Atal Setu: Best Areas to Invest Around Mumbai Trans Harbour Link
The areas around Atal Setu with the most on record sit at its two ends: Sewri, Wadala and the Parel side in Mumbai, and Ulwe, Dronagiri, the landfall villages, NAINA and Panvel on the mainland. Most mainland land is still planned rather than built, and each area hangs on a dated link such as the Pune expressway connector, 67% built in November 2026 for a February 2027 target.
By Rahul Mishra · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Which areas around Atal Setu are worth a look?
The Atal Setu best areas to invest in sit at the bridge's two ends, since 16.5 km of its 21.8 km runs over open sea. On the Mumbai side, that means Sewri, Wadala and Parel. On the mainland it means Ulwe, Dronagiri, the landfall villages, Gavhan, Jasai, Palaspe and Panvel, where most land is still planned, not built.
Our infrastructure record list only three interchanges: Sewri, Shivaji Nagar at Ulwe and Chirle on NH-4B. So this is a story of landfalls. Not of a corridor with towns along it. Savills India's H1 2026 report (via The Realty Today, 16 July 2026) says homes near Atal Setu saw stronger leasing and rent growth, with no Navi Mumbai figure. Past gains does not predict future ones.
The Mumbai Trans Harbour Link and where it meets land
The full name is the Atal Bihari Vajpayee Sewri-Nhava Sheva Atal Setu, though most people still calls it the Mumbai Trans Harbour Link or MTHL. The Press Information Bureau gave it as about 21.8 km and six lanes. About 16.5 km is over the sea and 5.5 km on land, at a cost of more than ₹17,840 crore. It was inaugurated on 12 January 2024 and opened to traffic the next day. Work had started on 23 March 2018, nearly six years before, which is worth remember when reading targets for links still coming.
MTHL property prices and land status, area by area
Our estimates are Property Nivesh plot estimates of 1 November 2026, for a typical residential plot. They are build from asking prices, so read them as a rough guide.
| Area | Land status | Price evidence | Depends on |
|---|---|---|---|
| Sewri | Port land, old chawls, new towers | No consultancy series | Sewri-Worli connector, target before 31 May 2027 |
| Wadala | Old societies, MMRDA notified area | No consultancy series | Metro Line 4, under construction |
| Parel side | Mill-area redevelopment | ANAROCK Lower Parel: gross yield about 3.0% (our sum, Q2 2026) | Elphinstone Road bridge, 63% (November 2026) |
| Ulwe | CIDCO node | Our estimate about ₹12,500 per sq ft (2026) | Ulwe Coastal Road, November 2026 target |
| Dronagiri | CIDCO node, still being reclaimed | Our estimate about ₹5,600 per sq ft (2026) | Coastal road extension, DPR stage |
| Chirle | Village land and gaothans | Our estimate about ₹920 per sq ft (2026) | Pune connector, February 2027 target |
| Gavhan and Jasai | Villages near the planned Aerocity | Our estimates about ₹1,140 and ₹1,840 per sq ft (2026) | Western Peripheral Road Phase II, DPR stage |
| Palaspe and NAINA villages | NAINA, planned by CIDCO | Our NAINA summary about ₹1,650 per sq ft (2026) | Pune connector |
| Panvel | Panvel Municipal Corporation, CIDCO nodes | Knight Frank ₹8,899 to ₹9,008 per sq ft (H1 2026) | Pune connector |
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Sewri property and the Mumbai end of the bridge
Sewri
Sewri, where the bridge starts, mixes old chawls, port land and a few new luxury towers. MahaRERA, the state's real estate regulator, shows Lodha Aureus registered on 16 March 2026 with 354 homes. Its completion date is 30 April 2033, and Lodha listed the price on request (6 November 2026).
Illustrative imageThe bigger change depend on the port. The Week reported ₹22,672 crore of eastern waterfront projects announced in February 2026, but the Victoria Dock marina was only at tender stage in November 2026. No consultancy publishes a Sewri price, so treat any sewri property figure as unverified.
Wadala
MMRDA wants its notified area near the Wadala Truck Terminal to become a business district. In October 2025 it offered a 10,860 sq m plot at a reserve of ₹1,629 crore (Free Press Journal); the result isn't officially confirmed. Metro Line 4 from Bhakti Park Metro and Wadala TT is still being built. The Monorail have carried no passengers since September 2025. See our guide to the best areas to invest in Wadala.
