Sector 113 Gurugram is an under-construction high-rise sector at the Delhi end of Dwarka Expressway, led by M3M Capital, Smartworld One DXP and M3M Mansion, with no residential tower OC on HRERA as of 27 November 2026. Its growth case rests on a finished expressway and UER-II, a 135% corridor price rise from 2021 to H1 2026 (ANAROCK), and metro lines that are still proposals.

By Mridul Shakya · Edited by Rakesh Mahajan · · 13 min read

Premium residential towers next to an expressway interchange with Delhi's suburbs beyond Illustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

Sector 113 Gurugram in short: what an investor is buying into

Sector 113 Gurugram is a under-construction high-rise sector at the Delhi end of Dwarka Expressway, and almost every home here is still being built. HRERA Gurugram's register shows four large residential registrations: M3M Capital, Smartworld One DXP, M3M Mansion and M3M St. Andrews at SCDA, with completion dates running from 2026 to 2032. No residential tower in the sector have an OC (occupation certificate, the document that lets people legally move in) on HRERA as of 27 November 2026.

So the growth question splits in two. One is what the corridor has done, which is on record. The other is whether these towers get finished and filled on time, which nobody can promise. This post put the dated facts for both side by side, so you can judge it yourself.

Where is Sector 113 Gurgaon on the Dwarka Expressway map?

Sector 113 sits at the Delhi end of the expressway, in the group of Sectors 108 to 115. HRERA addresses put its projects in the revenue estates of Chauma and Bajghera, close by the Bajghera border crossing into Delhi. M3M, which markets its Sector 111 and 113 colonies as SCDA ("Smart City Delhi Airport"), says it takes 3 minutes to UER-II, 5 minutes to Yashobhoomi and 7 minutes to IGI Airport. Those are the developer's own drive times, not a official measurement.

Both links to Delhi are now built. PIB dates the Haryana stretch to 11 March 2024, and the Delhi stretch plus UER-II, Delhi's 76 km third ring road, to 17 August 2025. Since November 2025 the expressway is tolled at Bijwasan: CMV360 reported on 3 April 2026 a car fare of ₹225 one way or ₹340 return, with a ₹350 local monthly pass for residents within 20 km, a cost Delhi commuters from here has to count. Our Dwarka Expressway locality guide covers every other stretch.

Sector 113 Gurugram projects on the HRERA register

HRERA, the Haryana Real Estate Regulatory Authority, is where every project selling flats must register a completion date. Our tally of its Gurugram register finds 12 rows whose address mention Sector 113, shops and offices included. The table keeps the housing ones, as read on 27 November 2026.

ProjectPromoterHRERA registrationHomesCompletion on the registerOC on HRERA
M3M Capital (Phases 1, 2 and 3)Union Buildmart Pvt Ltd (M3M India)GGM/531/263/2022/06; GGM/612/344/2022/87; GGM/825/557/2024/522,672Phase 1: 29 Jun 2027 (extended); Phase 2: 31 Dec 2026; Phase 3: 29 Feb 2028Retail area and two basements only (26 May 2026)
Smartworld One DXP (Phases 1 and 2)Nourish Developers Pvt Ltd (Smartworld Developers)GGM/645/377/2022/120; GGM/842/574/2024/691,790Phase 1: 31 Dec 2027; Phase 2: 31 Aug 2031None for homes
M3M MansionUnion Buildmart Pvt LtdGGM/802/534/2024/29 (18 Mar 2024)968 (961 flats plus 7 units)31 Mar 2030 (register); 29 Feb 2032 (Form REP-I)None for homes
M3M St. Andrews at SCDA (registered as M3M Mansion Ph-2)Union Buildmart Pvt LtdGGM/916/648/2025/19 (20 Feb 2025)24428 Feb 2031 (register); 29 Feb 2032 (Form REP-I)None for homes
La Vida Phase 2Gatevida Developers Pvt LtdGGM/639/371/2022/114 (28 Nov 2022)283Not on recordNot on record

Add the four M3M and Smartworld registrations and about 5,674 homes are rising at once in one sector, La Vida Phase 2 aside. HRERA gives sizes on carpet area, the floor inside your walls: St. Andrews' 244 golf suites and penthouses comes in 10 sizes from 1,495 to 4,165 sq ft carpet. No plotted, DDJAY or affordable housing policy project carries a Sector 113 address, so it is a flats-only sector for now.

