Adani Projects on Dwarka Expressway: The Marq, Oyster Grande, RERA

Adani Realty has four projects on Dwarka Expressway, all in Sectors 102 and 102A through its M2K joint venture: Oyster Grande, Oyster Greens, Oyster Arcade and The Marq. The Marq, registered in February 2026, starts at ₹4.60 crore on Adani's site and is due by 31 December 2031, while Oyster Grande Tower G and Oyster Arcade have lapsed registrations.

By Rajan Khosla · Edited by Rakesh Mahajan · · 13 min read

Illustration of high-rise towers with a landscaped entrance plaza in Gurugram Illustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.

Which Adani projects are on Dwarka Expressway?

Adani Realty has four projects on Dwarka Expressway, all in Sectors 102 and 102A and all through its joint venture with M2K. They are the Oyster Grande flats, the Oyster Greens plots, the Oyster Arcade shop plots and The Marq. The Marq, registered by HRERA on 24 February 2026, starts at ₹4.60 crore on Adani's site in November 2026 and is due by 31 December 2031.

HRERA is the Haryana Real Estate Regulatory Authority under the RERA Act. This guide uses its Gurugram register as it stood on 27 November 2026. Sector 102A is carved out of Sector 102 beside the expressway, so it counts as an expressway sector. All seven of Adani's HRERA registrations here is in these two sectors.

Two nearby names are not Adani projects. M2K Olive Greens and M2K Olive Green Floors in Sector 104 are by Sadan Realtech Pvt Ltd, a M2K group company. Adani Samsara is on Golf Course Extension Road, not on the expressway. Our Adani Realty developer page lists all its projects, and our guide to projects on Dwarka Expressway covers other builders.

Adani projects on Dwarka Expressway: HRERA number, status, price and possession

Only The Marq has a current price from Adani. For the older projects, the only prices on record is 2013 agreement values from HRERA orders, which are history, not today's prices.

ProjectSectorType and sizeStatusHRERA numberPrice (whose figure, when)RERA date or OC
The Marq102 and 102A368 flats, 3 and 4 BHK, 3 towersNew launch, Feb 2026RC/REP/HARERA/GGM/1042/774/2026/14From ₹4.60 crore, Adani's site, Nov 202631 Dec 2031
Oyster Grande Towers H and J102 and 102A176 flats, 88 per towerReady170 of 2017 and 171 of 2017₹1,63,15,277 for a 2,550 sq ft super area unit, buyer agreement, Sep 2013OC 12 Feb 2019
Oyster Grande Towers A, D and E102 and 102AFlatsReadyNo separate registration found₹1,30,16,296 for a 1,898 sq ft super area Tower A unit, buyer agreement, Dec 2013OCs of Dec 2017
Oyster Grande Towers B, C and F102 and 102AFlatsListed as completed by AdaniNone foundNot publishedOC dates not found
Oyster Grande Tower G102 and 102A58 large flatsRegistration lapsed 30 Sep 202437 of 2017Not publishedNo OC on HRERA
Oyster Greens102A288 DDJAY plotsRERA date passed, no CCRC/REP/HARERA/GGM/516/248/2021/84Not published9 Aug 2026
Oyster Greens commercial102A9 SCO plotsRERA date passedRC/REP/HARERA/GGM/701/433/2023/45Not published9 Aug 2026
Oyster Arcade10251 commercial plotsRegistration lapsed 24 Nov 2025, no CCRC/REP/HARERA/GGM/476/208/2021/44Not published24 Nov 2025

DDJAY is the Deen Dayal Jan Awas Yojana, Haryana's affordable plotted colony policy. SCO stand for shop-cum-office, a plot on which the owner builds a small commercial block. An OC, or occupation certificate, is DTCP's permission to occupy a building; DTCP is Haryana's town and country planning department. A CC is a completion certificate.

How did M2K's Sector 102 projects become Adani projects? The dated record

No date for the start of the Adani and M2K venture is published. What the official papers gives is a trail of dates. By August 2017, when the first HRERA registrations came, the promoter on record was already Adani M2K Projects LLP.

