Buying Guides
Rohini Sector 35 DDA Flats Price 2026: DDA Rates, Resale and Rent
Rohini Sector 35's DDA flats are one-bedroom LIG flats of about 33.3 to 33.9 sq m (358 to 364 sq ft) of plinth area, and the three resale listings we found in 2026 asked ₹16 lakh to ₹28 lakh. DDA's own last price, in November 2025, was ₹14 lakh to ₹14.2 lakh for flats across Sectors 34 and 35.
By Prerna Sharma · Edited by
Rakesh Mahajan · · 11 min read
What does a DDA flat in Rohini Sector 35 cost in 2026?
In our data, Rohini Sector 35's DDA flats rarely come up for resale. Only three listings turned up in 2026, and they asked ₹16 lakh to ₹28 lakh for a one-bedroom flat. When DDA last sold flats here, in November 2025, its own price was ₹14 lakh to ₹14.2 lakh.
DDA is the Delhi Development Authority, which plans Delhi's land and builds public housing. Here it built one type only: the LIG (lower income group) flat. DDA lists it as "LIG/One Bedroom" or 1 BHK, meaning one bedroom, hall and kitchen.
The flats stand in two pockets, 5 and 6. A pocket is a cluster of blocks with its own residents' welfare association (RWA). Blocks named in DDA's 2025 sale list for the sector include A1 to A4, B1 to B21 and C1 to C4. Sector 34 next door has four pockets, and our Sector 34 DDA flat rate guide covers it.
How big is a Sector 35 DDA flat, and what are the blocks like?
Small, and nearly identical from flat to flat. DDA prices each one on a plinth area of 358 to 364 sq ft, roughly 33.3 to 33.9 sq m. By DDA's account, that folds in a share of common area. DDA's papers carry no carpet area, meaning the usable floor inside the walls, and we won't estimate one.
On DDA's unit plan, one staircase serves four flats per floor. The bedroom is about 3 m by 2.2 m and the living room about 2.5 m by 3.6 m. There's also a small kitchen, a separate bath and WC, a lobby and a sit-out.
Blocks run to ground plus four floors, and DDA's published floor plan shows no lift. DDA's 2023 advertisement listed parking as available. Joining the RWA is compulsory, and it runs the pocket's daily upkeep.
Why are Rohini Sector 35 DDA flats so rarely listed for resale?
We can't say for sure, but three facts may help. The estate is smaller than Sector 34's, many first owners never moved in, and DDA kept selling flats here itself.
On size, every DDA round that split the sectors gave Sector 35 the smaller share. It had 188 unsold flats to Sector 34's 1,516 in July 2023. In November 2025 it had 66 flats on offer to Sector 34's 241, on our count of DDA's list.
On occupancy, DNA India wrote in July 2017 about a pocket it called "sector 34 (pocket 5)". There, 1,760 flats were offered in 2014, 900 were allotted and only 350 were lived in. DDA's own papers place Pocket 5 in Sector 35, so the report most likely describes this sector. Those 350 homes were about one in five of the flats offered.
The same report found roads, water and sewer lines unfinished in both sectors. The nearest market was 5 km off, Rithala metro 7 km, and residents spoke of chain snatching and thefts. We haven't checked what has changed since, so visit on a weekday and again on a weekend.
A decade ago, three of the five Sector 35 listings we found, from October 2016, offered the flat on power of attorney. Point 3 of the checklist explains why that matters.
What has DDA charged for Rohini Sector 35 flats since 2014?
DDA's price for these flats is lower now than in 2014. Most rounds priced Sectors 34 and 35 together. In July 2023 and March 2024, DDA listed Sector 35's flats on their own.
