Buying Guides
Best Residential Projects in Mansarovar Jaipur and Extension, 2026
Twelve residential projects in Mansarovar Jaipur and Mansarovar Extension are on RERA Rajasthan's register (as saved on 9 October 2026) and placed in the area by their developer or the Rajasthan Housing Board, from RHB's Gulmohar Apartment estimated at ₹90.40 lakh to Ashiana Oma listed up to ₹264.87 lakh. Six are RHB flat projects in old Mansarovar near the Pink Line and six are private projects in the Extension, chosen on registration and location, not on quality.
By Pranav Adhikari · Edited by
Rakesh Mahajan · · 14 min read
Illustrative image Best Projects in Mansarovar Jaipur: What This List Covers
Twelve residential projects in Mansarovar Jaipur and Mansarovar Extension are on RERA Rajasthan's register for Jaipur district (as saved on 9 October 2026) and placed in the area by their developer or the Rajasthan Housing Board. Six are RHB flats in old Mansarovar and six are private projects in the Extension, priced from RHB's Gulmohar at an estimated ₹90.40 lakh to Ashiana Oma at up to ₹264.87 lakh. It's a fact list, not a ranking or a recommendation.
RHB, the state housing agency, laid out Mansarovar in numbered sectors and built its flats, markets and City Park. Mansarovar Extension is not a RHB or JDA (Jaipur Development Authority) scheme name. Developers use it for the newer belt towards Ajmer Road, Bhankrota and Jaisinghpura Road. Which sector suit you is covered in best residential areas in Mansarovar Jaipur, and city prices sit on our Jaipur city page.
How These Residential Projects Were Chosen
Every project here pass three tests. Its RERA number shows Application Approved on our register copy, not revoked or suspended. A developer page or RHB paper places it in the area. And some basic facts are published. RERA is the Real Estate Regulatory Authority, where projects register their promoter, phases and dates. Our explainer on what buyers must check on RERA in 2026 walks through it.
Each register entry carries a tehsil, meaning the revenue sub-division it's filed in; Oma, Valenza and Geeta show Sanganer. Declared completion is the promoter's own date, and it can be extend. Of the register's 2,388 rows, 16 names mention Mansarovar by our tally: 12 RHB entries and four from Trimurty. What didn't made the list:
- Four plotted Trimurty Real Estate entries named The Greater Mansarovar (A to D), in Jaipur tehsil with no address; a name alone don't prove the location.
- RHB's shop registrations and its plotted Farm House Scheme in Sector 4 SFS; plot buyers can see our RHB plot scheme guide.
- Projects placed here only by listing websites.
Whether to pick the old township or the newer belt is its own question, which our Mansarovar vs Mansarovar Extension comparison takes on.
Flats in Mansarovar Jaipur and the Extension at a Glance
RERA numbers and declared completion dates are from RERA Rajasthan's register for Jaipur district (as saved on 9 October 2026). The rest comes from developer pages and RHB documents, dated as shown. In RHB's labels B is a basement and S a stilt level, so B+S+12 means 12 floors above both.
| Project (area) | Developer | RERA number | Type | Sizes (basis) | Price as published (date) | Status / declared completion |
|---|---|---|---|---|---|---|
| Ashiana Oma (Extension) | Ashiana Housing | RAJ/P/2026/4802; RAJ/P/2026/4867 | 3 and 4 BHK flats | 1,740 to 2,700 sq ft super built-up; 1,050 to 1,721 sq ft carpet | Listed at ₹138.58 lakh to ₹264.87 lakh (2 Nov 2026) | Launched / 31/07/2030 and 01/02/2031 |
| Ashiana Ekansh (Extension) | Ashiana Housing | RAJ/P/2022/2276; RAJ/P/2023/2355; RAJ/P/2024/3082; RAJ/P/2024/3191 | 2, 3 and 4 BHK flats | 4 BHK: 2,411 sq ft super built-up; 1,631.39 sq ft carpet | 4 BHK listed at ₹226.57 lakh to ₹246.47 lakh (read 28 Nov 2026) | Under construction / 28/02/2027 to 30/11/2029 |
| Valenza (Extension, Patrakar Colony) | Siddhi Homes Realty; marketed by Mahima Group | RAJ/P/2024/3450 | 3 and 4 BHK flats, penthouses | 2,417 to 3,149 sq ft (basis not stated) | Listed at ₹1.78 crore onwards (read 28 Nov 2026) | New launch / 30/04/2029 |
