DLF The Arbour vs DLF Privana: Which Project Is Better?
DLF The Arbour in Sector 63 launched at about ₹18,000 per sq ft in February 2023 and has the earlier HRERA completion date, 31.03.2030, while the three DLF Privana phases in Sectors 76 and 77 sold from 2023 to 2025 and are due from 2031 to 2034. Neither can be called better on quality; the choice rests on location, handover timing and price per sq ft.
By Mridul Shakya · Edited by
Rakesh Mahajan · · 14 min read
Illustrative image DLF The Arbour vs DLF Privana: the short answer
DLF The Arbour vs DLF Privana comes down to time, place and price. The Arbour is one 4 BHK project in Sector 63 on Golf Course Extension Road, launched in February 2023 at about ₹18,000 per sq ft, with an HRERA completion date of 31.03.2030. DLF Privana is a larger township in Sectors 76 and 77 off the Southern Peripheral Road (SPR), sold in three phases from 2023 to 2025, with HRERA completion dates from 2031 to 2034.
Neither is better on quality in any way the record can show. Both is sold out and both are still being built. What differs is when you get keys, which corner of Gurugram you live in, and what buyers paid per sq ft.
HRERA is the Haryana Real Estate Regulatory Authority; its Gurugram register holds each project's number and declared completion date. Carpet area is the floor inside your walls. Super area adds your share of lobbies, lifts and club, so it's always bigger.
Where are Sector 63 and Sectors 76 and 77?
DLF The Arbour stand on land in village Maidawas, Sector 63, as HRERA records it. That's the Golf Course Extension Road belt, which Business Today (9 September 2026) describes as linking to Golf Course Road, NH-48, Sohna Road and the SPR. Our Golf Course Extension Road locality page covers the corridor in full, and the sibling list of luxury projects on Golf Course Extension Road go tower by tower.
Privana sit in Sectors 76 and 77, in villages Shikhopur and Kherki Daula, as our project pages give it. DLF's release of 8 January 2024 places it near the meeting point of the SPR, NH-48, the Dwarka Expressway (NPR) and the CPR, beside the Aravalli range. It name a TCS campus, an upcoming Amex campus and about 385 acres of commercial Sectors 75 and 74A nearby. Our SPR locality page has the wider corridor.
So it's a established luxury road versus a newer belt on the NH-48 side. Our lines show the price gap, though they cover each corridor, not these projects.
| Corridor (our locality line) | 2020 average, per sq ft | 2025 average, per sq ft | Five-year change |
|---|---|---|---|
| Golf Course Extension Road (The Arbour) | ₹8,700 | ₹19,500 | 125% |
| SPR (DLF Privana) | ₹6,200 | ₹15,500 | 150% |
Source: our Golf Course Extension Road line and our SPR line, average asking price across the projects and listings we track, area basis not stated, as of 2025. Past growth doesn't predict future growth.
Homes, towers and sizes side by side
The Arbour is single product. HRERA lists one apartment type of 209.51 sq m, about 2,255 sq ft carpet, and PTI (16 March 2023) called them 1,137 identical 4 BHK plus study plus utility homes of 3,950 sq ft. PTI didn't state its basis, but the number fit a super area. These are two measures of the same flat, not a clash.
Privana is a family of phases. DLF Privana South and DLF Privana West mix 4 BHK apartments with penthouses, and DLF's own 2026 blogs give the standard 4 BHK as about 3,577 sq ft and 3,575 sq ft, with no basis stated. DLF Privana North has 1,152 4 BHK homes of about 2,236 sq ft carpet and 12 penthouses up to 4,847 sq ft carpet, as Outlook Business reported on 18 June 2025 citing DLF.