Illustration of a low-rise retail arcade in front of residential towersIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.
DateWhat happenedRecord
10 Apr 2012DTCP licences 29 and 30 of 2012 for the Oyster Grande group housing colony, 19.238 acres in Sectors 102 and 102ADTCP OC of 12 Feb 2019
10 Aug 2017HRERA registers Oyster Grande Tower G (37 of 2017); promoter Adani M2K Projects LLPHRERA certificate
29 Aug 2017HRERA registers Towers J and H (170 and 171 of 2017)HRERA certificates
Dec 2017 to Feb 2019DTCP OCs for Towers D, E, A, J and HDTCP memos on HRERA
25 Nov 2020DTCP licence 37 of 2020 for Oyster Arcade; HRERA registration on 24 Aug 2021HRERA register
10 Aug 2021DTCP licence 44 of 2021 for Oyster Greens, held by Radhey Buildhome Pvt Ltd and M2K Projects LLP; HRERA registration on 13 Dec 2021HRERA certificate
30 Sep 2024Tower G registration ends; the register marks it lapsedHRERA register
2 Dec 2024DTCP lets the developer on licence 24 of 2012 change from Adani M2K Projects LLP to Adani M2K Realtors LLPHRERA notice, 30 Jan 2026
24 Feb 2026HRERA registers The Marq; promoter Adani M2K Realtors LLPHRERA certificate

Two things stands out. Radhey Buildhome Pvt Ltd is a licence holder for both Oyster Greens and The Marq. The OC for Towers J and H was addressed to Aakarshan Estate Pvt Ltd, care of Adani M2K Project LLP. And the newest project moved to a fresh company, Adani M2K Realtors LLP, more than a year before registration.

Adani Oyster Grande in Sector 102: towers, OC dates and sizes

Oyster Grande is a high-rise colony that Adani puts at about 19 acres; the DTCP OC of 12 February 2019 says 19.238 acres. Adani lists towers A, B, C, D, E, F, H and J plus a 'Platinum Tower'. It offer 3, 4 and 5 BHK flats of 87.24 to 290.51 sq m, or 939 to 3,127 sq ft. That is RERA carpet area, the floor inside the walls.

TowerOC dateNote
D, E and the EWS block11 Dec 2017From an HRERA order on a Tower E flat
A20 Dec 2017Possession offered 25 Jan 2018
J and H12 Feb 201988 flats each, stilt plus 23 floors
B, C and FNot foundAdani lists the project as completed
GNone on HRERARegistration lapsed 30 Sep 2024

Adani's page calls the project completed and sold out. Yet its FAQ says one tower, the Platinum Tower, is still in finishing stage. Adani doesn't say if that is Tower G, and the public record doesn't say either.

A Tower A buyer was offered possession on 25 January 2018, before the due date of 2 June 2018. A buyer of an 11th-floor unit in Tower H or J, due on 14 March 2018, got the offer on 16 February 2019. That is about 11 months after the date, and HRERA ordered delay interest at 10.70%.

Complaint figures here are counts only. HRERA's judgements list, in a copy saved on 6 November 2026, shows 31 decisions against Adani M2K Projects LLP from 2018 to 2026. They are 22 complaints, 5 executions, 2 adjudications and 2 cases HRERA took up itself, and the list don't name the project. Our guide to checking a builder's record on RERA explains them.

What is the status of Oyster Grande Tower G?

Tower G is the one gap in Oyster Grande. HRERA registered it on 10 August 2017 as 37 of 2017, for 58 large flats on 0.2401 acres. By carpet area there are 44 flats of 216.73 sq m, 12 of 218.68 sq m and 2 of 397.81 sq m.

In its form of December 2019 the promoter reported 2 of 58 flats booked and construction 30% complete. It moved the completion date to 30 September 2024. That date has passed. The register now list Tower G as a lapsed project, with no OC uploaded about 26 months after the date.

HRERA shows 5 monitoring cases on Tower G: 2 pending, 2 at first hearing and 1 not yet received. Neither Adani nor HRERA has published a current construction update.

