DLF Hamilton Court 2, Sector 28, DLF Phase 4 Gurgaon
DLF Hamilton Court 2 investment in Sector 28, DLF Phase 4 Gurgaon: prices, rent and risks
DLF Hamilton Court 2 in Sector 28, DLF Phase 4 Gurgaon can't be judged as an investment yet, because the numbers an investor needs don't exist. As of 23 November 2026 the project is not RERA registered, and DLF has published no price, unit size, payment plan or possession date. DLF says even the name is undecided.
What we can do is set out what's on record: the area's price and rent data from named sources, the costs Haryana law fixes, the risks visible in the filings, and the checks to run before any money moves. We make no forecast of price, rent or appreciation.
- RERA status
- Not registered as of 23 November 2026
- DLF's launch target
- Q4 FY27 (January to March 2027)
- DLF price list
- None published
- Expected launch sales (DLF, 14 May 2026)
- Rs 8,000 to 9,000 crore, if not higher
- NCR prices, Q2 2026 (ANAROCK)
- Up 13% year on year; sales down 6%
- Gurugram homes of Rs 10 crore plus, 2025
- Rs 24,120 crore across 1,494 units
The short answer
- HRERA Gurugram's registered-projects list, read on 23 November 2026, has no entry for this project, so there is no legal sale, price or completion date to assess.
- No named report publishes a price series or rent figure for Sector 28 or DLF Phase 4; the only local numbers are indicative asking rates for the original Hamilton Court.
- ANAROCK's Q2 2026 data showed NCR prices up 13% year on year while sales fell 6%, a mixed signal for anyone entering at the top of the market.
- Haryana stamp duty is 7% for men, 5% for women and 6% for joint buyers, with the registration fee capped at Rs 50,000.
- DLF's launch target has moved three times on record, from FY27 to its second half and then to Q4 FY27.
- About Rs 35,000 crore of luxury launches are lined up on Golf Course Extension Road, according to Business Today on 9 September 2026.
Is DLF Hamilton Court 2 a good investment?
Nobody can answer that honestly today. An investment case needs an entry price, a unit size, a payment schedule and a delivery date, and DLF has published none of them. HRERA Gurugram's register, read on 23 November 2026, has no entry for the project, so nothing is legally on sale.
RERA is the Real Estate (Regulation and Development) Act, the law that makes a developer register a project before advertising or selling it. HRERA is Haryana's regulator under that law. Registration matters to an investor because it puts the sanctioned plan, the carpet areas and a completion date on a public record. Carpet area is the usable floor inside the flat's walls and the only measure RERA recognises. Super area adds a share of lobbies and lifts, so it's always bigger.
What is on record is thinner, but it's a start:
- Land: 11.148 acres in village Chakkarpur, Sector 28, under two DTCP licences. DTCP is Haryana's Department of Town and Country Planning, which licenses land for housing.
- Environmental clearance (EC) dated 27 September 2024, granted on a concept basis for 3 main towers and 283 apartments.
- Promoter: DLF Home Developers Ltd, with individual landowners as co-licensees on a 0.533-acre parcel.
- Positioning: DLF said on 17 October 2026 it will be a "luxury-plus product" and "at par with our recent luxury launches".
- Timing: DLF's stated target is a launch "sometime in Q4" of FY27, which means January to March 2027.
The name is a market label too. DLF said on 17 October 2026 that the project is yet to be named. Our RERA page tracks the registration, and the launch date page follows the timeline.
What is the price trend in the area around Sector 28, DLF Phase 4?