Free property updates

Never Miss a Property Opportunity!

Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.

Where would you like to receive updates?
Send me

Free. Only updates worth your time, and you can stop any time. We never sell or share your number or email. By subscribing you agree to get Property Nivesh updates on the channel you chose. Stop updates

Is there an OC in Sector 113 yet? What the certificates and dates show

Not for homes. The first DTCP occupation certificate on the M3M Capital colony, memo dated 26 May 2026, cover only the retail area (lower ground to 2nd floor) and two basements of the 15.0625-acre colony. That retail is M3M Capital Walk, where M3M advertises 876 shops on about 1 km of frontage. The other certificate is a completion certificate of 8 November 2023 for M3M 113 Market, a SCO (shop-cum-office) plotted market where plot owners builds their own blocks.

A large convention centre building with a wide plaza seen from a distanceIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

Dates have already moved once. Extension No. 10 of 2026, granted on 23 April 2026, pushed M3M Capital Phase 1 from 30 June 2026 to 29 June 2027. Phase 2, with 1,760 units, is registered to 31 December 2026 and had no extension listed on 27 November 2026. On top of it, a blanket HRERA order (No. 9/1-2026, dated 11 August 2026) gives eligible projects four extra months, so most dates in the table can slide by that much.

Two records also disagree. For M3M Mansion the register says 31 March 2030 while its Form REP-I reads 29 February 2032; for St. Andrews it is 28 February 2031 against 29 February 2032. We gives both because neither is settled, and the one that matters to a buyer is the date written in the builder-buyer agreement.

Sector 113 Gurugram price: the evidence on record

No consultancy publishes a sector-level price for Sector 113; ANAROCK's quarterly tables tracks only "Dwarka Expressway" as one micro-market. So the evidence is a few dated launch figures plus the corridor average, each with it's own area basis. Super built-up area adds a share of lobbies and common areas, so the same home look cheaper per sq ft on it.

WhatFigureArea basisPeriod and source
M3M Capital launch, 2.5 BHK of about 1,300 sq ftFrom ₹1.5 croreNot statedFeb 2022; company press release in Business Standard, 10 Feb 2022
M3M Capital launch, 3.5 BHK of about 1,700 sq ftFrom ₹1.9 croreNot statedFeb 2022; same release
Smartworld One DXP Phase II (890 units), average quoted base price₹17,999 per sq ftBuilt-upQ3 2024; ANAROCK NCR Residential Market Viewpoints Q3 2024 (25 Oct 2024)
ANAROCK Dwarka Expressway average quoted base price, same quarter₹10,350 per sq ftBuilt-upQ3 2024; same ANAROCK report
ANAROCK Dwarka Expressway average quoted base price, latest₹14,180 per sq ftSuper built-up (as printed)Q2 2026; ANAROCK NCR Q2 2026 Viewpoints (3 Aug 2026)

Read side by side, Smartworld's Phase II launched at roughly 1.7 times ANAROCK's corridor average for the same quarter and the same basis, so the sector was priced as an upper-end pocket of the road, not a entry one. M3M Capital's 2022 tickets work out to roughly ₹11,200 to ₹11,500 per sq ft on the sizes quoted, but the release didn't say which area, so take that as approximate only.

M3M St. Andrews has no published launch price at all. What a Sector 113 flat resells for today isn't published by any government or consultancy source either, so ask to see registered sale deeds in the same tower before trusting a quote.

How has the Dwarka Expressway line moved since 2020?

With no series of its own, Sector 113 leans on the corridor. Our Dwarka Expressway price tracker follows the average asking price across the projects and listings we track.

YearOur Dwarka Expressway line (₹ per sq ft, average asking price)
20205,200
20216,000
20227,800
202310,200
202412,500
202513,500

Source: our Dwarka Expressway line, as of 11 October 2026. That is a rise of about 160% from 2020 to 2025. ANAROCK, on its own separate series, put the corridor's average basic selling price at ₹6,032 per sq ft in 2021 and ₹14,180 in H1 2026, a 135% rise, above Gurugram's ₹13,350 (Dwarka Expressway report, September 2026).

