Sion Flyover Widening: What It Means for Property Prices in Sion and Chembur
The BMC plans to add two parallel arms to the Sion flyover to relieve southbound congestion from Chembur and Ghatkopar. Commutes could ease, but the work is not due until December 2028, so any price effect is distant and uncertain.
By Prerna Sharma · Edited by Rakesh Mahajan · Source: The Indian Express
Published
Figures checked against the source report and our project research · Editorial standards
Illustrative What happened?
The Indian Express reported that the Brihanmumbai Municipal Corporation intends to build two additional carriageway arms beside the existing Sion flyover on the Eastern Express Highway. The present structure is 1.09 km long and has three lanes, of which just one handles traffic moving south from Ghatkopar and Chembur towards Dadar.
According to the newspaper, each new arm will measure 1.12 km in length with a width of 8.5 metres, crash barriers included, and will sit alongside the old flyover without altering its alignment. They will start at Sion Circle and join the highway directly. The cost is put at Rs 125.37 crore, with the civic body targeting December 2028.
The Indian Express also noted that the flyover was built in 2003 by the state roads corporation and passed to the BMC in 2022. An IIT Bombay audit in 2017 found damaged bearings and expansion joints, part of the concrete fell in 2019, and major repairs started in 2020. The new arms are separate from the rebuilt Sion railway overbridge opened last month.
Which sectors are affected?
- Sion
- Chembur
- Ghatkopar
- Eastern Express Highway
- Sion Circle
- South Mumbai commute corridor
Distance from the projects
Distances as sourced on our research pages.
| Project | To | Distance |
|---|---|---|
| Oberoi International Business Park | Western Express Highway | 0.4 km |
| Commerz | Western Express Highway | 0.4 km |
| Oberoi Garden City | Western Express Highway | 0.4 km |
| Piramal Vaikunth | Eastern Express Highway | 1.3 km |
| Godrej Horizon | Eastern Express Highway | 1.5 km |
| Piramal Revanta | Upcoming Goregaon-Mulund Link Road | 1.7 km |
Potential impact
If the arms are delivered on schedule, the daily drive from Chembur and Ghatkopar towards Dadar and South Mumbai should become less of a crawl at Sion. Better road access is a modest supporting factor for demand in nearby central and eastern Mumbai neighbourhoods, though it rarely moves prices on its own.
There are reasons for caution. This is a plan with a deadline more than two years away, and civic projects in Mumbai often slip. Mumbai's average price of Rs 32,000 per sq ft is driven mainly by location, project quality and supply, so any uplift from this work is likely to be small and gradual, and it cannot be guaranteed.
Last updated:
Source
-
The Indian Express · 9 Nov 2026, 12:07 pm IST
“Chembur to Colaba, faster: Sion flyover to get two new arms to ease traffic bottleneck”
https://indianexpress.com/article/cities/mumbai/chembur-colaba-sion-flyover-two-new-arms-express-highway-10956080/