Konanakunte Cross Flyover Plan: What It Means for Buyers and Renters on Kanakapura Road
Deccan Herald and The New Indian Express report that a split flyover and a skywalk are planned at Konanakunte Cross, with tendering under way. If built, the work could ease daily commutes in this part of south Bengaluru, but nothing is under construction yet.
By Rajan Khosla · Edited by Rakesh Mahajan · Source: Deccan Herald and The New Indian Express
Published
Figures checked against the source report and our project research · Editorial standards
Illustrative What happened?
Deccan Herald reported that the Greater Bengaluru Authority is planning a flyover at Konanakunte Cross to deal with worsening traffic. Greater Bengaluru Development Minister Krishna Byre Gowda announced it on Saturday, and the tendering process has already started.
According to the same reports, B-SMILE has drawn up a split-type design with elevated stretches of roughly 600 metres on each side of the junction. The cost, including land acquisition, is put at around Rs 77 crore. The minister said officials have been told to speed up the tender and begin work early.
The New Indian Express added that a skywalk is also to be planned, since a Metro station at the junction is raising pedestrian movement. Smaller fixes are meant to come sooner: better footpaths, zebra crossings, road markings, and a free left turn using some Metro-owned land near Forum Mall.
Which sectors are affected?
- Konanakunte Cross
- Kanakapura Road, Bengaluru
- South Bengaluru residential neighbourhoods
- Commuters and pedestrians around the Metro station
Distance from the projects
Distances as sourced on our research pages.
| Project | To | Distance |
|---|---|---|
| Embassy Boulevard | Bellary–Airport Road | 1 km |
| Prestige Tech Park | Radisson Blu Hotel, Bengaluru Outer Ring Road | 2 km |
| Brigade Tech Gardens | Outer Ring Road (Marathahalli) | 2.5 km |
| Embassy Springs | Hyderabad–Bangalore highway (NH 44) | 4 km |
| Brigade Tech Gardens | M. G. Road (CBD) | 12 km |
Potential impact
A signal-free stretch can shorten and steady travel times at a junction that is currently a bottleneck. Over time, that tends to make nearby homes easier to sell and rent, since commute pain is a common reason buyers and tenants avoid an address. The size of any price or rent effect is unknown, and it would depend on how fast the work is finished.
Caution is needed. The story covers a plan at tender stage, not a finished project, and flyover works in Indian cities often run late. Construction itself can add disruption, noise and diversions for residents near the junction. For context, our data puts the Bengaluru average at Rs 12,800 per sq ft with a rental yield of 3.8%, but we have no locality-level figures for this stretch, so we are not projecting any change.
Last updated:
Sources
-
Deccan Herald · 22 Nov 2026, 1:44 am IST
“GBA plans flyover, skywalk to ease traffic congestion at Konanakunte Cross”
https://www.deccanherald.com/india/karnataka/bengaluru/gba-plans-flyover-skywalk-to-ease-traffic-congestion-at-konanakunte-cross-4227014
-
The New Indian Express · 22 Nov 2026, 7:59 am IST
“Flyover to come up at Konanakunte Cross to ease traffic congestion”
https://www.newindianexpress.com/cities/bengaluru/2026/Nov/22/flyover-to-come-up-at-konanakunte-cross-to-ease-traffic-congestion