Investment Guides
Is Sector 108 Gurugram a Good Investment Destination? A 2026 Verdict
Sector 108 Gurugram is a careful yes for end users and long-term holders: most of its housing has OCs on the HRERA record and the Dwarka Expressway reaches Delhi since August 2025. It is weaker for quick gains, with unfinished internal roads, no sanctioned metro and a few projects still without an OC.
By Pranav Adhikari · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Is Sector 108 Gurugram a good investment? The short answer
Sector 108 Gurugram is a reasonable buy for someone who wants a finished, lived-in address at the Delhi end of the Dwarka Expressway, but it is not a cheap or a quick-flip market. Most of the housing here already have occupation certificates on the HRERA record, and the expressway to Delhi and the airport is fully open since August 2025. The weak spots are unfinished internal roads, a metro that is still only a proposal, and a few projects with no OC.
So it is a careful yes for end users and long holders, and weaker for a fast price jump. Past growth on the corridor do not predict the next five years.
Where Sector 108 sits on the Dwarka Expressway, and how it reaches Delhi
Sector 108 lies at the Delhi end of the road, in the stretch of Sectors 108 to 115. HRERA addresses put its projects in the revenue estates of Babupur and Dharampur villages, in tehsil Kadipur. If you want the whole corridor first, our Dwarka Expressway locality page lays out the stretches.
The road itself is no longer a promise. The Press Information Bureau recorded the 19 km Haryana section opening on 11 March 2024 and the 10.1 km Delhi section, with a tunnel to IGI Airport, on 17 August 2025. That second date is what change the sector 108 dwarka expressway story, because the Delhi end got a direct, signal-free run into the city.
How close is Delhi? Only the developers give a figure. Experion says on its Westerlies page that the township is 0 km from the Delhi border with a 75 m road into Delhi, and Raheja calls Vedaanta "almost zero distance" from the border. No government body has published a travel time for Sector 108.
Sector 108 Gurugram projects: what HRERA and DTCP records show
HRERA is the Haryana Real Estate Regulatory Authority, where every new project must register before it sells. HRERA Gurugram's register, in our copy of 9 October 2026, carries about 18 registrations with a Sector 108 address, counting commercial and lapsed rows.
The table lists residential projects placed in Sector 108 by HRERA, DTCP or the developer, chosen by address and not ranked.
| Project | Developer | Type | HRERA registration | OC or completion on record |
|---|---|---|---|---|
| SOBHA City | Sobha Ltd | Apartments, 1,548 units on 39.375 acres | Seven phases: 86 of 2017 to GGM/620/352/2022/95 | DTCP OCs from 8 Apr 2022 to 29 Sep 2026; some towers have none yet |
| Experion The Heartsong | Experion Developers | Apartments | 306 of 2017; 113 of 2017; GGM/360/92/2019/54 | OCs 2 May 2018 to 20 Aug 2022; completion certificate 23 Feb 2023 |
| Experion The Westerlies | Experion Developers | Plots and Experion-built villas, 116.5125 licensed acres | 103 of 2017 plus four later registrations | Part completion certificates 31 Jul 2017, 22 Mar 2018, 30 Jan 2024; villa OCs 2019 to 2022 |
| Raheja Vedaanta (with Vedas, Vedaanta Floors) | Raheja Developers | Apartments and floors | Not on the HRERA register (pre-RERA) | Lived in; no dated OC on the HRERA record |
| Kavyam Phase-1 | Agrante Realty Ltd | Affordable housing policy flats | GGM/291/2018/23 (27 Nov 2018) | No OC (The Tribune, 14 Oct 2026) |
| ROF Alante | Nani Resorts | Type not confirmed | Registered 2019 | Not on record |
Two smaller registrations, Zephyr at The Westerlies (28 builder floors) and Experion Hub 108 (18 SCO units, which is shop-cum-office plots), carry lapsed marks with no OC. Part of Sobha International City, a villa colony, spill into Sectors 106, 108 and 109 as per HRERA orders. Its sizes and status are covered in our post on Sobha villas on Dwarka Expressway.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Which Sector 108 homes have an OC, and which are still waiting
An OC, or occupation certificate, is the DTCP letter that says a building is fit to live in. A completion certificate goes further and covers the whole colony. In Sector 108 this paperwork is the strongest argument in favour.