No named research report publishes a price series for Sector 28 or DLF Phase 4, so there's no clean local trend to quote. What exists is wider NCR and Gurugram data from named reports, plus asking rates quoted in the market for the original Hamilton Court nearby. Treat the two very differently.
| Data point | Figure | Source and basis | What it is not |
|---|---|---|---|
| NCR home prices, Q2 2026 | Up 13% year on year | ANAROCK data, reported by The Tribune, 30 June 2026 | Not a Sector 28 figure |
| NCR home sales, Q2 2026 | Down 6% | Same ANAROCK data | Not specific to luxury homes |
| Gurugram homes of Rs 10 crore and above, 2025 | Rs 24,120 crore, 1,494 units | India Sotheby's International Realty and CRE Matrix, via PTI, 23 February 2026 | Not a price trend |
| Oberoi Realty launch, Sector 58 | Rs 35,000 per sq ft base; homes from Rs 18 crore | Business Today, 7 July 2026 | A different micro-market |
| DLF Dahlias, Sector 54 | Entry above Rs 100 crore; premium homes Rs 160 to 170 crore | DLF, reported by Business Today, 5 August 2026 | Not a guide to this project's price |
| Original Hamilton Court resale asking rate | Rs 27,500 per sq ft, September 2026 | Quoted in the market; indicative | Not a transaction price, not the new project |
| Sector 27 average asking rate | Rs 22,700 per sq ft, September 2026 | Quoted in the market; indicative | Not registered sale data |
The asking rate for the older Hamilton Court barely moved over nine months: Rs 27,250 per sq ft in December 2025, Rs 27,800 in March 2026 and Rs 27,500 in September 2026. That's a band of Rs 550 per sq ft. It reads as flat, but it's a line of asking prices in an older building, not of completed deals.
The Sotheby's and CRE Matrix count works out to an average of about Rs 16.1 crore a home. That shows the buyer pool for very expensive Gurugram homes was deep in 2025. It doesn't show the pool will stay as deep when several luxury launches arrive together. For city-wide numbers, see our Gurgaon property rates.
Illustrative image What rent could a home fetch, and what about rental yield?
There's no rent figure for the new project, because no home exists and no unit size is published. No named report gives rents for Sector 28 either. The only numbers are indicative market quotes for the original Hamilton Court, and those quotes contradict themselves, so a rental yield can't be worked out.
Rents quoted in the market for the older building run from Rs 28.7K to Rs 85K a month in one reading, and Rs 26K to Rs 63K in a September 2026 update of the same source. The older flats are also a different product from what DLF describes as luxury-plus. Neither range belongs in a yield sum for the new homes.
Rental yield is a year's rent divided by what the home cost you, all charges included. Once DLF publishes a price and you have rent evidence from actual leases, run the sum on our rental yield calculator. Until then, any yield percentage shown for this project is a guess.
Costs of buying and holding: what is fixed and what is unpublished
Two costs are fixed by Haryana rules and can be worked out for any price: stamp duty and the registration fee. Everything else, from the per sq ft rate to monthly maintenance, is unpublished for this project. So the honest cost sheet today has a few firm lines and many blanks.
| Cost | What is known | Status for this project |
|---|---|---|
| Base price | No list price, starting price or rate from DLF | Not published |
| Stamp duty | 7% for men, 5% for women, 6% for joint ownership | Fixed by Haryana rules |
| Registration fee | 1%, capped at Rs 50,000 | Fixed by Haryana rules |
| Money before the agreement for sale | RERA allows no more than 10% | Applies only once the project is registered |
| PLC, EDC/IDC, club and parking | No schedule of charges | Ask for the full cost sheet at launch |
| IFMS and monthly maintenance | No figure | Ask for the rate and the area it is charged on |
| Payment plan | None from DLF | Not published |
| Loan interest during construction | Depends on the plan and the lender | Cannot be estimated yet |
A simple illustration at Rs 10 crore
Rs 10 crore is the threshold the India Sotheby's and CRE Matrix report uses for its top bracket. It is not a price for this project. We use it only to show the scale of the fixed costs.
- Stamp duty for a male buyer: Rs 10 crore x 7% = Rs 70 lakh.
- Stamp duty for a female buyer: Rs 10 crore x 5% = Rs 50 lakh.
- Stamp duty for joint owners: Rs 10 crore x 6% = Rs 60 lakh.
- Registration fee: 1% would be Rs 10 lakh, but the cap holds it at Rs 50,000.
- Most a registered promoter could collect before the agreement for sale: Rs 10 crore x 10% = Rs 1 crore.
