Buying Guides
SUDA Plot Scheme 2027: Sachin e-Auction, 120 sq m Plots, EWS Draws
No SUDA plot auction or housing draw for 2027 had been announced as of 27 November 2026. The latest SUDA plot scheme was the 2026 online auction of 139 plots at its Sachin housing complex, most of them 120 sq m residential plots at an upset price of ₹65,339 per sq m, with results not yet published.
By Pranav Adhikari · Edited by
Rakesh Mahajan · · 13 min read
Illustrative image SUDA plot scheme 2027: what Surat has announced
No SUDA plot scheme 2027 had been announced as of 27 November 2026, and no 2027 housing draw either. The latest plot offer was SUDA's 2026 online auction of 139 plots at its Sachin housing complex, and its results have not been published. The latest housing draw was held on 15 September 2025.
Surat stand apart from its neighbours here. Ahmedabad's authority sells big parcels that mostly companies buy, as our AUDA plot scheme guide explains. Vadodara's November 2026 plots are far larger too, see the VUDA plot scheme guide. The SUDA plot scheme in 2026 offered plots of 120 sq m that a family can realistically bid on.
For what comes next, DeshGujarat reported on 9 March 2026 that SUDA's 270th board meeting decided to build 972 houses under PMAY-Urban 2.0 at Kholvad. No application dates were given. The board also approved a ₹1,149.78 crore budget for 2026-27. Three draft TP schemes of about 460 ha in the H-Node area near the bullet train station are to go to the state government.
The past pattern is thin but it is clear enough also. Housing draws took place on 19 October 2024 and 15 September 2025. The plot auction opened for registration in July 2026, with auction days set for August and September. To be ready for a next round, keep bank details for RTGS or NEFT payment handy and check the notices on SUDA's website on every week.
Which body this is: the Surat Urban Development Authority
Every SUDA Surat scheme here comes from the Surat Urban Development Authority. The Gujarat government constituted it under section 22(1) of the Gujarat Town Planning and Urban Development Act, 1976. Its area is the Surat Municipal Corporation area plus 195 surrounding villages. Places that turns up in its notices include Sachin, Navagam, Vanakla-Okha-Vihel, Kholvad in Kamrej, Kanad in Olpad, Vesu and Bhestan.
SUDA's office is Suda Bhavan, opposite Agam Arcade, Vesu-Abhva Road, Vesu, Surat 395007, as printed on its 2026 auction notice. Don't confuse it with the Surat Municipal Corporation, which is a separate body with its own Department of Affordable Housing. Gujarat Housing Board schemes in Surat is separate too and are not covered here.
SUDA Surat TP scheme: how land turns into plots and housing
SUDA plans land around Surat through TP (town planning) schemes. Owners' land in an area is pooled, the scheme marks out roads and public uses, and each owner is handed back with a reshaped final plot (FP). Through this land pooling, a field can come back smaller but with a road along it.
Under the Act a scheme can keep about 10% of its area for weaker-section housing, per section 40(3)(j). Up to 15% can go for sale by the authority, per section 40(3)(jj)(a). SUDA's own housing sits on such plots: Navagam TP 45, Vanakla TP 30 and Kholvad TP 48.
SUDA's Sanction TP Schemes page lists 17 sanctioned draft schemes, such as TPS 35 Kumbharia-Saroli, TPS 45 Navagam-Vav and TPS 102 Kanad. It also lists 5 sanctioned preliminary ones, such as TPS 57 Kharvasa-Eklera. Each come with its notification, map and F-Form to download, which answers the search for a TP scheme PDF. The new H-Node drafts are TP-62/A (Chedchha-Oviyan-Sabargam-Antroli), TP-62/B (Sabargam-Niyol) and TP-62/C (Antroli).
How SUDA sells: online auction for plots, draw for homes
SUDA sells plots it owns by online auction on the (n)Code nProcure portal. In 2026 these were leftover plots of its old housing complex at Sachin, which is split into Sector 1, 2 and 3. Here a sector just means a block of that complex.
Illustrative imageThe e-auction has two parts. First you file an online sealed bid, meaning a price you submit privately. Then the plot goes live for 30 minutes, and bids must climb with ₹10 per sq m each time. A bid in the last five minutes add five more minutes to the clock. Every plot has an upset price, SUDA's floor or reserve price, and an EMD, the earnest money deposit that proves you're serious.