Parel and the Worli side
The Sewri-Worli Elevated Connector will carry bridge traffic across the island city to Worli. Its double-decker bridge at Elphinstone Road was 63% built in November 2026, Mid-Day reported (our Elphinstone Road bridge story). The nearest firm price row is ANAROCK's Lower Parel, where our Q2 2026 sum gave a gross yield (a year's rent over the price) of about 3.0%. Our Worli price tracker follows the Worli end.
The mainland end at Shivaji Nagar: Ulwe and Dronagiri
Ulwe
Ulwe is the CIDCO node at the Shivaji Nagar interchange, beside Navi Mumbai International Airport. A CIDCO node is a township planned by CIDCO, the state body that built Navi Mumbai. Ulwe's link is the 5.8 km Ulwe Coastal Road with a 0.903 km airport arm. Mumbai Live reported it nearly 80% done for a November 2026 target, but the opening was unconfirmed by 28 November. Once open, CIDCO say the airport will be about five minutes from Atal Setu.
Our Ulwe estimate rose from about ₹8,800 per sq ft in 2023 to about ₹12,500 in 2026, but no consultancy runs a Ulwe series. Prices and rents are in our Ulwe investment guide, and flights in our post on the Navi Mumbai airport's impact on property prices.
Dronagiri
Dronagiri is a CIDCO node in Uran taluka beside the JNPA port, with a station on the Kharkopar-Uran line since 12 January 2024. CIDCO is still reclaiming Sectors 43 and 45. CIDCO puts a logistics park at Pushpak Node near Dronagiri at about 560 hectares (379 elsewhere in its budget). A 13.5 km coastal road extension waits on a DPR, or detailed project report. Our estimate went from about ₹6,290 per sq ft (2024) to about ₹5,600 (2026), so it haven't moved in a straight line.
Property near Atal Setu's landfall: Chirle, Gavhan and Jasai
The NH-4B landfall
The bridge lands on NH-4B (NH 348) among villages. Village land, gaothan plots (a village's old settled core) and scheme plots trade here, and few homes are finished. The key road is the 7.35 km elevated link to the Mumbai-Pune Expressway via Palaspe. MMRDA put it at 67% built in November 2026, for a February 2027 target (our connector news story).
Our estimate for plots in Chirle and Ranjanpada went from about ₹320 per sq ft in 2023 to about ₹920 in 2026. That is nearly three times, or about ₹10 lakh a guntha of 1,089 sq ft. How plot costs differs by node is in our 1 guntha plot in Navi Mumbai guide. The catch is that KSC New Town covers 124 villages around here and some oppose acquisition. So gains is not assured, even with the connector on time.
Gavhan and Jasai
Gavhan sits at Gavan Phata junction, where CIDCO's 3.2 km Western Peripheral Road Phase II, at DPR stage in April 2026, is to end. A planned Aerocity of about 270 hectares is nearby, and its master plan were still being prepared. Our one-source estimate for Gavhan is about ₹1,140 per sq ft (2026). Jasai went from about ₹830 (2025) to about ₹1,840 (2026), more than double in a year, so take it as tentative.
Palaspe, the NAINA villages and the Panvel side
Palaspe
Palaspe is one of 23 villages in the NAINA Interim Development Plan of 27 April 2017, and it sits on the connector's path. NAINA, the Navi Mumbai Airport Influence Notified Area, is the airport belt that CIDCO plan. Marathon Nextgen Realty launched The Nirvana Collection, the last phase of its Nexzone township at Palaspe Phata from ₹98 lakh all-inclusive (25 February 2026). The developer claims Atal Setu is about 15 minutes away.
Illustrative imageNAINA villages
NAINA now covers 94 villages over 225.59 sq km. In a town planning scheme (TPS), owners pool land and get back a freehold 40% final plot with FSI 2.5 (floor space index, the buildable floor per unit of plot). That plot pays no CIDCO transfer charge, the fee CIDCO takes when its leasehold land is resold. TPS 1 and 2 were final in April 2026, with 3 to 12 at earlier stages. Parts of Nere, Vihighar and Usarli Bk lie in the Matheran Eco-sensitive Zone, where buildings stop at 9 m.
Our NAINA summary estimate is about ₹1,650 per sq ft for 2026, roughly ₹18 lakh a guntha. A Free Press Journal piece (October 2025) gave ₹5 lakh to ₹25 lakh a guntha, without naming a source. Village by village figures are kept inside our 1 guntha price in Panvel post.
