Investment Guides
Navi Mumbai Metro Expansion: Investment Opportunities, Line by Line
The Navi Mumbai Metro has one open line, Line 1 from CBD Belapur to Pendhar, running since 17 November 2023 through Kharghar and Taloja. Lines 1A and 2 to the airport were approved on 9 June 2026 with full running targeted for FY 2031-32, so prices near planned stations rest on plans, not trains.
By Prerna Sharma · Edited by
Rakesh Mahajan · · 12 min read
Illustrative image Kharghar metro stations and the other Line 1 stops
DNA India's pre-opening list (5 April 2023) gives the 11 stops in order: Belapur, Sector-7 Belapur, Science Park, Utsav Chowk, Sector-11 Kharghar, Sector-14 Kharghar, Central Park, Petha Pada, Sector-34 Kharghar, Panchnand and Pendhar Terminal. Signboards can differ slight, such as Pethpada or Panchanand. Six of the 11 are Kharghar metro stations, from Utsav Chowk to Sector-34 Kharghar.
Price evidence by stop (Knight Frank, 9 July 2026; Property Nivesh estimates, 29 October 2026; CIDCO Homes AUG-26 scheme):
| Stops | Node and civic body | Price evidence on record |
|---|---|---|
| Belapur to Science Park | CBD Belapur (Navi Mumbai Municipal Corporation) | No consultancy series |
| Utsav Chowk to Sector-34 Kharghar | Kharghar (Panvel Municipal Corporation) | Our estimate ₹11,300 per sq ft (2026); Knight Frank ₹10,500 to ₹12,351 (H1 2026) |
| Panchnand, Pendhar Terminal | Taloja (Panvel Municipal Corporation) | CIDCO EWS 1 BHK ₹23.5 lakh at Raigad Residency; no consultancy series |
| Sagar Sangam (Line 1A) | CBD Belapur side | Not on record |
| Line 2 stops | Pendhar to NMIA Terminal 4 | Station names not on record |
Kharghar's sectors gets a full profile in our guide to the best areas to buy property in Kharghar. Note that Kharghar is the only stretch of Line 1 with a consultancy price range.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Why the maps of Line 2 don't match
Older descriptions put Line 2 near Kamothe, Kalamboli and Khandeshwar. CIDCO's own April 2026 budget says in its opening pages that Line 2 runs Khandeshwar to Taloja MIDC. The Free Press Journal (17 November 2025) had it going from Pendhar to Taloja MIDC via Kalamboli and Kamothe, about 16 km, and ANAROCK's Panvel report lists "Line 2: Taloja-Khandeshwar 8.15 km".
The budget's project section, which the 9 June 2026 approval follow, defines Line 2 as Pendhar to the airport. The state's 28 km figure appears to add Line 1's 11.10 km to the 17.09 km of Lines 1A and 2. The alignment can still change, so a flat sold as "next to Line 2" needs a station name and CIDCO's drawing. For the Panvel side, read our verdict on whether Panvel is a good place to invest.
Risks of buying on a planned Navi Mumbai metro line
Illustrative image- Time. Construction of Lines 1A and 2 only starts in FY 2027-28. Your EMI, the monthly home loan instalment, start long before any train.
- Route. Line 2 has been described at least three ways since 2025, so a promised station isn't certain.
- Taloja MIDC. In July 2024 the Supreme Court asked MPCB, the state pollution board, to report on effluent from about 900 factories into the Kasardi river (Free Press Journal, 26 July 2024).
- Water. CIDCO cut supply by 10% in all its nodes from 28 May 2026 (Free Press Journal, 26 May 2026).
- Line 8. A private partner have still to be found, so the 2030 target leans on a contract that isn't signed.
Questions
Frequently Asked Questions
When will the Navi Mumbai Metro reach the airport? +
Not soon. Line 2, from Pendhar to NMIA Terminal 4, was approved with Line 1A on 9 June 2026. CIDCO expects construction to start in FY 2027-28 and the lines to be fully running by FY 2031-32. Metro Line 8 from Mumbai's old airport is targeted for 2030, but no concessionaire is on record yet.
How much is a ticket on Navi Mumbai Metro Line 1? +
The Free Press Journal reported fares of ₹10 to ₹30 in November 2025, with trains every 10 minutes at peak and every 15 minutes off-peak. Before opening, DNA India listed fares of ₹10 to ₹40. Reports of a cut of about 33% from 7 September 2024 are tentative, so check the current fare at the station.
