PropertyNivesh.in

Market Trends

GIFT City Metro Connectivity: Impact on Nearby Property Prices

GIFT City metro connectivity comes from the 5.4 km GNLU to GIFT City spur, open since 17 September 2024, with the full Phase 2 line to Mahatma Mandir since 11 January 2026 and a 3.33 km Shahpur extension approved on 24 February 2026. No named study has measured price changes near these stations, so any metro premium is unproven.

By Akansha Singh · Edited by Rakesh Mahajan · · 13 min read

An elevated metro train crossing a river near glass towers in Gujarat at dusk Illustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

GIFT City metro connectivity in short

GIFT City metro connectivity today rests on one spur: a 5.4 km elevated line from GNLU to GIFT City, with stations at PDPU and GIFT City, running since 17 September 2024. The full Ahmedabad Gandhinagar metro Phase 2 reached Mahatma Mandir on 11 January 2026, and a 3.33 km GIFT City to Shahpur extension was approved on 24 February 2026. No named study has measured what the line did to prices near its stations.

That last point matter more than any brochure line. So this post sticks to what can be checked: station by station, date by date, then the price records that exists, with their limits spelled out.

If you are comparing localities rather then stations, our guide to the best residential areas near GIFT City, Raysan, Kudasan and Sargasan goes area by area. Here the line itself is the subject.

Ahmedabad Gandhinagar metro Phase 2: which stations are open and since when

The Ahmedabad Gandhinagar metro Phase 2 opened in two big steps. The first section was inaugurated on 16 September 2024 and public service start the next day, as The Metro Rail Guy reported on 16 September 2024 and a GMRC public notice hosted by GIFTCL confirmed on 17 September 2024. GMRC is Gujarat Metro Rail Corporation, a 50:50 Centre and Gujarat joint venture.

That first opening covered 20.8 km of the 28.25 km Phase 2. It gave six main-line stations, GNLU, Raysan, Randesan, Dholakuva Circle, Infocity and Sector 1, plus the spur. The seven intermediate stations between Motera Stadium and GNLU was not ready at the time of opening, per the same report.

Station or stretchLine sectionStatusDateSource
GNLU, Raysan, Randesan, Dholakuva Circle, Infocity, Sector 1Phase 2 main lineOperational17 September 2024The Metro Rail Guy, 16 September 2024
PDPU (also called PDEU), GIFT CityGNLU to GIFT City spur, 5.4 km elevatedOperational17 September 2024GMRC public notice hosted by GIFTCL, 17 September 2024
Akshardham, Juna Sachivalaya, Sector-16, Sector-24, Mahatma MandirFinal Phase 2 stretch to Mahatma MandirOperational11 January 2026 (some reports say 12 January)DeshGujarat, 9 January 2026
Three stations, names not publishedPhase 2B, GIFT City to Shahpur, 3.33 kmApproved; civil work order pendingApproved 24 February 2026ThePrint (PTI), 24 February 2026; DeshGujarat, 25 July 2026
Two more stations in the central office districtInside GIFT CityProposed; tenders in processReported 25 November 2025DeshGujarat, 25 November 2025

The final stretch has two version on record: five stations over 5.36 km per DeshGujarat, or seven stations over 7.8 km from Sector 10A per other reports. Knight Frank India's H1 2026 report says Phase 2 was fully commissioned on 11 January 2026.

How the GNLU to GIFT City metro spur works

The GNLU to GIFT City metro is a branch, not the main line. Trains leave the Phase 2 main line at GNLU, stop at PDPU, and ends at the GIFT City station. So a rider coming from Ahmedabad or from central Gandhinagar has to switch at GNLU unless a through service is run, and GMRC hasn't published a through-service pattern.

Timings at opening were reported by The Metro Rail Guy in September 2024: Sector 1 to Motera Stadium from 7:20 am to 6:40 pm, and GNLU to GIFT City from 8:20 am to 6:25 pm. Those are office-hour windows, which tells you who the spur were built for. GMRC did not publish a frequency at the time.

