On delivery, TVS Emerald and DRA Homes show no extensions across 34 and 25 TNRERA registrations, against 7 of 13 for Akshaya. On pricing, only Godrej publishes a worked cost sheet online, and even its total leaves out 7% stamp duty and registration. No Chennai builder shows every charge, so get an all-inclusive sheet in writing before you book.

By Pranav Adhikari · Edited by Rakesh Mahajan · · 15 min read

Illustration of a young couple walking towards a new apartment complex Illustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project named in this guide.

Quick answer: which Chennai builders suit a first-time buyer?

The trusted builders in Chennai for a first flat are the ones whose records you can check yourself, not the ones with the biggest hoardings. On TNRERA's register, TVS Emerald (0 extensions in 34 registrations), DRA Homes (0 in 25) and Radiance Realty (1 in 19) have the fewest for their size. Godrej's Azure page is the clearest on price. No builder here shows every charge online, so get an all-inclusive cost sheet in writing before you pay anything.

What you wantWho shows it on recordWhat to check
No extensions on TNRERA's registerTVS Emerald (0 of 34), DRA Homes (0 of 25)Two TVS projects past their date without a 'Completed' mark; DRA shows no prices
A worked cost sheetGodrej Properties (Azure, Padur)Total leaves out 7% stamp duty and registration
Rate and total on every pageRadiance Realty, CasagrandTotals exceed area times rate, unexplained
Itemised extrasHiranandani Communities (Hiranandani Parks)Figures dated December 2021
Lowest entry priceProvident Freedom ₹37 lakh, Jains Aadhya ₹45 lakh'Onwards' prices only

What should trusted builders in Chennai show? Delivery, quality and pricing

Trust rests on three things: dates that hold on TNRERA's register, few disputes after handover, and a price you can rebuild line by line. Most first-time buyer looks at the brochure and the sample flat, and stops there.

Illustration of a model flat bedroomIllustrative image
Illustrative image: an AI-generated picture of a model flat. It does not show any project named in this guide.
  • Delivery. TNRERA writes extensions as extra dates in the completion field, so compare the first date with the last. The status column is not always updated, and the completion certificate settles it. Our guide to checking a builder's track record on RERA shows the search step by step.
  • Quality. Visit a finished project of same builder and talk to the residents association. TNRERA orders about seepage, water or parking show what happens after handover.
  • Pricing transparency. You need the area basis, rate, total, booking amount, payment plan and extras. Builders with transparent pricing puts all this on paper before you book.
  • Paper trail. Many projects are registered to subsidiaries, such as Emerald Haven companies for TVS Emerald. The promoter on the RERA certificate should match the seller on your agreement.

Builder list: track record of 10 Chennai builders on TNRERA

For on-time possession builders in Chennai, the register points to TVS Emerald, DRA Homes and Radiance among these ten. Akshaya and Casagrand carry the most extensions. The count shows how often a completion date was extended, not how many months late a project ran. Premium names are in our guide to luxury builders in Chennai.

BuilderChennai-region registrationsWith an extensionMarked 'Completed'Order-list entries 2022 to Nov 2026 (not findings)Lowest price on builder's page
Akshaya137278Not published
Alliance (Urbanrise)142151₹60 lakh onwards
Casagrand792321198₹61 lakh
DRA Homes250115Not published
Godrej Properties4021₹78.49 lakh
Jain Housing12259₹45 lakh onwards
Mahindra Lifespace15144₹79 lakh+
Provident / Puravankara51021₹37 lakh onwards
Radiance Realty1911119₹60 lakh onwards
TVS Emerald340119₹64.99 lakh onwards

Order-list entries are rows in TNRERA's final-order lists that name a builder's companies. They include dismissed and execution matters and are not scaled to builder size. Read the table as starting point for your own checks.

Share of Chennai-region TNRERA registrations with an extension on recordShare of Chennai-region TNRERA registrations with an extension on record 0%10%20%30%40%50%60%TVS Emerald (0 of 34) TVS Emerald (0 of 34): 0% 0%DRA Homes (0 of 25) DRA Homes (0 of 25): 0% 0%Godrej Properties (0 of 4) Godrej Properties (0 of 4): 0% 0%Radiance Realty (1 of 19) Radiance Realty (1 of 19): 5% 5.3%Mahindra Lifespace (1 of 15) Mahindra Lifespace (1 of 15): 7% 6.7%Alliance (Urbanrise) (2 of 14) Alliance (Urbanrise) (2 of 14): 14% 14.3%Jain Housing (2 of 12) Jain Housing (2 of 12): 17% 16.7%Provident / Puravankara (1 of 5) Provident / Puravankara (1 of 5): 20% 20%Casagrand (23 of 79) Casagrand (23 of 79): 29% 29.1%Akshaya (7 of 13) Akshaya (7 of 13): 54% 53.8% Source: TNRERA Registered Projects (Building) lists 2017 to 2026, downloaded 22 November 2026; shares are our arithmetic on the counts
The share counts registrations with at least one extended completion date; it does not measure months of delay.