Homes go a different route. SUDA builds EWS (Economically Weaker Section) flats on its TP plots and allots them by computerised draw, a software lottery. The draw runs by category, General, SC, ST, OBC and blind or handicapped, and it publish a selected list and a waiting list.
| At SUDA | Housing draw | Plot e-auction |
|---|---|---|
| What is sold | EWS flats under the Mukhyamantri Gruh Yojana; PMAY-U 2.0 homes planned | Residential and commercial plots at Sachin |
| Smallest unit in 2026 | Not published | 67.50 sq m commercial, 120 sq m residential |
| How the winner is picked | Computerised draw by category, with a waiting list | Online sealed bid, then a 30-minute live auction |
| Money at the start | Not published | ₹10,000 tender fee per bid plus the plot's EMD |
| What you get | A flat, once allotted | A plot by registered sale deed |
SUDA schemes at a glance, 2024 to 2026
| Year | Scheme and location | How it was sold | Offered | Price as published | Applications or bids | Source |
|---|---|---|---|---|---|---|
| 2026 | Online auction of SUDA plots: Sachin Sector-1 (commercial), SUDA Housing Complex at Sachin, Sector 1 (along the Sachin-Palsana state highway), Surat | e-auction | 23 commercial plots | ₹54,302 per sq m (reserve price, 450 sq m (plot no. 04), Rs 2,44,35,900) ₹65,339 per sq m (reserve price, 91.06 to 108.56 sq m (6 plots), e.g. 101.56 sq m Rs 66,35,829) ₹67,464 per sq m (reserve price, 80.00 sq m (1 plot), Rs 53,97,120) | - | Surat Urban Development Authority, Jul 2026 |
| 2026 | Online auction of SUDA plots: Sachin Sector-2 (residential), SUDA Housing Complex at Sachin, Sector 2, Surat | e-auction | 19 residential plots | ₹47,225 per sq m (reserve price, 930 to 1,090 sq m (4 plots), 1,090 sq m Rs 5,14,75,250) ₹65,339 per sq m (reserve price, 157.50 sq m (2 plots), Rs 1,02,90,893) ₹65,339 per sq m (reserve price, 146.56 sq m (1 plot), Rs 95,76,084) | - | Surat Urban Development Authority, Jul 2026 |
| 2026 | Online auction of SUDA plots: Sachin Sector-3 (residential and commercial), SUDA Housing Complex at Sachin, Sector 3, Surat | e-auction | 97 plots (78 residential, 19 commercial) | ₹65,339 per sq m (reserve price, Commercial 138.31 sq m (2 plots), Rs 90,37,037) ₹65,339 per sq m (reserve price, Commercial 101.25 sq m (17 plots), Rs 66,15,574) ₹54,302 per sq m (reserve price, Residential 450 sq m (6 plots), Rs 2,44,35,900) | - | Surat Urban Development Authority, Jul 2026 |
| 2026 | PMAY-Urban 2.0 housing at Kholvad (972 houses), FP-227 of TP-48, near JB Diamond School, Kholvad, Kamrej taluka | Draw (lottery) | 972 houses (to be built) | - | - | DeshGujarat, 9 Mar 2026 |
| 2025 | Mukhyamantri Gruh Yojana draw: Vanakala TP 30, FP 129 (Vanakla-Okha-Vihel) EWS 2-2, TP 30 (Vanakla-Okha-Vihel), FP 129, Surat | Draw (lottery) | 32 EWS-2 homes allotted (selected list) | - | - | Surat Urban Development Authority, 15 Sep 2025 |
| 2024 | Mukhyamantri Gruh Yojana draw: TP 45 FP 101 EWS-2-3 (Navagam) and Vanakala TP 30 FP 129 EWS 1-7, Navagam (TP 45, FP 101) and Vanakla-Okha-Vihel (TP 30, FP 129), Surat | Draw (lottery) | 348 homes allotted (336 Navagam EWS-2 + 12 Vanakala EWS-1) | - | - | Surat Urban Development Authority, 19 Oct 2024 |
Every row in the table falls between 2024 and 2026, because SUDA's current website shows no plot auction or housing draw from 2021 to 2023. The three Sachin rows hold the price story. The draw rows, only the count of homes allotted.
