Investment Guides
Top 10 Areas Where Property Prices May Increase: Triggers to Watch
The top 10 areas where property prices may increase in 2026 and 2027 are the Yamuna Expressway, Greater Noida West, Ghaziabad's RRTS belt, Meerut, Gurugram's Global City edge, Bhogapuram in Visakhapatnam, Pune West, Chennai West, Bannerghatta Road and North Bengaluru. Each has an airport, metro, expressway or business-district trigger that opened in 2026 or is due by 2027, but delays, unsold stock and rising loan rates can stop prices from moving.
By Prerna Sharma · Edited by
Rakesh Mahajan · · 14 min read
Illustrative image Which are the top 10 areas where property prices may increase?
The top 10 areas where property prices may increase in 2026 and 2027, on our criteria, are the Yamuna Expressway near Jewar airport, Greater Noida West, Ghaziabad's RRTS belt, Meerut, Gurugram's Global City edge, Visakhapatnam's Bhogapuram corridor, Pune West, Chennai West, Bannerghatta Road and North Bengaluru. Each one has a trigger that has already opened or are due by 2027. Some of them already ran hard before the trigger arrived.
Lot of people search for areas where property prices will increase. Nobody can promise that, so we use the word may on purpose. The RBI raised the repo rate to 5.50% on 7 October 2026, and Knight Frank data reported by ET Realty showed NCR home sales fell 11% in January to September 2026.
This is not our ranking of the best areas for property appreciation. It is shortlist of areas with upcoming infrastructure in India, or just-opened infrastructure, where a dated event could change demand soon.
Top 10 areas at a glance
The table put every area side by side. Each price keeps the basis and period its source gave, so rows are not directly comparable.
| Area | City | Trigger, status and date | Price evidence (source, period) | Main risk |
|---|---|---|---|---|
| 1. Yamuna Expressway | Greater Noida (YEIDA) | Noida airport flights since 15 Jun 2026 (YIAPL); international date not fixed (TOI, 14 Nov 2026) | ₹8,900 per sq ft, super built-up, H1 2026, up 53% from 2024 (ANAROCK) | 16-month inventory overhang (ANAROCK) |
| 2. Greater Noida West | Greater Noida | Aqua Line extension approved 11 Nov 2026; about four years to build (The Tribune) | ₹10,150 per sq ft, labelled super built-up, Q2 2026 (ANAROCK) | Stalled registries; 7.7 quarters to sell (Knight Frank, H1 2026) |
| 3. Ghaziabad RRTS belt | Ghaziabad | Namo Bharat fully operational since Feb 2026 (PIB); fast trains from 16 Nov 2026 (TOI) | ₹9,668 per sq ft, H1 2026, up 15% in 12 months (Knight Frank) | Part of the rise is launch mix (Knight Frank) |
| 4. Meerut | Meerut | Namo Bharat and Meerut Metro since Feb 2026 (PIB); Ganga Expressway opened 29 Apr 2026 (AIR) | ₹6,500 to ₹6,700 per sq ft, basis not stated, May 2026 (Business Today, reported) | Logistics expected before housing (Knight Frank) |
| 5. Global City edge (Sectors 36A, 37C, 37D) | Gurugram | Global City remaining works due Dec 2026 (Haryana CM, 12 Aug 2026) | About ₹22,000 per sq ft average realisation at Estate 361, FY2026, basis not stated (Max Estates) | No anchor occupier announced; flooding in 37C and 37D |
| 6. Bhogapuram corridor | Visakhapatnam | Airport commercial flights since 17 Aug 2026 (Telangana Today) | VMRDA auction top bid above ₹12,000 per sq yd vs upset ₹6,000, 2026 (Deccan Chronicle) | Land prices are local quotes; title risk |
| 7. Pune West | Pune | Metro Line 3 inaugurated 3 Nov 2026 (The Economic Times) | Hinjewadi ₹11,140 to ₹11,309 per sq ft, H1 2026, up 4% in 12 months (Knight Frank) | Pune West unsold stock up 23% (Knight Frank) |
| 8. Chennai West (Porur) | Chennai | Poonamallee Bypass to Vadapalani metro opened 11 Oct 2026 (DT Next) | Porur ₹6,646 to ₹7,054 per sq ft, H1 2026, 0% in 12 months (Knight Frank) | Middle stations not open; city sales down 10% (ANAROCK, Q3 2026) |
| 9. Bannerghatta Road | Bengaluru | Pink Line elevated section open from 14 Nov 2026 (ThePrint, PTI) | ₹7,600 to ₹15,500 per sq ft, H1 2026, up 7% in 12 months (Knight Frank) | Bengaluru unsold stock up 35% (ANAROCK, Q3 2026) |
| 10. North Bengaluru (Hebbal, Yelahanka) | Bengaluru | Blue Line Hebbal to airport targeted Sep 2027 (Swarajya, Aug 2026) | Yelahanka ₹6,300 to ₹12,700 per sq ft, H1 2026, up 18% in 12 months (Knight Frank) | Metro target has slipped before |
How this shortlist was chosen
We picked areas on four test, and each had to pass all of them:
Illustrative image- A trigger opened or due in 2026 to 2027, with the body that said it and when.