| Item | The Arbour | Privana South | Privana West | Privana North |
|---|---|---|---|---|
| Sector | 63 | 76 and 77 | 76 and 77 | 76 and 77 |
| HRERA registration | RC/REP/HARERA/GGM/671/403/2023/15 (23.01.2023) | RC/REP/HARERA/GGM/772/504/2023/116 (18.12.2023) | RC/REP/HARERA/GGM/819/551/2024/46 | RC/REP/HARERA/GGM/954/686/2025/57 (05.06.2025) |
| Land | 25.087 acres | 25.148 acres | 12.572 acres | 17.701 acres |
| Towers | 5, of 38 to 39 storeys | 7 | 5 | 6, stilt plus 50 floors |
| Homes | 1,137 | 1,113 | 795 | 1,164 |
| Homes per acre (about) | 45 | 44 | 63 (DLF) | 66 |
| Product | 4 BHK + study + utility, one type | 4 BHK and penthouses | 4 BHK and penthouses | 1,152 4 BHK and 12 penthouses |
| 4 BHK size | 2,255 sq ft carpet (HRERA); 3,950 sq ft, basis not stated (PTI) | about 3,577 sq ft, basis not stated (DLF blog) | about 3,575 sq ft, basis not stated (DLF blog) | about 2,236 sq ft carpet (Outlook Business) |
Sources: HRERA Gurugram register and Form REP-I (read 29 November 2026); DLF press releases of 8 January 2024 and 9 May 2024; DLF Homes blogs (August 2026); Outlook Business, 18 June 2025. Homes per acre is a rough sum of homes over land, except West, where DLF gave the figure.
Note that an Arbour 4 BHK and a Privana North 4 BHK are almost same in carpet, about 2,255 against 2,236 sq ft. North also packs more homes per acre then the others.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Launch prices and later reported prices, with dates
Price is where the record get thin. DLF's Aakash Ohri said in a March 2023 BQ Prime interview that The Arbour came out at about ₹18,000 per sq ft, when flats in that part of town hadn't done more than about ₹14,000. That quote comes from search-index text of the article, so treat it as reported. PTI said each Arbour flat cost ₹7 crore and above.
Illustrative imageFor Privana South and West, DLF never published a per sq ft rate or a per-flat price. Only the totals is on record. Privana North is the one phase with number, from two sources that don't use same measure.
| Project | Price on record | Date | Source and basis |
|---|---|---|---|
| The Arbour | about ₹18,000 per sq ft | February 2023 launch | DLF's Aakash Ohri to BQ Prime, March 2023; area basis not stated |
| The Arbour | ₹7 crore and above a flat | February 2023 | PTI, 16 March 2023; per flat |
| Privana South | no per-flat price published | January 2024 | DLF press release, 8 January 2024 |
| Privana West | no per-flat price published | May 2024 | DLF press release, 9 May 2024 |
| Privana North | from ₹10 crore | June 2025 | project website as reported by Outlook Business, 18 June 2025; per flat |
| Privana North | ₹23,500 per sq ft | Q2 2025 | ANAROCK Research, Residential Market Viewpoints NCR Q2 2025; area basis not stated |
| The Aureva (next to The Arbour) | ₹28,000 per sq ft; average ₹11.5 crore | September 2026 | HDFC Sky (news), 5 October 2026; basis not stated, senior living |
A rough cross-check work for The Arbour: ₹18,000 per sq ft on 3,950 sq ft is roughly ₹7.1 crore. Dividing announced sales by homes gives rough averages: about ₹7 crore for The Arbour, about ₹6.5 crore for South, about ₹7 crore for West and about ₹9.5 crore for North. Penthouses lift those, so they aren't a flat price.
DLF The Aureva, the retirement tower beside The Arbour, is a different product, but its reported ₹28,000 per sq ft shows what DLF got in Sector 63 three years after The Arbour launch.
How fast each project sold, as DLF reported
All four registrations sold out quick, that's the reason why there's no fresh stock from DLF in any of them. The figures below are DLF's own or newspapers reporting DLF.
- The Arbour: sold in a pre-launch window of 15 to 17 February 2023 for more than ₹8,000 crore, with about 3,600 applicants and a lottery for allotment, PTI reported. NRIs took 14% and about 90% was end-users. The formal launch came on 24 February 2023.
- Privana South: about ₹7,200 crore in 72 hours before the official launch, DLF said on 8 January 2024. One unit per buyer was allowed, about 25% of buyers were NRIs, and the booking amount was ₹50 lakh against an industry norm of ₹10 lakh.
- Privana West: about ₹5,590 crore within 3 days, DLF said on 9 May 2024.