Scale these to the real price once it's out, using the stamp duty calculator. If you plan to borrow, the EMI calculator shows the monthly cost of the loan. The payment plan page will carry DLF's schedule when one exists, and the price page tracks the rate.
Holding costs matter more than usual where there's no possession date. Every year between paying and getting keys is a year of interest or idle capital with no rent coming in. You can't size that until DLF files a completion date with HRERA.
DLF Hamilton Court 2 appreciation: why we give no forecast
We don't forecast appreciation, and for this project nobody has the inputs to try. Appreciation is measured from an entry price, and there isn't one. Launch prices quoted in the market conflict with each other and none comes from DLF, so we haven't used any of them as a base.
The one DLF number is a sales total. On 14 May 2026 managing director Ashok Tyagi said DLF would have one big launch in DLF City in the "INR 8,000 to INR 9,000 crores range, if not higher". Our reading, from the same call, is that this launch is the Phase 4 project. DLF didn't name it.
Divide that total by the 283 apartments in the EC and you get roughly Rs 28 crore to Rs 32 crore a home. Please don't read that as a price. The EC was granted on a concept basis. In January 2026 DLF spoke of 2 to 2.5 million sq ft with TDRs, the transferable development rights that add buildable area. In August 2026 it said the product was "still on the drawing board". If the unit count changes, the average changes with it.
Our rule on return claims
If anyone shows you a percentage return for this project, ask which named report it comes from and what entry price it assumes. No named report on record gives such a figure.
Illustrative image What are the risks, and how do you check them?
The main risks are the ones any unregistered, unpriced project carries: the launch can move, the plan can change, and money paid early has weak legal cover. On top of those sit a crowded luxury pipeline in Gurugram and a developer record that has both strengths and court trouble.
| Risk | What the record shows | How to check |
|---|---|---|
| No RERA registration | No entry on HRERA Gurugram's list on 23 November 2026 | Search the HRERA register yourself before paying anything |
| Launch timing | Target moved from FY27 to its second half, then to Q4 FY27 | Read DLF's next earnings call transcript |
| Plan may change | EC is on a concept basis; a fresh EC is needed if planning changes | Compare the RERA filing with the EC's 283 units and 3 main towers |
| Possession date | None from DLF or HRERA | Wait for the completion date in the registration |
| Luxury supply | About Rs 35,000 crore of luxury launches lined up on Golf Course Extension Road | Track competing launches and how much of each is sold |
| Demand | NCR sales fell 6% in Q2 2026 while prices rose 13% | Follow quarterly sales data from named reports |
| Licence validity | Licence 128 of 2014 runs to 24 August 2029; licence 26 of 2023 to 8 February 2028 | Ask for current licence copies at agreement stage |
| Land held with co-licensees | 0.533 acres is licensed to individual landowners in collaboration with DLF | Ask for the collaboration agreement and a title report |
| Developer disputes | HRERA Gurugram lists 21 decisions in 2025 and 9 in 2026 naming DLF respondents | Read the orders on HRERA Gurugram's website |
| Unverified litigation story | DLF's transcripts tie its PIL to Goa, not Gurugram | Ask for a court record, not a forwarded message |
| Look-alike websites | Sites posing as DLF use the Hamilton Court 2 name | Trust only DLF's own domain and HRERA's register |
HRERA Gurugram's public advisory of 14 August 2026, as reported, warned that buyers could be approached with pre-launch schemes or offers before a project has its approvals and registration. Its message was plain: don't put money into unregistered projects. An EOI, or expression of interest, is a token paid to signal intent before launch. DLF has announced none. The booking page explains the rule in full.
On the developer, the record cuts both ways. DLF built DLF City, and HRERA records show completion certificates issued ahead of registered dates on recent commercial-plot projects. Against that, the Supreme Court ordered a CBI probe on 25 February 2026 into The Primus in Sector 82A, and Gardencity Enclave's completion date moved to 30 October 2028. Our reviews page and DLF developer page go deeper.
One more thing to watch is the site itself. DLF's EC compliance report for April to September 2025 says the project is in construction phase. Yet the photos in it, dated 3 October 2025, show levelled, hoarded ground with a site office, and DLF called the product a drawing-board item in August 2026. There's no RERA progress report to settle it.