| Year | DDA round | Flats offered | DDA price per flat |
|---|---|---|---|
| 2014 | Housing Scheme 2014 | 10,875 across both sectors | ₹15 lakh to ₹15.25 lakh |
| 2017 | Housing Scheme 2017 | 4,349 across both | ₹14.83 lakh to ₹15.08 lakh |
| 2021 to 2022 | Special Housing Scheme 2021 | 2,003 across both | ₹14.15 lakh to ₹14.35 lakh |
| July 2023 | Online Running Scheme 2023, FCFS Phase IV | 188 in Sector 35 alone (Pocket 5) | ₹14.01 lakh to ₹14.24 lakh |
| March 2024 | Diwali Special Housing Scheme 2023, added flats | 28 in Sector 35 alone | ₹14.1 lakh to ₹14.24 lakh |
| 2024 | Sasta Ghar Housing Scheme 2024, Phases I and II | 726 across both, then 282 more (Phase I had 16 in Sector 35) | ₹14.1 lakh to ₹14.4 lakh list price |
| November 2025 | Jan Sadharan Awaas Yojana 2025, Phase II | 308 across both (66 in Sector 35) | ₹14 lakh to ₹14.2 lakh |
Counts are flats offered, not sold. The 2017 row comes from a Lok Sabha answer.
Sector 35's split price came in July 2023, when its flats started at ₹14.01 lakh against Sector 34's ₹14.1 lakh. Both topped out at ₹14.24 lakh. That round was first come, first served (FCFS), so there was no lottery. By March 2024, 28 of the 188 were still unsold.
In the Sasta Ghar round, upper floors were cheaper. A 3rd-floor flat got 10% off and a 4th-floor flat 15%, putting them at about ₹12 lakh to ₹13 lakh. Over 700 of Rohini's LIG flats had sold by 21 September 2024, Business Standard reported. In November 2025 there was no discount, yet all 308 flats were booked on the first day. Of Sector 35's 66 in that round, 43 were on the 3rd or 4th floor.
Per sq ft of plinth area, DDA charged about ₹4,200 in 2014, ₹4,100 in 2017 and ₹3,900 from 2021 to 2025. Two costs sat outside its 2023 price: ₹2,000 for a water connection and ₹28,080 to convert a Rohini 1 BHK to freehold.
What do owners ask for a Rohini Sector 35 DDA flat on resale?
Our resale figures are Property Nivesh estimates, compiled by our team from public listing data, asking-price based. A deal can close below the ask. Sector 35's record has gaps, and the table shows them instead of filling them.
| Year | Listings | Asking price per flat | Per sq ft of DDA plinth area |
|---|---|---|---|
| 2021 | 19 | ₹16 lakh to ₹21 lakh, middle ₹19 lakh | ₹4,400 to ₹5,800, middle ₹5,300 |
| 2022 to 2025 | None in our data | Not known | Not known |
| 2026 so far | 3 | ₹16 lakh to ₹28 lakh | ₹4,400 to ₹7,700 |
Three listings can't give a firm middle figure, so read 2026 as a range. One unusual ask changes the picture a lot.
The per sq ft column uses one fixed area. Owners call this flat anything from 270 to 500 sq ft, as carpet, built-up or super area. So we divide every ask by 361.4 sq ft, the midpoint of DDA's plinth area. ₹16 lakh over 361.4 sq ft, for example, is about ₹4,400.
A decade ago, the five listings we found asked about ₹17.75 lakh to ₹21.5 lakh. Since 2021, every resale ask we hold has sat above DDA's price of the time, which has never passed ₹15.25 lakh.
How does Rohini Sector 35 compare with Sector 34 next door?
Same DDA design, mostly the same DDA price, very different supply. Our 2026 data has 59 resale listings for Sector 34 and three for Sector 35. The full Sector 34 figures are in our Sector 34 rate guide.
| What we compared | Sector 35 | Sector 34 |
|---|---|---|
| Pockets with DDA flats | 5 and 6 | 1 to 4 |
| DDA flats on offer, November 2025 | 66 | 241 |
| Resale listings, 2026 so far | 3 | 59 |
| Resale ask per flat, 2026 | ₹16 lakh to ₹28 lakh | ₹17 lakh to ₹23 lakh |
| Ask per sq ft of plinth area, 2026 | ₹4,400 to ₹7,700 | ₹4,700 to ₹6,400 |
| Monthly rent, 2026 | ₹5,000 (one listing) | ₹4,000 to ₹6,000 |
With far more listings behind it, Sector 34's range is the steadier local yardstick. Sector 35's is wider at both ends, as you'd expect from three asks.