The chart turns those counts into a share of each builder's registrations.

Akshaya

Strengths: founded in 1995, it says it has built 171 landmarks. Pages list RERA numbers and certificate references, and it promises 10 years of maintenance on ongoing projects, terms not shown.

Watch: Tango's 2017 blocks were extended five times, from 31 May 2019 to 29 November 2024. None of seven project pages checked shows a price. In one case at its Today project in Thaiyur, possession promised for 18 July 2016 came with a handover letter of 9 August 2023. The complaint was dismissed as time-barred, with no finding on the rest. Get latest dates in writing, that is more safer way.

Alliance Group (Urbanrise)

Strengths: 2 of 14 registrations extended, and ready projects such as Revolution One on OMR (₹60 lakh onwards) show prices.

Watch: every price carries an unexplained asterisk, with no area basis or extras. TNRERA ordered a Jasmine Springs handover without a maintenance demand (28 October 2025) and 11.10% delay interest in a Galleria Residences case.

Casagrand

Strengths: its DRHP lists 83 completed Chennai projects as of 30 June 2025 and says it focuses on mid-end homes. Each page gives a built-up rate and price range, from ₹61 lakh at Casagrand Primrose, and CRISIL rates it A-/Stable.

Watch: totals exceed area times rate by about 5% to 22%. TNRERA imposed a ₹5 lakh Section 61 penalty over misleading Elysium advertisements (19 May 2025). The appellate tribunal awarded ₹3 lakh delay compensation at Supremus (22 July 2026); the promoter argued the flat was complete and cited force majeure. Ask the sales team to explain about each line. See its developer page.

DRA Homes

Strengths: no extensions on 25 registrations, and DRA Trinity was marked 'Completed' though its registered date is 6 November 2031. It publishes committed and delivery dates for 21 finished projects.

Watch: prices sit behind an enquiry form, and cancelling after the agreement costs 10% of the apartment value. Ask the price list by email before you go for site visit.

Godrej Properties

Strengths: Azure in Padur has the only worked cost sheet here, with agreement values from ₹78.49 lakh and a full payment schedule. ICRA rates Godrej AA+ (Stable).

Watch: its 'Total Cost to Customer' leaves out stamp duty and registration. The register gives 31 December 2027 for Azure Blocks 3 and 4; Godrej's page shows a different RERA possession date, May 2030. More on the Godrej developer page.

Jain Housing

Strengths: entry tickets from ₹45 lakh at Aadhya in Semmancheri, and only 2 of 12 registrations extended.

Watch: 'onwards' prices without area basis or extras, and project counts that differ by page (171+, 210+, 220+). The register gives Aadhya 31 October 2029; the page shows December 2027.

Mahindra Lifespace

Strengths: Lakewoods (from ₹79 lakh) says its price excludes taxes, stamp duty and registration, and shows its TNRERA number and validity. India Ratings and CRISIL rate Mahindra AA.

Watch: a sold-out Happinest page calls Lakewoods prices 'all inclusive'. Aqualily Phase 2C2 was re-registered, moving from January 2022 to 31 December 2024. Ask for the full sheet early, many buyers comes to know the extras only at allotment.

Provident / Puravankara

Strengths: listed, rated IND A-/Stable, with low entry prices: Provident Freedom from ₹37 lakh and Purva Windermere from ₹51.49 lakh.

Watch: Bayscape gives the full price break-up only at allotment and has not declared possession; the register lists 5 August 2028. Windermere's page shows possession on 31 December 2026 for phases the register dates 2027 to 2029.

Radiance Realty

Strengths: every page shows rate, total, RERA number and completion date, and Radiance publishes committed and certificate dates for its last 10 projects. See the Radiance developer page.

Watch: totals exceed area times rate unexplained, and homepage targets run earlier than TNRERA (Solitaire: June 2028 against 31 December 2029). On Radiance Icon, TNRERA had imposed ₹1 lakh under Section 63 over water and sewerage, and on 17 June 2026 added ₹5 lakh for continued non-compliance.

TVS Emerald

Strengths: no extension in the completion field of any of its 34 registrations, and starting prices on every page. The Atrium FAQ states 10% at booking plus 10% at agreement.

