SPR road Gurgaon is open from NH-48 to Vatika Chowk, but its elevated upgrade had no contract award by 29 November 2026. Sectors 69 and 71 carry most new HRERA supply, while 70A, 72 and 74 have more delivered stock with OC documents listed.
By Preeti Pandey · Edited by
Rakesh Mahajan · · 12 min read
Illustrative image SPR Road Gurgaon: The Short Answer
SPR road Gurgaon, the Southern Peripheral Road, is a working road from NH-48 near Kherki Daula to Vatika Chowk on Sohna Road, but its elevated upgrade was still at tender stage on 29 November 2026. For spr property investment, Sectors 69 and 71 carry most of the new registered supply, while Sectors 70A, 72 and 74 has more delivered stock with OC documents listed. Sector 76, at the NH-48 end, is where DLF's Privana projects sit.
This guide put the road works first, then walks through the spr sectors one at a time. "Best" is judged on three things you can check: documented supply, a delivery record and access to the road's junctions. It isn't a ranking of build quality, which no public record shows.
HRERA is the Haryana Real Estate Regulatory Authority, Gurugram, where projects must registers before selling. An OC, or occupation certificate, is the document that say a building is fit to live in. For the corridor map, see our SPR locality page.
Southern Peripheral Road Works: Built, Tendered and Planned
The southern peripheral road is not new. In 2022, when GMDA put its upgrade into a package, NBM&CW described it as about 12 km from Ghata village on Faridabad Road to Kherki Daula, with a six-lane main road and six-lane service roads. What is pending is the signal-free, elevated version. Read the status column carefull: a tender, an approval and an award is three different steps.
| Work | Status | Source and date |
|---|---|---|
| SPR main road, NH-48 to Vatika Chowk, plus the Vatika Chowk to Ghata Chowk arm | Operational; signal-free upgrade in planning | GMDA records, 20 June 2026 |
| GCER and SPR upgrade in a ₹845 crore package | Tendered | NBM&CW, 6 October 2022 |
| Elevated Package 1, NH-48 to Vatika Chowk (about 4.23 km, about ₹776.19 crore excluding GST) | First tender (₹755 crore, March 2026) withdrawn; re-tendered 1 October 2026; bids closed 18 November; no award reported | GMDA tender notice, 1 October 2026; Hindustan Times, 3 October 2026 |
| Elevated road, Vatika Chowk to Ghata Chowk | DPR consultant stage | Swarajya, 24 June 2026 |
| Vatika Chowk two-level interchange (about ₹850 crore) | Tender finalised | Hindustan Times, 14 November 2026 |
| Leg-IV stormwater drain, Vatika Chowk to NH-48 | Commissioned before the 2026 monsoon, GMDA said | The Tribune, 25 July 2026 |
| Greater SPR phase 1, Gurugram-Faridabad Road to Sohna Road | Land award of ₹986 crore for about 160 acres; owners object | Hindustan Times, 14 and 24 November 2026 |
Package 1 would carry four elevated lanes each way, and GMDA gives 30 months from award, so no finish date can be worked out yet. Our news desk covered it in SPR elevated road tender and what it means for prices.
The figures don't agree either. Haryana's Budget 2026-27, as Swarajya reported on 3 March 2026, listed 5.1 km to NH-48 at about ₹1,065 crore and 8.84 km to Ghata at about ₹1,846 crore, while the Ghata arm was also given as 6 km and 8.5 km. Treat every length and cost as tentative.
How SPR Links NH-48, Dwarka Expressway, Sohna Road and GCER
The road's value are in its ends. On the west it meets NH-48, where the Press Information Bureau describes Dwarka Expressway Package-4 as ending at the "NH-8/SPR intersection"; the 19 km Haryana section opened on 11 March 2024. On the east it meets Sohna Road at Vatika Chowk, and the Gurugram-Sohna highway (NH-248A) is open since 11 July 2022. The third arm, Vatika Chowk to Ghata Chowk, runs along Golf Course Extension Road.