Panvel
Knight Frank put Panvel at ₹8,899 to ₹9,008 per sq ft in H1 2026, up 9% on a year. Our Panvel property rates page estimates about ₹8,300 per sq ft for flats in 2026.
Third Mumbai (KSC New Town): what exists so far
Karnala-Sai-Chirner New Town, called Third Mumbai, covers 323.44 sq km across 124 villages of Uran, Pen and Panvel talukas. MMRDA dates its notification to 15 October 2024 and is the New Town Development Authority. Business Today (14 August 2026) reported that acquisition began in March 2026. Landowners are offered 22.5% developed land, money or TDR (transferable development rights), and some villages call it a land grab. MMRDA itself have warned that meaningful returns are 5 to 10 years away. The chief minister's USD 100 billion goal is a plan only (our Third and Fourth Mumbai story). No price data for Pen or Uran villages is on record.
Connector projects at both ends, with their status
The expressway side gets more depth in our post on the Mumbai-Pune Expressway expansion.
| Project | What it is | Latest status | Target |
|---|---|---|---|
| Atal Setu-Mumbai-Pune Expressway connector (MMRDA) | 7.35 km elevated, via Chirle and Palaspe; about ₹1,100 crore reported (tentative) | 67% built (MMRDA, November 2026) | February 2027 |
| Sewri-Worli Elevated Connector | About 4.5 km elevated, Sewri to Worli | About 60% (MMRDA, January 2025); Elphinstone bridge 63% (Mid-Day, November 2026) | Before 31 May 2027 (chief minister, 5 October 2026) |
| Ulwe Coastal Road (CIDCO) | 5.8 km to the Shivajinagar interchange, plus a 0.903 km airport link | Nearly 80% (Mumbai Live); opening not confirmed by 28 November 2026 | November 2026 |
| Coastal road extension to Dronagiri and Karanja-Rewas (CIDCO) | About 13.5 km, about ₹900 crore (tentative) | DPR consultant being appointed (CIDCO, April 2026) | Not stated |
| Western Peripheral Road Phase II (CIDCO) | 3.2 km to Gavan Phata junction | DPR stage (CIDCO, April 2026) | Not stated |
A percentage built is not a opening date. The 60% and 63% above measures different pieces of one road. The chief minister's order is in our Sewri-Worli connector deadline story, and a citywide board is in our infrastructure impact report for Mumbai.
Atal Setu toll, traffic and travel time as stated
These figures are as the cabinet, MMRDA, PTI and newspapers gave them. MMRDA hasn't published an official end-to-end travel time.
Illustrative image| What | Figure | Source and date |
|---|---|---|
| Car toll, single journey | ₹250 (50% of proposed rates), to 31 December 2026; electric cars and buses exempted | Maharashtra cabinet, via Free Press Journal, 20 January 2026 |
| Shivaji Nagar (Ulwe) to Sewri, car | ₹200 from 17 January 2024 for one year; current status not confirmed | Autocar Professional, 29 January 2024 |
| First-year traffic | About 22,689 vehicles a day, against more than 56,000 projected | ThePrint (PTI), 29 January 2025 |
| Vehicles to 27 March 2026 | 2,00,00,316, over 91% private | Free Press Journal (MMRDA figures), 29 March 2026 |
| South Mumbai to Panvel | From 1.5 hours to about half an hour | MMRDA year review, January 2025 |
First-year traffic was roughly two-fifths of the projection, and the bridge is still mostly a road for the private vehicles. The toll from 1 January 2027 is not on record yet, so check it before you budget.
Checklist: buying land or a flat near the landfall
Near a landfall the paperwork decide more than the price does, check it first.
- Find out who plans the land (a CIDCO node, NAINA, MMRDA or a municipal corporation) and get the zone in writing.
- For a NAINA plot, check the TPS stage and whether a final plot is allotted with a property card.
- For farmland, read the 7/12 extract, the land record for a survey number. Under section 63 of the Maharashtra Tenancy and Agricultural Lands Act, 1948, a non-agriculturist needs the Collector's permission to buy.
- Check the Matheran Eco-sensitive Zone, mangrove and CRZ (coastal regulation zone) limits for the survey number.
- Near the airport, check the Airports Authority of India height limit. It was 55.10 m above mean sea level from 2020, with up to 160.10 m possible since July 2022.
