Patal Lok Tunnel Plan: What It Means for Property Prices in Mumbai's BKC and Airport Belt
Mumbai Live reported that MMRDA showed the state government a 31-km underground road network linking the airport, BKC and both express highways. It is still an idea under review, so any effect on property prices is a long way off and uncertain.
By Rachna Gupta · Edited by Rakesh Mahajan · Source: Mumbai Live
Published
Figures checked against the source report and our project research · Editorial standards
Illustrative What happened?
Mumbai Live reported that MMRDA presented a proposal called 'Patal Lok' to Chief Minister Devendra Fadnavis at a review meeting on Thursday, 19 November. It is an integrated network of underground roads, with a one-way length of about 31 km.
According to the report, the tunnels would join the Bandra-Worli Sea Link, Bandra-Kurla Complex, Terminal 2 of the Mumbai airport and the Eastern Express Highway. Entry and exit points are planned near the BKC bullet train station, Dharavi, the airport and the Western and Eastern Express Highways.
The same meeting also looked at two alternative alignments for the Uttan-Bhayandar-Virar sea link, which is meant to connect Mumbai with the Vadhavan port. Mumbai Live noted that both ideas are still being studied and that the timeline, cost and execution plan have not been announced.
Which sectors are affected?
- Bandra-Kurla Complex
- Dharavi
- Mumbai airport Terminal 2
- Western Express Highway
- Eastern Express Highway
- Bandra-Worli Sea Link
- Uttan-Bhayandar-Virar sea link
Distance from the projects
Distances as sourced on our research pages.
| Project | To | Distance |
|---|---|---|
| Oberoi International Business Park | Western Express Highway | 0.4 km |
| Commerz | Western Express Highway | 0.4 km |
| Oberoi Garden City | Western Express Highway | 0.4 km |
| Piramal Vaikunth | Eastern Express Highway | 1.3 km |
| Godrej Horizon | Eastern Express Highway | 1.5 km |
| Piramal Revanta | Upcoming Goregaon-Mulund Link Road | 1.7 km |
Potential impact
If the tunnel gets approved and built, the areas near its entry and exit points could see better road access to the airport and the business district. Buyers and tenants who value a faster drive between the east and west sides of the city may then pay more for homes close to those points. That is a possibility, not a forecast.
For now nothing has been sanctioned or costed, so prices should not be expected to move on this news alone. Mumbai already averages about 32000 per sq ft in our data, and a project of this size usually takes years, with route changes likely along the way. Construction disruption near the access points is a risk that the report does not address.
Last updated:
Source
-
Mumbai Live · 20 Nov 2026, 2:05 pm IST
“Patal Lok Tunnel Project: 31-Km Underground Road to Ease Mumbai Traffic Congestion”
https://www.mumbailive.com/en/civic/the-problem-of-traffic-jam-in-mumbai-can-be-solved-95081