- Privana North: valued at ₹11,000 crore and sold within a week in June 2025, Outlook Business reported. In its May 2026 HRERA declaration DLF said all 1,164 homes were booked and ₹3,117.84 crore collected, roughly 28% of the sale value.
The three Privana phases add up to 3,072 homes and about ₹23,790 crore of announced sales. For the full list of what DLF has launched and planned, see our post on DLF new projects in Gurgaon.
HRERA timelines and what's on record about construction
This is the most biggest practical gap between the two. HRERA's register gives each project a declared completion date. Then HRERA Gurugram's Order No. 9/1-2026 of 11 August 2026 added four months, automatically, to every project registered by 31 July 2026 whose completion falls on or after 28 February 2026. The register still show the original dates.
Illustrative image| Project | HRERA completion date | With the four-month order (about) | What DLF says |
|---|---|---|---|
| The Arbour | 31.03.2030 | July 2030 | commissioning expected in 2027 (Q2 FY27 call, 17 October 2026) |
| Privana South | 30.06.2031 | October 2031 | follows The Arbour from FY27-28 onwards |
| Privana West | 31.12.2031 | April 2032 | follows The Arbour from FY27-28 onwards |
| Privana North | 30.09.2034 (register) | January 2035 | its own May 2026 Part G form says 30.06.2031 |
Sources: HRERA Gurugram register (read 27 November 2026), Order No. 9/1-2026 of 11 August 2026, DLF Q2 FY27 earnings call transcript of 17 October 2026. Privana North's two dates disagree, so asking DLF in writing which one goes into your agreement is wise.
On the build, the record is mostly paperwork. HRERA's Form REP-I gives The Arbour a construction start of 01.09.2022. An addendum of 01.05.2025 added a phasing plan for 1,137 main homes, 201 EWS homes (flats for the economically weaker section) and 18 commercial units. Privana South and West got addenda on 26.06.2026 adding one commercial unit each.
No occupation certificate, or OC, the official nod that a tower can be lived in, is on record for any of the four yet. DLF's 2027 commissioning is a plan, not a handover date.
Design and site details DLF has put on record
DLF has told more about Privana's design than The Arbour's. For South it gives ground coverage under 15%, 85% plus open space, 3.4 m floor-to-floor and design by ARCOP. For West it gives about 80% open space, 3 car parks per 4 BHK and 4 per penthouse, with HB Design on the master plan.
For The Arbour, the record is mainly HRERA's: licence 123 of 2012, five towers, one flat type. Privana runs on licence 219 of 2023 for about 116.296 acres, which also hold Privana Enclave, 41 plots DLF says are only for some collaborator obligations. The next high-rise phase is due early 2027, DLF said on 4 August 2026, but it wasn't on HRERA as of 6 November 2026.
Resale: can you still buy into The Arbour or Privana?
With DLF sold out, a buyer today gets in only by taking over an allottee's booking, sometime called a transfer or endorsement. DLF hasn't published a resale price for either, and no registered resale deal is on record.
In its Q1 FY27 call of 4 August 2026, DLF said Privana had demand in secondary sales 'between INR 2,500-4,000 a square foot already'. It didn't say if that's a premium or a price, so it's a tentative, unclear remark only.
Savills India Research, which groups Golf Course Extension Road with the SPR, found completed values of ₹2 crore plus homes up only 2% year on year in H1 2026, after 16% to 20% a year over 2021 to 2025. That's not a forecast. Our post on SPR road development covers the corridor's works.
Haryana charges 7% stamp duty for men and about 5% for women, plus 1% registration capped at ₹50,000, as listed in our state costs table. On a ₹7 crore deal that's roughly ₹49 lakh for a man, or roughly ₹35 lakh for a woman. Duty is on the higher of the deal value and the collector rate value, the government's minimum for the area. Confirm rates before paying.
Roads, water and metro around each project
Illustrative image- Water near The Arbour: GMDA's Sector 72 boosting station started in November 2026 and supply 75 MLD to Sectors 58 to 74, which had relied partly on groundwater and tankers, Hindustan Times reported on 19 November 2026.
- Water at Privana: Sectors 77 to 80 have no piped drinking water yet, a big worry for families; supply to Sectors 76 to 80 is expected early 2027 after a pipeline link, Hindustan Times reported on 19 November 2026. Treat that date as tentative.