If you hold a Tower G flat, or is offered one on resale, check three things. Ask the promoter in writing whether it has applied to HRERA to extend or renew the registration. Ask whether an OC application has gone to DTCP. And follow the 5 monitoring cases on the HRERA register for any order.

Adani Oyster Greens plots in Sector 102A: DDJAY, sizes and completion

Oyster Greens is a DDJAY plotted colony of 288 plots on 14.99375 acres in Sector 102A, on DTCP licence 44 of 2021. HRERA registered it on 13 December 2021, subject to bank guarantees of ₹25 lakh for the zoning and service plans.

Illustration of a residential tower under construction with cranesIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.

The plots run from 95.513 to 150 sq m, which Adani give as 114.213 to 179.399 sq yd. Adani marks them sold out. Its last progress note, from April 2025, said road works were completed and signage work was ongoing.

The RERA date was 9 August 2026. That date is passed and no completion certificate is filed on HRERA. HRERA's Order 9/1-2026 of 11 August 2026 adds four months to such dates, which takes it to about 9 December 2026.

A separate registration of 6 March 2023 covers 9 SCO plots in the colony's commercial pocket, also due on 9 August 2026. Adani puts Oyster Greens about 1 km from the expressway and 20 minutes from IGI Airport. HRERA lists 1 monitoring case on the plots, from 2022, at first hearing.

Adani Oyster Arcade in Sector 102: a lapsed registration

Oyster Arcade is a commercial plotted colony of 51 plots on 2.5 acres in Sector 102, on DTCP licence 37 of 2020. The plots run from 49.813 to 129.878 sq m, and buyers may build a basement, ground and four floors under DTCP rules. In its January 2023 filing, Adani M2K reported 48 of the 51 plots sold.

HRERA registered it on 24 August 2021 with a completion date of 24 November 2025. The register now mark it as a lapsed project, and there is no CC on the HRERA record 12 months after the date. Adani lists it as sold out with possession on 24 November 2025, and the handover of plots isn't on the public record.

HRERA lists 1 monitoring case on it, from 2022, now disposed. Our guide to commercial projects on Dwarka Expressway covers other shop plots.

The Marq by Adani in Sector 102A: price, sizes and possession

The Marq is Adani's only launch on the expressway in 2025 and 2026. HRERA registered it on 24 February 2026, with Adani M2K Realtors LLP as promoter and Radhey Buildhome Pvt Ltd as licence holder. The completion date is 31 December 2031 on both the register and Adani's page.

It sits on about 5.16 acres, which Adani places at the junction of the 60 m and 75 m sector roads. The certificate list three towers: A and B at ground plus 46 floors, and an EWS tower at ground plus 4. It holds 368 homes, 8 commercial units and 66 EWS flats, EWS meaning economically weaker section.

SourceHomesSizeArea basisPrice
Adani's site3 BHK, 3 BHK with study, 3 BHK with study and servant room, 4 BHK2,565 to 3,559 sq ft (238.30 to 330.64 sq m)RERA carpet plus exclusive area, as Adani statesFrom ₹4.60 crore, Nov 2026
HRERA Form REP-I368 homes100.4 to 165.9 sq mCarpetNot given
Listings3 BHK and 4 BHK2,375 to 3,295 sq ftSaleable, as listed₹4.28 to 5.93 crore, asking prices, Oct 2026

The gap between these sizes is wide, so ask which one your price is for. Adani's figure adds exclusive areas to the carpet, while HRERA's form gives carpet alone. On the listing quotes, ₹4.28 crore for 2,375 sq ft and ₹5.93 crore for 3,295 sq ft both works out to about ₹18,000 per sq ft. That is on saleable area.

ANAROCK's average quoted rate for the corridor was ₹14,180 per sq ft in Q2 2026, on super built-up area. Listings for Sector 102 asked ₹12,800 per sq ft on average in November 2026. Adani's page carried no price in April and July 2026, and now it show ₹4.60 crore onwards.

