L&T Aravista, Sector 86 Gurgaon
L&T Aravista master plan, Sector 86 Gurgaon: land, phases, towers and layout
The L&T Aravista master plan covers a licensed group housing colony of 19.975 acres across Sectors 81 and 86, which is why it's searched as Sector 86 Gurgaon. DTCP, Haryana's town planning department, approved nine phases for it on 16 September 2026. Seven residential towers are planned in all.
Only the first slice is before HRERA, the Haryana Real Estate Regulatory Authority: 7.1969 acres with three G+37 towers and 444 flats. The Authority approved that application on 16 November 2026 subject to corrections. On 23 November 2026 no registration certificate or number had been issued, so this is still a pre-launch project.
Everything below comes from the approved site plan and the drafts filed with HRERA, not from a brochure.
- Licensed land
- 19.975 acres in Sectors 81 and 86 (HRERA records)
- DTCP phasing
- Nine phases, approved 16 September 2026
- Residential towers
- Seven planned, three in the Phase 1 filing
- Phase 1 on file
- 444 flats, three G+37 towers, 7.1969 acres
- Ground coverage
- 11.0% proposed against 35% permitted
- Density
- 129.57 persons per acre (100 to 300 permitted)
The short answer
- HRERA's records show a licensed colony of 19.9750 acres in Sectors 81 and 86, while the DTCP zoning plan gives 19.9743 acres.
- DTCP split the colony into nine phases on 16 September 2026, and only Phases I and II, 7.1969 acres together, are in the current HRERA application.
- Seven residential towers are planned, but public filings describe only Towers 1, 2 and 3, each G+37 with 148 flats.
- The approved area statement shows ground coverage of 11.0% against 35% permitted and a density of 129.57 persons per acre.
- The clubhouse sits in DTCP Phase III as two community buildings, which is outside the Phase 1 registration now before HRERA.
- On 23 November 2026 the project had no HRERA registration number and was not on the register of registered projects.
How big is L&T Aravista? Land area on record
HRERA's hearing brief and Form REP-I put the licensed colony at 19.9750 acres in Sectors 81 and 86, Gurugram. The DTCP zoning plan of 10 April 2026 shows a slightly smaller site of 19.9743 acres, or 8.0833 hectares. L&T's own press release of 27 April 2026 simply rounds it to 20 acres.
The small gap has an explanation. The draft builder buyer agreement says the promoter owns 19.9750 acres and holds peaceful possession of 19.9743 acres. For planning sums a third figure matters more: the net planned area of 19.14065 acres, on which ground coverage, FAR and density are worked out.
The land sits on three DTCP licences for a group housing colony. HRERA's records say all three were issued to International Green Scapes Ltd, the L&T Realty subsidiary that made the application. Who that company is, and how L&T came to own it, is on our L&T Realty developer page.
| Licence | Area | Valid up to | Villages |
|---|---|---|---|
| 47 of 2009 | 11.350 acres (revised from 11.412 acres on 18 February 2026) | 20 August 2029 | Nawada Fatehpur |
| 104 of 2012 | 6.475 acres | 5 October 2029 | Nawada Fatehpur and Naharpur Kasan |
| 24 of 2026 | 2.15 acres | 8 February 2031 | Nawada Fatehpur |
L&T Aravista site plan: the nine DTCP phases and what sits where
DTCP approved the phasing plan by a memo dated 16 September 2026, splitting the colony into nine phases. Two are in the current HRERA application: Phase I, which is purely roads, and Phase II, which holds Towers 1, 2 and 3. The other seven are marked 'to be applied' in the filings.
| DTCP phase | Area (acres) | What it holds | HRERA position |
|---|---|---|---|
| Phase I | 2.9602 | 60 m sector road, 12 m service road, 24 m internal sector road | In the current application |
| Phase II | 4.2367 | Towers 1, 2 and 3 plus a 337.745 sq m sub-station site | In the current application |
| Phase III | 4.5882 | Community building and convenient shops | To be applied |
| Phase IV | 0.8885 | EWS block | To be applied |
| Phase V | 1.6616 | Tower 4 | To be applied |
| Phase VI | 1.2749 | Tower 5 | To be applied |
| Phase VII | 2.3584 | Towers 6 and 7 | To be applied |
| Phase VIII | 1.2783 | Future expansion | To be applied |
| Phase IX | 0.7273 | Proposed primary school | To be applied |
One naming trap. What HRERA calls 'Phase 1' is DTCP Phases I and II added together, 7.1969 acres. That's about 36% of the licensed land. The nine phase areas add up to roughly 19.974 acres, in line with the zoning plan figure.