- SPR elevated road: GMDA re-tendered Package 1, 4.23 km from NH-48 to Vatika Chowk, on 1 October 2026 with bids closing 18 November, after the March 2026 tender were withdrawn. Work runs 30 months from award. No award reported (Hindustan Times, 3 October 2026).
- Metro: the Sector 56 to Pachgaon line via Sectors 56, 61, 65 and 66 and Kherki Daula is still a proposal with a revised DPR being finalised (ThePrint, PTI, 11 September 2026). Gurugram Metro Phase 1, under construction since 5 September 2025, serves Sector 72A on the SPR as per PIB's 2023 cabinet note. Neither project have a station date on record.
Who each project suits, going by the facts
The Arbour may fit you if you want the earlier handover, since DLF expects to commission it in 2027 and HRERA's date is 31.03.2030. It suits someone who like a settled corridor with hospitals, schools and finished towers, as our line describes it, and is fine with one standard 4 BHK plan.
A Privana phase may fit you if you work near NH-48 or Sectors 74A and 75, want a big township with high open space, or want a penthouse. You'll need lot of patience: HRERA dates run to 2034, water and the SPR elevated road are pending, and North's 2025 rate was well above The Arbour's 2023 rate, though from different sources.
If you're comparing these with other big flats in the city, our best 4 BHK apartments in Gurugram list covers more projects, and the DLF developer page has the builder's full record with us.
A checklist before you buy an Arbour or Privana booking
- Get the original allotment letter, builder-buyer agreement and payment receipts, and match the flat number to HRERA registration GGM/671/403/2023/15 (The Arbour) or the right Privana number.
- Ask DLF in writing for its transfer or endorsement charge and the steps, before you pays any token.
- Check which completion date sits in the agreement, specially for Privana North, where 30.09.2034 and 30.06.2031 are both on record.
- Confirm how much the seller already paid, and what still due on the demand schedule.
- Check the carpet area in the agreement, not only the brochure figure, because DLF's 3,577 and 3,575 sq ft numbers carry no stated basis.
- Work out stamp duty and the 1% registration fee on the full deal value, and ask a lawyer to read the transfer papers.
- For Privana, ask when piped water and road works around Sectors 76 and 77 are due, and get the answer in writing if you can.
Prices and dates changes, so recheck each one with DLF and HRERA on the day you sign. For more DLF context, our comparison of DLF Camellias vs DLF Magnolias look at DLF's ready Golf Course Road towers.
Questions
Frequently Asked Questions
Is The Arbour the same project as The Sixty Three on HRERA? +
Yes. DLF registered the Sector 63 project on 23.01.2023 as The Sixty Three under RC/REP/HARERA/GGM/671/403/2023/15. HRERA approved the change of name to The Arbour by a corrigendum entered on 16.02.2023. The public register row still prints the old name, but later HRERA documents, such as the 01.05.2025 addendum, call it The Arbour.
Which is bigger inside, an Arbour 4 BHK or a Privana North 4 BHK? +
On carpet area they are close. HRERA gives The Arbour's single flat type as 209.51 sq m, about 2,255 sq ft carpet. Outlook Business, citing DLF on 18 June 2025, gave a Privana North 4 BHK as about 2,236 sq ft carpet. For Privana South and West, DLF's figures of about 3,577 and 3,575 sq ft have no stated basis, so they can't be compared directly.
What did a DLF Privana South flat cost at launch? +
DLF did not publish a per-flat or per sq ft price for Privana South. It said on 8 January 2024 that it sold 1,113 homes for about ₹7,200 crore before the official launch. Dividing that total by the homes gives a rough average of about ₹6.5 crore, but penthouses are in the mix, so that's not the price of a standard 4 BHK.
Does the HRERA four-month extension apply to The Arbour and Privana? +
Yes, as HRERA Gurugram's Order No. 9/1-2026 of 11 August 2026 covers every project registered by 31 July 2026 whose completion falls on or after 28 February 2026. That includes The Arbour and Privana South, West and North. The register still shows the original dates, so the extended dates are about four months later than what you see there.