The Form REP-I puts the estimated project cost at ₹1,197.67 crore. Before registration, the promoter, the earlier developer and the landowner filed an affidavit that nothing had been advertised, booked or sold.

Sector 102 also has the 883-bed Shri Sheetla Mata Devi Medical College hospital. Its construction deadline moved to 31 December 2026, with no start date for patients (The Tribune, 18 October 2026). Our upcoming projects on Dwarka Expressway list sets The Marq beside other new launches. The Adani new property launch guide covers Adani's other cities.

Is Adani Samsara on Dwarka Expressway?

No. Adani Samsara is on Golf Course Extension Road, with phases registered in Sectors 60 and 63 there and in Sector 32. Adani's other Gurugram registrations, Lushlands and Veris at Gwal Pahari and Downtown Avenue in Sector 62, is outside the expressway sectors too. The two corridors are also moving at different speed. Savills India put the H1 2026 rise in rental values at 22% on Dwarka Expressway, against 2% for Golf Course Extension Road and SPR.

Illustration of a clubhouse lounge looking out to a pool deckIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this post.

What to check before you buy an Adani project on Dwarka Expressway

  1. Check which Adani company is on your papers. It is Adani M2K Projects LLP for Oyster Grande, Oyster Greens and Oyster Arcade. For The Marq it is Adani M2K Realtors LLP, with Radhey Buildhome Pvt Ltd as licence holder.
  2. For The Marq, match the number to RC/REP/HARERA/GGM/1042/774/2026/14. One spot on Adani's page show 1042/731 instead.
  3. Ask whether the ₹4.60 crore is for Adani's carpet plus exclusive area or for HRERA's carpet of 100.4 to 165.9 sq m. Get the carpet area in sq m in the agreement.
  4. For an Oyster Grande resale, ask for that tower's OC. Towers A, D, E, H and J have OCs, while no OC dates for B, C and F are on the record.
  5. For Tower G, check the lapsed status on the register and whether an extension or fresh registration have been applied for. Ask too if any OC application exists.
  6. For Oyster Greens, ask for the CC date. The register date of 9 August 2026 has passed, and the four-month order only takes it to about 9 December 2026.
  7. For Oyster Arcade plots, ask when the CC will be filed and whether your plot is handed over. The registration lapsed on 24 November 2025.
  8. Don't mix up M2K Olive Greens in Sector 104, by Sadan Realtech, with Adani's Oyster Greens in Sector 102A.

Our home loan EMI calculator shows the monthly cost of a ₹4.60 crore flat, and our RERA checks for 2026 walk through the register. The Dwarka Expressway price tracker and locality guide give corridor prices by year.

Questions

Frequently Asked Questions

Which Adani projects are on Dwarka Expressway? +

Adani Realty has four, all in Sectors 102 and 102A through its M2K joint venture: the Oyster Grande high-rise flats, the Oyster Greens DDJAY plots, the Oyster Arcade commercial plots and The Marq, registered with HRERA on 24 February 2026. Adani Samsara is on Golf Course Extension Road, and M2K Olive Greens in Sector 104 is not an Adani project.

What is the price of Adani The Marq in Gurugram? +

Adani's own site shows The Marq from ₹4.60 crore in November 2026, for 3 BHK to 4 BHK homes that Adani sizes at 2,565 to 3,559 sq ft of RERA carpet plus exclusive area. Listings in October 2026 quoted ₹4.28 crore to ₹5.93 crore for 2,375 to 3,295 sq ft saleable. HRERA's form gives carpet areas of 100.4 to 165.9 sq m.

When is possession of The Marq in Sector 102A? +

HRERA's register and Adani's page both give 31 December 2031 as the completion date. HRERA registered The Marq on 24 February 2026 with three towers: A and B at ground plus 46 floors and an EWS tower at ground plus 4. It has 368 homes, 8 commercial units and 66 EWS flats on about 5.16 acres.

Which towers of Adani Oyster Grande have an OC? +

DTCP OCs on the HRERA record cover Towers D and E and the EWS block from 11 December 2017, Tower A from 20 December 2017, and Towers J and H from 12 February 2019. No OC dates for Towers B, C and F are on the record. Tower G has no OC on HRERA, and its registration lapsed on 30 September 2024.