| Mahima's Elanza (Extension) | Mahima Real Estate | RAJ/P/2017/029 | 2, 3 and 4 BHK flats | 1,567 to 2,705 sq ft (basis not stated) | Sold out | Sold out / 31/03/2018 |
| Mahima's Florenza (Extension) | Shiv Kripa Build Estate; Mahima Group | RAJ/P/2017/039 | 2, 3 and 4 BHK flats | 1,306 to 2,430 sq ft (basis not stated) | Sold out | Sold out / 31/08/2021 |
| Shubhashish Geeta (Extension, Jaisinghpura Road) | Shubhashish Builders and Developers | RAJ/P/2019/1061; RAJ/P/2021/1433; RAJ/P/2022/1819; RAJ/P/2022/2208 | 3 BHK villas | Not published | Not published | Phase I sold out / 28/07/2026 |
| Gulmohar Apartment (Mansarovar, Sector 5) | RHB | RAJ/P/2025/3696 | 160 HIG flats | 154 to 157 sq m super built-up | Estimated at ₹90.40 lakh to ₹92.10 lakh (10 May 2025) | In progress / 30/04/2031 |
| Dwarka Residency Phase 1 (Mansarovar) | RHB | RAJ/P/2018/732 | Flats, B+S+12 | Not published | Not published | Completed 21/12/2018 (RHB list) |
| Dwarka Residency Phase II (Mansarovar) | RHB | RAJ/P/2020/1186 | Flats | Not published | Not published | Completed 30/11/2021 (RHB list) |
| Dwarka Twins HIG (Mansarovar) | RHB | RAJ/P/2018/724 | HIG flats, B+S+9 | Not published | Not published | Completed 16/08/2018 (RHB list) |
| Dwarka Apartment (Mansarovar, Zones III to V) | RHB | RAJ/P/2018/746 | MIG-B 3 BHK flats, S+9 | Not published | Auction reserve ₹50,29,300 (18 Mar 2020) | Completed 21/08/2018 (RHB list) |
| Arawali Enclave HIG (Mansarovar, New Sanganer Road) | RHB | RAJ/P/2018/626 | HIG flats, B+S+13 | Not published | Not published | Completed 16/08/2018 (RHB list) |
Eight of the twelve shows no current developer price: five completed RHB blocks, the two sold-out Mahima projects and Geeta.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
New Projects in Mansarovar Extension: Oma, Ekansh and Valenza
Only three projects here still sell new homes, all in the Extension.
Illustrative imageAshiana Oma
Ashiana Housing places Oma near Ajmer Road and plans 490 homes on about 10.35 acres, with a 17% building footprint and 43% open space. Its price list dated 2 November 2026 runs from ₹138.58 lakh for a 3 BHK to ₹264.87 lakh for a 4 BHK, and Ashiana calls the prices indicative. Construction World reported on 25 July 2026, citing the company, that 224 homes was booked from 437 expressions of interest. Possession isn't published, so ask your flat's phase.
Ashiana Ekansh
Ekansh is reached from Ajmer Road and the Ring Road, per Ashiana, with 560 homes on 8.6 acres and a 19,600 sq ft clubhouse. Only the 4 BHK is priced, at ₹226.57 lakh to ₹246.47 lakh for 2,411 sq ft super built-up. The page don't agree with itself: the phase table marks every phase under construction, yet a summary line calls the first two ready to move. Its RERA numbers appear only as QR codes, so ours are the register's entries. Dates differ too, with Phase III at December 2027 on Ashiana's table against 30 November 2029 on the register, nearly two years apart.
Valenza
Mahima Group markets Valenza under Mansarovar Extension, while the page text put it in Patrakar Colony. The register's promoter is Siddhi Homes Realty, so check which firm signs your agreement. Mahima shows three towers of 3 and 4 BHK flats and penthouses, 2,417 to 3,149 sq ft, listed at ₹1.78 crore onwards (read 28 November 2026). It states no size basis and no possession date.
Resale Flats and Villas in Mansarovar Extension
Mahima's Elanza
Elanza registered on 4 August 2017 as an ongoing project when RERA began, and Mahima now shows it sold out. Flats are 2, 3 and 4 BHK from 1,567 to 2,705 sq ft, basis not given. So any flat here come from an owner; ask for completion papers and the society's dues.
Mahima's Florenza
Mahima lists Florenza as its own, but the register's promoter is Shiv Kripa Build Estate Private Limited. It's sold out, with 2, 3 and 4 BHK flats of 1,306 to 2,430 sq ft. Same like Elanza, check the seller's title chain hardest.