ANAROCK's quarterly table also show the pace cooling, from 12% quarter-on-quarter in Q1 2025 to 1% in Q2 2026, though its printed basis switched from built-up to super built-up in that last quarter. None of these series is specific to Sector 113, and past growth do not predict future growth.

Rent and rental yield around Sector 113

There is no sector-level or project-level rent for Sector 113 from a non-listing source, and with no residential OC there is hardly any homes to let yet. Corridor figures are what exist. For a roughly 1,000 sq ft 2 BHK anywhere on the expressway, ANAROCK's Q2 2026 Viewpoints gave ₹25,500 to ₹37,000 monthly, while its September 2026 report put H1 2026 at ₹25,000 to ₹31,250, up 87% from 2021. Savills India's H1 2026 Market Watch recorded rents up 22% year on year on the expressway, against 3% in New Gurugram.

A metro viaduct under construction near residential towersIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

Gross rental yield is a year's rent divided by the price, before maintenance, tax and empty months; net yield is what is left after those. Taking ANAROCK's own Q2 2026 rent and price for a 1,000 sq ft 2 BHK, gross yield comes to roughly 2.2% to 3.1%, near the about 3% on our Dwarka Expressway line. That is for a finished, rented flat, a Sector 113 buyer earns no rent at all until possession.

Growth potential: dated catalysts for Sector 113, Dwarka Expressway

Here growth potential means dated items on record that could change daily life in the sector. None is a promise of higher prices.

CatalystWhat it isStatus and dateSource
Dwarka Expressway and UER-II29 km, 8-lane expressway; Delhi's third ring roadOpen since 2024 and 2025; about 1.5 km of GMDA service road still unbuilt for want of land (Nov 2026)PIB; Hindustan Times, Nov 2026
Rezangla Chowk to Dwarka Sector 21 metro8.40 km, seven stations including Sectors 110 and 111State DPR approved 19 Oct 2022; awaiting MoHUA, no central sanction (Jul 2026)The Tribune, 27 Jul 2026
Yashobhoomi to Rajiv Chowk metroAbout 20 km underground route (DMRC draft)Proposal sent for approval under Delhi Metro Phase V (reported 18 Nov 2026)Hindustan Times, 18 Nov 2026
Shiv Murti to Ambience Mall elevated road2.7 km three-lane flyover past the NH-48 mergeDPR expected within a month; ministry approval pending (24 Nov 2026)The Times of India, 24 Nov 2026
M3M Capital Financial Centre165 units: offices, multiplex and retailLaunched 30 Jul 2026; HRERA completion 30 Jun 2033, M3M says 2029HRERA Form REP-I; VOIworld, 30 Jul 2026
Storm drainage, Sectors 112 to 115₹32.80 crore of drains, pumping station in Sector 115Due May 2026; completion not confirmedThe Tribune, 29 Jul 2025

The metro rows matter most and are the least certain. Sectors 110 and 111 would get stations on the Rezangla Chowk line, but no official distance to Sector 113 is published, and our news note on the Yashobhoomi to Gurugram metro proposal explain why a proposal is not yet a project. On offices, M3M says a global aviation company have committed to about 75,000 sq ft in the Financial Centre; that is the developer's statement as VOIworld reported it on 30 July 2026.

Risks in Sector 113, with their dates

  • Supply landing together: M3M Capital (2,672 units), Smartworld One DXP (1,790) and M3M Mansion (968) are all under construction, so many resale and rental flats could reach the market in same few years.
  • Corridor stock: ANAROCK counted 38,680 units supplied on Dwarka Expressway from 2021 to H1 2026 and 10,770 unsold in H1 2026, about 95% of them under construction, which it puts at about 18 months of inventory (September 2026).
  • Internal roads: ANAROCK's September 2026 report says internal sector roads in Sectors 108 to 113 "remain inconsistent", and last-mile connectivity in several pockets are still developing.
  • Drains and sewers: the Sectors 112 to 115 drainage was due in May 2026 and the master sewer for Sectors 99 to 115 about January 2027; neither completion has been confirmed yet.
  • Dates: two registrations carry conflicting completion dates, and M3M Capital Phase 2's date of 31 December 2026 had no extension listed a month before it fall due.