Watch: Peninsula Phase-I (due 31 July 2025) and Atrium (due 6 May 2026) have no 'Completed' mark, and parking and maintenance break-up comes at allotment. In an October 2026 order on an Anna Nagar project of Emerald Haven Development, reported by Construction World, TNRERA accepted the promoter's explanation of a PIN code mismatch. It still imposed a ₹50,000 Section 13 penalty, as agreements were unregistered after buyers had paid ₹1.72 crore of ₹2.88 crore.

What does an all-inclusive cost sheet include? Base, PLC, parking, club, GST and registration

An all-inclusive cost sheet rolls every charge into the one figure you will pay: base price, floor rise or PLC, parking, club, corpus, maintenance, EB and water, GST, and stamp duty with registration. No builder page in this research shows every line. Godrej's Azure sheet comes closest; Hiranandani Parks lists most extras, as on December 2021.

Illustration of a desk with a calculator and house keyIllustrative image
Illustrative image: an AI-generated picture of working out costs. It does not show any project named in this guide.
ComponentRate or amount on record
Base priceRate times area; Casagrand and Radiance use built-up area, TVS Emerald super built-up
Floor rise and PLC₹25 per floor on a ₹4,000 per sq ft base at Hiranandani Parks; separate price heads at Casagrand
Car parking₹2.5 lakh covered at Hiranandani Parks; Godrej Azure allots 1:1 with no separate line
Club membership₹75,000 lifetime at Hiranandani Parks
Corpus fund₹1 lakh at Hiranandani Parks
Advance maintenance₹1,24,999 with sinking fund on Godrej Azure's sample; 18 months at ₹3.50 per sq ft at Hiranandani Parks
EB and water connection₹1 lakh at Hiranandani Parks
GST on the flat5% under construction; 1% if affordable; nil after the completion certificate
GST on extras18% on maintenance and other charges (Godrej Azure and Hiranandani Parks pages)
Stamp duty and registration6% below ₹50 lakh; 7% up to ₹3 crore; 9% above (G.O. 131)
Legal chargesNot itemised on any builder page here

A worked example from a real sheet

Godrej's sample for a 2 BHK of 1,050.17 sq ft at Azure starts at an agreement value of ₹79,04,115. GST at 5% adds ₹3,95,206, and advance maintenance with sinking fund adds ₹1,24,999. That makes the page's 'Total Cost to Customer' of ₹84,24,320. The page also says 7% stamp duty and registration is due at possession, which is ₹5,53,288 more, so the real total is ₹89,77,608.

Godrej Azure 2 BHK sample cost sheet, with stamp duty addedGodrej Azure 2 BHK sample cost sheet, with stamp duty added ₹0L₹20L₹40L₹60L₹80LAgreement value Agreement value: ₹79L ₹79.04 lakhGST at 5% GST at 5%: ₹4L ₹3.95 lakhAdvance maintenance and sinking fund Advance maintenance and sinking fund: ₹1L ₹1.25 lakhStamp duty and registration at 7% (outside the builder's total) Stamp duty and registration at 7% (outside the builder's total): ₹6L ₹5.53 lakh Source: Godrej Azure project page cost sheet, read 22 November 2026; GST and 7% figures are our arithmetic on the agreement value
The builder's total of ₹84.24 lakh stops before stamp duty and registration, which add ₹5.53 lakh.

The last bar is the part that sits outside the builder's own total.

Value bands and GST

Under G.O. 131, duty is charged on the composite value (land share plus building, on super built-up area) or the document value, whichever is higher. Just under ₹50 lakh you pay 6%, about ₹3 lakh; just over, 7%, about ₹3.5 lakh. Our stamp duty calculator lets you test both sides of a band.

GST is 1%, not 5%, on a flat with up to 60 sq m (about 646 sq ft) of carpet area costing up to ₹45 lakh. The test uses the RERA Section 2(k) carpet area, so ask for that figure in writing. Take the sheet home and read it slow, with a calculator in your hand. Many buyer forgets the extras till the final demand letter comes.

Cost-sheet red flags to catch before you pay a booking amount

The biggest red flag is a price you cannot rebuild from the sheet. Each item below comes from a Chennai builder's page, a TNRERA order or the RERA Act.