Shubhashish Geeta
Geeta is the only villa project here. The House of Shubhashish places it on Jaisinghpura Road, the Extension's medical hub, with 3 BHK villas and about 70% open area. Phase I is sold out, and later prices aren't published. All four phases declared completion on 28 July 2026. That date has passed and the 9 October 2026 register copy show no revision or completion certificate, so ask for RERA's extension order.
Rajasthan Housing Board Projects in Old Mansarovar
Old Mansarovar is mostly older RHB flats and plot houses. RHB sells new flats by lottery, a draw among registered applicants. Leftover stock goes to e-auction, an online bid that starts from a reserve price, the lowest bid it accept. RHB's e-auction for 22 to 24 December 2026 offers just three Mansarovar lots, every one commercial. HIG and MIG mean higher and middle income group.
Illustrative imageGulmohar Apartment, Sector 5
Gulmohar is RHB's newest home project here, with 160 HIG flats in Sector 5. RHB's booklet of 10 May 2025 estimates ₹92.10 lakh for Types I and II and ₹90.40 lakh for Type III. By our count of RHB's deposit lists, 369 registrations came in before registration closed on 26 June 2025. The register's declared completion is 30 April 2031, while RHB's own list say 31 December 2030.
Dwarka Residency Phase 1, Vikramaditya Marg
Registered on 21 May 2018, this B+S+12 block was completed on 21 December 2018 per RHB, after the register's declared 30 September 2018. Sizes and prices aren't published, so ask seller for the carpet area.
Dwarka Residency Phase II
Registered on 24 January 2020, Phase II was finished on 30 November 2021 per RHB, ahead of the declared 30 January 2023. RHB doesn't publish its sizes, get the carpet area in writing.
Dwarka Twins HIG, Vikramaditya Marg
HIG flats in a B+S+9 build, registered on 16 May 2018 and completed on 16 August 2018 per RHB. No sizes or prices are published; compare carpet areas when you visit.
Dwarka Apartment, Zones III to V
MIG-B 3 BHK flats over stilt plus nine floors, completed on 21 August 2018 per RHB. On 18 March 2020 RHB still had 147 unsold, offered at a reserve of ₹50,29,300 each. That 2019-20 rate is not a today's price.
Arawali Enclave HIG, New Sanganer Road
HIG flats over B+S+13, registered on 6 February 2018 and completed on 16 August 2018 per RHB's list. JDA began clearing encroachments on about 3 km of New Sanganer Road on 5 October 2026, PTI reported via ThePrint. Check how the work effect your access.
Price per Sq Ft: New Extension Flats vs Old Mansarovar
Super built-up area is the carpet area, the usable floor inside your walls, plus a share of walls, lobbies and common spaces. Below is our rounded arithmetic on each published price. It's set against Property Nivesh estimates (October 2026), which track asking prices per sq ft of super built-up area from public listings and market reports.
| Project and unit | Published price (date) | Area used | About per sq ft |
|---|---|---|---|
| Oma 3 BHK | ₹138.58 lakh to ₹154.76 lakh (2 Nov 2026) | 1,740 sq ft | ₹7,960 to ₹8,890 |
| Oma 3 BHK + study | ₹173.73 lakh to ₹191.67 lakh (2 Nov 2026) | 2,044 sq ft | ₹8,500 to ₹9,380 |
| Oma 4 BHK | ₹239.92 lakh to ₹264.87 lakh (2 Nov 2026) | 2,700 sq ft | ₹8,890 to ₹9,810 |
| Ekansh 4 BHK | ₹226.57 lakh to ₹246.47 lakh (read 28 Nov 2026) | 2,411 sq ft | ₹9,400 to ₹10,220 |
| Valenza | Listed at ₹1.78 crore onwards (read 28 Nov 2026) | 2,417 sq ft, if the smallest home | About ₹7,360, tentative |
| RHB Gulmohar, Types I and II | ₹92.10 lakh, estimated (10 May 2025) | 157 sq m (1,690 sq ft) | ₹5,450 |
| Mansarovar flats, Property Nivesh estimate | 2026 | Super built-up | ₹5,300 |
On these numbers an Ashiana flat in the Extension cost roughly 1.5 to 1.9 times our Mansarovar estimate. It's rough, since we don't publish a separate Extension series. Our Mansarovar estimate was about ₹2,750 in 2020. Our city tracker puts Jaipur at ₹5,600 per sq ft (last reviewed 2 October 2026), with 52% five-year growth. Its gross rental yield, a year's rent before costs as a share of price, is 3.1%.
Past growth don't predict future growth. The full spread is on our Jaipur property rates page. Dearer flats citywide are in our top 10 luxury apartments in Jaipur.