Rent is our thinnest Sector 35 number. The single rental we found listed 600 sq ft in a three-storey building, so it may not be a DDA LIG block. In 2017, DNA India put rents for 2014-scheme LIG flats in Rohini and Narela at ₹2,000 to ₹3,000 a month. Our rental yield calculator tests any rent against a price.
Further afield, the same plinth basis gives very different asks. Narela's Sectors G-2 and G-8 came to about ₹7,200 per sq ft in 2026, but from only two listings. Our Narela LIG flat sale report has DDA's side. Dwarka Sector 23B asked about ₹17,900 per sq ft, roughly three times Rohini, for a flat of the same DDA design. Location, not the flat, makes that gap. Plots in Sector 35 are another product, covered on our Rohini plot price page.
What could the Rohini Sector 35 metro station and UER-II change?
Delhi Metro's approved Phase IV line from Rithala to Narela and Nathupur (Kundli) has a station called Rohini Sector 35. The Union Cabinet cleared the 26.463 km line on 6 December 2024 at ₹6,230 crore. Seven of its 21 new stations carry Rohini sector names.
Nothing is built yet. Bids for the Rohini civil works, about 11.3 km with 10 stations, were opened on 13 October 2026. No construction start had been announced by 31 October 2026. The approval allowed four years from sanction, but we can't give an opening date. Until then, Rithala on the Red Line is the nearest working station for most of Sectors 24 to 37.
The road is already open. Urban Extension Road-II (UER-II), Delhi's new outer ring road, opened from Alipur to Dichaon Kalan on 17 August 2025. It crosses Bawana Road near Sectors 35 and 36, and DDA's sale notices in 2023 and 2025 both pointed buyers to it.
Whether any of this has moved Sector 35 asks, we can't tell, because there are too few listings since 2021. Our Rohini infrastructure impact report tracks each project.
What should you check before buying a Rohini Sector 35 DDA flat?
A resale DDA flat is only as safe as its papers.
- The pocket. Make sure the flat is in Pocket 5 or 6, and that the block and flat number match DDA's papers. Even a 2017 news report labelled Pocket 5 as Sector 34.
- The conveyance deed. DDA sells these flats freehold, so you'd own the flat outright, not on lease. But ownership moves only once DDA's conveyance deed to the allottee is registered. Before that, DDA doesn't accept a resale and may cancel the allotment.
- A registered sale deed. The Supreme Court ruled in 2011 that a general power of attorney (GPA), agreement to sell or will gives no ownership. That's the risk in the power-of-attorney listings of 2016.
- Resale conditions. DDA's 2021 and 2024 brochures limit the five-year bar on selling to EWS (economically weaker section) flats, and these are LIG flats. In 2017, DDA's Housing Commissioner told DNA India that the five-year lock-in clause had been removed. Read this flat's own allotment letter and deed for any condition.
- Freehold status. From 2 January 2026, DDA stopped accepting new leasehold-to-freehold conversion requests. That matters only if a past owner left conversion unfinished, as DDA sold here as freehold from 2021 to 2025. The Delhi High Court gave DDA two months from 28 September 2026 to decide 1,373 pending applications; see our report on that deadline.
- Stairs and water. DDA's published floor plan shows no lift, so walk up to the flat. Try the taps on the top floor as well.
- Dues and mutation. Get a no-dues letter from the pocket's RWA and see that MCD property tax is paid. Once the deed is registered, the buyer's name goes into MCD's tax records, a step called mutation that's been online since December 2022. It proves who pays tax, not who owns the flat.
- Stamp duty. Delhi charges a man 6% and a woman 4%, plus 1% for registration and a ₹100 pasting fee. They apply to the price or the circle-rate value, the government's floor value, whichever is more. On ₹16 lakh, a man pays ₹96,000 plus ₹16,000 plus ₹100, or ₹1,12,100, and a woman pays ₹80,100. On ₹28 lakh the totals are ₹1,96,100 and ₹1,40,100.