The draft allotment letter describes the colony as 99.5% residential and 0.5% commercial, the commercial part being convenient shopping.
Illustrative image How many towers and floors does L&T Aravista have?
Seven residential towers are planned across the colony under the DTCP phasing, plus a separate EWS block for economically weaker section housing. Three of them, Towers 1, 2 and 3, form the Phase 1 filing. The approved site plan shows each as G+37, while HRERA's hearing brief writes S+37. Either way, that's 37 floors above ground or stilt level.
The site plan counts 34 typical floors plus refuge floors on the 17th, 25th and 34th, topped by the terrace, overhead tank and machine room. There are three basements. Hafeez Contractor is the design consultant, with SBA Design N Code LLP as associate architects, per the title block of the approved drawings.
Each tower has 148 flats, which gives 444 in Phase 1. Towers 1 and 2 hold the 2 BHK flats and most of the 3 BHK types. Tower 3 holds the 4 BHK types, three larger 3 BHK flats and, per the site plan, 46 service personnel units attached to main flats. Sizes by type are on the floor plan page.
| Building | DTCP phase | Homes on record | Mix |
|---|---|---|---|
| Towers 1 and 2 | Phase II | 296 (148 each) | 2 BHK Elita, 3 BHK Majesta and Regalia |
| Tower 3 | Phase II | 148 | 3 BHK Grandeur (3 flats), 4 BHK Royale and Luxuria (145 flats) |
| Tower 4 | Phase V | Not filed | Not published |
| Tower 5 | Phase VI | Not filed | Not published |
| Towers 6 and 7 | Phase VII | Not filed | Not published |
| EWS block (G+4) | Phase IV | 84 units in the approved statement | EWS units |
Towers 4 to 7 are a blank for now. Their phases haven't been filed with HRERA, so no public document gives their heights, flat counts or mix. A figure of about 900 homes for the whole colony is quoted in the market, but there's no official total.
L&T Aravista master plan in numbers
This table pulls the planning figures from the approved site plan's area statement, Form REP-I and the 16 November 2026 hearing brief into one place. Treat them as the filed position on 23 November 2026. HRERA had asked for corrections to some forms, so a few figures could be restated.
| Item | Figure | Where it is stated |
|---|---|---|
| Licensed land | 19.9750 acres | HRERA hearing brief, Form REP-I |
| Site area on the zoning plan | 19.9743 acres (8.0833 ha) | DTCP zoning plan, 10 April 2026 |
| Net planned area | 19.14065 acres | Zoning plan and draft agreement |
| DTCP phases | Nine | DTCP memo, 16 September 2026 |
| Area in the current HRERA application | 7.1969 acres | Form REP-I |
| Residential towers | Seven planned, three in Phase 1 | Draft agreement Schedule G |
| Floors, Towers 1 to 3 | G+37 (site plan), S+37 (hearing brief), three basements | Approved site plan, hearing brief |
| Flats in Phase 1 | 444: 6 two-BHK, 293 three-BHK, 145 four-BHK | CA inventory certificate |
| EWS block | 84 units, G+4 | Approved area statement |
| Ground coverage | 11.0% proposed, 35% permitted | Approved area statement |
| Residential FAR | 123.435% proposed, 175% permitted | Approved area statement |
| Density | 129.57 persons per acre, 100 to 300 permitted | Approved area statement |
| Population assumed | 2,480 persons | Approved area statement |
| Organised open space | 5,977.486 sq m proposed, 5,845.614 sq m required | Approved area statement |
| Car parking | 1,571 bays for main units, 72 for EWS, 314 EV slots | Approved area statement |
| Community buildings (Phase III) | 5,422.034 sq m and 1,085.528 sq m built-up | Approved site plan |
How much open area is there, and how dense is it?