Apartments Near Mansarovar Metro and the Extension's Wait
The Pink Line starts at Mansarovar. It has run to Chandpole since 3 June 2015 and to Badi Chaupar since 23 September 2020, per the Jaipur Metro Rail Corporation (JMRC). The six RHB projects sit inside the township the line serve, so they're the apartments near Mansarovar metro on this list. No walking distances are published; check a map.
The Extension has no metro yet; Shubhashish says a car ride from Geeta to Mansarovar Metro Station takes 8 to 9 minutes. Phase 1D, about 1.35 km to the 200 Feet Bypass crossing, was "currently stopped" per Rajasthan Patrika on 26 February 2025. JMRC now aims for June 2027 (The Times of India, 11 October 2026), a tentative date until trains runs. See what the 2028 Line 1 target means for buyers. NHAI's ₹130.65 crore award for the junction there, as Swarajya reported from a ministry statement on 28 March 2026, gives no completion date.
What to Compare Between These Mansarovar Projects
Line up any two projects here. Facts come from the sources above, the GST Council's 34th meeting decision (effective 1 April 2019) and our state costs table.
Illustrative image| What to compare | What the records show | What to ask |
|---|---|---|
| Seller | RHB in old Mansarovar; Ashiana, Siddhi Homes Realty (Valenza) and Shubhashish in the Extension | Which company signs the agreement |
| How you buy | RHB lottery or e-auction; developer booking at Oma, Ekansh and Valenza; owners for sold-out stock | Allotment letter and transfers (resale) |
| Area basis | Ashiana: super built-up and carpet; Mahima: not stated; RHB: built-up and super built-up | Carpet area of your unit, in writing |
| Carpet share | Oma 3 BHK about 60%; Ekansh 4 BHK about 68% | The loading on your unit |
| Density | Oma about 47 homes an acre; Ekansh about 65 | The approved site plan |
| Taxes | GST 5% on under-construction homes outside the affordable category; stamp duty 6% plus 1% registration (our state costs table) | Confirm the duty on the IGRS Rajasthan site |
On Oma's lowest 3 BHK at ₹138.58 lakh, 7% duty and registration is about ₹9.7 lakh and 5% GST about ₹6.9 lakh. A completed flat sold after its completion certificate don't attract GST. Try our stamp duty calculator and home loan EMI calculator.
Checklist: How to Check a Mansarovar Project Before Booking
- Search the RERA number on the RERA Rajasthan portal and match name, phase and promoter to your agreement.
- Confirm the status is Application Approved, not revoked or suspended.
- If the declared completion date has passed, as with Geeta, ask for the extension order.
- Get your unit's carpet area in writing.
- Ask for the current dated price list; Oma's list changed between 31 October and 2 November 2026.
- For an RHB flat, read the scheme booklet and lottery result; for a resale, see the allotment and every transfer.
- Check the seller's title and the society's dues before paying any token.
- Add GST, stamp duty and registration, and confirm the duty on the IGRS Rajasthan site.
- Drive to work and to Mansarovar metro station at peak hours.
Our guide on how to check a builder before buying goes more deep on track records. For RHB's newer schemes, see our note on RHB launching four projects.
Where to Read Next on Mansarovar and Jaipur
For projects on the corridor next door, our list of residential projects on Ajmer Road picks up where the Extension end. If budget comes first, our guide to locations to buy property in Jaipur under ₹1 crore compares areas across the city.
Questions
Frequently Asked Questions
Is Valenza a Mahima Group project? +
Mahima Group markets Valenza and lists it under Mansarovar Extension, but RERA Rajasthan's register for Jaipur district (as saved on 9 October 2026) names Siddhi Homes Realty as the promoter of RAJ/P/2024/3450. The page text places the project in Patrakar Colony. Before booking, check which company signs your agreement and receives your payments, and match it to the RERA certificate.
Are Ashiana Ekansh's Phases I and II ready to move in? +
Ashiana's own Ekansh page gives two answers. Its phase-wise table lists Phases I to IV as under construction, giving possession months from October 2026 to March 2028. Yet a summary line on the same page describes the first two phases as ready to move. The register's declared completion for Phase I is 28 February 2027. Ask Ashiana for the completion certificate of the tower you are shown, in writing.
Has Shubhashish Geeta passed its declared completion date? +
Yes. All four Geeta phases declared completion on 28 July 2026, and the copy of RERA Rajasthan's register saved on 9 October 2026 shows no revised date and no completion certificate for them. That doesn't tell you what is built on the ground. Ask the developer for an extension order or a current progress report, since the page's construction updates date from April and May 2024.