The draws got smaller. The October 2024 draw allotted 348 homes across Navagam and Vanakala, and the September 2025 one allotted 32. The 972 Kholvad houses are far more than either draw, but they are still to be build and have no dates. The "Applications or bids" column stays empty, since SUDA has not published how many applied.
SUDA plot e-auction 2026: 139 plots at Sachin
In July 2026 SUDA put 139 plots at Sachin up for online auction: 97 residential and 42 commercial. Registration and payment of the EMD and tender fee ran from 27 July to 17 August 2026, and queries were due by 5 August 2026. The auctions were scheduled in 30-minute slots from 24 August to 10 September 2026.
| Sachin block | Plots | Sizes | Upset price per sq m | Auction dates |
|---|---|---|---|---|
| Sector 1, along the Sachin-Palsana state highway | 23 commercial | 67.50 to 450 sq m | ₹54,302 to ₹69,919 | 24 and 25 August 2026 |
| Sector 2 | 19 residential | 120 to 1,090 sq m | ₹47,225 to ₹65,339 | 31 August 2026 |
| Sector 3 | 78 residential, 19 commercial | 101.25 to 450 sq m | ₹54,302 to ₹65,339 | 1, 2, 7, 8, 9 and 10 September 2026 |
Source: SUDA's Sachin Sector 1, 2 and 3 auction notices, July 2026. Most residential plots were 120 sq m, about 144 sq yd, with 71 of them in Sector 3 alone. Larger the plot, lower the rate it carried. Sector 2's four biggest, 930 to 1,090 sq m, were at ₹47,225 per sq m, and the 450 sq m plots at ₹54,302.
The smallest commercial plots, 67.50 sq m (about 81 sq yd) in Sector 1, had the highest rate. That was ₹69,919 per sq m, or ₹47,19,533 a plot. SUDA hasn't published which plots sold or at what bids, so treat these as starting prices only and check SUDA's notices for the result.
What a 120 sq m SUDA plot costs at the upset price
Take the most common plot, 120 sq m in Sector 2 or 3. The upset price is ₹65,339 per sq m, about ₹54,630 per sq yd. So the plot comes to ₹78,40,680 and the EMD is ₹7,84,068, as SUDA's notice gives. A winning bid can only be at or above this figure.
Illustrative image| Step | When | Amount at the upset price |
|---|---|---|
| Tender fee, not refundable | At registration | ₹10,000 |
| EMD | At registration | ₹7,84,068 |
| First 10% of the bid | Within 10 days of the Letter of Intimation | ₹7,84,068 |
| Balance 90% of the bid, EMD counted in it | Within 90 days of the Letter of Intimation | ₹70,56,612, of which ₹62,72,544 after the EMD |
The figures are worked out on SUDA's stated plot price and payment terms. Stamp duty and registration on the sale deed are the buyer's cost. Our stamp duty calculator and registration charges calculator give an estimate. Funding the 10% from savings? The down payment calculator helps, and the home loan EMI calculator shows what a loan for the rest might cost.
Rules after you win a SUDA plot
The winner gets a Letter of Intimation, which works as the allotment letter for the plot. Payment is tight: 10% in 10 days and the rest in 90 days. SUDA may stretch the balance up to 270 days, but it charge 1% interest a month on the unpaid amount. Possession comes only after 100% payment.
This is an outright sale. The sale deed is registered within 6 months of the possession letter. So the buyer owns the plot freehold, meaning outright, and not as leasehold under a lease deed for a fixed term. That's a real difference with authorities who lease plots.
Two rules bite later. Construction must start within 2 years of possession, or SUDA can take back the plot and forfeit everything paid. And if you surrender the plot yourself within a year of full payment, SUDA keeps the EMD plus 20% of the total. For losing bidders the news is better, the EMD comes back without interest within 45 days of the auction.
SUDA housing scheme: Mukhyamantri Gruh Yojana and PMAY draws
The SUDA housing scheme most families meet is the Mukhyamantri Gruh Yojana, the Gujarat Chief Minister's housing scheme, for EWS flats. PMAY, the central Pradhan Mantri Awas Yojana, is the other name to know, because SUDA's next project fell under PMAY-Urban 2.0.
