Buying Guides
Best Residential Projects in Sector 66 Gurugram: The 2026 Project List
The residential projects in Sector 66 Gurugram are Emaar's Palm Drive and Palm Terraces Select (ready), Smartworld The Edition and BPTP Downtown 66 (due 2031 and 2032) and Emaar's Marbella plots. Only Downtown 66 has a reported price, from ₹5.32 crore for 3 and 3.5 BHK.
By Mridul Shakya · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image Which residential projects are in Sector 66 Gurugram?
The residential projects in Sector 66 Gurugram on HRERA Gurugram's register are Emaar's Palm Drive and Palm Terraces Select towers, Emaar's Marbella villas and plots, Smartworld The Edition and BPTP Downtown 66. Palm Drive and Palm Terraces Select have occupation certificate documents listed, while The Edition and Downtown 66 carry completion dates of 01.02.2031 and 31.10.2032. The rest of what is registered in the sector are offices and shops.
So the buyer here has three quite different choices: a resale flat in a finished Emaar society, a new flat in one of two big towers projects that is still years from handover, or a plot in Marbella. This page is not a ranking. It just lay out what each project has on record, so you can compares like with like.
For a verdict on the neighbourhood as a whole, the post is Sector 65 Gurugram a good place to buy property covers the for and against, and our Sector 67 investment guide covers the sector on the other side.
All Sector 66 Gurugram projects on HRERA, with status
The table below is every project with homes or plots that HRERA Gurugram's register places in Sector 66, as read on 29 November 2026. HRERA is the Haryana Real Estate Regulatory Authority, the body every new project has to register with before selling. An OC (occupation certificate) is the permission to live in a finished building.
| Project | Developer (promoter) | HRERA registration | Type | Status on record |
|---|---|---|---|---|
| Palm Drive and Palm Terrace Select | Emaar (Emaar MGF Land Ltd) | GGM/408/140/2020/24, 10.09.2020 | Flats and 4 villas | Ready; OC document dated 25.01.2018 |
| Palm Terraces Select | Emaar (Emaar MGF Land Ltd) | 19 of 2018 (interim), 01.02.2018 | Flats | Ready; OC documents dated 08.03.2019 and 08.08.2019 |
| Smartworld The Edition | Smartworld Developers (Etsy Realcon Pvt Ltd) | RC/REP/HARERA/GGM/756/488/2023/100, 06.11.2023 | Flats | Under construction; completion 01.02.2031 |
| BPTP Downtown 66 | BPTP Ltd | RC/REP/HARERA/GGM/981/713/2025/84, 19.09.2025 | Flats | Under construction; completion 31.10.2032 |
| Marbella | Emaar (Emaar MGF Land Ltd) | 307 of 2017 (interim), 17.10.2017, Sectors 65 and 66 | Villas and plots | Villas handed over, Emaar told HRERA on 06.07.2026; OC documents listed without dates |
| Marbella Phase 2 | Emaar (Emaar MGF Land Ltd) | GGM/440/172/2021/08, 01.03.2021, Sectors 65 and 66 | Plots | Completion 31.12.2027 on the register; no completion certificate on the portal |
| Marbella Terraces | Emaar India Ltd | GGM/1068/800/2026/40, 25.06.2026 | Plots | Registered; completion 31.12.2031 |
| Marbella Phase 7 | Emaar India Ltd | GGM/1080/812/2026/52, 05.08.2026 | Plots | Registered; certificate valid to 31.12.2031 |
| The Cityscape | French Buildmart Pvt Ltd | GGM/527/259/2022/02, 24.01.2022 | Not stated in the register row | Lapsed; validity ended 30.09.2022 |
Our tally of the register finds 17 rows that mention Sector 66, but more than half is commercial. M3M IFC, AIPL Joy Street, AIPL Joy Gallery, AIPL Autograph, Emaar's Colonnade and Elan Empire are offices and retail, and Emaar Business Square (109 commercial units across Sectors 65 and 66) was registered on 17.11.2026. By our count from the register's lapsed flag, 4 registrations in Sector 66 have lapsed or expired.