Can I still buy a flat in Mahima's Elanza or Florenza? +
Not from Mahima. The developer marks both as sold out, so only resale flats from owners are possible. Elanza (RAJ/P/2017/029) has 2, 3 and 4 BHK flats of 1,567 to 2,705 sq ft, and Florenza (RAJ/P/2017/039) has 1,306 to 2,430 sq ft, neither with a stated area basis. Check the seller's title papers and the society's dues before paying anything.
How did Ashiana Oma's first booking round go? +
Construction World reported on 25 July 2026, quoting a company statement, that 224 Oma homes were converted into confirmed bookings worth about ₹372 crore on 18 and 19 July 2026, from 437 expressions of interest. That is the company's own account. Early bookings say nothing about future prices, so judge any flat on its own papers, dates and listed price.
Did Ashiana Oma's prices change in November 2026? +
Yes, a little. The Oma page read on 31 October 2026 showed ₹135.10 lakh to ₹260.82 lakh; the price list dated 2 November 2026 shows ₹138.58 lakh to ₹264.87 lakh, about 2.6% higher at the bottom of the range. Ashiana calls its prices indicative, so ask for the dated list that applies on the day you book.
Why is The Greater Mansarovar not on this list? +
Trimurty Real Estate's four plotted projects called The Greater Mansarovar A to D are on the register (RAJ/P/2025/4472, 4514, 4482 and 4411), filed in Jaipur tehsil. The register gives no address, though, and a project name is not proof of location. Until a developer page or RHB record places them in Mansarovar, they stay off this list.
How many people applied for RHB's Gulmohar flats? +
By our count of RHB's deposit lists, Gulmohar Apartment drew 369 registrations, 320 online and 49 offline, for 160 HIG flats before registration closed on 26 June 2025. That is roughly 2.3 applicants a flat. RHB posted the lottery programme on 19 June 2025, so check RHB's published result list to see whether a flat was allotted.
Is the ₹92.10 lakh Gulmohar price fixed? +
RHB's booklet of 10 May 2025 calls ₹92.10 lakh (Types I and II) and ₹90.40 lakh (Type III) estimated prices, for flats of about 154 to 157 sq m super built-up. An estimate is not a final figure. Check the cost and payment schedule in RHB's allotment papers, and add stamp duty and the registration fee on top.
Sources
- Real Estate Regulatory Authority, Rajasthan: project register, Jaipur district (as saved by Property Nivesh on 9 October 2026)
- Ashiana Housing: Ashiana Oma, Premium Homes, Jaipur, project page and price list file dated 2 November 2026 (read 28 November 2026; earlier read 31 October 2026)
- Ashiana Housing: Ashiana Ekansh, Premium Homes, Mansarovar Extension, Jaipur, project page (read 28 November 2026)
- Mahima Group: Valenza project page (read 28 November 2026 and 31 October 2026)
- Mahima Group: home page, residential project cards (Elanza, Florenza, Valenza)
- Shubhashish Homes (The House of Shubhashish): Shubhashish Geeta Phase I project page (construction updates dated April and May 2024)
- Rajasthan Housing Board: Booklet, Gulmohar Apartments, Sector 5, Mansarovar, Jaipur (SFS 2025), 10 May 2025
- Rajasthan Housing Board: deposit lists (online and offline), Gulmohar Apartments 2025, June 2025
- Rajasthan Housing Board: List of the RHB projects and schemes registered under RERA (undated, mid-2025 or later)
- Rajasthan Housing Board, Circle-II Jaipur: available houses and flats for Neelami Utsav as on 18 March 2020 (Mansarovar)
- Rajasthan Housing Board: Premium Properties December 2026 e-auction list (22 to 24 December 2026)
- Construction World: Ashiana Oma records Rs 3.72 billion in bookings (25 July 2026)
- Jaipur Metro Rail Corporation: home page, Phase 1A and 1B
- Rajasthan Patrika (English): Jaipur metro expansion plan, 100 km network planned for Jaipur (26 February 2025)
- The Times of India: Jaipur Metro Line 1 set for full operation by March-April 2028 (11 October 2026)
- Swarajya, reporting a Ministry of Road Transport and Highways statement: Jaipur Bypass junction upgrade on NH-48 (28 March 2026)
- PTI via ThePrint: Jaipur officials raze illegal encroachments amid protest from traders (5 October 2026)
- GST Council: 34th meeting decision on GST for under-construction housing (effective 1 April 2019)
- Property Nivesh: Jaipur locality estimates, asking price per sq ft of super built-up area and gross rental yield (October 2026)
- Property Nivesh: Jaipur city tracker (last reviewed 2 October 2026)
- Property Nivesh: state costs table, Rajasthan stamp duty and registration fee