- 19 October 2024: draw for TP 45, FP 101, EWS-2-3 at Navagam put 336 names on the selected list and 317 on the waiting list. The same day, Vanakala TP 30, FP 129, EWS 1-7 got 12 selected and 78 waiting.
- 15 September 2025: the draw for Vanakala TP 30, FP 129 (Vanakla-Okha-Vihel), EWS 2-2 put 32 names on the selected list. Another 150 went on the waiting list.
The lists carry applicants' names, so check yours on SUDA's own lists and not on copies shared around. SUDA's completed projects also include an LIG housing project and also housing projects at Vesu and Bhestan too. The coming 972 PMAY-Urban 2.0 houses are to be built at FP-227 of TP-48, Kholvad, in Kamrej taluka. SUDA's home page links to the central PMAY-U 2.0 online survey.
Eligibility, fees and documents for SUDA schemes
For the EWS draws SUDA has only put out the selected and waiting lists. Prices, carpet areas, income limits, deposits and refund rules for those homes are not published, and nor is the number of applications. A registration amount, the money that goes with a housing form, is not stated either. Read the form in full when the next one opens.
Illustrative imageFor plots the rules are wrote out. The auction is open, with one bid per plot and a separate fee and EMD for each. Fees and EMD are paid by RTGS or NEFT through the portal. A bid without the fee, the EMD or the sealed bid is rejected, and if the sealed bid is missing the EMD is forfeited. Plots are sold under the Urban/Area Development Authorities (Disposal of Land and Other Properties) Regulations, 2002.
How to bid or apply with SUDA, step by step
As SUDA's 2026 notices set it out:
- Plots: register on the (n)Code nProcure e-auction portal inside the window (27 July to 17 August 2026 for the Sachin auction).
- Plots: pay the ₹10,000 tender fee and the plot's EMD by RTGS or NEFT through the portal.
- Plots: submit an online sealed bid for each plot. One bid per plot, each with its own fee and EMD.
- Plots: bid in the plot's 30-minute slot, raising by ₹10 per sq m. A bid in the last five minutes extends the slot by five minutes.
- Plots: if you win, pay 10% within 10 days of the Letter of Intimation and the balance within 90 days.
- Plots: take possession after full payment and sign the sale deed within 6 months.
- Housing: watch SUDA's website for the selected and waiting lists after each computerised draw.
A computerised draw isn't something an agent can bend, whatever they claim. Pay SUDA's fees only through the portal.
Checklist before you bid, and where to read next
- Is the notice from SUDA, and not the Surat Municipal Corporation or Gujarat Housing Board?
- Can you pay 10% within 10 days and the rest within 90 days of winning?
- Have you planned for stamp duty and registration on the sale deed?
- Can you start construction within 2 years of possession?
- Have you visited the plot and matched its number to the Sachin layout?
Of the three Gujarat authorities, SUDA is the one whose 2026 plots were sized for a single family. The Ahmedabad and Vadodara guides linked above show the other two models. For a Gujarat price benchmark on our site, see Ahmedabad property rates.
Questions
Frequently Asked Questions
Does SUDA have a plot scheme for individuals in 2027? +
SUDA had announced nothing for 2027 by 27 November 2026. It does sell plots individuals can bid for, by online auction rather than lottery. Its 2026 Sachin auction offered 139 plots, mostly 120 sq m residential plots at an upset price of ₹65,339 per sq m and small commercial plots from 67.50 sq m.
What was the last date for the SUDA Sachin plot auction? +
Registration and payment of the EMD and tender fee for the Sachin auction ran from 27 July to 17 August 2026, and queries were due by 5 August 2026. The auctions were scheduled from 24 August to 10 September 2026 in 30-minute slots. SUDA had not published results by 27 November 2026.
What is the SUDA plot price per sq m? +
Upset prices in the 2026 Sachin auction were ₹47,225 per sq m for 930 to 1,090 sq m plots, ₹54,302 for 450 sq m plots, ₹65,339 for most residential and some commercial plots, and up to ₹69,919 for 67.50 sq m commercial plots. Winning bids can be higher; SUDA has not published them.