- Price evidence from an official body, a consultancy or our own data, with basis and period.
- A risk record, like delays, unsold stock or disputes.
- No forecasts of our own; where a firm forecasts, we says who and when.
A few terms first. Carpet area is the floor you can use inside the walls; super built-up area adds a share of lobbies and lifts, so a rate on it look lower. A circle rate (Gurugram calls it a collector rate) is the government's minimum value for registration and sets stamp duty. RERA is the state regulator where projects must register. Ready to move means finished, usually with an OC (occupation certificate); under construction means you pay while it is built.
Our other posts handles different questions. For track records, see which locations in India have the highest appreciation potential. For the pipeline, read which areas will appreciate the most in the next 5 years, and for a wider list, our top emerging real estate investment locations in India.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
The 10 areas, one by one
Every profile give the trigger, the price evidence and what could stop prices.
1. Yamuna Expressway near Noida International Airport
The airport began commercial flights on 15 June 2026, its operator YIAPL said. By mid-November IndiGo and Akasa Air ran 35 daily flights to 16 cities, as The Times of India reported on 14 November 2026. YEIDA has gathered investment proposals of ₹36,867 crore expected to create 53,032 jobs, Hindustan Times reported, but these is proposals, not finished plants.
ANAROCK's September 2026 report puts the average base selling price at ₹8,900 per sq ft (super built-up) in H1 2026, up 53% from ₹5,800 in 2024. Our Yamuna Expressway locality page, which use a different method, shows ₹6,500 per sq ft for 2025. In Sector 22D, Gaur Alaris is listed on our page from ₹1.32 crore at an indicative ₹8,500 per sq ft.
ANAROCK also counts 4,580 unsold units and a 16-month overhang. Our guide to the best areas near Jewar airport goes sector by sector.
2. Greater Noida West
The Union Cabinet cleared an 8.44 km Aqua Line extension from Noida Sector 51 to Greater Noida West Sector 4 on 11 November 2026, at ₹2,390 crore, as The Tribune reported. It is meant to finish within four years, so this is a approval, not an opening. The UP cabinet had approved an earlier version on 3 December 2019, NMRC records show.
ANAROCK's average quoted rate was ₹10,150 per sq ft in Q2 2026, labelled super built-up; its older tables used built-up area, so no fair percentage change can be worked out. Nirala Trio in Sector 2, possession due December 2028, starts from about ₹1.44 crore on our page. The Daily Jagran reported residents' and RERA-case figures in February 2026 of over 50,000 flats with stalled registrations here.
3. Ghaziabad RRTS belt
The 82.15 km Delhi-Ghaziabad-Meerut Namo Bharat corridor is fully operational, PIB said on 6 August 2026. NCRTC started limited-stop fast Namo Bharat trains on 16 November 2026, cutting Ghaziabad to Begumpul from 37 to 28 minutes, TOI reported.
Knight Frank's H1 2026 data puts Ghaziabad at ₹9,668 per sq ft, up 15% in 12 months, with 3.2 quarters to sell, the lowest in NCR. Migsun Atharva in Raj Nagar Extension is ready to move since December 2025, our page shows. The catch: Knight Frank says part of the rise came from new launches at higher price points lifting the average.