How the shortlist was chosen
Four of these projects make our shortlist, and and the reason are paperwork, not taste. We kept a project when its record gives most of the following, so a buyer can actually check it:
- a named developer and a live HRERA registration number
- number of homes or plots, and the land area
- sizes with their basis (carpet area or plot area)
- a published price with a date, or a clear note that none are published
- a completion date, or an OC on record
Carpet area is the floor inside your walls; super area adds a share of lobbies, lifts and clubhouse, so it is always bigger. Marbella Phase 2, Phase 7 and the old villa colony are left out of the shortlist only because there is less detail, not because of anything bad found against it. The Cityscape is left out because its registration lapsed in 2022.
Free property updates
Never Miss a Property Opportunity!
Get the latest property news, investment opportunities, new launches and government plot scheme updates directly.
You're subscribed
One last tap so our WhatsApp updates reach you:
Say hello on WhatsAppIt opens a chat with +91 79824 13588, our main number. Save it in your contacts.
Shortlist of residential projects in Sector 66 Gurugram: sizes and prices
Sizes below are from each project's HRERA Form REP-I or certificate. The one price is a newspaper report, not a developer price list. Prices changes often, so ask for a dated cost sheet.
Illustrative image| Project | Homes | Sizes (basis) | Published price | Land | Completion |
|---|---|---|---|---|---|
| Smartworld The Edition | 961 units | 908 flats of 1,598 to 1,904 sq ft, 36 of 1,308 to 1,573 sq ft, 12 of 3,465 to 3,737 sq ft (carpet) | Not published by the developer or newspapers | 10.70 acres | 01.02.2031 (HRERA) |
| BPTP Downtown 66 | 504 flats, 3 towers of 168 | About 142 and 123 sq m carpet per flat on average (our division of tower totals) | 3 and 3.5 BHK from ₹5.32 crore (Construction World, 10 June 2026, as reported) | 4.235 acres | 31.10.2032 (HRERA) |
| Palm Drive and Palm Terrace Select | 720 main units, 48 EWS, 37 shops | Not given on the certificate | No developer price (resale only) | 17.429 acres | Ready (OC document 25.01.2018) |
| Marbella Terraces | 247 plots | 120 to 497 sq m; EWS plots 50 sq m (plot area) | No developer or newspaper price | 20.24 acres | 31.12.2031 (HRERA) |
EWS means economically weaker section homes or plots, which the rules set aside at fixed prices. They are not on open sale like the main units.
Smartworld The Edition: the largest new tower project
Smart World The Edition is the biggest new housing in the sector by far. HRERA's Form REP-I (submitted 19.10.2023) gives 961 units on 10.70 acres under DTCP licence 83 of 2022, and the promoter Etsy Realcon is the owner of the licence too. A DTCP licence is the Haryana town planning department's permission to develop a colony on that land.
Most of the flats is in one size band, 1,598 to 1,904 sq ft carpet, with a handful of very large units of 3,465 to 3,737 sq ft. HRERA does not state the BHK configuration, so ask the developer which layout match which size. Our project page counts 6 towers.
The Economic Times reported in July 2024 that Smartworld gave a ₹581 crore civil contract to Ahluwalia Contracts, and put the saleable area at about 3 million sq ft with expected revenue of ₹6,000 crore. The developer's own graphic says the site is 800 m from M3M IFC; that is a marketing claim, not a measured distance. No launch price is on record from Smartworld or a newspaper.
BPTP Downtown 66: the newest flat registration
BPTP registered Downtown-66 with HRERA on 19.09.2025, and it is the most recent flat project in the sector. The form shows 504 apartments in 3 towers of 168 each, on 4.235 acres taken from a 14.518-acre area under licences 31 of 2008 and 73 of 2024. BPTP is shown as the collaborator, which means the land belongs to another party who has tied up with it.