The approved area statement proposes ground coverage of 8,525.628 sq m, which is 11.0% of the site against 35% permitted. Put the other way, about 89% of the net planned area has no building footprint on it. That 89% includes internal roads and surface areas, not only gardens.
Organised open space, meaning tot lots and a playground, is a narrower measure. The plan proposes 5,977.486 sq m against 5,845.614 sq m required, a margin of about 132 sq m. The requirement is worked at 15% of 9.6259 acres for Phases 2 to 4.
Within the 7.1969 acres now before HRERA, Form REP-I allots the land as shown below. Parks and playgrounds take 1.6974 acres, about 40% of the 4.2367-acre tower phase.
| Use | Area (acres) |
|---|---|
| Sector roads (DTCP Phase I) | 2.9602 |
| Parks and playgrounds | 1.6974 |
| Roads within the tower phase | 1.4349 |
| Apartment construction | 1.0213 |
| Electric sub-station | 0.0831 |
| Total | 7.1969 |
Density and FAR
Density is stated as 129.57 persons per acre on a population of 2,480, inside the permitted band of 100 to 300. FAR, the floor area ratio that caps how much can be built on a plot, is 1.75 permitted. The plan uses 123.435% so far.
Read those two numbers with care. They sit in a statement covering the buildings approved so far. Towers 4 to 7 are not described in it, so both would need restating when those phases are filed.
Illustrative image What sits inside the project?
Beyond the seven towers, the phasing plan places a community building with convenient shops in Phase III, an EWS block in Phase IV, a future expansion pocket in Phase VIII and a primary school site in Phase IX. Phase II also carries a 337.745 sq m electric sub-station site to be gifted to the government.
Where the clubhouse is
The draft agreement promises a clubhouse for all owners and occupants of the colony. On the approved site plan it appears as two community buildings in Phase III. Community Building-1 is G+2 with 5,422.034 sq m of built-up area, including 163.538 sq m of convenient shopping. Community Building-2 is G+1 with 1,085.528 sq m.
Together that's 6,507.562 sq m, roughly 70,000 sq ft of built-up area. A larger figure of about 1.25 lakh sq ft of club and amenity space is quoted in the market. It may count outdoor facilities, but no filing confirms it.
Mind the timing. Phase III is outside the current registration, and Form REP-I shows club house land and cost as nil for Phase 1. Ask when the club's phase will be registered and built. The facility list is on our amenities page.
Parking and services
The parking count is high: 1,571 car bays for main units against 666 required at 1.5 per unit. That works out to about 3.5 bays per Phase 1 flat. There are 72 bays for EWS units and 314 EV charging slots. Form REP-I's service estimates for Phase 1 list sewage treatment, rainwater harvesting, a renewable energy system, underground water tanks and street lighting.
Roads and edges on the L&T Aravista site plan
DTCP Phase I is not housing at all. It is 2.9602 acres of road: the 60 m sector road between Sectors 81 and 86, a 12 m service road and a 24 m internal sector road in Sector 86. The draft agreement says the promoter will hand these to the Haryana government free of cost.
HRERA's team visited on 12 November 2026 and recorded access through the 12 m service road along with the 60 m and 24 m roads. It also noted that the service road 'is not constructed at the site'. The promoter submitted a road access permission from GMDA, the Gurugram Metropolitan Development Authority.
The site plan shows Sector 87 and Sector 81-A across the 60 m roads. Distances and the wider road picture are on the location page.
What the master plan doesn't tell you yet
Several things a buyer would want from a master plan are not public. There is no brochure from L&T Realty, no official total of homes for the colony, nothing on Towers 4 to 7, and no stated timing for the clubhouse phase. The plan can also change, within what the rules allow.
- Towers 4 to 7: heights, flat counts and unit mix are not in any filing.