Rail is more far off. The Gurugram Metro under construction lists a Sector 72A station on the Sohna Road side (Haryana press note, 5 September 2025). The Sector 56-Panchgaon metro, with a proposed Kherki Daula station, was at revised DPR stage on 11 September 2026 (ThePrint, PTI), and GMRL hasn't published a station-wise date.
Water matter as much as roads. Hindustan Times reported on 19 November 2026 that GMDA began 75 MLD of piped supply to Sectors 58 to 74 from the Sector 72 boosting station, while PTI had given 95 MLD for Sectors 58 to 80. Ask your society what actually reach its tank.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
SPR Sectors Compared: Supply and Delivery
Here is the sector 70 71 72 73 74 75 76 belt, plus 69 and 70A, side by side. Figures come from HRERA Gurugram's register read on 29 November 2026 and our tally of registrations since 1 January 2025.
Illustrative image| Sector | Main projects | New homes on HRERA since 2024 | Delivered stock on record |
|---|---|---|---|
| 69 | Smartworld Sky Arc, Trump Residences, Tulip Violet, South Drive plots | 1,465 (three towers) | Tulip Yellow and Tulip Lemon: OC documents |
| 70 | Tulip Crimson, Tulip Melrose, Solitaire, Elan Epic offices | 872 (two towers) | Elan Epic: OC/CC listed |
| 70A | Astaire Gardens, Green Oaks, The Oval, Seggovias | 234 (two towers) | Green Oaks and 2017 to 2019 societies: OC/CC listed |
| 71 | Titanium SPR, Cloverdale SPR, Tonino, Birla Pravaah, Alban | About 3,300 | M3M Broadway: OC/CC listed |
| 72 | Tata Primanti | None since January 2025 | Tata Primanti Phase 2: OC uploaded |
| 73 | DLF Alameda floors, M3M Prive 73 | None since January 2025 | Delivered societies |
| 74 | M3M Corner Walk, M3M Skywalk | None since January 2025 | Corner Walk: OC/CC listed |
| 75 | No named project on record | None since January 2025 | Not on record |
| 76 | DLF Privana (76 and 77), Whiteland projects | Privana West 795; Privana North 1,164 | Not on record |
The pattern is plain. Sectors 69 to 71 is where new towers are registered; 72 to 74 is mostly finished stock. Sector 76 ties more to NH-48 and Dwarka Expressway than to Sohna Road.
Sectors 69, 70A and 71: Where the Big Launches Are
These three has their own detailed guides, so here is only the road story.
Sector 69
Smartworld Sky Arc (952 flats, completion 31.05.2032) and Trump Residences Gurgaon (298 homes, validity 30.09.2032) share one promoter, so over 1,200 homes finish around the same time. Our Sector 69 investment guide covers the rest.
Sector 70A
The low-rise and plotted sector of the belt, with BPTP's Astaire Gardens and many older societies with OC/CC listed. New towers is small. For a verdict, read is Sector 70A a good place to invest.
Sector 71
Sector 71 hold the biggest wave: about 3,300 flats registered since 2024, due between 30.06.2030 and 01.01.2033. Signature Global calls its land here the SG SPR Estate and has said more launches are planned. See best residential projects in Sector 71 and our post on Tonino Lamborghini Residences in Sector 71.
Sectors 70, 72, 73, 74, 75 and 76 on the SPR
Sector 70
Tulip Crimson (720 flats) and Tulip Melrose (152 flats) lead the new supply, Solitaire adds 856 small affordable flats, and Elan Epic offices have OC/CC listed. The weak spot is water: Newslaundry listed Sector 70 among tail-end supply areas in June 2026.
Sector 72
Tata Primanti is an ready society with an OC uploaded against Phase 2 on HRERA. Its 3 BHK is about 1,507 sq ft and 4 BHK about 2,071 sq ft of carpet area, which is the floor inside your walls.
Sector 73
A finished, low-rise sector with DLF Alameda floors and M3M Prive 73. JLL said in March 2022 that SPR floor launches in Sector 73 were priced ₹12,000 to ₹13,200 per sq ft of super built-up area in 2021. Super area add common spaces to the carpet area, so it always reads bigger. Canary Greens is a lapsed registration here.