4. Meerut
Meerut got two openings in one year. The Namo Bharat line, with 23 km of Meerut Metro on the same tracks, run fully since February 2026, PIB said. The 594 km Ganga Expressway to Prayagraj opened on 29 April 2026, All India Radio News reported.
Price data is thin. Business Today reported ₹6,500 to ₹6,700 per sq ft in May 2026 without a source or area basis, and the 30% to 40% rise in the same report is a developer claim. Knight Frank expect Meerut to activate faster than other corridor districts, but says logistics parks will come before housing.
5. Gurugram's Global City edge (Sectors 36A, 37C, 37D)
HSIIDC's Global City covers about 1,000 acres. Haryana's Chief Minister said on 12 August 2026 that 80% of physical work was done and the rest are due by December 2026. A minister put phase one at about 70%, The Times of India reported on 21 November 2026, with land allotment to investors after completion.
Max Estates reported an average realisation of about ₹22,000 per sq ft at Estate 361 in FY2026, area basis not stated. No anchor employer has been named, and Sectors 37C and 37D flood every monsoon, TOI reported. Our post on upcoming infrastructure projects in Gurgaon tracks the metro and roads.
6. Visakhapatnam north: Bhogapuram airport corridor
The Alluri Sitarama Raju International Airport began commercial flights on 17 August 2026, Telangana Today reported. PIB said it cost over ₹5,640 crore and is designed for 6 million passengers a year. Google broke ground on 28 April 2026 on a US$15 billion AI hub at Tarluvada.
A VMRDA auction at Raghamanda, about 7 km away, drew a top bid above ₹12,000 per sq yd against an upset price of ₹6,000, the VMRDA chairman told Deccan Chronicle. Per-acre figures in that report is local quotes, not registered deeds.
7. Pune West: Hinjewadi, Wakad, Baner
Pune Metro Line 3, about 23 km from Maan and Hinjewadi to District Court, was inaugurated on 3 November 2026, The Economic Times reported, after missed deadlines. Our news desk covered what Line 3 means for Hinjewadi and Baner.
Knight Frank's H1 2026 range for Hinjewadi is ₹11,140 to ₹11,309 per sq ft, up 4% in 12 months; Wakad was 0%. Pune West's unsold stock rose 23% to 24,315 units, which is the worry.
8. Chennai West: Porur, Poonamallee, Iyyappanthangal
The Poonamallee Bypass to Vadapalani metro section opened on 11 October 2026, DT Next reported: about 15 km, 11 stations. Trains still run non-stop between Porur Junction and Vadapalani because the middle stations are not open.
This is the most cleanest before and after test here. Knight Frank recorded 0% change in Porur over 12 months to H1 2026, at ₹6,646 to ₹7,054 per sq ft. The Hindu reported on 3 November 2026 that Koyambedu-Alandur is likely by March 2027.
9. Bengaluru: Bannerghatta Road
The Pink Line's elevated section, six stations from Kalena Agrahara to Tavarekere, opened to public from 14 November 2026, ThePrint (PTI) reported. The underground part is still under construction.
Knight Frank shows prices up 7% in 12 months and 15% in 6 months to H1 2026, across ₹7,600 to ₹15,500 per sq ft. With range that wide, project matters more than the area average. ANAROCK says Bengaluru's unsold stock rose 35% to 80,200 units in Q3 2026.
10. North Bengaluru: Hebbal, Yelahanka
Swarajya reported in August 2026 that the Blue Line's Hebbal to airport section is targeted for September 2027, with the full line moved to March 2028. Foxconn's Devanahalli plant hired nearly 30,000 workers in nine months, Business Today reported.
Knight Frank shows Yelahanka up 18% in 12 months, at ₹6,300 to ₹12,700 per sq ft, and says part of the metro is already in these price. Our North Bengaluru rates page tracks the belt. The date have slipped before: ANAROCK's January 2025 report expected the airport line by June 2026.
What official rate data shows near new infrastructure
Government rates move too, and they set your stamp duty. Property Nivesh Research found, in our infrastructure impact study for India, that Gurugram's collector rate for flats in Sectors 104 to 115 along the Dwarka Expressway rose 120% between FY2022-23 and FY2026-27. Central Gurugram group housing rose 110% in same years.