Stamp duty, collector rates and other costs on a Sector 113 flat

Haryana's stamp duty, per our state costs table, runs 7% for a male buyer and about 5% for a female buyer, with registration at 1% up to a ₹50,000 ceiling. It applies to whichever is higher, your deal value or the collector rate value (the government's floor value for that spot). So a ₹1.5 crore flat means about ₹10.5 lakh of duty for a man or about ₹7.5 lakh for a woman. Confirm rates before paying; our stamp duty calculator do the sum for any price.

A high-floor apartment living room with a view of an expressway interchange at nightIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

The Deputy Commissioner Gurugram's 2026-27 collector list, from 1 April 2026, raised residential plot rates in Sectors 104 to 106 and 109 to 115 by about 45%; check the flat row for your tower too. Under-construction buys also carry EDC and IDC (external and internal development charges set by the state), PLC (preferential location charge for a better floor or view) and IFMS (an interest-free maintenance security deposit). Get each of them written down before any booking amount.

A Sector 113 checklist before you book

  1. Match the HRERA registration number on the brochure with HRERA Gurugram's register and note the latest completion date shown there.
  2. Where the register and Form REP-I differ, ask which completion date goes into your builder-buyer agreement.
  3. Check whether your own tower has an OC uploaded on HRERA; the 26 May 2026 OC covers retail and basements only.
  4. Get the price in writing with its area basis (carpet, built-up or super area) and the carpet area of your unit.
  5. List EDC, IDC, PLC, IFMS, parking and club charges separately before paying a booking amount.
  6. Look up the collector rate row for your address on the Gurugram revenue list, since duty runs on the higher value.
  7. Count the Bijwasan toll if you commute to Delhi, and check whether the ₹350 local monthly pass covers your address.
  8. Treat both metro lines as proposals until the Union government sanctions them.

Who Sector 113 suits, and where to read next

Sector 113 suits a buyer who want a new high-rise near the Delhi border and the airport and can wait until 2027 to 2032, and an investor that is comfortable with heavy competing supply at handover. It doesn't suit someone who need to move in now. For older societies with OCs a short way down the road, read our Sector 108 investment check and the Sector 102 guide.

To compare the whole road sector by sector, see the best investment sectors near Dwarka Expressway, the Dwarka Expressway investment guide for 2026, the upcoming projects on Dwarka Expressway, our Dwarka Expressway projects shortlist and the city-wide Gurgaon property rates page.

Questions

Frequently Asked Questions

Can I move into a flat in Sector 113 Gurugram today? +

Not on the official record. HRERA Gurugram shows no OC for any residential tower in Sector 113 as of 27 November 2026. The only OC on the M3M Capital colony, dated 26 May 2026, covers its retail area and two basements. The earliest housing dates on the register are M3M Capital Phase 2 on 31 December 2026 and Phase 1 on 29 June 2027.

What is the price per sq ft in Sector 113 Gurugram? +

No consultancy publishes a Sector 113 figure. ANAROCK listed Smartworld One DXP Phase II at an average base price of ₹17,999 per sq ft on built-up area in Q3 2024, when its corridor average was ₹10,350. ANAROCK's Dwarka Expressway average was ₹14,180 per sq ft in Q2 2026 on super built-up area.

How many projects are registered in Sector 113 Gurugram? +

Our tally of HRERA Gurugram's register finds 12 rows whose address mentions Sector 113, including shops, offices and two Gatevida rows registered as Sectors 112/113. The housing core is four registrations: M3M Capital, Smartworld One DXP, M3M Mansion and M3M St. Andrews at SCDA, with about 5,674 homes between them.

Which villages does Sector 113 cover, and what is SCDA? +

HRERA addresses place Sector 113 projects in the revenue estates of Chauma and Bajghera, close to the Bajghera border crossing. SCDA, short for Smart City Delhi Airport, is M3M's marketing name for its colonies in Sectors 111 and 113. It is a brand label, not a government sector name, so documents will still say Sector 113.

Is there a metro station planned in Sector 113? +

Not in the sector itself. The Rezangla Chowk to Dwarka Sector 21 line has proposed stations in Sectors 110 and 111, but its state DPR still awaited MoHUA in July 2026, The Tribune reported. A Yashobhoomi to Rajiv Chowk route is a proposal under Delhi Metro Phase V, reported on 18 November 2026. Neither has central sanction.