  • Spur length: 5.4 km, elevated, per the GMRC notice of 17 September 2024.
  • Stations on the spur: PDPU (PDEU) and GIFT City, and nothing in between.
  • Interchange point: GNLU, on the main line between the Motera Stadium side and Raysan.
  • Timings today: check GMRC before you depend on them, since the 2024 hours was opening-week figures.

So a home near PDPU or GNLU is one or two stops from GIFT City, while one near Infocity or Sector 1 need the change at GNLU.

Free property updates

Never Miss a Property Opportunity!

Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.

Where would you like to receive updates?
Send me

Free. Only updates worth your time, and you can stop any time. We never sell or share your number or email. By subscribing you agree to get Property Nivesh updates on the channel you chose. Stop updates

The GIFT City metro station and the planned stations inside GIFT City

The present GIFT City metro station is not in the heart of the office district. DeshGujarat wrote on 9 April 2026 that the existing station is some distance from the main activity zone, and that the Shahpur extension bring the line closer to GIFT City's office complexes, banks, the SEZ area and Gujarat Biotechnology University. An SEZ is a special economic zone; inside GIFT City the SEZ hosts the IFSC, the International Financial Services Centre regulated by IFSCA.

An elevated metro station platform with commuters out of focusIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

Separately, DeshGujarat reported on 25 November 2025 that two more stations are planned inside the central office district, one near the SBI building, with tenders in process and roughly two years expected, plus a GSRTC bus terminal with no timeline. That is a proposal, not a awarded work. Whether these two are the same as the three Phase 2B stations is not stated in the reports, and the names of the Phase 2B stations hasn't been published.

Phase 2B: the GIFT City to Shahpur metro extension, step by step

Phase 2B is the next real change to the gift city metro map. The Union Cabinet approved it on 24 February 2026, as PTI reported via ThePrint the same day: a 3.33 km elevated extension of the North-South corridor from GIFT City to Shahpur, with three stations and about four years to complete.

The cost has two figures on record: ₹1,067.35 crore from PTI and ₹1,017 crore from DeshGujarat in April and July 2026. Neither explain the gap, so read it as about ₹1,067 crore, with the lower figure as a alternative report.

StepWhat happenedDateSource
ApprovalUnion Cabinet approves 3.33 km, 3 stations, ₹1,067.35 crore, four years24 February 2026ThePrint (PTI), 24 February 2026
Civil tenderViaduct and 3 stations, estimate ₹290.33 crore excluding taxes, 18 months9 April 2026DeshGujarat, 9 April 2026
Financial bidsRanjit Buildcon lowest bidder at ₹280.83 crore, 3.27% below estimate, of four valid bids25 July 2026DeshGujarat, 25 July 2026
Work orderExpected after GMRC's technical evaluation; no award reportedPending as of 29 November 2026DeshGujarat, 25 July 2026
Projected ridershipAbout 23,702 passengers (2029) and 58,059 (2041)24 February 2026ThePrint (PTI), 24 February 2026

So the extension sit at the lowest-bidder stage, and the four-year clock hasn't visibly started because no work order is on record. Any opening year in an advert is a guess unless it quote GMRC.

GIFT City metro ridership: what has been published

Ridership for the spur is not published. GMRC hasn't released station-wise numbers for GIFT City, PDPU or any Phase 2 station, so nobody can say from records how many GIFT City workers actually ride the train each day.

A metro viaduct under construction beside a roadIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

Two wider figures exist. Knight Frank India's H1 2026 report says the Ahmedabad network spans about 67.56 km across four lines and carry over 51 million passengers a year. And the Phase 2B projection above, about 23,702 riders in 2029, is a planning estimate made for the approval, not a count.

For context on who might ride, GIFT City's workforce is reported at over 25,000 by Knight Frank (H1 2026) and nearly 30,000 by Outlook Business (July 2026). Neither figure are a station count.