The same study found that, of 28 project sections with both an official construction start and an opening, the median took 5.3 years to open, and 11 had at least one official delay. Gurugram's list from 1 April 2026 also raised residential land rates on Dwarka Expressway sectors by 45% and the Sector 36A line by 25%, the district lists show.
In Noida, Property Nivesh Research found in our Noida infrastructure report that YEIDA's residential plot allotment rate rose 96% from FY2022-23 to FY2026-27. New RERA projects in Gautam Buddh Nagar averaged 57 a year in 2024 to 2025, up from 31.
Property price rise near new airport: what past data shows
Infrastructure has moved prices before, but often before the opening day. Past growth does not predict future growth.
Illustrative image| Example | Trigger and date | Before | After | Source and basis |
|---|---|---|---|---|
| Dwarka Expressway, Gurugram | Haryana section opened 11 Mar 2024; Delhi section 17 Aug 2025 (PIB) | ₹6,032 per sq ft, 2021 | ₹14,180 per sq ft, H1 2026 (up 135%) | ANAROCK, Sep 2026, super built-up |
| Yamuna Expressway | Airport inaugurated 28 Mar 2026; flights 15 Jun 2026 | ₹5,800 per sq ft, 2024 | ₹8,900 per sq ft, H1 2026 (up 53%) | ANAROCK, Sep 2026, super built-up |
| Panvel, Navi Mumbai | Airport domestic 25 Dec 2025; international 15 Jul 2026 | 2021 level | ₹14,935 per sq ft, H1 2026 (up 76% since 2021) | ANAROCK, Aug 2026, carpet |
| Panvel, Navi Mumbai | Same airport | Six months earlier | 0% change to H1 2026 | Knight Frank, Jul 2026 |
| KR Puram, Bengaluru | Blue Line under construction | Five years earlier | ₹7,230 per sq ft, H1 2024 (up 43%) | ANAROCK, Oct 2024 |
For airports, Panvel is the warning. Knight Frank shows Navi Mumbai up only 3% in 12 months to H1 2026, so much of the effect seem priced in before opening. Our Panvel property rates page has the local numbers.
What about the metro impact on property prices? ANAROCK said in February 2026 that micro-markets near operating metro corridors keep seeing appreciation, but Wakad and Porur was flat before their lines opened.
Which forecasts say property prices may increase in 2027?
These are the firm's numbers, not ours.
| Area | Latest level | Forecast for 2027 | Who forecasts, and when |
|---|---|---|---|
| Yamuna Expressway | ₹8,900 per sq ft, H1 2026 | ₹10,580 per sq ft | ANAROCK, September 2026 |
| Dwarka Expressway | ₹14,180 per sq ft, H1 2026 | ₹14,800 per sq ft | ANAROCK, September 2026 |
ANAROCK forecasts, made in September 2026, put the Dwarka Expressway's 2027 figure only a little above today's level. Both corridors carry 16 to 18 months of unsold stock on ANAROCK's count.
The National Housing Bank's press release of 8 September 2026 showed it's 50-city RESIDEX up 7.0% in Apr-Jun 2026, with Faridabad up most at 24.4%. Our property appreciation calculator shows what a yearly rise would mean for a budget, but the result is only arithmetic.
When prices do not rise: delays, oversupply and prices already priced in
A trigger can fail to lift prices when the project slips, too many homes get built, or buyers paid for the news years earlier. Higher loan costs adds a fourth reason: SBI's regular home loans cost 7.50% to 8.80% from 15 October 2026, Business Today reported.
Illustrative image| Case | What happened | Source |
|---|---|---|
| Thane, Ghodbunder Road | Metro Line 4 phase 1 targeted Dec 2026 after missing April 2026; 36,116 unsold units, 17.4 quarters to sell; prices up 1% in 12 months | Swarajya, Oct 2026; MMRDA; Knight Frank H1 2026 |
| Navi Mumbai | Airport open; prices up 3% in 12 months to H1 2026 | Knight Frank |
| Parandur, Chennai | Airport dropped on 24 Aug 2026 after about 1,700 acres were acquired | DT Next |
| Hyderabad | 28-month overhang, about 1,14,700 unsold units | ANAROCK, Q3 2026 |
| Faridabad | Jewar link under construction; June 2025 completion missed; no official new date | PIB, 19 May 2026 |
Plenty of unsold stock mean buyers have choice, and sellers cannot push prices easily, which is Thane's story.
