Hebbal Corridor Pledge: What It Means for Property Prices in North Bengaluru
Karnataka's Chief Minister says the Mehkri–Hebbal corridor, including a short tunnel, will be finished in 18 months. The works could improve access along Ballari Road over time, but traffic will likely get worse before it gets better.
By Akansha Singh · Edited by Rakesh Mahajan · Source: Deccan Herald and The Hindu
Published
Figures checked against the source report and our project research · Editorial standards
Illustrative What happened?
Deccan Herald reported that Chief Minister D K Shivakumar said the Mehkri–Hebbal Integrated Corridor, being taken up by the Bangalore Development Authority, will be completed within 18 months. He described it as an effort to reduce congestion on Ballari Road, and said the state had asked for defence land for the elevated section.
According to Deccan Herald, the Chief Minister said only certain heavy vehicles and goods carriers may face temporary limits at specified hours, and that other traffic would keep moving. Diversion roads are being prepared, and the paper gave a rough budget of about Rs 9 crore for them. He also said the short tunnel is a separate project from the 16-km tunnel road proposal.
The Hindu reported that Bengaluru Traffic Police plan strict no-parking rules and double Cobra Beat deployment on the alternative routes, including BEL Road. It said work on one of the three Ballari Road lanes is on, and officials expect congestion to extend beyond Mehkri Circle at peak hours. Both alternative stretches are in poor condition and are due for asphalting and possible widening.
Which sectors are affected?
- Hebbal
- Ballari Road
- Mehkri Circle
- BEL Road
- Vidyaranyapura
- North Bengaluru
Distance from the projects
Distances as sourced on our research pages.
| Project | To | Distance |
|---|---|---|
| Embassy Boulevard | Bellary–Airport Road | 1 km |
| Prestige Tech Park | Radisson Blu Hotel, Bengaluru Outer Ring Road | 2 km |
| Brigade Tech Gardens | Outer Ring Road (Marathahalli) | 2.5 km |
| Embassy Springs | Hyderabad–Bangalore highway (NH 44) | 4 km |
| Brigade Tech Gardens | M. G. Road (CBD) | 12 km |
Potential impact
If the corridor is delivered on the stated timeline, travel between Hebbal and the northern stretch toward the airport could become more predictable. That kind of gain tends to help demand in nearby residential areas, but a promise from a minister is not a finished road, and timelines on Bengaluru infrastructure have often slipped. Land availability, including the defence land request, is still an open question.
In the near term the effect may run the other way. Lane closures and diversions could lengthen commutes for residents of Hebbal, Vidyaranyapura and nearby areas, which can weigh on rents and buyer interest in the weakest-connected pockets. Bengaluru's city-wide average of 12,800 per sq ft is a useful yardstick, but we have no locality-level price trend for Hebbal, so no firm price call is possible.
Last updated:
Sources
-
Deccan Herald · 10 Nov 2026, 7:53 am IST
“Hebbal short tunnel, elevated road to be ready in 18 months: CM DK Shivakumar”
https://www.deccanherald.com/india/karnataka/bengaluru/hebbal-short-tunnel-elevated-road-to-be-ready-in-18-months-cm-dk-shivakumar-4213225
-
The Hindu · 10 Nov 2026, 3:36 pm IST
“Strict no-parking, double Cobra Beat deployment on alternative routes to ease Hebbal traffic”
https://www.thehindu.com/news/cities/bangalore/strict-no-parking-double-cobra-beat-deployment-on-alternative-routes-to-ease-hebbal-traffic/article71685548.ece