Which areas the GIFT City metro serves

Metro access near GIFT City is uneven. Some localities have a station carrying their own name, others only sit near one, and Koba has none at all in the sources read. The table below lists each area with its nearest stations by name, not by distance, because no official distance from these localities to GIFT City has been published.

AreaNearest station(s) by nameStation statusWhat else is on record
RaysanRaysan (main line, north of GNLU)Operational since 17 September 2024Apartments by local developers; no GujRERA project with a developer price found
RandesanRandesan (main line, between Raysan and Dholakuva Circle)Operational since 17 September 2024Knight Frank India, H1 2026: GIFT City jobs sustaining mid-to-premium demand
PDPU (PDEU) Road beltPDPU (spur), GNLUOperational since 17 September 2024Housing near the PDEU campus; no named project with a developer price
SargasanInfocity, Sector 1Operational since 17 September 2024On the SG Highway near Infocity
KobaNo station named KobaNot applicableKnight Frank India, H1 2026: named with Zundal and Randesan as demand beneficiaries
KudasanNo station named in the sourcesNot applicableSouth of Sargasan along the Koba-Gandhinagar road
Central Gandhinagar (Sector-16, Sector-24, Mahatma Mandir)Sector-16, Sector-24, Mahatma MandirOperational since 11 January 2026Mahatma Mandir station serves Gandhinagar Capital railway station (DeshGujarat, 9 January 2026)

Station data is from The Metro Rail Guy (16 September 2024) and DeshGujarat (9 January 2026). One honest caveat: a station name is not a walking distance. Check where a society actually sit before you assume it's a short walk.

For rents around these same stations, see our post on the best areas near GIFT City for rental income, which deal with tenants and yields.

GIFT City connectivity beyond the metro: airport, buses and the bullet train

The train is only part of gift city connectivity. The Press Information Bureau's backgrounder of 28 November 2025 says GIFT City is about 20 minutes from Ahmedabad airport and 15 minutes from the proposed high-speed rail terminal, and that 12 electric buses links it with Ahmedabad and Gandhinagar. Those are PIB's own times, not measured trips at peak hour.

  • Mumbai-Ahmedabad High Speed Rail: a Gandhinagar-area station is under construction, and Knight Frank India's H1 2026 report puts it at about 2027-28. That is a consultancy's tentative projection, not a railway date.
  • Roads: Sargasan lie on the SG Highway and Kudasan along the Koba-Gandhinagar road, but no official travel time from either to GIFT City is published.

If you are buying inside GIFT City rather than near it, the zone and lease rules matter more than the station; our guide on whether you can buy a flat in GIFT City explain them.

Metro impact on property prices in Gandhinagar: what the evidence shows

Here is the plain answer on metro impact property prices Gandhinagar buyers ask about. No named, dated study by a consultancy, a university or a government body has measured price changes near Gandhinagar or GIFT City metro stations.

Residential towers near an elevated metro lineIllustrative image
Illustrative image: an AI-generated picture made for this guide. It does not show any project or building named in this post.

What does exist is city-level and project-level data, and none of it isolate the metro. Each row below comes from one source on one basis, so don't join them into a single trend.

MeasureFigurePeriodSource and basis
NHB RESIDEX, Ahmedabad, year-on-year7.9%Quarter ending September 2024 (spur opened that month)NHB, HPI at assessment prices from bank and HFC valuations
NHB RESIDEX, Ahmedabad, year-on-year6.0% to 6.8%Quarters of 2025NHB, same basis
NHB RESIDEX, Ahmedabad, year-on-year7.2% and 7.9%Quarters ending March and June 2026NHB, same basis
Ahmedabad average residential price₹4,826 per sq ft, up 3%H1 2026Knight Frank India, H1 2026 report, primary market
Motera price range₹3,500 to ₹4,200 per sq ft, up 2%H1 2026Knight Frank India, H1 2026 report
North zone unsold homes11,106, up 14%H1 2026Knight Frank India, H1 2026 report
GIFT City residential pricesUp 30 to 35% "in recent months" (quoted)Reported July 2026JLL's Karan Singh Sodi, quoted by Outlook Business, 4 July 2026
Ahmedabad average asking price₹6,800 per sq ft; 55% over five years2026Our city tracker, asking prices across tracked projects and listings

Read that table for what it can't tell you. The NHB index for Ahmedabad was 7.9% in the quarter the spur opened, dipped through 2025, and came back to 7.9% by June 2026, but it cover the whole city, not station catchments. Knight Frank publish no GIFT City or Gandhinagar price at all. Local asking prices sit on our Ahmedabad property rates page. The JLL quote is about GIFT City homes, says nothing of the metro, and is a remark in an interview rather then a series.