Dholera is another caution: its airport target moved from October 2025 to end-2026, and the Enforcement Directorate says one group collected ₹2,676 crore from investors on false claims about Dholera land.
Checklist before buying near a new trigger
These step work for any area here, or any place sold on a coming metro or airport.
- Find the official status of the trigger (approved, tendered, under construction or opened) and the date the body gave, not the date in an advert.
- Check the delay record: how many times has the target moved before?
- Look up the project on the state RERA website and match the registration number, plot and completion date.
- Compare the quoted price with a consultancy or official figure on the same basis (carpet or super built-up) and period.
- Check unsold stock in the micro-market; a long overhang gives room to negotiate.
- For flats, ask about the OC and registry status; in Greater Noida West, check registries society by society.
- For plots, verify title, approved layout and land use with the authority, and treat fixed-return offers as a warning sign.
- Work out your EMI at current rates and stamp duty on the circle rate before you commit.
Where to go next
A trigger are a reason prices may move, nothing more. For the two big NCR markets side by side, our Noida vs Gurgaon comparison is the next read, and the sibling posts linked above covers track record, pipeline and emerging cities.
Questions
Frequently Asked Questions
What are the top 10 areas where property prices may increase? +
On our criteria they are the Yamuna Expressway, Greater Noida West, Ghaziabad's RRTS belt, Meerut, Gurugram's Global City edge, Bhogapuram in Visakhapatnam, Pune West, Chennai West, Bannerghatta Road and North Bengaluru. Each has a dated trigger that opened in 2026 or is due by 2027. It is a shortlist with evidence and risks, not a return estimate.
Where will property prices rise in India? +
No one can say for certain. Areas with triggers just opened or due include North Bengaluru, where the Hebbal to airport metro was targeted for September 2027 (Swarajya, August 2026), and Chennai West, where Koyambedu-Alandur was reported likely by March 2027. ANAROCK forecasts the Yamuna Expressway at ₹10,580 per sq ft in 2027, a forecast made in September 2026.
Do property prices always rise near a new airport? +
No. Navi Mumbai's airport opened for domestic flights on 25 December 2025 and international flights on 15 July 2026, yet Knight Frank shows Navi Mumbai prices up only 3% in 12 months to H1 2026, and Panvel at 0% over six months. Much of the effect appears to have been priced in before opening.
What is the metro impact on property prices? +
It varies. ANAROCK said in February 2026 that micro-markets near operating metro corridors keep seeing appreciation. But Knight Frank recorded 0% change in Porur and Wakad over 12 months to H1 2026, before their new lines opened in October and November 2026. Supply, loan rates and earlier price rises also matter.
Is the Yamuna Expressway already priced in? +
Part of the airport story may be. ANAROCK puts the average base selling price at ₹8,900 per sq ft in H1 2026, up 53% from 2024, with 4,580 unsold units and a 16-month overhang. AAI data cited by TOI show monthly passengers falling from 76,593 in July to 55,890 in September 2026.
Why is Faridabad not on this list? +
This list needs a dated trigger. Faridabad's main one, the 31.4 km link to Jewar airport, is under construction but has no official completion date in the latest PIB release of 19 May 2026, after missing its June 2025 target. The NHB press release of 8 September 2026 still shows Faridabad with the biggest annual rise of 50 cities, 24.4% in Apr-Jun 2026.
Why do some areas have little price data? +
New markets often lack consultancy series. In Meerut the only figure is Business Today's ₹6,500 to ₹6,700 per sq ft from May 2026, with no source or area basis. Around Bhogapuram, land prices are local quotes plus one VMRDA auction. Such figures are rough signals, so registered deals are worth checking before deciding.
How do rising interest rates affect these areas? +
They make buying costlier. The RBI raised the repo rate to 5.50% on 7 October 2026, and Business Today reported SBI home loans at 7.50% to 8.80% from 15 October 2026. Knight Frank data reported by ET Realty showed NCR sales down 11% in January to September 2026, which is why this list says may.