Illustration of covered parking in an apartment basementIllustrative image
Illustrative image: an AI-generated picture of covered parking. It does not show any project named in this guide.
  • A total above area times rate. Casagrand Primrose: 1,121 sq ft at ₹4,449 is ₹49.9 lakh against a listed ₹61 lakh. Radiance Solitaire: 658 sq ft at ₹7,999 is ₹52.6 lakh against ₹60 lakh. Ask what the gap covers.
  • No area basis. Jain Housing and Urbanrise pages do not say whether sizes are carpet, built-up or super built-up. Ask for the carpet area under RERA Section 2(k).
  • 'All inclusive' that is not. As the Lakewoods example shows, go by the project page and the final sheet.
  • Break-up only at allotment. TVS Emerald and Provident pages hold back parking, maintenance or the full break-up until then. Ask before the booking amount.
  • More than 10% before a registered agreement. RERA Section 13(1) caps the advance at 10% until the agreement for sale is registered.
  • Heavy cancellation terms. DRA deducts 10% of the apartment value after the agreement; Casagrand's DRHP says it may withhold 20% of the booking amount.
  • Dates that differ from the register. Where a builder's page and TNRERA disagree, plan on the register date.

Get every answer on email, it becomes your record later. Sales staff may tell that these are standard charges, still ask for break-up.

Which builder is right for you as a first-time buyer?

For a first-time buyer aged 28 to 40, budget and loan amount decide most of the shortlist, and the TNRERA record decides the rest. Compare one project from each of two or three builders on the same cost sheet.

First-time buyer, 28 to 40, budget under ₹50 lakh

Published entry prices here are Provident Freedom (from ₹37 lakh) and Jains Aadhya (from ₹45 lakh). Check whether your flat qualifies for 1% GST, and note that stamp duty and registration is 6% below ₹50 lakh. Plan Aadhya on its register date of 31 October 2029. Take your time over booking even if sales team push you.

First-time buyer, 28 to 40, budget ₹60 lakh to ₹1 crore

Most choice sits here: TVS Emerald Atrium (₹64.99 lakh), Radiance Solitaire (₹60 lakh), Casagrand Primrose (₹61 lakh) and Suncity (₹62 lakh), Provident Bayscape (₹66.49 lakh), Godrej Azure (₹78.49 lakh) and Mahindra Lakewoods (₹79 lakh). Add 5% GST, 7% stamp duty and registration and the extras, then check the EMI on our home loan EMI calculator. Small difference in price is worth paying if the record is cleaner.

First-time buyer, 28 to 40, who wants a ready flat

A flat bought outright after the completion certificate carries no GST. Ready options include Urbanrise Revolution One (₹60 lakh onwards) and Jains Alpine Meadows in Pallavaram (₹58 lakh onwards). Revolution One's register entry still shows no 'Completed' mark, so ask for the completion certificate of your block. A resale flat pays 9% duty and registration, so compare with our Chennai resale flat prices by locality and our ready-to-move vs under-construction guide.

How we evaluated

We compared builders on public records read on 22 November 2026, and treated awards and builders' own on-time claims as claims, not evidence.

  • TNRERA's Registered Projects (Building) lists, 2017 to November 2026: 4,091 registrations matched on promoter name, Chennai region meaning the Chennai, Kancheepuram, Chengalpattu and Thiruvallur codes.
  • TNRERA's final-order lists for 2022 to November 2026, 1,975 entries in all, and the operative pages of about 20 orders.
  • Builder pages, FAQs and cost sheets, Casagrand's DRHP, annual reports, and CRISIL, ICRA and India Ratings records.
  • G.O. (Ms.) No. 131 and No. 166, the TNREGINET duty table, and GST Council and CBIC papers.

Limits: register counts show how often dates moved, not by how much, and the status column is not always current. Order-list entries are not outcomes. Consumer commission cases are not covered for most builders, so search those records for your shortlist. Any buyer can repeat these checks in a weekend, it need only patience and spreadsheet.

Conclusion

Trusted builders in Chennai are the ones whose records hold up: few extensions on TNRERA's register, completion certificates in hand, and a full cost sheet. In November 2026, TVS Emerald, DRA Homes and Radiance had the fewest extensions for their size, and Godrej the clearest prices. Each still has gaps worth asking about. Shortlist two or three, get the full sheet in writing and match the promoter name before you pay.

For a second opinion on a cost sheet or a TNRERA entry, talk to a Property Nivesh advisor.

Disclaimer: Project details change. Check every fact on the TNRERA portal and the builder's documents, and speak to a lawyer or financial adviser before you decide.