There is also a warning sign in the same Knight Frank report. It describe North zone supply as infrastructure-led and running ahead of end-user absorption, with 8.4 quarters to sell. A new station can draw launches as easily as it draws buyers. And past growth, from any source, does not predict future growth. For the wider price picture see GIFT City property prices in 2027 and our Ahmedabad city page.

How to check a metro claim before you buy near a station

A metro line is a fact you can verify; a "metro premium" is usually a sales line. Run these checks first. They also helps for the bigger question in GIFT City vs Gandhinagar for property investment.

  1. Ask which station the project is nearest to, by name, and check that station is operational on GMRC's notices.
  2. If the advert cites the Shahpur extension, ask for the GMRC work order; as of 29 November 2026 none is reported.
  3. Ask for the source and date of any price premium figure. A developer or portal claim is not a study.
  4. Check the project on GujRERA, Gujarat's real estate regulator, for registration number, completion date and carpet area. Carpet area is the usable floor inside the walls; super built-up area adds common spaces.
  5. Confirm the zone if the home is inside GIFT City. GIFT City land is leased from GIFTCL for 99 years, so you buy a developer-built flat on leasehold land, not freehold land.
  6. Work out your costs. Our state costs table lists Gujarat stamp duty at 4.9% and registration at 1%, with women buyers exempt from the registration fee; duty is charged on the higher of the deal value and the jantri value, Gujarat's circle rate. Confirm with the sub-registrar before paying.
  7. Walk or drive the route from the flat to the station at office hours and time it yourself, because no official locality-to-station times are published.

Our guide to what buyers must check on RERA covers step 4 in more depth, and the stamp duty calculator do the sums for step 6.

Where this leaves buyers near the GIFT City metro

The gift city metro station has worked since September 2024, central Gandhinagar joined the line in January 2026, and the Shahpur extension is approved but waiting on a work order. Those dates is solid. What the line has done to prices near stations is not on record, and a buyer should treat any premium as unproven.

If you want the bigger verdict, read is GIFT City a good place to invest in real estate in 2027. For how the city around it is shifting, there's how GIFT City is changing the real estate market of Gandhinagar.

Questions

Frequently Asked Questions

Is there a metro station inside GIFT City? +

Yes. The GIFT City station at the end of the GNLU spur has been open since 17 September 2024, per a GMRC notice. DeshGujarat reported in April 2026 that it sits some distance from the main office zone, which is why the Shahpur extension and two proposed stations in the central office district are meant to bring the line closer.

How do I reach GIFT City by metro from Ahmedabad? +

Ride the Phase 2 main line towards Gandhinagar and change at GNLU for the spur, which stops at PDPU and then GIFT City. In September 2024 the spur ran from 8:20 am to 6:25 pm, as The Metro Rail Guy reported. GMRC has not published a frequency or a through service, so check current timings before relying on them.

When will the GIFT City to Shahpur metro open? +

No opening date has been published. The Union Cabinet approved the 3.33 km extension on 24 February 2026 with about four years to complete, per PTI. Civil bids were opened in July 2026 and Ranjit Buildcon was lowest bidder, but no work order is reported as of 29 November 2026, so the build clock has not visibly started.

What are the names of the three Phase 2B stations? +

They have not been published. PTI and DeshGujarat both describe three stations on the GIFT City to Shahpur extension without naming them. DeshGujarat separately reported in November 2025 that two stations are planned in the central office district, one near the SBI building, but it is not stated whether these are part of Phase 2B.