Why does DLF Privana North show two different completion dates? +
The HRERA register gives Privana North a completion date of 30.09.2034. DLF's own Part G form, filed in May 2026 with the Privana Enclave application, gives 30.06.2031 as both the initial and likely date. The record holds both. Before buying a North booking, ask DLF which date is written into your agreement and keep the reply.
How much booking amount did DLF take for Privana South? +
DLF said in its press release of 8 January 2024 that the booking amount for Privana South was ₹50 lakh, against an industry norm of ₹10 lakh. It also allowed only one unit per buyer. DLF said these steps were part of how it sold the phase, in which about 25% of buyers were NRIs.
Is there a resale price on record for DLF The Arbour or DLF Privana? +
No. DLF hasn't published a resale price for either, and no registered resale deal for them is on record. In August 2026 DLF mentioned secondary demand at Privana 'between INR 2,500-4,000 a square foot' without saying if that was a premium or a price, so it is a tentative remark only. Ask sellers for their allotment papers and the actual amount paid.
Will DLF launch another Privana phase? +
DLF said on 4 August 2026 that the next Privana phase, a taller high-rise than North, is due early 2027. In May 2026 it had said there was no Privana phase planned for FY27 right now. As of 6 November 2026 no fourth high-rise phase was on HRERA, and no price has been published or reported, so treat the timing as tentative.
Sources
- HRERA Gurugram, Registered Projects (Gurugram), register copy read 27 November 2026
- HRERA Gurugram, Form REP-I (Parts A-H), The Sixty Three (renamed The Arbour), application 29 August 2022, read 29 November 2026
- HRERA Gurugram, Corrigendum for The Sixty Three (name change to The Arbour), entered 16 February 2023
- HRERA Gurugram, Addendum to registration certificate, The Arbour, 1 May 2025
- HRERA Gurugram, Addenda to registration certificates, DLF Privana South and DLF Privana West, 26 June 2026
- HRERA Gurugram, Order No. 9/1-2026 HARERA/GGM (Admn), four-month extension, 11 August 2026
- HRERA Gurugram, Form REP-I Part G in the Privana Enclave application, 25 May 2026
- PTI (via NewsDrum), DLF sells all 1,137 flats in Gurugram project within 3 days for over Rs 8,000 cr, 16 March 2023
- BQ Prime (now NDTV Profit), Left Lot Of Money On Table, Says DLF After $1-Billion Luxury Sales, March 2023
- DLF Ltd, press release on DLF Privana South sales of over Rs 7,200 crore, 8 January 2024
- DLF Ltd, press release DLF Witnesses Record Sales of Luxury Residences with DLF Privana West, 9 May 2024
- Outlook Business, DLF's Rs 11,000 Cr Luxury Apartment Project in Gurugram Sells Out in A Week, 18 June 2025
- ANAROCK Research, Residential Market Viewpoints, NCR, Q2 2025, 1 August 2025
- DLF Homes, developer blogs on DLF Privana South (3 August 2026) and DLF Privana West (11 August 2026)
- DLF Ltd, Q1 FY27 earnings conference call transcript, 4 August 2026; Q2 FY27 earnings conference call transcript, 17 October 2026; Q2FY27 results presentation, 16 October 2026
- HDFC Sky (news), DLF Sells Entire 172 Senior Living Homes in New Project at Gurugram for Rs 1,985 Cr, 5 October 2026
- Business Today, Golf Course Extension Road gets Rs 35,000 crore luxury housing push, 9 September 2026
- Savills India Research, Delhi-NCR Residential Market Watch, Year-End 2025 (January 2026) and H1 2026 (July 2026)
- Hindustan Times, reports on GMDA water supply for Sectors 58 to 74 and Sectors 76 to 80, 19 November 2026; SPR elevated corridor re-tender, 3 October 2026
- ThePrint (PTI), Haryana chief secy reviews Sector 56-Panchgaon metro project, 11 September 2026
- PIB, Union Cabinet approves Metro connectivity from HUDA City Centre to Cyber City with spur to Dwarka Expressway, 7 June 2023
- Property Nivesh, Golf Course Extension Road and SPR locality lines (2020 to 2025) and state costs table