How far is Sector 113 from IGI Airport? +

Only developer figures exist. M3M says its Sector 111 and 113 projects are 7 minutes from IGI Airport, 5 minutes from Yashobhoomi and 3 minutes from UER-II. No government body has published an official distance or travel time, so check the drive yourself at the hour you would usually travel.

What rent could a 2 BHK near Sector 113 earn? +

There is no sector-level rent on record. For the whole corridor, ANAROCK quoted ₹25,500 to ₹37,000 a month for a 2 BHK of about 1,000 sq ft in Q2 2026. Against its price for the same quarter, that is a gross yield of roughly 2.2% to 3.1%, before maintenance and empty months.

Why do M3M Mansion and St. Andrews show two completion dates? +

HRERA's register gives M3M Mansion 31 March 2030 and St. Andrews 28 February 2031, while both Form REP-I filings read 29 February 2032. HRERA's order of 11 August 2026 can also add four months. Ask the developer which date your builder-buyer agreement carries before you pay.

Sources

  1. HRERA Gurugram, register of registered projects and Form REP-I filings for M3M Capital, Smartworld One DXP, M3M Mansion, M3M Mansion Ph-2 (M3M St. Andrews at SCDA), M3M Capital Financial Centre and La Vida Phase 2, read 27 November 2026
  2. HRERA Gurugram, Extension No. 10 of 2026 for M3M Capital Phase 1, 23 April 2026
  3. HRERA Gurugram, Order No. 9/1-2026 HARERA/GGM (Admn), four-month extension of completion timelines, 11 August 2026
  4. HRERA Gurugram, OC/CC record for M3M 113 Market, completion certificate dated 8 November 2023
  5. DTCP Haryana, occupation certificate memo ZP-1531-IV/SD(RD)/2026/18314 for the M3M Capital colony retail area and basements, 26 May 2026
  6. Business Standard (ANI/NewsVoir press release), M3M Capital launch, 10 February 2022
  7. ANAROCK Research, NCR Residential Market Viewpoints Q3 2024, 25 October 2024
  8. ANAROCK Research, NCR Residential Market Viewpoints Q1 2025, Q1 2026 and Q2 2026 (3 August 2026)
  9. ANAROCK Research, Dwarka Expressway Residential Real Estate Report, The Blueprint to Reality, September 2026
  10. Savills India Research, Delhi-NCR Residential Market Watch, H1 2026, July 2026
  11. Press Information Bureau (PMO), Dwarka Expressway Haryana section inauguration, 11 March 2024, and Delhi section and UER-II inauguration, 17 August 2025
  12. CMV360, Delhi Gurgaon travel cost rises as NHAI increases toll from April 1, 3 April 2026
  13. The Tribune, Merged DPR, 5 stations: Gurugram airport metro plan, 27 July 2026
  14. Hindustan Times, Yashobhoomi to Gurugram among 8 routes proposed under Delhi Metro new project, 18 November 2026
  15. The Times of India, Shiv Murti-Ambience Mall flyover plan may be ready in a month, 24 November 2026
  16. VOIworld, M3M launches Rs 600-crore Capital Financial Center in Gurugram, 30 July 2026
  17. The Tribune, GMDA to lay master sewer network in sectors 99-115, 23 January 2025; GMDA to improve drainage network in New Gurugram, 29 July 2025
  18. Deputy Commissioner Gurugram (Revenue Department), Collector Rate of Tehsil Gurugram for 2026-27, from 1 April 2026
  19. M3M India, M3M Crown and M3M Capital Walk project pages (drive times and shop count, developer statements)
  20. Property Nivesh, Dwarka Expressway line (city tracker), as of 11 October 2026; state costs table

Mentioned here

Projects in this analysis

Chat with Us +91 79824 13588
A man reading about property on his phone at home

Free advice

Have a question before you buy?

Get straight answers from our advisor on projects, prices, home loans and paperwork. Free, with no obligation.

Unbiased advice. Your data is never sold to builders or brokers.

Prefer WhatsApp? Chat with Us: +91 79824 13588

Free property updates

Never Miss a Property Opportunity!

Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.

Where would you like to receive updates?
Send me

Free. Only updates worth your time, and you can stop any time. We never sell or share your number or email. By subscribing you agree to get Property Nivesh updates on the channel you chose. Stop updates