Rohini is a Category E colony on Delhi's circle rate list, and Delhi last revised its residential land rates in September 2014. We don't hold the circle value for these flats. Run your own figures in our stamp duty calculator, and see Rohini property rates for the wider area.
Questions
Frequently Asked Questions
What is the price of a DDA flat in Rohini Sector 35? +
The three resale listings we found in 2026 asked ₹16 lakh to ₹28 lakh for a one-bedroom LIG flat. These are Property Nivesh estimates from public listing data, so they show asks, not deals. DDA's own price for Sectors 34 and 35 in November 2025 was ₹14 lakh to ₹14.2 lakh. Stamp duty and registration are extra.
How big is a Rohini Sector 35 DDA flat? +
DDA's plinth area for these flats is 358 to 364 sq ft, about 33.3 to 33.9 sq m, and DDA says that figure takes in a share of common area. DDA gives no carpet area. Its plan shows one bedroom, a living room, a small kitchen, a separate bath and WC, a lobby and a sit-out.
Which pockets in Rohini Sector 35 have DDA flats? +
Pockets 5 and 6. Blocks in DDA's 2025 list for the sector include A1 to A4, B1 to B21 and C1 to C4. Every pocket has its own RWA, and buyers have to join it. A 2017 newspaper report called Pocket 5 part of Sector 34, but DDA's own papers place it in Sector 35.
Is there a lock-in on reselling a Sector 35 DDA flat? +
Not in DDA's 2021 and 2024 brochures, which keep the five-year bar on selling for EWS flats only. These are LIG flats. In 2017, DDA's Housing Commissioner told DNA India the five-year lock-in clause had been removed. The flat you're offered may still carry its own terms, so read its allotment letter and conveyance deed before paying anything.
When will the Rohini Sector 35 metro station open? +
No date is known. The station is on the Phase IV line from Rithala to Narela and Nathupur, approved on 6 December 2024. Bids for the Rohini civil works were opened on 13 October 2026, and no construction start had been announced by 31 October 2026. Rithala on the Red Line is the nearest working station.
Sources
- Property Nivesh resale asking-price estimates for DDA LIG flats in Rohini Sectors 34 and 35, compiled by our team from public listing data (asking-price based), October 2026
- Property Nivesh rent research, Rohini Sectors 34 and 35, October 2026
- Property Nivesh estimates for DDA LIG flats in Narela Sectors G-2 and G-8 and Dwarka Sector 23B, October 2026
- Delhi Development Authority, Housing Scheme 2014 brochure, September 2014
- Delhi Development Authority, Special Housing Scheme 2021 brochure, December 2021
- Delhi Development Authority, Online Running Scheme 2023 circular (29 June 2023), 2023 sale advertisement and Diwali Special Housing Scheme 2023 circular (8 March 2024)
- Delhi Development Authority, Sasta Ghar Housing Scheme 2024 brochure (August 2024) and Phase I and Phase II circulars (4 September and 12 November 2024)
- Delhi Development Authority, Jan Sadharan Awaas Yojana 2025 Phase II circular and flat list, 23 October 2025
- Lok Sabha, Ministry of Housing and Urban Affairs, answer on DDA flats offered in the Housing Scheme 2017, 31 March 2022
- DNA India, report on DDA's 2014-scheme flats in Rohini and Narela, 15 July 2017
- Business Standard (PTI), report on the Sasta Ghar Housing Scheme 2024, 23 September 2024
- Business Standard (PTI), report on the Jan Sadharan Awaas Yojana 2025 Rohini flats, 8 November 2025
- Press Information Bureau, Union Cabinet approval of Delhi Metro Phase IV corridors, 6 December 2024
- Press Information Bureau, opening of the UER-II Alipur to Dichaon Kalan stretch, 17 August 2025
- Supreme Court of India, 2011 ruling on sales by GPA, agreement to sell or will
- Delhi High Court, 2026 orders on DDA freehold conversion applications
- ThePrint (PTI), MCD mutation goes fully online, 23 December 2022
- Property Nivesh Rohini locality research (circle rate category, metro and UER-II status), October 2026
- Department of Revenue, Government of NCT of Delhi, stamp duty and registration fee rates, October 2026