- Phase VIII: 1.2783 acres marked 'future expansion' with no stated use.
- Extra land and FAR: the draft agreement allows future addition of abutting land and extra FAR under the TDR Policy 2021, which deals with transferable development rights.
- Clearances: Environment Clearance was applied for on 14 August 2026 and not yet obtained; fire scheme and service plan approvals were also pending.
- Areas: super or saleable areas and balcony sizes are not published. HRERA records carpet area, the usable floor area inside the flat.
- Brochure: the draft filed with HRERA was marked 'Submitted but needs to be revised' and is not public. See our brochure page for what stands in for it.
Dates for the first three towers are on file: construction from 1 January 2027 and the occupation certificate, the OC that allows people to move in, by 31 December 2032. See launch date and RERA status for the detail. The developer has published no prices; the price page explains what is only quoted.
Pre-launch status
On 23 November 2026 the project had no HRERA registration certificate or number and was not on the register of registered projects. The promoter's affidavit says no advertisement, marketing or booking has been done. Until a number shows on the register, the plan is something to study, not something to pay against.
How to read the L&T Aravista site plan
The approved site plan, with its area statement, was uploaded to HRERA's project page on 19 November 2026 along with floor plans, sections, elevations and basement plans of Towers 1 to 3. It's a public document. Here's the order we'd read it in.
- Start with the title block. It names the licences, the architects and the DTCP approval. The revised building plans were approved on 15 October 2026 and are valid to 14 October 2031.
- Find the phase boundaries. Note which phase your tower sits in and which phases surround it, because later phases mean later construction next door.
- Read the area statement. Ground coverage, FAR, density, open space and parking are all there, each with a permitted figure beside the proposed one.
- Locate the shared buildings. Mark the two community buildings, the EWS block, the school site and the sub-station against your tower.
- Trace the roads. Follow the 60 m, 24 m and 12 m roads to the entry points, and ask which are built today.
- Mark the blanks. Future expansion land and unfiled towers are open questions. Put them to the promoter in writing once the project is registered.
For the rest of the project, start at the L&T Aravista overview. If you'd like a second pair of eyes on the drawings, talk to a Property Nivesh advisor. You can also compare other new project launches or browse our Gurgaon city page.
Questions people ask
How big is L&T Aravista?
HRERA's records put the licensed group housing colony at 19.9750 acres across Sectors 81 and 86, Gurugram, on three DTCP licences. The DTCP zoning plan shows 19.9743 acres, and the net planned area used for planning sums is 19.14065 acres. The application now before HRERA covers 7.1969 acres of that, holding three towers and the sector roads.
How many towers and floors are planned at L&T Aravista?
The DTCP phasing plan shows seven residential towers plus an EWS block. Towers 1, 2 and 3 form Phase 1 and are G+37 on the approved site plan, written as S+37 in HRERA's hearing brief, with three basements and 148 flats each. Heights and flat counts for Towers 4 to 7 are not in any public filing.
How much open area is there in L&T Aravista?
The approved area statement shows buildings covering 11.0% of the net planned area against 35% permitted, so about 89% carries no building footprint. Organised open space for tot lots and a playground is 5,977.486 sq m against 5,845.614 sq m required. Within the Phase 1 land, Form REP-I allots 1.6974 acres to parks and playgrounds.
Where is the clubhouse on the L&T Aravista master plan?
The approved site plan shows two community buildings in DTCP Phase III: one G+2 with 5,422.034 sq m of built-up area and one G+1 with 1,085.528 sq m. Phase III is outside the current HRERA application, and Form REP-I shows no club house land or cost in Phase 1. The club's registration and construction timing is not published.
What is the difference between RERA Phase 1 and the DTCP phases?
DTCP, the town planning department, split the colony into nine phases. HRERA's 'L & T Realty Aravista Phase 1' combines DTCP Phase I, the 2.9602 acres of sector and service roads, with DTCP Phase II, the 4.2367 acres holding Towers 1 to 3 and a sub-station site. Together they make 7.1969 acres. The remaining seven phases are yet to be applied for.
Is the L&T Aravista master plan approved?