- For a flat, check the MahaRERA registration, completion date and extensions, and the OC (occupancy certificate, the permission to live in it).
- Reselling a leasehold CIDCO plot, held on a long CIDCO lease, carries the transfer charge. In 2026-27 it is ₹2,44,200 for 61 to 100 sq m in Airoli to Ulwe.
- Budget stamp duty, the tax on the deed, at the 6% in our state costs table, plus 1% registration capped at ₹30,000. Duty is charged on the higher of the agreement value and the ready reckoner value (the state's minimum value), so confirm both first.
Where to go from here
Both ends reward patience more then speed, since most of what they wait on is still being built or planned. For the wider fringe, see our top emerging real estate investment locations in the MMR.
Questions
Frequently Asked Questions
Where can you get on and off Atal Setu? +
Our infrastructure record lists three interchanges: Sewri at the Mumbai end, Shivaji Nagar at Ulwe, and the NH-4B landfall on the mainland. About 16.5 km of the 21.8 km bridge runs over the sea, so there is no housing along the middle. That is why property interest gathers at these points and along the roads leading off them.
What is the Atal Setu car toll in 2026? +
A car pays ₹250 for a single journey from 1 January to 31 December 2026, after the Maharashtra cabinet extended the 50% toll concession in January 2026, as the Free Press Journal reported. Electric cars and buses were exempted. A ₹200 rate for the Ulwe to Sewri stretch from January 2024 was set for one year, and whether it still applies is unconfirmed.
When will the Atal Setu to Mumbai-Pune Expressway connector open? +
MMRDA's target is February 2027. It said the 7.35 km elevated road from the landfall through Palaspe was 67% built in November 2026, and in April 2026 the Free Press Journal counted 143 of 176 foundations done. A target is not a promise, so if a purchase depends on this road, note the date and its source and check the next progress update.
Is the Sewri end linked directly to Worli yet? +
Not yet. The Sewri-Worli Elevated Connector is under construction, and its main double-decker bridge at Elphinstone Road was 63% built in November 2026, according to Mid-Day. On 5 October 2026 the chief minister directed that the connection be finished and opened before 31 May 2027, in a release from the state's information department. Treat that date as a target.
Is land at Chirle part of NAINA or Third Mumbai? +
It depends on the village and the survey number. Palaspe is in CIDCO's NAINA plan, 80 NAINA villages moved to MMRDA in March 2024, and MMRDA's KSC New Town covers 124 villages in Uran, Pen and Panvel talukas. Ask the seller for the planning authority and zone in writing, then confirm it with that authority before paying anything.
Is there a consultancy price for Ulwe, Dronagiri or the landfall villages? +
No consultancy figure exists for Ulwe, Dronagiri, Karanjade, Taloja or Pen; near the bridge, firm data covers Panvel, Kharghar and Navi Mumbai as a whole. For land, what exists are Property Nivesh plot estimates, CIDCO auction and reserve rates, and a newspaper range for NAINA that names no source. Price any deal against more than one of them.
Has Atal Setu traffic matched what was projected? +
Not in the first year. An MMRDA report put average traffic below 23,000 vehicles a day, and PTI gave 22,689, against more than 56,000 projected at opening. Use has grown since: MMRDA counted 2,00,00,316 vehicles by 27 March 2026, over 91% of them private. A 2026 daily average has not been published, so the trend is hard to read.
Can I buy farmland near the landfall if I am not a farmer? +
Not without permission. Under section 63 of the Maharashtra Tenancy and Agricultural Lands Act, 1948, a sale of agricultural land to a non-agriculturist is not valid without the Collector's permission. Buyers show farmer status with a Tahsildar's certificate or their own 7/12 holdings. Since February 2026, building plan approval counts as non-agricultural permission where the development plan allows that use, PTI reported.