What is the status of Oyster Grande Tower G? +

HRERA's register lists Tower G as a lapsed project. Its registration, 37 of 2017, ended on 30 September 2024 and no OC has been uploaded. The promoter's December 2019 form showed 2 of 58 flats booked and construction 30% complete. HRERA shows 5 monitoring cases on it: 2 pending, 2 at first hearing and 1 not yet received.

Is Adani Oyster Greens complete? +

Not on HRERA's record. Oyster Greens, a DDJAY plotted colony of 288 plots in Sector 102A, had a RERA date of 9 August 2026, and no completion certificate is filed. HRERA's Order 9/1-2026 adds four months, which takes the date to about 9 December 2026. Adani marks the plots sold out; its last progress note is from April 2025.

Is Adani Samsara on Dwarka Expressway? +

No. Adani Samsara is on Golf Course Extension Road, with phases registered in Sectors 60 and 63 and in Sector 32. Adani's only projects in the Dwarka Expressway sectors are in Sectors 102 and 102A: Oyster Grande, Oyster Greens, Oyster Arcade and The Marq. Lushlands and Veris at Gwal Pahari are also outside the expressway.

How did Adani get its Dwarka Expressway projects from M2K? +

Through joint-venture firms. Adani M2K Projects LLP was already the promoter when HRERA registered Oyster Grande towers in August 2017, on DTCP licences of 10 April 2012. On 2 December 2024 DTCP let the developer on The Marq's licence change to Adani M2K Realtors LLP. No date for the start of the venture is published.

Sources

  1. HRERA Gurugram, Registered Projects list, read 27 November 2026 (rows to 26 November 2026)
  2. HRERA (Panchkula), Registration Certificates No. 37 of 2017 (10 August 2017, Oyster Grande Tower G), No. 170 of 2017 and No. 171 of 2017 (29 August 2017, Towers J and H)
  3. HRERA Gurugram, Form REP-I for Oyster Grande Tower G, submitted 31 December 2019
  4. DTCP Haryana, Occupation Certificate memo of 12 February 2019 for Oyster Grande Towers J and H, uploaded on HRERA, and HRERA OC records for registrations 170 and 171 of 2017
  5. HRERA Gurugram, orders in Complaint No. 71 of 2018 (decided 29 October 2018), No. 6755 of 2022 and No. 2408 of 2021 (both 20 April 2023), Oyster Grande
  6. HRERA Gurugram, Registration Certificate No. 84 of 2021, Form REP-I and project record, Oyster Greens
  7. HRERA Gurugram, Form REP-I for the Oyster Greens commercial pocket (Part G lists Oyster Arcade bookings), Form REP-I for Oyster Arcade and its hearing record of 24 August 2021
  8. HRERA Gurugram, Registration Certificate No. 14 of 2026 (24 February 2026) and Form REP-I, The Marq
  9. HRERA Gurugram, public notice of 30 January 2026 on the application to register The Marq by Adani M2K Realtors LLP
  10. HRERA Gurugram, Order No. 9/1-2026 dated 11 August 2026 (automatic four-month extension)
  11. HRERA Gurugram, monitoring cases shown on the Registered Projects list, and the Ruling and Judgements list (copy saved 6 November 2026)
  12. Adani Realty, project pages for Oyster Grande, Oyster Greens, Oyster Arcade and The Marq, read November 2026 (archived April and July 2026 snapshots of The Marq page)
  13. Listing portal project page for Adani The Marq, last updated October 2026, and Sector 102 asking average, November 2026 (asking prices; portal not named)
  14. ANAROCK quarterly average quoted rate, Dwarka Expressway, Q2 2026
  15. Savills India, Gurugram residential report, H1 2026 (rental value change year on year)
  16. The Tribune, 18 October 2026, on the Sector 102 medical college hospital
Chat with Us +91 79824 13588
A man reading about property on his phone at home

Free advice

Have a question before you buy?