarajya, 27 October 2026).
What is planned on Mulund's salt pans? +
Rental and rehab housing for Dharavi residents. Of 58 acres in the Jamasp area, 42.51 acres were allotted in October 2024 and handed over in April 2025, but the Supreme Court ordered status quo and no construction had started by June 2025 (Free Press Journal). An undated Mumbai Live report said about 26,380 homes are proposed and the Maharashtra Coastal Zone Management Authority ordered an inquiry.
Are Oberoi Eternia and Enigma ready to move in? +
Oberoi Realty reports both as ready. Eternia received a full occupation certificate, as reported in January 2026, and had 991 of its 1,312 homes booked by 30 September 2026. Enigma's OC appears in the FY26 annual report, with 644 of 682 homes booked. Ask for the OC copy and the flat's MahaRERA details before you pay.
How much does a new flat at The Prestige City in Mulund cost? +
Prestige Estates launched Phase 2 of Prestige Forest Hills on 30 June 2026 with 500 three and four-bedroom homes of 946 to 2,643 sq ft carpet, from about ₹2.73 crore, as per its announcement reproduced by Equitybulls. That is a starting price, so the flat you want may cost more. Check the MahaRERA entry, PR1181012600556, for the completion date.
Sources
- ANAROCK Research, Residential Market Viewpoints: Mumbai Metropolitan Region Q3 2026, 21 October 2026
- ANAROCK Research, MMR Q2 2026 Residential Market Viewpoints, 3 August 2026
- ANAROCK Research, MMR Q1 2026 Residential Market Viewpoints, 7 May 2026
- ANAROCK Research, MMR Q3 2025 Residential Market Viewpoints, 3 November 2025
- ANAROCK Research, Residential Market Viewpoints MMR, Q1 2024 (24 May 2024), Q3 2024 (25 October 2024), Q1 2025 and Q2 2025
- ANAROCK Research and Advisory, Mumbai Metropolitan Region (MMR): Infrastructure-Led Urban and Real Estate Transformation, September 2026
- Knight Frank India, India Real Estate: Office and Residential Market, January-June 2026 (H1 2026), 9 July 2026
- Oberoi Realty, Results Update Q2FY27 (investor presentation), 16 October 2026
- Oberoi Realty, Q2 FY27 Earnings Conference Call transcript, 19 October 2026
- Oberoi Realty, stock exchange filing on the acquisition of Nirmal Lifestyle Realty under the IBC, 12 August 2024
- Prestige Estates Projects, announcement of Phase 2 of Prestige Forest Hills, Mulund, as reproduced by Equitybulls, 30 June 2026
- MahaRERA, registration certificates P51800077457 (Forest Hills Ph 1, 29 May 2025) and P51800045339 (Bellanza Phase 1, 15 May 2025)
- MMRDA, Metro Line 4 overview and present status, updates as on 31 August 2026
- Swarajya, Thane Metro Line 4 first phase from Gaimukh to Cadbury Junction set to open in December 2026, 27 October 2026
- Free Press Journal, Thane Enters Metro Era: Trial Run Of Line 4 And 4A Marks Historic Milestone, 22 September 2025
- Free Press Journal, Mumbai's GMLR Project Advances As 2nd TBM Joins Excavation Of Twin Tunnels, 8 November 2026
- Swarajya (citing The Indian Express), Rs 14,000 crore Goregaon-Mulund Link Road first phase from Dindoshi to SGNP likely to open by May 2026, 29 November 2025
- Free Press Journal, Dharavi Redevelopment Stalled As Mulund Land Remains Locked In Legal Dispute, 13 June 2025
- Mumbai Live, MCZMA orders inquiry into proposed housing project on Mulund salt pan land (undated)
- Lodha Developers, Q2 FY2027 Post Results Conference Call transcript, 2 November 2026
- Property Nivesh news: Goregaon-Mulund Link Road clearance (16 October 2026); GMLR second tunnel machine starts digging (8 November 2026); Eastern Freeway Extension work starts (29 September 2026); Society redevelopment GR (3 October 2026)
- Property Nivesh, Piramal Revanta project page, checked 2 October 2026
- Property Nivesh, infrastructure dataset, Mumbai Metro Line 4 stations record, 9 October 2026
- Property Nivesh, state costs table (Maharashtra stamp duty and registration)