Sources
- Press Information Bureau, Prime Minister's Office: PM inaugurates Atal Bihari Vajpayee Sewri-Nhava Sheva Atal Setu in Navi Mumbai, 12 January 2024
- Business Standard (PTI, citing MMRDA): Over 5 mn vehicles used Atal Setu since its opening on Jan 13, 26 August 2024
- ThePrint (PTI): Maharashtra cabinet keeps toll rates on Atal Setu unchanged till Dec 2025, 29 January 2025
- Free Press Journal: Maharashtra Cabinet Extends 50% Toll Concession On Atal Setu Till End Of 2026, 20 January 2026
- Autocar Professional: Maha Govt tweak in toll charges sees over 3 lakh vehicles ply on Mumbai Trans Harbour Link, 29 January 2024
- Free Press Journal (figures shared by MMRDA): Atal Setu Crosses 2 Crore Vehicle Mark In Just 26 Months, 29 March 2026
- MMRDA: Rebooting Mumbai, Reshaping the Future of MMR in 2024 (year review), January 2025
- Knight Frank India: India Real Estate, Office and Residential Market, January to June 2026, 9 July 2026
- The Realty Today (reporting Savills India's H1 2026 premium residential report), 16 July 2026
- Free Press Journal: MMRDA Accelerates Atal Setu-Mumbai-Pune Expressway Missing Link Project, 21 April 2026
- Free Press Journal: MMRDA To Complete Rs 1,100 Crore Elevated Corridor Linking MTHL and Mumbai-Pune Expressway (headline; date not read)
- Property Nivesh news: Atal Setu-Pune Connector 67% Done, reporting MMRDA, 9 November 2026
- Directorate General of Information and Public Relations, Maharashtra (Mahasamvad): CM war room review (Marathi release), 5 October 2026
- Property Nivesh news: Elphinstone Road Double-Decker Bridge, reporting Mid-Day, 24 November 2026
- Property Nivesh news: Sewri-Worli Connector Deadline, 5 October 2026
- The Week: Mumbai Rs 22,672-crore makeover, eastern waterfront set to become maritime powerhouse by 2047, 7 February 2026
- Property Nivesh news: Victoria Dock Yacht Marina, reporting The Times of India, 5 November 2026
- MahaRERA: registration certificate PR1170002502863 (Aureus), read 30 October 2026; Lodha price page, read 6 November 2026
- Free Press Journal: MMRDA To Auction Wadala Truck Terminal Plot For Rs 1,629 Crore, 20 October 2025
- MMRDA: Metro Line 4 overview, 31 August 2026; Free Press Journal: Mumbai Monorail Restart Delayed Despite CBTC Safety Clearance, 8 August 2026
- Property Nivesh: derived gross yields from ANAROCK Research's MMR Q2 2026 Residential Market Viewpoints, November 2026
- CIDCO: Budget 2026-27, Statement of the Vice Chairman and Managing Director (Performance Review 2025-26 and Budget Estimate 2026-27), 18 April 2026
- Mumbai Live (citing CIDCO's Vijay Singhal to The Indian Express): From Mumbai to Navi Mumbai airport in just 5 minutes (undated)
- JLL India: Navi Mumbai airport opens a new real estate corridor, 14 August 2026
- Free Press Journal: Maharashtra PM Modi inaugurates extension of 40 suburban train services (Kharkopar-Uran), 12 January 2024
- CIDCO: Transfer Charges for the year 2026-27 (circular CIDCO/M (TS-I)/2026/203), 30 March 2026
- CIDCO: Frequently Asked Questions, NAINA Town Planning Schemes, 1 August 2019
- CIDCO: NAINA Town Planning Schemes and gazette notice on TPS 13 and 14, 29 April 2026
- Free Press Journal: Govt Removes 80 Villages From NAINA, Hands It Over To MMRDA, 6 March 2024
- Free Press Journal: Navi Mumbai Property Prices Set To Skyrocket, Airport Launch Triggers Massive Real Estate Buzz, 7 October 2025
- Ministry of Environment and Forests, Government of India: Notification S.O. 133(E) on the Matheran Eco-Sensitive Area, 4 February 2003
- Free Press Journal: AAI relaxes height restrictions around Navi Mumbai airport, 31 July 2022
- Business Today: Third Mumbai, how MMRDA plans to build Karnala-Sai Chirner New Town from scratch, 14 August 2026
- Property Nivesh news: Third and Fourth Mumbai Plans, 26 November 2026
- Marathon Nextgen Realty press release (PNN/ANI via ThePrint): The Nirvana Collection at Nexzone, 25 February 2026
- Property Nivesh plot price research (Navi Mumbai and Panvel), 1 November 2026; Property Nivesh Panvel property rates page, 29 October 2026
- Maharashtra Government Gazette: Maharashtra Tenancy and Agricultural Lands Act, 1948, section 63, as amended (text via PRS Legislative Research); Press Trust of India via ThePrint on NA permission, 11 February 2026
- Property Nivesh state costs table (Maharashtra stamp duty and registration)