Partly. DTCP approved the phasing on 16 September 2026 and revised building plans on 15 October 2026. HRERA approved the Phase 1 registration at its 16 November 2026 hearing subject to corrections, but on 23 November 2026 no certificate or registration number had been issued and the project was not on the public register of registered projects.
Can the L&T Aravista master plan change later?
It can, within limits. Phase VIII is marked future expansion, Towers 4 to 7 are not yet filed, and the draft builder buyer agreement allows the promoter to add abutting land and extra FAR under the TDR Policy 2021. The filed specifications are also called indicative. Ask the promoter in writing what is fixed for your tower once registration is complete.
Where can I see the L&T Aravista site plan?
The promoter uploaded the approved site plan with its area statement to HRERA's project page on 19 November 2026, along with typical floor plans, sections, elevations, basement plans, a green area drawing and the DTCP phasing approval. L&T Realty's own website had no Aravista page or brochure on 23 November 2026, so the HRERA documents are the official set.
More on L&T Aravista
- L&T Aravista: overview What L&T Aravista is, who builds it, its HRERA status and the headline numbers on record.
- L&T Aravista: price No official price list yet: quoted figures, per sq ft sums and full cost for L&T Aravista.
- L&T Aravista: payment plan Draft stages filed with HRERA, a worked schedule on sample prices and the 10% advance rule.
- L&T Aravista: location Address, access roads, quoted distances and the unbuilt service road around L&T Aravista.
- L&T Aravista: launch date Dated timeline from the 2009 licence to the HRERA hearing, plus the 2032 and 2033 possession dates.
- L&T Aravista: rera RERA status, the pending certificate and how to verify L&T Aravista on the HRERA site yourself.
- L&T Aravista: reviews Pros, cons, L&T Realty's delivery record and who the project suits, from the filings.
- L&T Aravista: brochure No official brochure yet: what the HRERA filings show and how to read one when it arrives.
- L&T Aravista: booking Booking steps, the draft Rs 10 lakh application money, documents and refund terms.
- L&T Aravista: floor plan Carpet areas for all six home types, 1,114 to 2,336 sq ft, and how to read the plans.
- L&T Aravista: amenities 29 listed amenities by user group, the clubhouse's filed size and timing, and what upkeep will involve.
- L&T Aravista: highlights Ten sourced facts on L&T Aravista, with what is on record split from what is only quoted.
- L&T Aravista: investment Corridor prices, rent benchmarks, holding costs and risks for L&T Aravista, with no forecasts.
- L&T Aravista: faqs 27 buyer questions on L&T Aravista answered from HRERA filings: price, RERA, possession, sizes.
Related on Property Nivesh
Talk to an advisor about L&T Aravista
Tell us what you are looking for in L&T Aravista. Our advisor calls you with what is confirmed so far and answers your questions on price, plans and paperwork.
✓
Request received
A senior property advisor will reach you within 4 working hours. No spam, no builder hand-offs — your details stay with our advisory desk only.
Sources
- HRERA Gurugram, project detail page for L & T Realty Aravista Phase 1 including proceedings, read 23 November 2026
- HRERA Gurugram, hearing brief and proceedings, 16 November 2026
- HRERA Gurugram, Form REP-I Parts A to H, submitted 19 October 2026
- International Green Scapes Ltd via HRERA, approved site plan ST-01 with area statement, uploaded 19 November 2026
- DTCP Haryana via HRERA, approval of phasing plan, memo dated 16 September 2026
- International Green Scapes Ltd via HRERA, draft builder buyer agreement and draft allotment letter, uploaded 19 November 2026
- International Green Scapes Ltd via HRERA, CA inventory certificate, uploaded 19 November 2026
- Larsen & Toubro, press release on NCR land acquisition, 27 April 2026
Property Nivesh is an independent property research and advisory site. This guide is not the website of L&T Realty and is not connected with the developer. Facts are as of 23 November 2026 and come from the sources listed on each page; prices quoted in the market are indicative. Pictures marked "Illustrative image" are AI-generated and do not show the project.