Illustrative imageExperion The Heartsong is the cleanest case. HRERA's certificate record shows OCs of 2 May 2018, 19 February 2020, 20 January 2022 and 20 August 2022, and one completion certificate dated 23 February 2023 for all three registrations. Experion The Westerlies now has part completion certificates for every part of its licensed land, the latest for 26.0775 acres on 30 January 2024 as per DTCP Haryana.
SOBHA City is mostly finished but not fully. DTCP Haryana issued its latest OC on 29 September 2026 for towers D-2 and Z-1 (72 and 54 flats) and an EWS block, EWS meaning flats for economically weaker sections. Still, HRERA showed no OC for towers A3, A4, C5, C6, D1, D3, D4 and Z2 as of late November 2026. Sobha counted 336 homes completed there in FY26 (investor presentation, 4 May 2026), but Sobha call a tower complete once fit for living, which is not an OC.
- Kavyam: possession was due 20 August 2023, and The Tribune reported on 14 October 2026 that there was no OC; HRERA ordered 10.8% delay interest to 26 buyers.
- Raheja Vedaanta: Raheja said in November 2016 these homes was among about 1,300 units handed over (The Tribune, 26 Nov 2016), yet no dated OC show on the HRERA record. Our post on Raheja projects on Dwarka Expressway has more.
Sector 108 Gurugram price: what has been published, and on what basis
No consultancy publish a price for Sector 108 alone. ANAROCK, the only firm with a steady quarterly series here, tracks the whole "Dwarka Expressway" micro-market, so any sector 108 gurugram price you see from a firm is really a corridor figure. What exist for the sector is a developer price and two recorded plot deals.
- Sobha listed Vista Residences, Phase 6 of SOBHA City, as 4 bed homes of 2,423 to 2,459 sq ft from ₹4.14 crore, size basis not stated, and marks it sold out (Sobha project page, modified 30 June 2026).
- HRERA's order of 20 January 2026 record two Westerlies Phase-4 plots of 462 sq m (552.55 sq yd) bought under agreements of 5 November 2024 for about ₹7.86 crore and ₹8.10 crore in total.
For the corridor, the table uses one firm and one series, ANAROCK's quarterly NCR Residential Market Viewpoints, primary market, printed on built-up area. Super area adds a share of common spaces to the flat's own carpet area, so it reads bigger.
| ANAROCK report | Average quoted base price, Dwarka Expressway (per sq ft) | Average 2 BHK rent, about 1,000 sq ft (per month) |
|---|---|---|
| Q1 2024 | ₹8,700 | ₹22,000 to ₹29,000 |
| Q3 2024 | ₹10,350 | ₹23,000 to ₹34,000 |
| Q1 2025 | ₹12,300 | ₹24,000 to ₹35,000 |
| Q3 2025 | ₹13,150 | ₹25,000 to ₹36,000 |
| Q1 2026 | ₹14,000 | ₹25,000 to ₹37,000 |
ANAROCK's Q2 2026 report printed ₹14,180 per sq ft on super built-up area, so it is not lined up in the same column. Its separate Dwarka Expressway report of September 2026 put the rise from ₹6,032 in 2021 to H1 2026 at 135%. For our own view, see the Dwarka Expressway price tracker, where our Dwarka Expressway line moves from ₹5,200 per sq ft in 2020 to ₹13,500 in 2025.
Rents and rental yield near Sector 108
No firm print a Sector 108 rent either. The nearest dated figure is ANAROCK's Q2 2026 range of ₹25,500 to ₹37,000 a month for a 2 BHK of about 1,000 sq ft across the Dwarka Expressway. Savills India, in its H1 2026 Delhi-NCR Residential Market Watch, found expressway rents up 22% year on year, against 6% for capital values of completed homes there.