Questions

Frequently Asked Questions

which builders in chennai are trusted for first time buyers +

No single list fits every project, but on TNRERA's register TVS Emerald (no extensions in 34 Chennai-region registrations), DRA Homes (0 of 25) and Radiance Realty (1 of 19) show the fewest extensions for their size among mid-segment builders. Godrej publishes the clearest cost sheet, for Azure. Check the specific project's register entry, completion certificate and a full cost sheet before you book.

how to check rera completion date in tamil nadu +

Open TNRERA's Registered Projects (Building) lists, which run year by year from 2017, and find the project by its registration number or promoter name. The completion field shows the original date and any extensions written after it. The status column is not always updated, so ask the builder for the completion certificate number and confirm it with the approving authority.

what should an all inclusive cost sheet show for a flat in chennai +

It should show the carpet area and rate, floor rise or PLC, car parking, club membership, corpus fund, advance maintenance, EB and water charges, GST, and stamp duty with registration, adding up to one final figure. It should also state the booking amount, payment schedule and cancellation terms. If any line says it will be shared at allotment, ask for it in writing first.

stamp duty and registration charges for new flat in chennai 2026 +

For a builder's first sale, Tamil Nadu charges 6% in total below ₹50 lakh, 7% from ₹50 lakh to ₹3 crore and 9% above ₹3 crore, including the 2% registration fee. This comes from G.O. (Ms.) No. 131, in force since 1 December 2023, and applies to the composite value or the document value, whichever is higher. A resale flat pays 7% stamp duty plus 2% registration.

gst on under construction flat in chennai +

GST is 5% without input tax credit on an under-construction flat, and 1% if it counts as affordable, meaning up to 60 sq m of carpet area and up to ₹45 lakh in Chennai. A flat bought outright after the completion certificate has no GST. The Godrej Azure and Hiranandani Parks pages show 18% GST on maintenance and other extras, so budget for that too.

casagrand vs tvs emerald for first flat +

Both build mid-segment homes in Chennai. TVS Emerald shows no extensions in its 34 Chennai-region TNRERA registrations, though two are past their date without a 'Completed' mark. Casagrand has extensions on 23 of 79, but its DRHP reports 83 completed Chennai projects and its pages show a rate and total. Compare the specific projects' register entries and cost sheets.

how much booking amount can a builder take in tamil nadu +

Under RERA Section 13(1), a builder cannot take more than 10% of the cost as an advance before a written agreement for sale is signed and registered. TNRERA enforces this: in October 2026 it imposed a ₹50,000 penalty on Emerald Haven Development over unregistered agreements at an Anna Nagar project. Ask for the agreement draft before your payments cross 10%.

are car parking and club charges extra in chennai flats +

Often, yes. Hiranandani Parks listed covered parking at ₹2.5 lakh and lifetime club membership at ₹75,000 as on December 2021, and Casagrand bills car parking as a separate price head. Godrej Azure allots parking with no separate charge line. Open parking is a common area under RERA, so ask exactly what a parking charge buys you.

Sources

  1. Tamil Nadu Real Estate Regulatory Authority, Registered Projects (Building) lists 2017 to 2026, downloaded 22 November 2026
  2. Tamil Nadu Real Estate Regulatory Authority, final orders lists (Bench 1, Bench 2 and Adjudicating Officer) 2022 to November 2026, read 22 November 2026
  3. Tamil Nadu Real Estate Regulatory Authority, orders in C.Nos. 124 to 128 of 2023 (19 May 2025), C.No. 131 of 2024 (28 October 2025) and C.No. 58 of 2023 (17 June 2026)
  4. Tamil Nadu Real Estate Appellate Tribunal, Appeal No. 10 of 2026 (Casagrand Supremus), 22 July 2026
  5. Commercial Taxes and Registration Department, Government of Tamil Nadu, G.O. (Ms.) No. 131, 1 December 2023, and G.O. (Ms.) No. 166, 19 December 2025
  6. GST Council Secretariat, Minutes of the 33rd GST Council Meeting, February 2019; CBIC, FAQs on real estate, May 2019, and Circular No. 234/28/2024-GST, 11 October 2024
  7. Government of India, Real Estate (Regulation and Development) Act, 2016, Sections 2(k), 13 and 18
  8. Casagrand Premier Builder Limited, Draft Red Herring Prospectus, 24 December 2025
  9. Developer project pages and FAQs of Godrej Properties (Azure), Hiranandani Communities (Hiranandani Parks, figures as on December 2021), TVS Emerald, Radiance Realty, DRA Homes, Jain Housing, Urbanrise, Provident, Mahindra Lifespace and Akshaya, read 22 November 2026
  10. Construction World, TN RERA Fines Emerald Haven Rs. 50,000 for Unregistered Agreements, 2 November 2026

Mentioned here

Projects in this analysis

Chat with Us +91 79824 13588
A man reading about property on his phone at home

Free advice

Have a question before you buy?

Get straight answers from our advisor on projects, prices, home loans and paperwork. Free, with no obligation.

Unbiased advice. Your data is never sold to builders or brokers.

Prefer WhatsApp? Chat with Us: +91 79824 13588