The form gives only a combined carpet area per tower. Divided by flats, that comes to about 142 sq m (roughly 1,528 sq ft) in one tower and about 123 sq m (roughly 1,324 sq ft) in the other two. These are averages, real flats will be bigger and smaller.
Construction World reported on 10 June 2026 that 3 and 3.5 BHK flats start from ₹5.32 crore; the size basis was not given, so a per sq ft rate can't be worked out honest. HRERA puts construction start at 01.01.2026 and completion at 31.10.2032, with an estimated cost of ₹1,188.75 crore. That is a long wait, so check the payment plan carefully against the building stage.
Emaar Palm Drive and Palm Terraces Select: the ready choice
If you are wanting to move in soon, these two are the only finished flat societies of the sector. Emaar India registered Palm Drive and Palm Terrace Select on 10.09.2020 for 17.429 acres of a 45.476-acre licence, covering 720 main units, 48 EWS units and 37 shops. An OC document dated 25.01.2018 is on the portal. Palm Terraces Select, an interim registration of 01.02.2018, shows OC documents dated 08.03.2019 and 08.08.2019.
Illustrative imageThere's a delivery history which is worth of reading. HRERA awarded 10.85% delay interest to Palm Drive allottees in an order of 16.10.2025, and the Haryana Real Estate Appellate Tribunal dismissed Emaar's appeal against it on 24.07.2026. The Tribunal also decided two more appeals by a Palm Drive allottee on 31.08.2026. None of this stop a resale, but it tells you the handover ran late.
Because resale only, there is no developer price. Ask the seller for the conveyance deed, the OC that covers their exact tower, and the society's maintenance dues before you agree a number.
Marbella plots in Sector 66 Gurgaon: registered and pending
Marbella is Emaar's plotted colony spread across Sectors 65 and 66, and Emaar told HRERA it is being developed in eleven phases. Phases 1 and 2 are complete by Emaar's account and phases 3 to 11 were unlaunched. Two new phases sits in Sector 66.
- Marbella Terraces (earlier called Marbella Phase 5): 247 plots on 20.24 acres, of which 147 general, 50 NPNL and 50 EWS, sized 120 to 497 sq m. At registration, licence 41 of 2011 had expired on 02.05.2026 with renewal applied, and environmental clearance, revised service plans and tree-cutting permission was still pending.
- Marbella Phase 7: 12 plots on 2.594 acres, one of 299 sq m, two of 377 sq m and nine of 418 sq m. The portal list prints completion as 31/12/2026 but the certificate says 31 Dec 2031, so the list looks like a typing error.
- Marbella Phase 2 (Sectors 65 and 66): 501 plots on 66.059 acres. Emaar's April 2026 declaration shows 52 plots booked while its 2024-25 forms showed 137, the two figures don't agree.
At the Phase 7 hearing on 06.07.2026, Phase 1 allottees objected to layout changes and denser building; HRERA left them free to seek compensation, and the complainant said a writ, CWP 12724 of 2026, is pending in the Punjab and Haryana High Court. Separately, Business Standard reported on 5 September 2025 that the CCI found no prima facie case on a complaint about builder floors on 97 Marbella plots. No developer price for these plots is published.
Ready versus under construction in Sector 66
This table sorts the residential stock by stage, from HRERA's register and certificates as read on 29 November 2026. See our post on ready-to-move vs under-construction property in Gurugram for the tax and risk side of that choice.
| Stage | Projects | What the record shows | What to ask |
|---|---|---|---|
| Ready (OC on record) | Palm Drive and Palm Terrace Select; Palm Terraces Select | OC documents dated 25.01.2018, 08.03.2019 and 08.08.2019 | Which tower each OC covers; conveyance deed |
| Handed over (developer's statement) | Marbella villas | Emaar says villas are handed over; OC documents listed without dates | The OC for the specific villa |
| Under construction | Smartworld The Edition; BPTP Downtown 66 | Completion 01.02.2031 and 31.10.2032 | Quarterly progress filed with HRERA; payment plan |
| Plots, registered | Marbella Terraces; Marbella Phase 7; Marbella Phase 2 | Completion 31.12.2031 (Terraces, Phase 7) and 31.12.2027 (Phase 2) | Licence renewal, environmental clearance, service plans |
HRERA Order 9/1-2026 of 11.08.2026 add four months to projects registered by 31.07.2026 that fall due on or after 28.02.2026, but the register still prints the original dates.