Sector 74
Mostly commercial. M3M Corner Walk has OC/CC listed, M3M Skywalk flats sit within it, and Magnum Business District is also in Sector 74. No study measures their effect on rents.
Sector 75
It falls inside our SPR line (Sectors 68 to 75A), but no named housing project is on record and HRERA shows no new registration since January 2025. Ask to any seller for the licence and registration number.
Sector 76
At the NH-48 end, DLF's Privana spans Sectors 76 and 77. Our pages list Privana West (795 units, possession Dec 2031) and DLF Privana North (1,164 units, possession Sep 2034), and DLF registered Privana Enclave on 23 July 2026. See DLF The Arbour vs DLF Privana.
SPR Projects on HRERA: Registration and Due Date
These are the larger spr projects registered as housing since 2024, from HRERA Gurugram's register read on 29 November 2026. HRERA Order 9/1-2026 of 11 August 2026 adds four months to projects registered by 31 July 2026 that fall due on or after 28 February 2026, but the register still print original dates.
Illustrative image| Project | Sector | HRERA registration, date | Homes | Due on HRERA |
|---|---|---|---|---|
| Smartworld Sky Arc | 69 | GGM/878/610/2024/105, 11.10.2024 | 952 | 31.05.2032 |
| Trump Residences Gurgaon | 69 | GGM/925/657/2025/28, 13.03.2025 | 298 | 30.09.2032 |
| Tulip Crimson | 70 | GGM/834/566/2024/61, 12.08.2024 | 720 | 31.12.2031 |
| Tulip Melrose | 70 | GGM/1007/739/2025/110, 07.11.2025 | 152 | 31.12.2033 |
| Signature Global Titanium SPR | 71 | GGM/831/563/2024/58, 03.06.2024 | 613 | 28.02.2031 |
| Signature Global Cloverdale SPR | 71 | GGM/955/687/2025/58, 10.06.2025 | 770 | 31.05.2031 |
| Tonino Lamborghini Residences | 71 | GGM/1056/788/2026/28, 08.04.2026 | 812 | 01.01.2033 |
| Birla Pravaah | 71 | GGM/1006/738/2025/109, 06.11.2025 | 492 | 31.03.2032 |
| Alban (Pyramid Infratech) | 71 | GGM/796/528/2024/23, 11.03.2024 | 622 | 30.06.2030 |
The list is chosen by size and registration, not quality. Our page for Signature Global Titanium SPR carries an older registration number; rely on the HRERA figures above.
SPR Property Prices: Our Line, Consultancies and Launch Rates
Our SPR line is the average asking price across the projects and listings Property Nivesh tracks on the corridor (area basis not stated), updated 2 October 2026. Follow it on our SPR price tracker.
| Year | Our SPR line (₹ per sq ft) |
|---|---|
| 2020 | 6,200 |
| 2021 | 7,000 |
| 2022 | 9,200 |
| 2023 | 12,000 |
| 2024 | 14,200 |
| 2025 | 15,500 |
That is a rise of about 150% from 2020 to 2025. Past growth does not predict future growth, and the latest consultancy numbers shows a slowdown.
ANAROCK, in its SPR report of 3 July 2024, put the average basic selling price in the primary market at ₹9,481 per sq ft in 2023, up 53% from 2016. It is a different basis from our line, so don't compare them directly.
Savills groups Golf Course Extension Road with SPR and tracks only premium homes of ₹2 crore and above. It said completed values grew 16% to 20% a year from 2021 to 2025, but only 2% year on year in H1 2026, with under-construction values up 1%.
Developer figures is single points. Birla Estates' parent reported ₹17,613 per sq ft of saleable area realised at Birla Pravaah to 30 September 2026, and Signature Global's CEO put Tonino Lamborghini Residences at "a little above ₹22,000" per sq ft at launch (6 August 2026).