Do flats near Raysan or PDPU metro stations cost more? +

Nobody has shown it with a dated study. No consultancy, university or government body has published price changes near Gandhinagar or GIFT City metro stations. Prices for Raysan and the PDPU belt appear only on portals, which vary widely. Ask any seller quoting a metro premium for the source, the date and the basis of the figure.

Did Ahmedabad prices rise after the GIFT City metro opened? +

The NHB RESIDEX for Ahmedabad showed 7.9% year-on-year growth in the quarter ending September 2024, between 6.0% and 6.8% through 2025, and 7.9% again by June 2026. That index covers the whole city on bank valuation prices, so it cannot tell you what the metro alone did near its stations.

How many people use the GIFT City metro station? +

GMRC has not published station-wise ridership for GIFT City, PDPU or other Phase 2 stations. Knight Frank India says the whole Ahmedabad network carries over 51 million passengers a year. For Phase 2B, PTI reported a projected 23,702 riders in 2029 and 58,059 in 2041, which are planning estimates rather than counts.

Does Koba have a metro station? +

No station named Koba appears on Phase 2 in the sources read. The stations nearest by name to the GIFT City side are Raysan, Randesan and GNLU on the main line and PDPU on the spur. Knight Frank India still names Koba, with Zundal and Randesan, as a locality where GIFT City jobs sustain demand.

Sources

  1. Gujarat Metro Rail Corporation (GMRC), public notice hosted by GIFT City Company Ltd: Commencement of services Motera to Sector-1 and GNLU to GIFT City, Phase-2, 17 September 2024
  2. The Metro Rail Guy: Ahmedabad Metro's Phase 2 to Gandhinagar Inaugurated, 16 September 2024
  3. DeshGujarat: 5 new stations to open on Ahmedabad-Gandhinagar Metro route; key destinations within walking distance, 9 January 2026
  4. ThePrint (PTI): Cabinet approves extension of Gujarat Metro from GIFT City to Shahpur, 24 February 2026
  5. DeshGujarat: GIFT City - Shahpur Metro: Rs 290 crore tender invited for construction of viaduct, 3 stations, 9 April 2026
  6. DeshGujarat: Ahmedabad Metro Phase 2B: Ranjit Buildcon emerges as lowest bidder for GIFT City - Shahpur extension, 25 July 2026
  7. DeshGujarat: GIFT City to have Two More Metro Stations; GSRTC Terminal also on Cards, 25 November 2025
  8. Knight Frank India: India Real Estate, Office and Residential Market H1 2026, Ahmedabad chapter, July 2026
  9. Press Information Bureau, Government of India: Smart Finance, Smart Future: GIFT City (backgrounder), 28 November 2025
  10. Outlook Business (Ashutosh Mishra): Towers, Tax Structures and Regulations in Place. All GIFT City Needs Now is Society, 4 July 2026
  11. ANI via NewKerala: GIFT City workforce report, 19 January 2026
  12. National Housing Bank: RESIDEX national press releases, quarters ending September 2024 to June 2026
  13. GIFT City Company Ltd: Final Pricing Policy (allotment of Development Rights), effective 15 September 2024
  14. Property Nivesh city tracker (Ahmedabad) and state costs table (Gujarat), 2026
Chat with Us +91 79824 13588
A man reading about property on his phone at home

Free advice

Have a question before you buy?

Get straight answers from our advisor on projects, prices, home loans and paperwork. Free, with no obligation.

Unbiased advice. Your data is never sold to builders or brokers.

Prefer WhatsApp? Chat with Us: +91 79824 13588

Free property updates

Never Miss a Property Opportunity!

Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.

Where would you like to receive updates?
Send me

Free. Only updates worth your time, and you can stop any time. We never sell or share your number or email. By subscribing you agree to get Property Nivesh updates on the channel you chose. Stop updates

Rent, sell or advertise

Tell us what you need

Pick one, answer a few questions, and our team calls you back. It is free.

What would you like to do?