Illustrative imageGross rental yield is the year's rent divided by the price, before maintenance, tax and empty months, while net yield is what is left after those. Using ANAROCK's Q2 2026 rent and price for the same 1,000 sq ft, the gross yield work out to roughly 2 to 3%. Our Dwarka Expressway line shows about 3%. No rent for any named Sector 108 society is on record.
The case for and against Sector 108 Gurgaon
Side by side, sector 108 gurgaon looks like a mature pocket on a road that has finally opened, with a few loose ends that are not small.
| For Sector 108 | Against Sector 108 |
|---|---|
| Both sections of the expressway open, Delhi section since 17 Aug 2025 (PIB) | Internal sector roads in Sectors 108 to 113 "remain inconsistent" (ANAROCK, Sept 2026) |
| Heartsong has a completion certificate (23 Feb 2023); Westerlies has part completion certificates for all licensed land | Kavyam has no OC, possession was due 20 Aug 2023 (The Tribune, 14 Oct 2026) |
| SOBHA City OCs keep coming, latest 29 Sep 2026 (DTCP Haryana) | Several SOBHA City towers had no OC on HRERA in late Nov 2026 |
| Corridor rents up 22% year on year (Savills, H1 2026) | About 18 months of unsold stock on the corridor (ANAROCK, Sept 2026) |
| Developers state 0 km to the Delhi border (Experion) | No metro line sanctioned; nearest stations at Sectors 110 and 111 are proposals |
| Few new registrations at the Delhi end, 7 dated 2025 or later (our HRERA count, 9 Oct 2026) | Bijwasan toll of ₹225 one way for a car from 1 Apr 2026 (CMV360, as reported) |
Our count of HRERA Gurugram's register on 9 October 2026 found 77 registrations at the Delhi end (Sectors 108 to 115), only 7 of them dated 2025 or later, against 26 since 2025 in the middle stretch. Less new supply can mean less resale competition, but it also mean fewer launches to choose. For the sector-by-sector picture, read best investment sectors near Dwarka Expressway.
Risks in Sector 108, with dates
The risks on record are specific and dated. Roads come first. Hindustan Times reported in November 2026 that about 1.5 km of GMDA service road along the expressway is still unfinished for want of land, with the worst gap near Daulatabad; our news note on the service road gaps explain what it mean for daily access.
Delays are the second risk. The Westerlies villa OCs ran to 3 November 2022, about 26 months after the extended date of 23 August 2020, and Phase 3's part completion certificate came 42 months late, as per DTP Gurugram records compiled on HRERA. HRERA also imposed a ₹10 lakh penalty on Experion in November 2021 for non-compliance during registration.
Supply is the third. ANAROCK counted 38,680 units supplied on the corridor from 2021 to H1 2026, with 10,770 unsold and about 95% of them under construction. Costs are the fourth: collector rates, the state's minimum value for charging stamp duty, rose about 45% for residential plots in Sectors 99 to 110 and about 9% for group housing flats for 2026-27, as per the Deputy Commissioner Gurugram's rate list effective 1 April 2026. Duty is charged on whichever is higher, the deal value or the collector rate value.
Civic gaps make the last one. GMDA's sewer network for Sectors 99 to 115 was approved on 23 January 2025 with 24 months to finish (The Tribune), and completion isn't confirmed.
Metro and road plans: what is approved and what is only proposed
No metro serves Sector 108 today, and none is sanctioned. The Rezangla Chowk to Dwarka Sector 21 line, 8.40 km with seven stations including Sectors 110 and 111, got Haryana's DPR approval on 19 October 2022, and The Tribune reported on 27 July 2026 it was still awaiting the Union housing ministry.
Illustrative imageA Yashobhoomi to Rajiv Chowk route of about 20 km was proposed under Delhi Metro Phase V, Hindustan Times reported on 18 November 2026; see our Yashobhoomi metro proposal note. On roads, The Times of India reported on 24 November 2026 that a DPR for a 2.7 km Shiv Murti to Ambience Mall elevated road was expected within a month. All three are plans, so treat them as possible upside only.