Will Line 2 stop at Kamothe, Kalamboli or Khandeshwar? +
The route in CIDCO's project section and the state's 9 June 2026 approval runs from Pendhar past the Taloja MIDC area to NMIA Terminal 4, and it does not name those nodes. Older descriptions, including CIDCO's own budget foreword and a November 2025 newspaper report, put Line 2 near them. Ask for CIDCO's alignment drawing before trusting a sales map.
Where does Metro Line 12 from Kalyan meet the Navi Mumbai metro? +
CIDCO says Line 2 will interchange with Metro Line 12, the 23.57 km Orange Line that MMRDA is building from Kalyan to Taloja. The exact interchange station is not on record. Line 12 was under construction as of 9 October 2026, its foundation stone was laid on 7 September 2019, and no opening date has been published.
How many people ride the Belapur to Pendhar line? +
CIDCO's budget statement of 18 April 2026 says monthly ridership had crossed 5.93 lakh, or roughly 20,000 trips a day by simple division. The line logged over 1.15 crore riders in its first two years. The state expects about 12 lakh daily riders in future on the joined-up line to the airport.
Did Kharghar prices rise after the metro opened in 2023? +
Our Kharghar estimate went from ₹9,800 per sq ft in 2023 to ₹11,300 in 2026, about 15%, while Panvel town rose about 10%. Atal Setu opened in January 2024 and the airport in 2025, so the metro's share cannot be isolated. Knight Frank showed Kharghar up 6% in the year to H1 2026 and flat over six months.
Are Navi Mumbai Metro Lines 3, 4 and 5 planned? +
No current official plan for Lines 3, 4 or 5 is on record. The approved expansion is Lines 1A and 2, which CIDCO wants to run with Line 1 as one corridor from Sagar Sangam to the airport. Treat any project advert that names other Navi Mumbai lines as a claim to check with CIDCO.
Is Taloja near Pendhar a cheaper way to live on the metro? +
On CIDCO prices it is: the AUG-26 scheme listed EWS 1 BHK homes at Raigad Residency, Taloja Sector 39, for ₹23.5 lakh. Demand was thin, with 3,142 successful applicants for 4,779 homes. Taloja sits beside Taloja MIDC, has faced water cuts and has no consultancy price series, so weigh those before counting on the station.
Sources
- CIDCO, Budget 2026-27: Statement of Shri Vijay Singhal, Vice Chairman & Managing Director (Performance Review 2025-26 & Budget Estimate 2026-27), 18 April 2026
- Directorate General of Information and Public Relations, Maharashtra (Mahasamvad), Cabinet Infrastructure Committee approves Navi Mumbai Metro Line 1A and Line 2 and the Ghodbunder-Bhayandar project (Marathi), 9 June 2026
- Free Press Journal, Navi Mumbai Metro Line 1 Crosses 1.15 Crore Ridership In Two Years, CIDCO Plans Major Expansion, 17 November 2025
- DNA India, Navi Mumbai Metro Belapur-Pendhar line: list of 11 stations, ticket prices revealed, 5 April 2023
- Press Information Bureau, foundation stone of Mumbai Metro Line 12, Kalyan - Taloja, 7 September 2019; length, cost and status from Property Nivesh infrastructure records, 9 October 2026
- Property Nivesh, Panvel property rates: Kharghar and Panvel town and outskirts (asking-price based estimates), 29 October 2026
- Knight Frank India, India Real Estate: Office and Residential Market, January-June 2026 (H1 2026), 9 July 2026
- JLL India, Navi Mumbai airport opens a new real estate corridor, 14 August 2026
- ANAROCK Research, Micro Market Report: Panvel, Navi Mumbai, MMR (Line 1 cost and Line 2 description as printed)
- Free Press Journal, Navi Mumbai: CIDCO Lottery For 4,779 EWS Homes Draws 3,142 Successful Applicants, 11 September 2026
- CIDCO (CIDCO Homes), My Preferred CIDCO Home, AUG-26 EWS scheme listing (Raigad Residency, Taloja Sector 39)
- Free Press Journal, Navi Mumbai: SC Orders MPCB To Report On Chemical Pollution In Taloja, Caused By Industrial Effluents In Kasardi River, 26 July 2024
- Free Press Journal, Navi Mumbai: CIDCO imposes 10 per cent water cut from May 28 amid falling reservoir levels and monsoon concerns, 26 May 2026
- Free Press Journal, NMIA starts international operations with first Air India Express flight to Abu Dhabi, 15 July 2026