Rents, Yields and Buying Costs Along SPR
Savills said premium rents on Golf Course Extension Road and SPR rose 8% in 2025 and 2% year on year in H1 2026. Our SPR line gives a gross rental yield of 3.1%, near our city tracker's 3.2% for Gurgaon. Gross yield is a year's rent over the price; net yield is what remain after maintenance, tax and empty months. No consultancy publishes a rupee rent for SPR alone, so ask for signed lease deeds from the same tower.
Our reading of the official collector-rate lists shows a median rise of about 45% in SPR residential land lines for FY2026-27. The collector rate is the government's minimum value, and stamp duty is charged on the higher of it and the deal value. As listed in our state costs table, Haryana duty is 7%, women pay about 5%, and registration is 1% capped at ₹50,000; confirm before paying. City-wide figures are on our Gurgaon property rates page.
Risks on Record for SPR Property Investment
Illustrative image- The road is still on paper. Package 1 had no award by 29 November 2026 after a first tender was withdrawn, and the Ghata arm is at DPR stage.
- Same-time supply. About 5,650 flats registered since 2024 in Sectors 69, 70 and 71 is due between 2030 and 2033, per HRERA, which can crowd the resale market.
- Slower growth. Savills also said Gurugram luxury launches fell 28% to 4,549 units in H1 2026.
- Lapsed registrations. HRERA lists lapsed projects on the belt, among them Golf Heights (Ocean Seven, Sectors 69 and 70) and Supertech Hues and Azalia in Sector 68.
- Water and monsoon. GMDA claim the Leg-IV drain eased waterlogging, but check the society after rain.
A Checklist Before Buying in an SPR Sector
- Find the project on HRERA Gurugram's register and note the number, validity date and any OC or completion document.
- Check whether the gate is on the NH-48 to Vatika Chowk stretch or near the planned interchange.
- Ask about piped water against tanker use, especially in Sector 70.
- Count the flats in your sector which falls due in the same year as yours.
- Ask whether the price is on carpet or super area, and compare on one basis.
- Work out stamp duty on the higher of the deal value and the collector rate value.
- Get EDC and IDC (state development charges), PLC (a preferred-spot premium) and IFMS (a maintenance deposit) in writing.
Where to Go From Here
SPR is a finished road with an unfinished upgrade. The documented case differ by sector: new supply in 69 and 71, delivered low-rise stock in 70A, 72, 73 and 74, and an NH-48 link in 76. None of it promises a price rise.
For the wider south Gurgaon belt, read Sohna Road's best sectors and projects, or compare the city in best sectors to buy property in Gurgaon.
Questions
Frequently Asked Questions
Has construction started on the SPR elevated road? +
No award had been reported by 29 November 2026. GMDA re-tendered Package 1, NH-48 to Vatika Chowk, on 1 October 2026 at about ₹776.19 crore excluding GST, and bids closed on 18 November. GMDA gives 30 months from award, so no finish date can be given until a contractor is appointed.
Which sectors does the SPR elevated Package 1 serve? +
GMDA's tender record lists Sectors 69, 70, 70A, 71, 72, 73, 74, 75 and 76, plus the NH-48 end. The stretch is about 4.23 km from NH-48 to Vatika Chowk. The separate Vatika Chowk interchange, with a tender of about ₹850 crore finalised in November 2026, serves Sectors 48, 49 and 67 to 70A around the junction.
Which SPR sectors have the most new homes registered? +
Sector 71 has about 3,300 flats registered since 2024 across five projects, per HRERA Gurugram's register. Sectors 69, 70 and 71 together have about 5,650. Most of these fall due between 2030 and 2033, so buyers there should expect many finished homes reaching the resale and rental market at about the same time.
Which SPR sectors have ready homes with an OC on record? +
HRERA shows OC or completion documents for Tata Primanti Phase 2 in Sector 72, Green Oaks and several 2017 to 2019 societies in Sector 70A, and Tulip Yellow and Tulip Lemon in Sectors 69 and 70. Always open the document on the register yourself, because a listed link is not the same as a full OC for every tower.
What is the average property price on SPR? +
Our SPR line, the average asking price across projects and listings we track, was ₹15,500 per sq ft in 2025, up from ₹6,200 in 2020. ANAROCK gave ₹9,481 average basic selling price for 2023 on a primary-market basis. The two use different bases, so compare like with like.