Sector 66 on Golf Course Extension Road: offices, metro, water and price
Sector 66 sits on Golf Course Extension Road, in the revenue villages of Badshahpur and Maidawas per HRERA. Its strength is the office and shop cluster inside the sector: M3M IFC and AIPL Joy Street have OC or CC documents listed, and Emaar's Colonnade got its OC on 31.03.2022. Marengo Asia Hospitals is on the same road in Sector 56, says its own page.
Illustrative imageThere is no metro in sector yet. The proposed Sector 56-Panchgaon metro lists Sector 66 on its route, but ThePrint (PTI) reported on 11 September 2026 that it is at revised DPR stage, a proposal and not approved. On water, PTI reported on 29 September 2026 a Sector 72 boosting station for 95 MLD to Sectors 58 to 80, while our news report of 19 November 2026 says GMDA began sending 75 MLD to Sectors 58 to 74. Both figures are as reported.
One risk to check is a CBI case over land release in Sectors 58 to 67, where The Tribune reported more chargesheets on 11 November 2026. The case is before a court, so do check the title trail of any land careful.
On Sector 66 Gurugram price, there is no sector-level figure from a consultancy. Our Golf Course Extension Road line went from ₹8,700 per sq ft in 2020 to ₹19,500 in 2025 (area basis not stated), and you can track it on our Golf Course Extension price tracker. Savills India said premium values on Golf Course Extension Road and SPR, grouped together, rose only 1 to 2% year on year in H1 2026, after much faster growth in 2021 to 2025. Past growth doesn't predict future growth.
Checklist before you book in Sector 66
- Match the HRERA registration number on the brochure to the register, and check it hasn't lapsed.
- Ask for sizes in carpet area, and for the BHK layout of each size at The Edition.
- Get a dated cost sheet with PLC, EDC and IDC and IFMS shown apart. PLC is the extra for a preferred floor or view, EDC and IDC are the state's development charges, and IFMS is a maintenance deposit.
- For a resale at Palm Drive or Palm Terraces Select, see the OC for that tower and the conveyance deed.
- For a Marbella plot, ask whether licence 41 of 2011 has been renewed and environmental clearance granted.
- Check the title trail for any link to the land-release case.
- Budget stamp duty: our state costs table lists 7% in Haryana (about 5% for women) plus 1% registration capped at ₹50,000. Duty is charged on the higher of your deal value and the collector rate value; confirm before paying.
Where to read next
Sector 66 give you a short list but a clear one: two finished Emaar societies, two big new towers and a run of Marbella plots. If you're weighing it against towers further along the same road, our list of best luxury projects on Golf Course Extension Road goes project by project.
For the newer launch belt just south, read about property investment in Sector 63A. Rates across the city are on our Gurgaon property rates page, and our top projects in Gurgaon list covers the wider city.
Questions
Frequently Asked Questions
How many residential projects are registered in Sector 66 Gurugram? +
HRERA Gurugram's register, read on 29 November 2026, places nine projects with homes or plots in Sector 66, counting Marbella phases that span Sectors 65 and 66. They are Palm Drive and Palm Terrace Select, Palm Terraces Select, Smartworld The Edition, BPTP Downtown 66, four Marbella registrations and The Cityscape, whose registration lapsed in 2022.
Is there a ready-to-move flat society in Sector 66? +
Yes. Emaar's Palm Drive and Palm Terrace Select has an OC document dated 25.01.2018 on the HRERA portal, and Palm Terraces Select shows OC documents dated 08.03.2019 and 08.08.2019. Both are resale only, so ask the seller for the OC covering their tower and the conveyance deed.