Sources
- ANAROCK Research, Yamuna Expressway Micro Market Report, 17 September 2026
- ANAROCK Research, Dwarka Expressway Residential Real Estate Report 'The Blueprint to Reality', September 2026
- ANAROCK Research, NCR Q2 2026 Residential Market Viewpoints, 3 August 2026
- ANAROCK Research, Residential Market Viewpoints Pan-India Q3 2026, 9 October 2026
- ANAROCK Research, Micro Market Report: Panvel, Navi Mumbai, 4 August 2026
- ANAROCK Research, Micro Market Report: KR Puram, Bengaluru, 22 October 2024
- ANAROCK Research, Bagaluru Micro Market Report, 3 January 2025
- ANAROCK Research, Indian Residential Real Estate Sector Annual Report 2025, February 2026
- Knight Frank India, India Real Estate: Office and Residential Market H1 2026, 9 July 2026
- Knight Frank India, Beyond The Capital Trap: The Ganga Shift 2026
- National Housing Bank, National Press Release: RESIDEX for quarter ended June 2026, 8 September 2026
- Reserve Bank of India, Monetary Policy Statement 2026-27, 7 October 2026
- Noida International Airport (YIAPL), press release on first commercial flights, 15 June 2026
- Press Information Bureau, Namo Bharat RRTS parliament reply, 6 August 2026
- Press Information Bureau, PM to visit Andhra Pradesh and Karnataka on 1 August, 31 July 2026
- Press Information Bureau (MoRTH), DND-Faridabad-Sohna highway and Jewar link inspection, 19 May 2026
- Press Information Bureau, Dwarka Expressway Haryana section, 11 March 2024, and Delhi section, 17 August 2025
- Government of Haryana, PR Haryana press note 293 on Global City review, 12 August 2026
- District Administration Gurugram, Final Collector Rates for 2026, Gurugram and Manesar tehsils, 1 April 2026
- Max Estates Limited, investor release on FY2026 pre-sales, 6 April 2026
- Noida Metro Rail Corporation, NMRC Year-End 2019 Report
- The Times of India, Noida airport eyes CAT III certification, 14 November 2026
- The Times of India, RRTS fast service to cut Delhi to Meerut ride time, 15 November 2026
- The Times of India, Global City roads to link Dwarka Expressway, 21 November 2026
- The Times of India, GMDA plans drain for Dwarka eway sectors, 4 October 2026
- Hindustan Times, Yeida lines up projects for 5th investment event, 19 November 2026
- The Tribune, Cabinet approves metro rail link Noida to Greater Noida, 11 November 2026
- The Daily Jagran, Greater Noida West homebuyers face stalled registrations, 2 February 2026
- All India Radio News, PM inaugurates 594-km Ganga Expressway, 29 April 2026
- Business Today, Uttar Pradesh property boom: Ganga Expressway, 1 May 2026
- Telangana Today, Commercial flight operation begins at Bhogapuram airport, 17 August 2026
- Deccan Chronicle, Land prices near Bhogapuram airport following launch, 9 August 2026
- Adani Group newsroom, Google breaks ground on India AI Hub, 28 April 2026
- The Economic Times, Pune Metro gets Pink Line, 3 November 2026
- DT Next, Vadapalani-Poonamallee Metro key features, 12 October 2026
- The Hindu, Koyambedu-Alandur viaduct by December, 3 November 2026
- ThePrint (PTI), PM inaugurates Bengaluru Metro Pink Line, 13 November 2026
- Swarajya, Bengaluru Metro Blue Line to open in phases, 23 August 2026
- Business Today, Foxconn mini-township hires 30,000, 22 December 2025
- Business Today, SBI raises home loan rates by 25 bps, 18 October 2026
- ET Realty, NCR housing sales fall 11% in Jan-Sep 2026 (Knight Frank), 6 October 2026
- Swarajya, Thane Metro Line 4 first phase set to open in December 2026, 27 October 2026
- MMRDA, Thane's first metro: Metro Line 4 and 4A trial run release, 22 September 2025
- DT Next, Parandur airport dropped midway after land acquisition, 20 November 2026
- Directorate of Enforcement, press release on one group case, 11 August 2026
- Property Nivesh Research, Infrastructure Impact on Property Prices in India (2026 Study)
- Property Nivesh Research, Noida Infrastructure Impact on Property Prices, Q3 2026
- Property Nivesh, project pages and locality pages (Gaur Alaris, Nirala Trio, Migsun Atharva, Estate 361, Yamuna Expressway)