How do I pay for a SUDA plot after winning the e-auction? +
After the Letter of Intimation, pay 10% of the bid within 10 days and the balance 90%, which includes the EMD, within 90 days. SUDA may extend the balance up to 270 days at 1% interest a month. Possession follows full payment, and the sale deed is due within 6 months of the possession letter.
Is the EMD refunded if I lose a SUDA auction? +
Yes. SUDA's 2026 notices say unsuccessful bidders get the EMD back without interest within 45 days of the auction. The ₹10,000 tender fee is not refundable. If you file no sealed bid, the EMD is forfeited, and a bid without fee, EMD or sealed bid is rejected, so complete every step on the portal.
When was the last SUDA housing scheme draw result? +
SUDA's latest Mukhyamantri Gruh Yojana draw was on 15 September 2025 for Vanakala TP 30, FP 129, EWS 2-2, with 32 names on the selected list and 150 on the waiting list. The draw before it, on 19 October 2024, covered Navagam TP 45 and Vanakala EWS 1-7. Check your name on SUDA's own lists.
Is there a new SUDA housing scheme in 2026? +
DeshGujarat reported on 9 March 2026 that SUDA's board decided to build 972 houses under PMAY-Urban 2.0 at FP-227 of TP-48, Kholvad, in Kamrej taluka. No application window or draw date had been announced by 27 November 2026. SUDA's home page links to the central PMAY-U 2.0 online survey for applicants.
Where can I get the SUDA Surat TP scheme PDF and map? +
SUDA's Sanction TP Schemes page lists 17 sanctioned draft TP schemes and 5 sanctioned preliminary ones, and each has its notification, map and F-Form to download. Examples include TPS 35 Kumbharia-Saroli, TPS 45 Navagam-Vav, TPS 102 Kanad and TPS 57 Kharvasa-Eklera. Open the page on SUDA's own website.
What is the SUDA Bhavan address in Surat? +
SUDA's 2026 auction notice gives its office as Suda Bhavan, opposite Agam Arcade, Vesu-Abhva Road, Vesu, Surat 395007. That is SUDA's own office, which is separate from the Surat Municipal Corporation and its Department of Affordable Housing, so take SUDA scheme queries there or to its website.
What happens if I don't build on a SUDA plot? +
SUDA's 2026 auction terms say construction must start within 2 years of possession, or SUDA can take back the plot and forfeit all payments. If you surrender the plot yourself within a year of full payment, SUDA keeps the EMD plus 20% of the total amount. Plan your building money before you bid.
Sources
- Surat Urban Development Authority, An opportunity to be in Surat-Gujarat: online auction of SUDA plots in Sachin Sector 1, 2 and 3, July 2026
- Surat Urban Development Authority, On line auction of SUDA Plots: Sachin Sector-1 (advertisement table and RFP), July 2026
- Surat Urban Development Authority, On line auction of SUDA Plots: Sachin Sector-2 (advertisement table and RFP), July 2026
- Surat Urban Development Authority, On line auction of SUDA Plots: Sachin Sector-3 (advertisement table and RFP), July 2026
- Surat Urban Development Authority, Result of Draw Under Mukhya Mantri Gruh Yojna: selected and waiting lists, Vanakala TP 30 FP 129 EWS 2-2, 15 September 2025
- Surat Urban Development Authority, Result of Draw Under Mukhya Mantri Gruh Yojna: selected and waiting lists, TP 45 FP 101 EWS-2-3 (Navagam) and Vanakala TP 30 FP 129 EWS 1-7, 19 October 2024
- Surat Urban Development Authority, Sanction TP Schemes (sanctioned draft and preliminary TP schemes, with notification, map and F-Form)
- Surat Urban Development Authority, home page (notices, draw lists), 2026
- Surat Urban Development Authority, About
- Surat Urban Development Authority, Completed Projects
- Surat Municipal Corporation, EWS Housing (department page)
- Gujarat Town Planning and Urban Development Act, 1976, sections 22(1) and 40(3)(j) and (jj), as amended by Gujarat Act 11 of 2014
- DeshGujarat, SUDA Plans 3 TP Schemes Covering 460 Hectares Near Bullet Train Station in Surat, 9 March 2026