Checks before you buy in Sector 108 Gurgaon
Most stock here is resale, so the checks are about paper more than construction.
| What to check | Where it is recorded | Why it matters in Sector 108 |
|---|---|---|
| OC for your exact tower or villa | HRERA Gurugram OC/CC popup; DTCP certificate | SOBHA City and Westerlies villas got OCs tower by tower or plot by plot |
| Registration status and expiry | HRERA Gurugram register | Zephyr and Hub 108 carry lapsed marks |
| Extended completion date | HRERA Order 9/1-2026 of 11 Aug 2026 | It added four months to dates on or after 28 Feb 2026; the register still shows old dates |
| Size basis of any quote | Builder buyer agreement | Sobha's Vista sizes do not state carpet or super area |
| Stamp duty and registration | Our state costs table; Haryana revenue department | Duty 7%, about 5% for women; registration fee 1% capped at ₹50,000 |
- Ask the seller for the OC or completion certificate that names your tower, block or plot, and match it to the HRERA popup.
- For a SOBHA City flat, confirm whether your tower is among those still without an OC on HRERA.
- For a Westerlies plot, read the part completion certificate covering your phase and the HRERA order history of that phase.
- For Raheja Vedaanta, ask the seller for a dated OC copy, since none is on the HRERA record.
- Get every price in writing with its basis, carpet area or super area, and every extra like PLC (preferential location charge) and club fees.
- Work out the stamp duty on the higher of your deal value and the collector rate value, and confirm the rate before paying.
- Drive the internal road and service road you will use, at peak hour.
The duty figures in the table are as listed in our state costs table; confirm them with the sub-registrar before paying.
Who Sector 108 suits, and who should look next door
Sector 108 suits buyers who travel to Delhi, Dwarka or the airport often and want the shortest drive, and families who prefer a large occupied township with OCs, such as SOBHA City or The Heartsong. It also suit someone who want a plot in The Westerlies, less so budget buyers or anyone who need a metro now.
If you want newer towers with branded names, our guide to best residential projects in Sector 106 Gurugram covers the ready and under-construction mix there. For a sector that is almost all under construction, read property investment in Sector 113 Gurugram. Sector 102, with its ready mid-segment societies, is in our Sector 102 investment post.
To compare the sector with the city, the Gurgaon property rates page carries our city tracker, which put the Gurgaon average at ₹16,500 per sq ft as of October 2026. For the wider corridor debate, our Dwarka Expressway investment guide for 2026 is the next read.
Questions
Frequently Asked Questions
Is Sector 108 Gurugram ready to move in or still under construction? +
Mostly ready. Experion The Heartsong has a completion certificate dated 23 February 2023, The Westerlies has part completion certificates for all its licensed land, and SOBHA City has OCs from April 2022 to September 2026. Some SOBHA City towers still had no OC on HRERA in late November 2026, and Kavyam had none as of October 2026.
Which villages and tehsil does Sector 108 fall under? +
HRERA addresses place Sector 108 projects in the revenue estates of Babupur and Dharampur villages, in tehsil Kadipur. SOBHA City is registered under village Babupur, while The Heartsong and The Westerlies are registered under village Dharampur. This matters when you look up collector rates and registration documents.
What does a plot in The Westerlies cost? +
There is no public price list on record. An HRERA order of 20 January 2026 records two Phase-4 plots of 462 sq m (552.55 sq yd), bought under agreements of 5 November 2024, for about ₹7.86 crore and ₹8.10 crore in total. Ask the seller for a current quote.
How many HRERA registrations does Sector 108 have? +
Our copy of the HRERA Gurugram register of 9 October 2026 shows about 18 registrations with a Sector 108 address, including commercial and lapsed rows. Most belong to SOBHA City phases and Experion projects. Village-only addresses can be missed, so the true count may be slightly different.
Is there a metro station near Sector 108? +
Not yet. The Rezangla Chowk to Dwarka Sector 21 line would have stations in Sectors 110 and 111, but it has only a Haryana DPR approval of 19 October 2022 and was awaiting the Union housing ministry in July 2026. No distance from Sector 108 to those stations has been published.
Do I pay a toll to drive from Sector 108 to Delhi on the expressway? +
Yes, as reported. The Bijwasan plaza on the Dwarka Expressway charges a car ₹225 one way and ₹340 return from 1 April 2026, according to a CMV360 report of 3 April 2026. A local monthly pass for residents within 20 km was reported at ₹350. Confirm the current rate before you budget for it.