What is the price of BPTP Downtown 66? +
Construction World reported on 10 June 2026 that 3 and 3.5 BHK flats at BPTP Downtown 66 start from ₹5.32 crore. The report did not give the size basis, and BPTP has not published a price list on record. Ask for a dated cost sheet showing carpet area and all charges.
When will Smartworld The Edition be completed? +
HRERA Gurugram gives a completion date of 01.02.2031 for Smartworld The Edition, registration RC/REP/HARERA/GGM/756/488/2023/100. The Economic Times reported in July 2024 that a ₹581 crore civil contract went to Ahluwalia Contracts. HRERA Order 9/1-2026 adds four months to projects like this one, but the register still prints the original date.
Can I buy a plot in Sector 66 Gurgaon? +
Emaar's Marbella Terraces (247 plots of 120 to 497 sq m) and Marbella Phase 7 (12 plots of 299 to 418 sq m) were registered in 2026. No developer or newspaper price is on record. At registration, a licence renewal and environmental clearance were still pending for Terraces, so ask about both.
What sizes are the flats at Smartworld The Edition? +
HRERA's Form REP-I lists 908 flats of 1,598 to 1,904 sq ft carpet, 36 of 1,308 to 1,573 sq ft and 12 large units of 3,465 to 3,737 sq ft, plus 5 small units. The form does not say how many bedrooms each size has, so ask Smartworld for the layout plans.
Is there a metro station in Sector 66? +
Not yet. The proposed Sector 56-Panchgaon metro lists Sector 66 on its route, but ThePrint (PTI) reported on 11 September 2026 that its revised DPR was still being finalised and the line is not approved. GMRL or the state has not published a station date.
Are there any legal issues to check in Sector 66? +
Three are on record. A CBI case over land release in Sectors 58 to 67 had more chargesheets reported by The Tribune on 11 November 2026. The Appellate Tribunal upheld delay interest for Palm Drive allottees on 24.07.2026. Marbella Phase 1 allottees objected to layout changes, with a High Court writ reported pending.
Sources
- HRERA Gurugram, Registered Projects (Gurugram), read on the portal, 29 November 2026
- HRERA Gurugram, Form REP-I Parts A-H: Smartworld The Edition, submitted 19 October 2023
- HRERA Gurugram, Form REP-I Parts A-H: Downtown-66, submitted 15 July 2025
- HRERA Gurugram, Registration certificate, Palm Drive and Palm Terrace Select (GGM/408/140/2020/24), 10 September 2020
- HRERA Gurugram, Marbella Terraces and Marbella Phase 7 project records, certificates and proceedings, June to October 2026
- HRERA Gurugram, Order 9/1-2026, 11 August 2026
- Haryana Real Estate Appellate Tribunal, Appeal No. 1584 of 2025, Emaar India Ltd v Mayank Gagneja and others, 24 July 2026
- Economic Times, Smartworld Developers awards construction contract worth Rs 581 crore to Ahluwalia Contracts, July 2024
- Construction World, BPTP Downtown 66, Sector 66: 3 and 3.5 BHK from Rs 5.32 crore, 10 June 2026
- Business Standard, CCI dismisses complaint against Emaar India over Marbella villa project, 5 September 2025
- ThePrint (PTI), Haryana chief secy reviews Sector 56-Panchgaon metro project, 11 September 2026
- ThePrint (PTI), Gurugram water supply network set for major upgrade with commissioning of new boosting station, 29 September 2026
- Savills India Research, Delhi-NCR Residential Market Watch, H1 2026, July 2026
- Property Nivesh, Golf Course Extension Road locality line, 2020 to 2025
- Property Nivesh news, GMDA 75 MLD water supply, 19 November 2026; CBI chargesheets in Gurugram land release case, 11 November 2026 (reporting The Tribune)