Is the Sector 56-Panchgaon metro coming to SPR? +
It is only a proposal. ThePrint (PTI) reported on 11 September 2026 that the revised DPR was still to be finalised. The route lists a proposed Kherki Daula station near the SPR's NH-48 end. Its cost of about ₹8,500 crore appears only in news reports, and no station-wise date has been published.
How did collector rates change on SPR this year? +
Our reading of the official Gurugram collector-rate lists puts the median rise for SPR residential land lines at about 45% for FY2026-27. That raises stamp duty where the collector rate value is higher than the deal value. Check the exact line for your sector on the district list before you register.
Is the Greater SPR the same road as the SPR? +
No. The Greater SPR is a new master road planned for HSVP from Gurugram-Faridabad Road to Sohna Road through villages such as Behrampur and Badshahpur. A land award of ₹986 crore for about 160 acres was announced in November 2026, and landowners have objected to the rates.
Sources
- GMDA, tender notice Memo GMDA/Infra-1/EE/2026/090: SPR from NH-48 to Vatika Chowk via elevated corridor, Package-1, fresh tender, 1 October 2026
- Gurugram Metropolitan Development Authority, SPR records and Vatika Chowk to Ghata elevated corridor consultant engagement, 20 June 2026
- Hindustan Times, GMDA floats Rs 776 crore SPR elevated road project tender, 3 October 2026
- Hindustan Times, GMDA finalises Rs 850-crore tender for Vatika Chowk interchange, 14 November 2026
- Hindustan Times, Greater SPR land compensation and landowners seek higher payouts, 14 and 24 November 2026
- Hindustan Times, GMDA starts 75 MLD water supply in sectors 58 to 74, 19 November 2026
- Swarajya, SPR elevated corridor re-enters planning stage as GMDA seeks fresh DPR, 24 June 2026
- Swarajya, Haryana Budget 2026: Gurugram receives Rs 2,900 crore for elevated road and five flyovers, 3 March 2026
- Swarajya, Six-lane access controlled Gurugram-Sohna highway opens, 12 July 2022
- The Tribune, Rs 386 crore signal-free road plan, 28 May 2026
- The Tribune, Waterlogging hotspots down from 90 to 7 in Gurugram, claims GMDA, 25 July 2026
- NBM&CW, GMDA tender package for Golf Course Extension Road and SPR, 6 October 2022
- Press Information Bureau, Haryana section of Dwarka Expressway opened, 11 March 2024
- Department of Information, Public Relations and Languages, Haryana, Bhoomi pujan of Gurugram Metro, press note 176, 5 September 2025
- ThePrint (PTI), Haryana chief secy reviews Sector 56-Panchgaon metro project, 11 September 2026
- ThePrint (PTI), Gurugram water supply network set for major upgrade with new boosting station, 29 September 2026
- Newslaundry, Water comes once in 3 days: Gurugram's forgotten neighbourhoods, 24 June 2026
- HRERA Gurugram, Registered Projects (Gurugram), register read 29 November 2026
- HRERA Gurugram, Order 9/1-2026, 11 August 2026
- ANAROCK Research, NCR - SPR Gurugram Micro Market Report, 3 July 2024
- Savills India Research, Delhi-NCR Residential Market Watch, Year-End 2025 and H1 2026
- JLL India, Over 70% of Gurgaon residential launches in 2021 were low-rise independent floors, 8 March 2022
- Aditya Birla Real Estate Ltd, Q2 FY27 investor material, 26 October 2026
- Signatureglobal (India) Ltd, Q1 FY27 earnings conference call, 6 August 2026
- Business Today, Trump Towers Gurugram hits Rs 3,250 crore on launch day, 14 May 2025
- DLF Homes, Maximizing Your Rental Income in 2026, 30 April 2026
- Property Nivesh, SPR locality line 2020 to 2025 (updated 2 October 2026), city tracker (11 October 2026), state costs table and collector-rate median analysis (28 October 2026)