Exit options: resale, renting out and cancellation
An investor has three ways out: sell before possession, sell after it, or hold and rent. For this project none can be assessed yet. Transfer rules, transfer fees and any lock-in sit in allotment terms that don't exist. Rent needs a finished building with an OC, the occupation certificate issued after construction.
Liquidity deserves a hard look at this ticket size. The 1,494 Gurugram homes sold at Rs 10 crore and above in 2025 show real depth, yet that's a small set of buyers next to the wider market, and a resale can take time. DLF said it sells Dahlias "on an invitation basis only". It hasn't said if this project will follow, and that would shape who can buy from you later.
Cancellation is the exit nobody plans for. In an order of 14 August 2026 on DLF Skycourt, Sector 86, HRERA held that DLF had validly cancelled an allotment for non-payment but must refund the money paid, less 10% earnest money, with 10.80% interest. That's one order on another project. It shows the shape of the downside if a buyer stops paying.
Who might it suit, and what to check before committing money
On DLF's own description, a luxury-plus product in DLF Phase 4, this is a project for buyers with a large budget and a long holding period who value an established DLF City address. It's a harder fit for anyone who needs a known exit date or rental income soon.
- Confirm the registration on HRERA Gurugram's register and note its validity and completion date.
- Compare the registered towers, unit count and carpet areas with the EC of 27 September 2024.
- Get the full cost sheet in writing: base rate on carpet area, PLC, EDC/IDC, club, parking, IFMS and maintenance.
- Read the draft agreement for sale for transfer terms, cancellation and earnest money.
- Ask for licence copies with current validity and a title report covering the co-licensed parcel.
- Collect rent evidence from actual leases in DLF Phase 4, not quoted ranges.
- Deal only with RERA-registered agents, as HRERA advised in January 2026.
For the site and its surroundings, see the location page. The filed layout is on the master plan page, and short answers to common questions are in the FAQs.
Questions people ask
Is DLF Hamilton Court 2 a good investment?
It can't be assessed yet. As of 23 November 2026 the project in Sector 28, DLF Phase 4 has no RERA registration, no price, no unit sizes, no payment plan and no possession date. DLF has only said it will be a luxury-plus product with a launch targeted for January to March 2027. An investment view needs the registered filing and a written cost sheet first.
What is the price trend around Sector 28, DLF Phase 4 Gurgaon?
No named report gives a price series for Sector 28 or DLF Phase 4. ANAROCK's Q2 2026 data showed NCR prices up 13% year on year. Asking rates quoted in the market for the original Hamilton Court were Rs 27,250 per sq ft in December 2025 and Rs 27,500 in September 2026. Those are indicative asking figures, not registered transactions.
What rental yield can DLF Hamilton Court 2 give?
No yield can be calculated. The project has no price and no unit size, and no named report gives rents for Sector 28. Rents quoted in the market for the older Hamilton Court range from Rs 26K to Rs 85K a month across two conflicting readings, and that building is a different product. Any yield percentage shown today is a guess.
Will DLF Hamilton Court 2 appreciate in value?
We make no forecast, and no named source in our file makes one either. Appreciation is measured from an entry price, which DLF has not published. What is on record is mixed: NCR prices rose 13% in Q2 2026 while sales fell 6%, and about Rs 35,000 crore of luxury launches are lined up on Golf Course Extension Road.
What are the biggest risks for an investor?
Five stand out. The project is not RERA registered. DLF's launch target has moved from FY27 to Q4 FY27. The environmental clearance is on a concept basis, so the plan can change. No possession date exists. And luxury supply is building across Gurugram. Each can be checked against the HRERA register, DLF's earnings calls and the eventual registered plan.
How much stamp duty would I pay on a home here?
Haryana charges 7% for male buyers, 5% for female buyers and 6% for joint ownership, plus a registration fee of 1% capped at Rs 50,000. On an illustrative Rs 10 crore, which is not this project's price, that is Rs 70 lakh, Rs 50 lakh or Rs 60 lakh. The real figure depends on the price DLF publishes.