Is SOBHA City in Sector 108 the same as Sobha International City? +
No. SOBHA City is a group housing project in Sector 108 with seven HRERA phases. Sobha International City is a separate villa colony with Chintels that spreads across Sectors 106, 108 and 109, and an HRERA order of 27 January 2026 records it as not registered with HRERA. Check which one a listing means.
Did collector rates go up in Sector 108 for 2026-27? +
Yes. The Deputy Commissioner Gurugram rate list effective 1 April 2026 raised collector rates for residential plots in Sectors 99 to 110 by about 45% and for group housing flats by about 9%. Stamp duty is charged on the higher of your deal value and the collector rate value, so check the list before you register.
Sources
- Press Information Bureau (PMO), PM inaugurates 19 km Haryana section of Dwarka Expressway (PRID 2013391), 11 March 2024
- Press Information Bureau (PMO), PM inaugurates Delhi section of Dwarka Expressway and UER-II (PRID 2157281), 17 August 2025
- HRERA Gurugram (DTCP certificate record), OC/CC record, The Heartsong (306 of 2017): OC 02.05.2018; CC 23.02.2023, 23 February 2023
- DTCP Haryana (copy on HRERA), Sobha City OC, Tower D-2, Z-1 and EWS Block 01 (Phase 6), 29 September 2026
- DTCP Haryana (copy on HRERA), Part completion certificate memo LC-2755-PA(VA)-2024/3494 for 26.0775 acres (Westerlies Phases 3 and 4), 30 January 2024
- DTP Gurugram (compiled on HRERA), Occupation certificates for Experion-built villas in The Westerlies, 19 October 2019 to 3 November 2022
- HRERA Gurugram, Order dated 20 January 2026 in Complaints 2319 and 2323 of 2025 (The Westerlies Phase-4)
- HRERA Gurugram, Order No. 9/1-2026 HARERA/GGM (Admn), four-month extension of registration, 11 August 2026
- HRERA Gurugram, Order in Complaint No. 4677 of 2024 (Sobha International City), 27 January 2026
- HRERA Gurugram, Register of registered projects (Property Nivesh copy of 9 October 2026)
- Sobha Limited, SOBHA City Gurugram project page (Vista Residences), modified 30 June 2026
- SOBHA Limited, Investor Presentation Q4 FY2026, 4 May 2026
- Experion Developers, The Westerlies project page (Delhi border 0 km; 75 m road)
- Raheja Developers, Raheja Vedaanta project page
- The Tribune, Handing over homes at three projects, 26 November 2016
- The Tribune, Gurugram HARERA directs builder to pay 10.8% delay interest to 26 Kavyam homebuyers, 14 October 2026
- The Tribune, Merged DPR, 5 stations: Gurugram's airport metro plan finally takes shape, 27 July 2026
- The Tribune, GMDA to lay master sewer network in sectors 99-115, 23 January 2025
- The Tribune, Gurugram's 883-bed hospital still awaits operational timeline, 18 October 2026
- Hindustan Times, Dwarka Expressway service road gaps, November 2026
- Hindustan Times, Yashobhoomi to Gurugram among 8 routes proposed under Delhi Metro's new project, 18 November 2026
- The Times of India, Shiv Murti-Ambience Mall flyover plan may be ready in a month, 24 November 2026
- ANAROCK Research, NCR Residential Market Viewpoints, Q1 2024 to Q2 2026
- ANAROCK Research, Dwarka Expressway Residential Real Estate Report, The Blueprint to Reality, September 2026
- Savills India Research, Delhi-NCR Residential Market Watch, H1 2026
- Deputy Commissioner Gurugram (Revenue Department), Rate List of Sub Tehsil Kadipur for the Year 2026, effective 1 April 2026
- CMV360, Delhi Gurgaon travel cost rises as NHAI increases toll from April 1, 3 April 2026
- Property Nivesh city tracker and Dwarka Expressway line, October 2026; Property Nivesh state costs table