Is Rs 8,000 to 9,000 crore the price of the project?
No. It is the total sales value DLF's managing director expected from one big DLF City launch, stated on 14 May 2026. Dividing it by the 283 apartments in the environmental clearance gives about Rs 28 crore to Rs 32 crore a home, but the plan is on a concept basis and may change. DLF has published no unit price.
Is it safe to pay a token or EOI for DLF Hamilton Court 2 now?
DLF has announced no EOI, booking amount or booking window. The project is not RERA registered, and a promoter may not advertise, book or sell before registration. HRERA Gurugram's advisory of 14 August 2026, as reported, told buyers not to book in unregistered projects. Wait until the project appears on HRERA Gurugram's register, then read the filing.
More on DLF Hamilton Court 2
- DLF Hamilton Court 2: overview What DLF Hamilton Court 2 is, who builds it, where it stands today, and a guide to every page.
- DLF Hamilton Court 2: price No official price list yet: quoted figures, their basis and the stamp duty sums on sample prices.
- DLF Hamilton Court 2: payment plan No plan published yet: the 10% RERA cap, a sample schedule and loan disbursal explained.
- DLF Hamilton Court 2: location Where the Sector 28 site sits, the roads on record and the only measured airport distance.
- DLF Hamilton Court 2: launch date Launch target, dated timeline and why there is no possession date yet.
- DLF Hamilton Court 2: rera No HRERA number yet for the Sector 28 site: what the register shows and how to verify it yourself.
- DLF Hamilton Court 2: reviews Pros, cons and DLF's Gurugram delivery record, with no invented ratings or resident quotes.
- DLF Hamilton Court 2: brochure No official brochure exists yet; see what DLF's filings show and how to check one when it comes.
- DLF Hamilton Court 2: booking Booking is not open: no EOI, no amount, no HRERA registration. Steps and checks for launch.
- DLF Hamilton Court 2: floor plan No floor plans yet: what the concept filing shows floor by floor, and how to read sizes.
- DLF Hamilton Court 2: master plan Land, towers, floors, density and open area as filed, plus how to read the site plan.
- DLF Hamilton Court 2: amenities What DLF's filings show on the clubhouse, green area and services, and what is still only a claim.
- DLF Hamilton Court 2: highlights Ten sourced highlights of DLF's unnamed Sector 28 project, split into on record and claimed.
- DLF Hamilton Court 2: faqs 28 questions on DLF's unnamed Sector 28 project: name, price, RERA, launch, homes and checks.
Related on Property Nivesh
Talk to an advisor about DLF Hamilton Court 2
Tell us what you are looking for in DLF Hamilton Court 2. Our advisor calls you with what is confirmed so far and answers your questions on price, plans and paperwork.
✓
Request received
A senior property advisor will reach you within 4 working hours. No spam, no builder hand-offs — your details stay with our advisory desk only.
Sources
- HRERA Gurugram, Registered Projects (Gurugram) list, read 23 November 2026
- DLF Ltd, Q2 FY27 Earnings Conference Call transcript, 17 October 2026
- DLF Ltd, Q4 and FY26 Earnings Conference Call transcript, 14 May 2026
- DLF Home Developers Ltd, half-yearly EC compliance report for the group housing colony at Sector 28, submitted 28 November 2025
- The Tribune, report on ANAROCK Q2 2026 NCR housing data, 30 June 2026
- PTI, report on India Sotheby's International Realty and CRE Matrix luxury sales data, 23 February 2026
- Business Today, reports on Oberoi Realty bookings (7 July 2026), DLF Dahlias pricing (5 August 2026) and Golf Course Extension Road luxury supply (9 September 2026)
- HRERA Gurugram, order in CR 4849/2024 (DLF Skycourt), 14 August 2026
Property Nivesh is an independent property research and advisory site. This guide is not the website of DLF and is not connected with the developer. Facts are as of 23 November 2026 and come from the sources listed on each page; prices quoted in the market are indicative. Pictures marked "Illustrative image" are AI-generated and do not show the project.